UNITED S TATE S
N UCLE AR REGU LATORY COMMI SS ION
R E GI ON I V
6 1 2 E. LAMAR BLVD. , SU ITE 4 00
AR LIN GTON , TEXAS 7 6 01 1- 4005
December 10, 2009
John T. Conway, Senior Vice President
and Chief Nuclear Officer
Pacific Gas and Electric Company
77 Beale Street, B32
San Francisco, CA 94105
SUBJECT: DIABLO CANYON POWER PLANT - INITIAL INFORMATION REQUEST FOR
NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION
NRC INSPECTION REPORT 05000275/2010007 AND 05000323/2010007
Dear Mr. Conway
On February 8, 2010, the NRC will begin a triennial baseline Component Design Bases
Inspection at the Diablo Canyon Power Plant. A six-person team will perform this inspection
using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of
four NRC inspectors and two contractors, of which three inspectors will focus on engineering
and one inspector on operations. The current inspection schedule is as follows:
Onsite information gathering visit: Week of January 25-29, 2010
Preparation Week: February 1-5, 2010
Onsite weeks: February 8-12, 2010 and February 22-March 5, 2010
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days of time will be needed on the plant-referenced
simulator in order to facilitate the development of operator action-based scenarios. Additional
information and documentation needed to support the inspection will be identified during the
inspection, including interviews with engineering managers, engineers, and probabilistic safety
assessment staff.
Pacific Gas and Electric Company -2-
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than January 20, 2010. Insofar as
possible, this information should be provided electronically to the lead inspector. Since the
inspection will be concentrated on high risk/low margin components, calculations associated
with your list of high risk components should be available for review during the information
gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested are those items that the team will need access to
during the preparation week in order to finalize the samples to be inspected. The third group
lists information necessary to aid the inspection team in tracking issues identified as a result of
the inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. Additional requests by inspectors will be made
throughout all three onsite weeks for specific documents needed to complete the review of that
component/selection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the onsite portions of the inspection. In order to facilitate the inspection, we request that a
contact individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our
licensing engineer contact for this inspection is Mr. Steve Zawalick. If there are any questions
about the inspection or the requested materials, please contact the lead inspector at (817) 860-
8104 or via e-mail at ron.kopriva@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-275
50-323
License: DPR-80
Pacific Gas and Electric Company -3-
Enclosure:
Component Design Basis Inspection
Document Request
cc w/enclosure:
Sierra Club San Lucia Chapter
ATTN: Andrew Christie
P.O. Box 15755
San Luis Obispo, CA 93406
Nancy Culver
San Luis Obispo
Mothers for Peace
P.O. Box 164
Pismo Beach, CA 93448
Chairman
San Luis Obispo County
Board of Supervisors
1055 Monterey Street, Suite D430
San Luis Obispo, CA 93408
Truman Burns\Robert Kinosian
California Public Utilities Commission
505 Van Ness Ave., Rm. 4102
San Francisco, CA 94102
Diablo Canyon Independent Safety Committee
Attn: Robert R. Wellington, Esq.
Legal Counsel
857 Cass Street, Suite D
Monterey, CA 93940
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
City Editor
The Tribune
3825 South Higuera Street
P.O. Box 112
San Luis Obispo, CA 93406-0112
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 31)
Sacramento, CA 95814
Pacific Gas and Electric Company -4-
James R. Becker, Site Vice President
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, CA 93424
Jennifer Tang
Field Representative
United States Senator Barbara Boxer
1700 Montgomery Street, Suite 240
San Francisco, CA 94111
Chief, Technological Hazards Branch
FEMA Region IX
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Pacific Gas and Electric Company -5-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov)
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
DC Administrative Assistant (Agnes.Chan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
D. Norkin, NRR CDBI Coordinator (Donald.Norkin@nrc.gov)
SUNSI Review Completed: _X__Yes __X__ ADAMS: Yes No Initials: _TRF_
- Publicly Available Non-Publicly Available Sensitive ; Non-Sensitive
RIV:SRI:DRS/EB1 BC/EB1
RAKopriva TFarnholtz
/RA/ /RA/
12/10/09 12/10/09
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INFORMATION REQUEST FOR DIABLO CANYON POWER PLANT
COMPONENT DESIGN BASES (CDBI) INSPECTION
Inspection Report: 05000275/2010007
Information Gathering Dates: January 25-29, 2010
On-site Inspection Dates: February 8-12, 2010
February 22 - March 5, 2010
Inspection Procedure: IP 71111.21, "Component Design Bases Inspection"
Lead Inspector/Team Leader: Ronald A. Kopriva
817-860-8104
Ron.kopriva@nrc.gov
I. Information Requested Prior to the information Gathering Visit (January 20, 2010)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (ims.certrec.com and compact disc, preferred), in
care of Ronald A. Kopriva, January 20, 2010 to facilitate the reduction in the items to be
selected for a final list during the preparation week of February 1-5, 2010. The
inspection team will finalize the selected list during the prep week using the additional
documents requested in Section II of this enclosure. The specific items selected from
the lists shall be available and ready for review on the day indicated in this request.
- Please provide requested documentation electronically in "pdf" files, Excel, or other
searchable formats, if possible. The information should contain descriptive names, and
be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain
enough information to be easily understood by someone who has knowledge of
pressurized water reactor technology. If requested documents are large and only hard
copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection.
1. An excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk achievement worth (RAW) and Fussell-
Vesely (FV) from your internal events probabilistic risk assessment (PRA).
Include basic events with RAW value of 1.3 or greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA "system notebooks," and the latest PRA summary document.
-1- Enclosure
4. An excel spreadsheet of PRA human action basic events or risk ranking of
operator actions from your site specific PSA sorted by RAW and FV. Provide
copies of your human reliability worksheets for these items.
5. If you have an external events or fire PSA model, provide the information
requested in items 1-4 for external events and fire.
6. Any pre-existing evaluation or list of components and associated calculations
with low design margins, (i.e., pumps closest to the design limit for flow or
pressure, diesel generator close to design required output, heat exchangers
close to rated design heat removal, etc.).
7. List of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
8. A list of operating experience evaluations for the last 2 years.
9. A list of all time-critical operator actions in procedures.
10. A list of permanent and temporary modifications sorted by component identified
in Item 1.
11. List of current "operator work arounds/burdens."
12. A list of the design calculations, which provide the design margin information for
components included in Item 1. (Calculations should be available during the
information gathering visit).
13. List of root cause evaluations associated with component failures or design
issues initiated/completed in the last 5 years.
14. Current management and engineering organizational charts.
15. Diablo Canyon Power Plant IPEEE, if available electronically.
16. Mechanical piping drawings for:
Engineered safety features
Emergency core cooling systems
17 Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal AC power systems
Emergency AC/DC power systems including
120VAC power, and
125VDC/24VDC safety class systems
-2- Enclosure
18. List of any common-cause failures of components in the last 3 years.
19. An electronic copy of the Design Bases Documents.
20. An electronic copy of the System Health notebooks.
II. Information Requested to be Available on First Day of Preparation Week (February
1, 2010)
1. List of condition reports (corrective action documents) associated with each of
the selected components for the last 5 years.
2. The corrective maintenance history associated with each of the selected
components for the last 2 years.
3. Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and
also provide copies of reference material (such as drawings, engineering
requests, and vendor letters).
4. Copies of operability evaluations associated with each of the selected
components and plans for restoring operability, if applicable.
5. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
6. Copies of any open temporary modifications associated with each of the selected
components, if applicable.
7. Trend data on the selected electrical/mechanical components performance for
last 3 years (for example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., as applicable).
8. A copy of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
9. A copy of engineering/operations related audits completed in the last 2 years.
10. List of motor operated valves (MOVs) in the program, design margin and risk
ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Structure, system and components in the Maintenance Rule (a)(1) category.
13. Site top 10 issues list.
-3- Enclosure
14. Procedures used to accomplish operator actions associated with the basic
events in your PRA.
15. List of licensee contacts for the inspection team with pager or phone numbers.
III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
3. Reference materials (available electronically and as needed during all onsite
weeks):
General set of plant drawings
IPE/PRA report
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
Inspector Contact Information:
Ronald A. Kopriva - Team Lead
Senior Reactor Inspector
(817) 860-8104
Ron.kopriva@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Ronald A. Kopriva
612 East Lamar Blvd, Ste 400
Arlington, TX 76011
-4- Enclosure