MONTHYEARML24311A0392024-11-0505 November 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2024 ML24310A1292024-11-0404 November 2024 Acceptance of Requested Licensing Action Amendment Request ML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML24254A2562024-09-0606 September 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for August 2024 ML24248A2422024-09-0404 September 2024 Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24246A0152024-08-12012 August 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for July 2024 ML24194A1222024-07-11011 July 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for June 2024 ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24176A1612024-06-15015 June 2024 NRR E-mail Capture - (External_Sender) May 2024 FPL Marine Turtle Removal Monthly Report ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24134A0142024-05-10010 May 2024 NRR E-mail Capture - (External_Sender) Pasl Monthly Turtle Report for April 2024 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A2202024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for March 2024 ML24074A4262024-03-12012 March 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for February 2024 ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24036A2152024-02-0505 February 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for January 2024 ML24031A5472024-01-13013 January 2024 NRR E-mail Capture - (External_Sender) December 2023 FPL Marine Turtle Removal Monthly Report ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 – Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 2024-09-06
[Table view] Category:Environmental Monitoring Report
MONTHYEARL-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-169, Correction to the 2022 Annual Radioactive Effluent Release Report2023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report L-2022-062, Annual Radiological Environmental Operating Report for Calendar Year 20212022-04-13013 April 2022 Annual Radiological Environmental Operating Report for Calendar Year 2021 L-2022-063, 2021 Annual Environmental Operating Report2022-04-12012 April 2022 2021 Annual Environmental Operating Report L-2022-059, Unusual or Important Environmental Event - Turtle Mortality2022-04-0505 April 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-023, Annual Radioactive Effluent Release Report2022-02-23023 February 2022 Annual Radioactive Effluent Release Report L-2021-225, Correction to the 2020 Annual Radioactive Effluent Release Report2021-12-14014 December 2021 Correction to the 2020 Annual Radioactive Effluent Release Report L-2021-083, Annual Radiological Environmental Operating Report for Calendar Year 20202021-04-16016 April 2021 Annual Radiological Environmental Operating Report for Calendar Year 2020 L-2021-082, Submittal of 2020 Annual Environmental Operating Report2021-04-15015 April 2021 Submittal of 2020 Annual Environmental Operating Report L-2021-049, 2020 Annual Radioactive Effluent Release Report2021-03-0101 March 2021 2020 Annual Radioactive Effluent Release Report ML20323A2002020-11-18018 November 2020 Unusual or Important Environmental Event Capture of a Giant Manta Ray L-2020-047, Correction to the 2018 Annual Radioactive Effluent Release Report2020-04-20020 April 2020 Correction to the 2018 Annual Radioactive Effluent Release Report ML20090C1042020-03-10010 March 2020 Monthly Sea Turtle Capture Report for February 2020 L-2020-029, 2019 Annual Radioactive Effluent Release Report2020-02-24024 February 2020 2019 Annual Radioactive Effluent Release Report L-2019-206, Environmental Protection Plan, Minor Permit Revision Request for Chlorine Dioxide2019-11-25025 November 2019 Environmental Protection Plan, Minor Permit Revision Request for Chlorine Dioxide L-2019-199, Environmental Protection Plan Report, Unusual or Important Environmental Event2019-11-0909 November 2019 Environmental Protection Plan Report, Unusual or Important Environmental Event L-2019-148, Correction to the 2017 Annual Radioactive Effluent Release Report2019-07-25025 July 2019 Correction to the 2017 Annual Radioactive Effluent Release Report ML19093A0642019-04-30030 April 2019 Biological Assessment of Impacts to Sea Turtle and Smalltooth Sawfish for St. Lucie Continued Operations L-2019-094, Submittal of Annual Radiological Environmental Operating Report for Calendar Year 20182019-04-22022 April 2019 Submittal of Annual Radiological Environmental Operating Report for Calendar Year 2018 L-2019-066, Annual Environmental Operating Report2019-03-25025 March 2019 Annual Environmental Operating Report L-2019-038, 2018 Annual Radioactive Effluent Release Report2019-02-28028 February 2019 2018 Annual Radioactive Effluent Release Report L-2019-051, Unusual or Important Environmental Event - Turtle Mortalities - February 4, 2019 and February 11, 20192019-02-27027 February 2019 Unusual or Important Environmental Event - Turtle Mortalities - February 4, 2019 and February 11, 2019 L-2018-228, Environmental Protection Plan Report: Test Evaluation Report2018-12-28028 December 2018 Environmental Protection Plan Report: Test Evaluation Report ML18127A4462018-05-0707 May 2018 Response to 10/16/1973 Letter, Forwards Data on Florida Black Mullet Including Migration Patterns and Thermal Response L-2018-088, Annual Radiological Environmental Operating Report for Calendar Year 20172018-04-19019 April 2018 Annual Radiological Environmental Operating Report for Calendar Year 2017 L-2018-087, Transmittal of 2017 Annual Environmental Operating Report2018-04-10010 April 2018 Transmittal of 2017 Annual Environmental Operating Report ML18060A2052018-02-26026 February 2018 St. Lucie, Units 1 and 2, Submittal of 2017 Annual Radioactive Effluent Release Report L-2018-048, St. Lucie, Units 1 and 2, Submittal of 2017 Annual Radioactive Effluent Release Report2018-02-26026 February 2018 St. Lucie, Units 1 and 2, Submittal of 2017 Annual Radioactive Effluent Release Report L-2018-037, Environmental Protection Plan Report Regarding Turtle Mortalities on 01/18/2018, 01/20/2018, & 02/10/20182018-02-16016 February 2018 Environmental Protection Plan Report Regarding Turtle Mortalities on 01/18/2018, 01/20/2018, & 02/10/2018 L-2017-205, Unusual or Important Environmental Event - Capture of a Smalltooth Sawfish2017-11-28028 November 2017 Unusual or Important Environmental Event - Capture of a Smalltooth Sawfish L-2017-078, Annual Environmental Operating Report, 20162017-04-26026 April 2017 Annual Environmental Operating Report, 2016 L-2017-053, Annual Radiological Environmental Operating Report for Calendar Year 20162017-04-17017 April 2017 Annual Radiological Environmental Operating Report for Calendar Year 2016 L-2016-191, Environmental Protection Plan Report for 10/09/2016 Unusual or Important Environmental Event - Turtle Mortality2016-10-24024 October 2016 Environmental Protection Plan Report for 10/09/2016 Unusual or Important Environmental Event - Turtle Mortality L-2016-095, Transmittal of 2015 Annual Environmental Operating Report2016-04-27027 April 2016 Transmittal of 2015 Annual Environmental Operating Report L-2016-037, Annual Radioactive Effluent Release Report - 20152016-02-29029 February 2016 Annual Radioactive Effluent Release Report - 2015 L-2016-037, St. Lucie - Annual Radioactive Effluent Release Report - 20152016-02-29029 February 2016 St. Lucie - Annual Radioactive Effluent Release Report - 2015 L-2016-001, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality2016-01-0707 January 2016 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality L-2015-124, Annual Radiological Environmental Operating Report for Calendar Year 20142015-04-15015 April 2015 Annual Radiological Environmental Operating Report for Calendar Year 2014 2024-07-10
[Table view] |
Text
Balsam, Briana From: GLESS, JODIE [Jodie.Gless@fpl.com]
Sent: Monday, August 30, 2010 11:46 AM To: RidsNrrDlr Resource
Subject:
FW: July 2010 Canal Captures correction Attachments: St. Lucie caps 2010.xls; July 2010 Monthly report.docx; Notes2010.xls
Original Message-----
From: Dave Clark [1]
Sent: Thursday, August 05, 2010 12:36 PM To: Meghan Koperski Cc: diverdave1107@hotmail.com; Hollowell, Ed; Munne, Vince; Niebch, David; GLESS, JODIE; Frehafer, Ken; Shelley Norton; Bob Hoffman; mbresette@inwater.org
Subject:
July 2010 Canal Captures correction
Dear Megan,
Attached is the monthly summary of marine turtle removals for July 2010. In July, Inwater Research Group biologists captured twenty-nine(CORRECTION) (29) Caretta caretta and three (3) Chelonia mydas at the intake canal of the St. Lucie power plant on Hutchinson Island. During the month there were no mortalities and one turtle was transported to a rehabilitation facility. On July 23rd a sub-adult loggerhead was hand captured floating near the barrier net with three large prop wounds exposing the internal organs. This turtle was transported to the Marinelife Center in Juno Beach after consultation with personnel from FWCC. This incident was determined to be non-causal to power plant operation.
Throughout the month of July the temporary barrier net experienced light loads of algae that entered into the intake canal. This temporary barrier net has effectively kept turtles from moving further down the canal. A permanent fix to this net is expected in 2011. Underwater Engineering Service Inc. (UESI) had previously been cleaning the temporary net and finished the cleaning in the first week of July.
The tag numbers and morphometric data for all the turtles is attached. Also attached is the spreadsheet of all captures, mortalities, injuries, and causal events delineated by species and month/year to date for 2010. This spreadsheet also includes and tracks fresh scrapes incurred on captured turtles for the month of July, which includes totals and percentages. If you any questions please feel free to contact me.
Sincerely, David Clark Inwater Research Group, Inc.
4160 NE Hyline Dr.
Jensen Beach, FL 34957 Phone: (772) 216-5096 Email:dclark@inwater.org 1
MARINE TURTLE REMOVALS ST. LUCIE PLANT INTAKE CANAL July 2010 SMCL SSCL CSCL CMCW SMCW SMPL Weight Date Species Note Tag #'s Method (cm) (cm) (cm) (cm) (cm) (cm) (kg) 7/1/2010 Caretta UUH696/UUH697 78.00 80.50 84.40 78.60 60.60 59.50 71.00 Hand caretta capture 7/3/2010 Caretta 1 UUH698/UUH699 85.10 85.80 90.10 85.50 65.50 65.70 100.00 South caretta net 7/5/2010 Caretta 2 UUH700/UUH701 83.80 85.00 91.20 82.70 66.80 64.60 84.30 South caretta net 7/6/2010 Caretta 3 UUH702/UUH703 86.90 89.60 95.40 68.90 66.00 100.20 North caretta net 7/6/2010 Caretta 4 UUH704/UUH705 87.90 90.70 95.90 68.40 65.80 94.40 North caretta net 7/7/2010 Caretta 5 UUH706/UUH707 89.60 90.80 98.70 87.50 70.90 68.00 99.40 South caretta net 7/8/2010 Caretta UUH708/UUH709 46.10 46.90 51.10 49.20 40.20 37.80 14.90 Dip net caretta 7/9/2010 Caretta UUH710/UUH711 82.30 83.20 87.60 79.00 65.50 65.30 77.30 Hand caretta capture 7/9/2010 Caretta 6 UUH712/UUH713 84.70 88.00 98.00 86.50 67.70 70.70 99.10 Hand caretta capture 7/10/2010 Caretta 7 UUH714/UUH715 86.80 89.50 95.00 84.00 68.00 69.00 117.80 Hand caretta capture 7/10/2010 Caretta UUH716/UUH717 54.80 56.30 61.50 59.40 48.40 43.90 25.30 Hand caretta capture 7/10/2010 Caretta UUH718/UUH719 69.10 70.10 76.50 73.00 58.30 55.30 50.90 Hand caretta capture 7/10/2010 Chelonia UUH720/UUH721 70.00 71.10 75.90 68.80 56.50 56.80 43.60 Hand mydas capture 7/10/2010 Caretta 8 UUH722/UUH723 86.40 87.70 93.00 87.50 68.50 68.50 80.50 Hand caretta capture 7/12/2010 Caretta 9 UUH724/UUH725 88.30 89.50 96.50 85.30 67.20 67.70 91.60 Hand caretta capture 7/12/2010 Chelonia 11 UUH726/UUH727 45.40 46.00 48.00 42.50 35.50 37.90 12.90 Hand mydas capture 7/12/2010 Caretta 10 UUH729/UUH730 90.60 92.30 106.00 92.10 72.40 70.20 108.20 Hand caretta capture 7/13/2010 Chelonia 13 UUB722/UUB723 67.70 68.10 72.50 66.10 52.90 54.80 41.00 Hand mydas capture
SMCL SSCL CSCL CMCW SMCW SMPL Weight Date Species Note Tag #'s Method (cm) (cm) (cm) (cm) (cm) (cm) (kg) 7/13/2010 Caretta 12 YYR261/YYR262 67.50 68.50 74.60 69.30 56.90 53.50 50.00 Hand caretta capture 7/15/2010 Caretta 14 UUH731/UUH732 86.00 88.00 92.40 83.90 67.90 64.80 89.50 North caretta net 7/19/2010 Caretta 15 UUH733/UUH734 84.50 85.90 94.40 83.60 64.50 67.00 80.60 North caretta net 7/19/2010 Caretta 16 UUH735/UUH736 83.70 88.20 96.10 83.30 67.20 65.30 93.60 South caretta net 7/20/2010 Caretta UUH737/UUH738 80.90 82.10 89.60 79.60 61.10 61.60 71.90 South caretta net 7/23/2010 Caretta 17 UUH739/UUH740 90.80 93.00 105.00 84.40 67.00 71.70 99.30 North caretta net 7/23/2010 Caretta 18 58.70 60.30 65.70 64.20 52.90 46.50 28.90 Hand caretta capture 7/23/2010 Caretta UUH741/UUH742 69.90 70.90 77.50 74.60 57.90 52.20 45.00 Hand caretta capture 7/24/2010 Caretta UUH743/UUH744 81.30 82.20 88.40 79.20 61.30 61.80 74.30 South caretta net 7/24/2010 Caretta UUH745/UUH746 79.60 81.30 88.40 80.70 63.30 60.30 68.60 South caretta net 7/27/2010 Caretta 19 TTJ741 69.70 70.40 75.80 71.60 57.30 54.00 48.70 Hand caretta capture 7/27/2010 Caretta UUH747/UUH748 62.00 63.20 68.30 63.40 52.20 48.00 32.70 Hand caretta capture 7/27/2010 Caretta UUH749/UUH750 77.60 79.40 86.00 80.00 63.60 59.60 68.60 Hand caretta capture 7/29/2010 Caretta UUH751/UUH752 82.70 83.40 88.00 77.70 61.40 62.00 73.40 North caretta net
NOTES
- 1. Adult Female. Tail length=201 mm
- 2. Adult Female. Tail length=226 mm
- 3. Adult Female. Tail length=136mm(measured to the vent)
- 4. Adult Female. Tail length=124mm(measured to the vent)
- 5. Adult Female. Tail length=205 mm
- 6. Adult Female. Tail length=200 mm
- 7. Adult Female. Tail length=258 mm
- 8. Adult Female. Tail length=175 mm
- 9. Adult Female. Tail length=214 mm
- 10. Adult Female. Tail length=210 mm
- 11. Recapture. Turtle was removed from the intake canal, tagged and released at Hutchinson Island on 11/13/04, 4/11/08, 5/5/08, 9/25/08, 10/12/08. Inconel tags (UUH726 & UUH727) inserted 7/12/201
- 12. Recapture. Turtle was removed from the intake canal, tagged and released at Hutchinson Island on 8/28/08, 6/17/09, 9/19/09.
- 13. Recapture. Turtle was removed from the intake canal, tagged and released at Hutchinson Island on 8/7/03, 9/22/03, 8/20/04, 4/26/06, 8/15/06, 12/10/09.
- 14. Adult Female. Tail length=224 mm
- 15. Adult Female. Tail length=214 mm
- 16. Adult Female. Tail length=240 mm
- 17. Adult Female. Tail length=217 mm
- 18. Turtle captured at the surface next to the barrier net with 3 large prop wounds exposing the internal organs. Turtle was transproted to Marine Life Center in Juno for rehabilitation.
- 19. Recapture. Turtle was removed from the intake canal, tagged and released at Hutchinson Island on 6/16/06, 8/16/07, 7/1/08.
SMCL = Straight Minimum Carapace Length SMCL = Straight Standard Carapace Length CSCL = Curved Standard Carapace Length CMCW = Curved Maximum Carapace Width SMCW = Straight Maximum Carapace Width SMPL = Straight Midline Plastron Length
Loggerheads Green turtles Hawksbills Leatherbacks Kemp's ridley (Eretmochelys (Dermochelys (Lepidochelys (Caretta caretta) (Chelonia mydas) imbricata) coriacea) kempii) Overall Totals Year to Year to Year to Year to Year to Year to Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date Captures 29 225 3 356 0 0 0 2 0 7 32 590 Causal Mortalities 0 0 0 0 0 0 0 0 0 0 0 0 Non-causal Mortalities 0 1 0 2 0 0 0 0 0 0 0 3 Causal Injuries 0 0 0 0 0 0 0 0 0 0 0 0 Sent to rehab 1 4 0 10 0 0 0 0 0 0 1 14 Fresh Year to Year to Year to Year to Year to Year to Scrapes Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date Jul-10 Date None 5 29 0 23 0 0 0 0 0 0 5 52 Minor 21 158 1 266 0 0 0 1 0 6 22 431 Moderate 3 38 2 66 0 0 0 1 0 1 5 106 Severe 0 0 0 0 0 0 0 0 0 0 0 0 Percent with mod/sev scrapes 10.3% 16.9% 66.7% 18.5% #DIV/0! ###### #DIV/0! 50.0% #DIV/0! 14.3% 15.6% 18.0%