ML103420651

From kanterella
Revision as of 06:32, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
FEMA, Comanche Peak Nuclear Power Plant - After Action Report/Improvement Plan, Drill Date August 18, 2010, Radiological Emergency Preparedness (REP) Program
ML103420651
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/17/2010
From:
Federal Emergency Management Agency
To:
Office of Nuclear Security and Incident Response
Cecere, Bethanny NSIR/DPR 415-6754
References
Download: ML103420651 (35)


Text

Comanche Peak Nuclear Power Plant After Action Report/

Improvement Plan Drill Date - August 18, 2010 Radiological Emergency Preparedness (REP) Program Published September 17, 2010

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

This page is intentionally blank.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Comanche Peak Nuclear Power Plant After Action Report/Improvement Plan Published September 17, 2010 Contents Executive Summary 3 Section 1: Exercise Overview 4 1.1 Exercise Details 4 1.2 Exercise Planning Team Leadership 4 1.3 Participating Organizations 5 Section 2: Exercise Design Summary 7 2.1 Exercise Purpose and Design 7 2.2 Exercise Objectives, Capabilities and Activities 7 2.3 Scenario Summary 7 Section 3: Analysis of Capabilities 8 3.1 Drill Evaluation and Results 8 3.2 Summary Results of Drill Evaluation 8 3.3 Criteria Evaluation Summaries 10 3.3.1 Support Jurisdictions 10 3.3.1.1 Cleburne Reception Center and Emergency Worker 10 Monitoring/Decontamination Station Section 4: Conclusion 17 Appendix A: Improvement Plan 18 Appendix B: Drill Evaluators and Team Leaders 22 Appendix C: Acronyms and Abbreviations 23 Appendix D: Exercise Plan 24 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

This page is intentionally blank.

2

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

EXECUTIVE

SUMMARY

On August 18, 2010, an out-of-sequence Reception Center drill was conducted for the Comanche Peak Nuclear Power Plant (CPNPP), located near Glen Rose, Texas. Personnel from the U.S.

Department of Homeland Security/FEMA (DHS/FEMA) Region VI, evaluated all activities. The purpose of the drills was to assess the level of preparedness of local responders to react to a simulated radiological emergency at the CPNPP. The previous Reception Center drill conducted at this site was on November 17, 2004.

Personnel from the City of Cleburne Emergency Management Personnel, City of Cleburne Fire Department, City of Cleburne Police Department, City of Cleburne Environmental Health Department, City of Cleburne Independent School District, City of Cleburne Administration, City of Cleburne Engineering, Johnson County Emergency Management, Careflite Ground, American Red Cross, and CPNPP participated in the drill. Evaluation Areas demonstrated included: Emergency Operations Management, Protective Action Implementation, and Support Operations/Facilities. Cooperation and teamwork of all participants was evident during the drill, and DHS/FEMA Region VI wishes to acknowledge these efforts.

This report contains the final evaluation of the out-of-sequence drill. The participants demonstrated knowledge of their emergency response plans and procedures and adequately implemented them. There were no Deficiencies and one Areas Requiring Corrective Action (ARCAs), corrected during the drill. Eight Plan Issues were also identified as a result of the drill.

3

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Comanche Peak Nuclear Power Plant Type of Exercise Drill Exercise Date August 18, 2010 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radiological Emergency 1.2 Exercise Planning Team Leadership Lisa Hammond RAC Chair FEMA Region VI Technological Hazards Branch Chief 800 North Loop 288 Denton, Texas, 76209 940-898-5199 lisa.hammond@dhs.gov Linda Gee Federal Planning Team Lead FEMA Region VI Technological Hazards Program Specialist 800 North Loop 288 4

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Denton, Texas, 76209 940-898-5368 linda.gee@dhs.gov Glenn Corbin State/Health Planner Texas Department of State Health Services State Emergency Planner Radiation Control Program, Environmental Monitoring P. O. Box 149347 Austin, Texas, 78714 512-834-6770 glenn.corbin@dshs.state.tx.us Wade Parks State Planner Texas Division of Emergency Management Tech. Hazards Supervisor P. O. Box 4087 Austin, Texas, 78773 512-424-5677 wade.parks@txdps.state.tx.us James "Jim" Ogden Utility Exercise Planner Comanche Peak Nuclear Power Plant Offsite Emergency Planner P. O. Box 1002 Glen Rose, Texas, 76042 254-897-6470 jogden2@luminant.com 5

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the Comanche Peak Nuclear Power Plant drill:

State Jurisdictions Texas Department of State Health Services Support Jurisdictions City of Cleburne Emergency Management City of Cleburne Fire Department City of Cleburne Independent School District City of Cleburne Administration Support City of Cleburne Environmental Health Department City of Cleburne Police Department City of Cleburne Engineering Johnson County Emergency Management Careflite Ground Private Organizations Comanche Peak Nuclear Power Plant American Red Cross 6

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

SECTION 2: EXERCISE DESIGN

SUMMARY

2.1 Exercise Purpose and Design The DHS/FEMA Region VI Office evaluated the drill on August 18, 2010 to assess the capabilities of local emergency preparedness organizations in implementing their Radiological Emergency Response Plans and procedures to protect the public health and safety during a radiological emergency involving Comanche Peak Nuclear Power Plant (CPNPP). The purpose of this report is to present the results and findings on the performance of the offsite response organizations during a simulated radiological emergency.

2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix D.

2.3 Scenario Summary The drill scenario was developed to evaluate the response of drill participants to an incident requiring evacuation of the public from the 10-mile Emergency Planning Zone surrounding Comanche Peak Nuclear Power Plant. The drill scenario provided for the evaluation of the City of Cleburne's Reception Center's ability to conduct monitoring, decontamination and registration of evacuees. A separate walk-through of the congregate care facility was conducted to ensure that services and accommodations provided at the Conference Center were consistent with established American Red Cross guidelines.

7

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Drill Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the August 18, 2010, drill evaluation to test the offsite emergency response capabilities of local governments in the 10-mile Emergency Planning Zone surrounding Comanche Peak Nuclear Power Plant.

Each jurisdiction and functional entity was evaluated on the basis of its demonstration of criteria delineated in the exercise evaluation areas as outlined in the April 25, 2002, Federal Register, Radiological Emergency Preparedness: Evaluation Methodology. Detailed information on the exercise evaluation area criteria and the extent of play agreement used in this drill are found in Appendix D of this report.

3.2 Summary Results of Drill Evaluation The matrix presented in Table 3.1 on the following page, presents the status of all exercise evaluation area criteria that were scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following letters:

M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise)

D - Deficiency assessed A - ARCAs assessed or unresolved ARCAs from previous exercises P - Plan Issue N - Not Demonstrated 8

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Table 3.1 - Summary of Drill Evaluation Cleburne RC DATE: 2010-08-18 SITE: Comanche Peak Nuclear Power Plant, TX M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not Demonstrated Emergency Operations Management Mobilization 1a1 Facilities 1b1 Direction and Control 1c1 Communications Equipment 1d1 Equip & Supplies to support operations 1e1 P Protective Action Decision Making Emergency Worker Exposure Control 2a1 Radiological Assessment and PARs 2b1 Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2c1 Rad Assessment and Decision making for the Ingestion Exposure Pathway 2d1 Rad Assessment and Decision making concerning Relocation, Reentry, and Return 2e1 Protective Action Implementation Implementation of emergency worker exposure control 3a1 M Implementation of KI decision 3b1 Implementation of protective actions for special populations - EOCs 3c1 Implementation of protective actions for Schools 3c2 Implementation of traffic and access control 3d1 Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3e1 Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions. 3f1 Field Measurement and Analysis Adequate Equipment for Plume Phase Field Measurements 4a1 Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b1 Laboratory operations 4c1 Emergency Notification and Public Info Activation of the prompt alert and notification system 5a1 Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media 5b1 Support Operations/Facilities Mon / decon of evacuees and emergency workers, and registration of evacuees 6a1 P Mon / decon of emergency worker equipment 6b1 Temporary care of evacuees 6c1 M Transportation and treatment of contaminated injured individuals 6d1 9

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

3.3 Criteria Evaluation Summaries 3.3.1 Support Jurisdictions 3.3.1.1 Cleburne Reception Center and Emergency Worker Monitoring/Decontamination Station

a. MET: 3.a.1, 6.c.1.
b. AREAS REQUIRING CORRECTIVE ACTION: 6.a.1.

ISSUE NO.: 14-10-6a1-A-06 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: During the process of monitoring evacuees following decontamination, it was noted that the emergency worker had the survey equipment on the X10 scale and not the X1 scale (according to plans and procedures and instructions attached to the Thermo/Bicron Surveyor 50 survey meter the meter should be on the X1 scale when conducting surveys).

POSSIBLE CAUSE: The emergency worker did not check the survey meter settings prior to use.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: The survey meter would not have detected lower levels of contamination that exceed the contamination action level identified in procedures while set on the X10 scale.

CORRECTIVE ACTION DEMONSTRATED: The EW was asked to re-demonstrate the use and knowledge of the survey equipment. The EW successfully re-demonstrated the use of the survey meter by accomplishing surveys using the proper scale.

10

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

c. DEFICIENCY: None
d. PLAN ISSUES: 1.e.1, 6.a.1.

ISSUE NO.: 14-10-1e1-P-01 CRITERION: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations.

CONDITION: The current plans and procedures make reference to the use of Form-5 for auto registration and Form-6 for tracking the issuance of survey meters. Copies of these forms, that are required for use by emergency workers, are not included in the plans.

POSSIBLE CAUSE: The tracking form (Form-6) and auto registration form (Form-

5) were not included in the latest revision of the reception center plan.

REFERENCE:

NUREG-0654, H.7, 10; J.10.a, b, e, J.11; K.3.a EFFECT: Emergency workers might not use the required form because they would not know to which form the plan is refererring.

RECOMMENDATION: Include Form-5 and Form-6 in the plans and procedures.

ISSUE NO.: 14-10-6a1-P-02 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: According to the guidance provided in the Interim Radiological Emergency Preparedness Program Manual, August 2002, the Offsite Response Organization (ORO) is required to demonstrate the ability to monitor 20% of the 11

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

population assigned to the facility in a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period. Using the current numbers provided in the plans, 20% of 14, 994 amounts to 2999 people expected at the reception center. It was noted that the scenario calculation only called for 1000 evacuees, which is not compliant with current plans and guidance. This reduction in number is due to inaccurate assumptions and misinterpretations of the guidance and should be corrected in future updates of the Cleburne reception center plan. It was also noted that the population number in the Comanche Peak Nuclear Power Plant (CPNPP) Cleburne Reception Center Operation Plan and Procedures (revised July 2010) have not been updated to reflect the current evacuation time estimates (ETE) from 2008.

POSSIBLE CAUSE: Offsite Response Organizations have misinterpreted the guidance in the Interim Radiological Emergency Preparedness (REP) Program Manual. In addition, the plan has not been updated to reflect the most current evacuation time estimates (ETE) completed in 2008.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: The assumptions made by the plan with regard to the populations expected at the reception center are not compliant with current guidance and are made using inaccurate population numbers. This underestimation of the amount of evacuees who may report to the reception center could result in a lack of preparedness to receive and process evacuees in timely manner.

RECOMMENDATION: Update plans to reflect current population numbers and remove assumptions on population estimation that are not compliant with current guidance.

ISSUE NO.: 14-10-6a1-P-03 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b) 12

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

CONDITION: The responsibility for interior decontamination of vehicles was not captured in the Cleburne Reception Center plans.

POSSIBLE CAUSE: The responsibility to decontaminate the interior of a vehicle is assumed by the offsite response organization to be the responsibility of Comanche Peak Nuclear Power Plant. It may not have been included in offsite plans because it is presumed to be handled by onsite personnel.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: Staff at the reception center would not be able to identify to the vehicles owner, who is responsible for completing the actions necessary to return their vehicle.

RECOMMENDATION: Update plans and procedures to reflect specifically who is responsible for completing the actions necessary to return the vehicle to its owner when the interior is contaminated. Also include how those actions will be accomplished to ensure the vehicle is returned to the owner in a timely manner.

ISSUE NO.: 14-10-6a1-P-04 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: The initial monitoring staff did not have any formal method for documenting contamination when found on an evacuee.

POSSIBLE CAUSE: Individuals responsible for the planning effort failed to recognize the need for documentation of contamination on evacuees.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a 13

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

EFFECT: The plans and procedures allow for decontamination of isolated areas rather than a full shower when the contamination is limited. Decontamination of isolated spots of contamination would be impossible to accomplish if the personnel decon team does not have anything documenting the location of contamination on the evacuee when they arrive at the personnel decon area.

RECOMMENDATION: Include a form for documenting areas of contamination found on evacuees during initial monitoring in plans and procedures. The form should accompany the evacuee from initial monitoring to the personnel decon area and should be provided to the personnel decon team for use during the decon process.

ISSUE NO.: 14-10-6a1-P-05 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: In situations where an evacuee was determined to be contaminated, but their vehicle was clean, the procedures call for the evacuee to move the car to the impound area. Rather than allow a contaminated person to exit the monitoring area, evacuees that were found to be contaminated were asked to provide information about the location of their car. If it was determined that their car was not found to be contaminated and was moved to the clean lot, the Radiological Officer (RO) asked for the make, model, vehicle description and license plate number from the evacuee.

The intent was to have these cars tagged and towed to the impound area with the other contaminated vehicles. It was noted that the information on the car was not recorded and no one was assigned to tag and tow the car.

POSSIBLE CAUSE: Responders deviated from plans and procedures to reduce the potential spread of contamination that may occur when a contaminated individual was allowed to return to their car to move it to the impound lot.

14

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: The plans and procedures would have created a situation that caused spread of contamination, so the responders made a decision to deviate from the plan.

The plan does not reflect the best practice demonstrated by the responders.

RECOMMENDATION: Update plan and procedures to reflect the activities demonstrated by responders during the drill in dealing with evacuee vehicles that belonged to contaminated individuals. Identify a team member who will be responsible for assuring the car is towed to the impound area. In addition, include a form that assists the responders in documenting the vehicle information so that it can be tagged and towed to the impound area.

ISSUE NO.: 14-10-6a1-P-07 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: During the registration process, it was noted that the evacuees were provided a newer version of the registration form that is not currently in their plan.

POSSIBLE CAUSE: Plans and procedures were not updated to reflect the use of the new form.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: Documentation forms were used for registration that were not consistent with current plans and procedures.

RECOMMENDATION: It is recommended that the Cleburne Reception Center Operations Plan and Procedures be updated with the newer version of the form used 15

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

during the evaluated drill and also implement a method to record the results of monitoring, and time of decontamination in these forms.

ISSUE NO.: 14-10-6a1-P-08 CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.,

K.5.b)

CONDITION: It was noted that emergency workers had beverages and were using chewing tobacco in the proximity of contaminated individuals and equipment.

POSSIBLE CAUSE: The plans and procedures do not provide for the prohibition of eating, drinking, smoking or chewing in potentially contaminated areas.

REFERENCE:

NUREG-0654 J.10.h, J.12, and K.5.a EFFECT: Personnel could have received unsafe and unnecessary exposure.

RECOMMENDATION: Provisions for the prohibition of eating, drinking, smoking and chewing should be included in plans and procedures.

e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 16

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

SECTION 4: CONCLUSION Based on the results of the drill, the offsite radiological emergency response plans and preparedness for the State of Texas and the affected local jurisdictions are deemed adequate to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public in the event of a radiological emergency. Therefore, 44 CFR Part 350 approval of the offsite radiological emergency response plans and preparedness for the State of Texas site-specific to Comanche Peak Nuclear Power Plant will remain in effect.

17

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

APPENDIX A: IMPROVEMENT PLAN Issue Number: 14-10-1e1-P-01 Criterion: 1e1 ISSUE: The current plans and procedures make reference to the use of Form-5 for auto registration and Form-6 for tracking the issuance of survey meters. Copies of these forms, that are required for use by emergency workers, are not included in the plans.

RECOMMENDATION: Include Form-5 and Form-6 in the plans and procedures.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

Issue Number: 14-10-6a1-P-02 Criterion: 6a1 ISSUE: According to the guidance provided in the Interim Radiological Emergency Preparedness Program Manual, August 2002, the Offsite Response Organization (ORO) is required to demonstrate the ability to monitor 20% of the population assigned to the facility in a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period. Using the current numbers provided in the plans, 20% of 14, 994 amounts to 2999 people expected at the reception center. It was noted that the scenario calculation only called for 1000 evacuees, which is not compliant with current plans and guidance. This reduction in number is due to inaccurate assumptions and misinterpretations of the guidance and should be corrected in future updates of the Cleburne reception center plan. It was also noted that the population number in the Comanche Peak Nuclear Power Plant (CPNPP) Cleburne Reception Center Operation Plan and Procedures (revised July 2010) have not been updated to reflect the current evacuation time estimates (ETE) from 2008.

RECOMMENDATION: Update plans to reflect current population numbers and remove assumptions on population estimation that are not compliant with current guidance.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

18

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Issue Number: 14-10-6a1-P-03 Criterion: 6a1 ISSUE: The responsibility for interior decontamination of vehicles was not captured in the Cleburne Reception Center plans.

RECOMMENDATION: Update plans and procedures to reflect specifically who is responsible for completing the actions necessary to return the vehicle to its owner when the interior is contaminated. Also include how those actions will be accomplished to ensure the vehicle is returned to the owner in a timely manner.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

Issue Number: 14-10-6a1-P-04 Criterion: 6a1 ISSUE: The initial monitoring staff did not have any formal method for documenting contamination when found on an evacuee.

RECOMMENDATION: Include a form for documenting areas of contamination found on evacuees during initial monitoring in plans and procedures. The form should accompany the evacuee from initial monitoring to the personnel decon area and should be provided to the personnel decon team for use during the decon process.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

19

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Issue Number: 14-10-6a1-P-05 Criterion: 6a1 ISSUE: In situations where an evacuee was determined to be contaminated, but their vehicle was clean, the procedures call for the evacuee to move the car to the impound area. Rather than allow a contaminated person to exit the monitoring area, evacuees that were found to be contaminated were asked to provide information about the location of their car. If it was determined that their car was not found to be contaminated and was moved to the clean lot, the Radiological Officer (RO) asked for the make, model, vehicle description and license plate number from the evacuee. The intent was to have these cars tagged and towed to the impound area with the other contaminated vehicles. It was noted that the information on the car was not recorded and no one was assigned to tag and tow the car.

RECOMMENDATION: Update plan and procedures to reflect the activities demonstrated by responders during the drill in dealing with evacuee vehicles that belonged to contaminated individuals. Identify a team member who will be responsible for assuring the car is towed to the impound area. In addition, include a form that assists the responders in documenting the vehicle information so that it can be tagged and towed to the impound area.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

Issue Number: 14-10-6a1-P-07 Criterion: 6a1 ISSUE: During the registration process, it was noted that the evacuees were provided a newer version of the registration form that is not currently in their plan.

RECOMMENDATION: It is recommended that the Cleburne Reception Center Operations Plan and Procedures be updated with the newer version of the form used during the evaluated drill and also implement a method to record the results of monitoring, and time of decontamination in these forms.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

20

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Issue Number: 14-10-6a1-P-08 Criterion: 6a1 ISSUE: It was noted that emergency workers had beverages and were using chewing tobacco in the proximity of contaminated individuals and equipment.

RECOMMENDATION: Provisions for the prohibition of eating, drinking, smoking and chewing should be included in plans and procedures.

CORRECTIVE ACTION DESCRIPTION:

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

CAPABILITY ELEMENT: START DATE:

AGENCY POC: ESTIMATED COMPLETION DATE:

21

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

APPENDIX B: DRILL EVALUATORS AND TEAM LEADERS DATE: 2010-08-18, SITE: Comanche Peak Nuclear Power Plant, TX LOCATION EVALUATOR AGENCY Cleburne Reception Center and Emergency Worker Nan Calhoun DHS/FEMA Monitoring/Decontamination Station Brad DeKorte DHS/FEMA

  • Linda Gee DHS/FEMA Tim Pflieger DHS/FEMA
  • Team Leader 22

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

APPENDIX C: ACRONYMS AND ABBREVIATIONS Acronym Meaning ARC American Red Cross ARCA Areas Requiring Corrective Action CPNPP Comanche Peak Nuclear Power Plant EOC Emergency Operations Center EOP Extent of Play EPZ Emergency Planning Zone EW Emergency Worker FEMA Federal Emergency Management Agency IC Incident Commander NCT North Central Texas NRC Nuclear Regulatory Commission ORO Offsite Response Organization PD Personnel Decontamination PPE Personal Protective Equipment RAC Regional Assistance Committee RC Reception Center RO Radiological Officer TLD Thermoluminscent Dosimeter 23

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

APPENDIX D: EXERCISE PLAN 24

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

CLEBURNE RECEPTION CENTER DRILL August 18, 2010 Revision 4 1.0 Introduction This drill will verify that the Cleburne Reception Center Personnel can effectively activate and operate the Reception Center in the event of an evacuation of the public from the 10-mile Emergency Planning Zone (EPZ) around the Comanche Peak Nuclear Power Plant (CPNPP).

2.0 FEMA Evaluation Criteria

1. e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations. (NUREG-0654, H.,

J.10.a.b.e.f.j.k., 11, K.3.a.)

3. a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.

Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.

(NUREG-0654, K.3.)

6. a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.;

K.5.b)

6. c.1 Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross current planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h.,

12.)

3.0 Guidelines The following guidelines have been developed to instruct drill participants of the extent of play required to fulfill the drill evaluation criteria.

1. Drill lead controller is responsible for conducting the drill per the drill package.
2. Controllers will be assigned as needed 25 to ensure the completion of drill evaluation

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

criteria.

3. This is a FEMA evaluated drill. Therefore, prompting is not permitted.
4. On-the-spot corrections are allowed in accordance with Recommended Initiative 1.5-Correct Issues Immediately (March 31, 2000)
5. The controllers should allow free-play. However, free-play will be stopped under the following conditions:
a. if the action taken would prevent a drill evaluation criterion from being met or is outside the scope of the drill.
b. if the actions are judged to be unsafe or leading to violations of the law.
c. if the actions would degrade systems or equipment, or degrade response to a real emergency.
6. If an actual emergency occurs, the drill will be terminated.
7. All radio and telephone communications will begin and end with THIS IS A DRILL.
8. All signs and postings should be marked either FOR TRAINING USE ONLY or DRILL IN PROGRESS.

4.0 Extent of Play These guidelines define the extent of play required to meet an objective and identify planned simulations.

Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations. (NUREG-0654, H.,

J.10.a.b.e.f.j.k., 11, K.3.a.)

No exceptions are requested.

Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.

Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.)

For player safety and working conditions in the intense summer heat, access to anti-contamination clothing will be demonstrated; however it will not be worn 26 during the exercise to prevent heat stress. The use of Personal Protective

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Equipment (PPE) will be demonstrated in accordance with applicable procedures, upon request by a FEMA evaluator, in air conditioned space inside of the Reception Center (i.e. dress/undress). In addition, FEMA evaluations taking place outside in the heat will be completed as early as possible during the morning of the drill to prevent potential heat injuries to both players and evaluators.

Criterion 6.a.1: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers. (NUREG-0654, J.10.h.; K.5.b)

All positions at the reception center will be staffed and rosters will be available to demonstrate personnel depth for subsequent shifts.

All evacuee and vehicle decontamination measures will be simulated.

All evacuee contamination levels will be via controller injects. Free play of these activities is not permitted.

Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with current American Red Cross planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities. (NUREG-0654, J.10.h., 12.)

American Red Cross personnel will demonstrate congregate care via sample shelter setup, equipment and supplies in a loaded trailer, rosters, interviews, and other resource documents.

5.0 Participants This drill will require the participation of the following agencies:

City of Cleburne Emergency Management Personnel City of Cleburne Administrative Support Staff as needed City of Cleburne Fire Department Personnel City of Cleburne Police Department City of Cleburne Parks and Recreation Personnel City of Cleburne Animal Control American Red Cross Personnel 6.0 Controller and Role Players A minimum of five (5) controllers will be required for this drill.

27 A minimum of six (6) role players with automobiles will be required for this drill.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

7.0 Initial Conditions An event at the CPNPP near Glen Rose, Texas began approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. A radioactive release in a Southeasterly direction from CPNPP has prompted the evacuation of approximately 1,000 residents and visitors from the 10-mile Emergency Planning Zone (EPZ).

8.0 Narrative Summary The Reception Center staff has been alerted to mobilize and prepare for evacuees by the Somervell County Judge. Set-up and activation has been completed according to the current Cleburne Reception Center Operations Plan and Procedures and the staff is ready for evacuees.

Evacuees begin to arrive at the Reception Center shortly after completion of the activation.

9.0 Time Line 0930 Drill begins. Notification to City of Cleburne received from the Somervell County EOC 1000 Evacuees begin to arrive 1115 Drill terminates 1130 Critique 1215 Activities Concluded 10.0 Facility Address Cleburne Senior Citizens Center 1212 Glenwood Drive Cleburne, TX 28

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

EVACUEE INFORMATION FOR CONTROLLERS EVACUEE CONTAMINATION VEHICLE STATUS NO. STATUS 1 (Male) Contaminated Contaminated Exterior 2 Clean Clean 3 Clean Clean 4 (Female) Contaminated Clean 5 (Male) Contaminated Contaminated Exterior &

Interior 6 (Female) Contaminated Clean NOTE TO CONTROLLERS IN DECONTAMINATION FACILITIES: Contaminated persons after completion of shower will be clean. The attendant will do a whole body frisk following the shower and will also frisk valuables in a bag. Once the personnel decon has been accomplished, no readings over background are necessary. The objective here is to evaluate the process not trip up the decon attendants.

CONTAMINATION LEVELS: When a portal monitor is used to determine evacuee contamination levels the individual will be asked to step back and be re-surveyed by the portal monitor. Reception Center staff should then, at a minimum, survey hands and feet to locate/isolate contamination on the individual with a hand-held survey meter. (NOTE: The sex of the evacuee may vary due to the volunteer Role Players available on the date of the exercise)

The following levels apply to individual Role Players: (Note: All radiation levels are above background)

EVACUEE # Location of Contamination and Level(s) Remarks

  1. 1 Left Hand - 450 cpm, Right Hand - 300 cpm, Will be clean after shower
  1. 4 Left Hand and Forearm - 400 cpm Will be clean after shower
  1. 5 Right Hand - 650 cpm, Seat of Pants - 400, Will be clean after shower and both shoes 600 cpm
  1. 6 Top of right shoe - 500 cpm, Right Hand - Will be clean after shower 350 cpm 29

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

30

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

VEHICLE CONTAMINATION DETAILS FOR CONTROLLERS 200 CPM IN RIGHT FRONT WHEEL WELLL 350 CPM ON DRIVERS DOOR HANDLE CONTAMINATION INFORMATION FOR VEHICLE #1 INTERIOR CONTAMINATION:

200 CPM STEERING WH.

350 CPM DRIVERS SEAT 400 CPM ON DRIVERS DOOR HANDLE CONTAMINATION INFORMATION FOR VEHICLE #5 NOTE: Vehicles depicted may differ from actual vehicles driven during this event.

31

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

Cleburne Reception Center Drill August 18, 2010 MESSAGE 1 TIME: 0930 FROM: Somervell County Judge TO: City Managers Office 817/645-0901 TEXT:

THIS IS A DRILL!

THIS IS THE SOMERVELL COUNTY JUDGE AT THE SOMERVELL COUNTY EOC. AN EVACUATION OF THE SOUTHEASTERN AREA OF SOMERVELL COUNTY HAS BEEN RECOMMENDED DUE TO A RELEASE OF RADIOLOGICAL MATERIAL AT THE COMANCHE PEAK NUCLEAR POWER PLANT. WE REQUEST THAT THE CLEBURNE RECEPTION CENTER BE ACTIVATED FOR THE RECEIPT OF EVACUEES.

WE ANTICIPATE THAT APPROXIMATELY 1,000 PERSONS ARE AFFECTED BY THIS EVACUATION.

THE EVACUATION INFORMATION HAS JUST BEEN BROADCASTED TO THE PUBLIC OVER THE EAS STATION. WE ANTICIPATE THAT THE FIRST EVACUEES WILL BE ARRIVING IN CLEBURNE WITHIN AN HOUR.

MY CALL BACK NUMBER IS 682-936-9100.

PLEASE GIVE ME YOUR NAME FOR THE LOG.

THANK YOU.

THIS IS A DRILL.

32

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Comanche Peak Nuclear Power Plant

_____________________________________________________________________

This page is intentionally blank.

33