ML110260442

From kanterella
Revision as of 05:12, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2010 Monticello Nuclear Generating Plant Initial License Examination Operating Test Comments
ML110260442
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/17/2010
From: Mcneil D
Operations Branch III
To:
Northern States Power Co, Xcel Energy
References
Download: ML110260442 (1)


Text

2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to Changed step to critical and be critical and be more specific specified the standard to on the standard. include using the correct side of the EAL Board for the plant Mode.

CR JPM a For performance step 3 on page Updated to 5 psig.

5 - update the evaluator cue for the correct suction pressure.

CR JPM d For Performance Step 5 add a Added range of 2.44-2.56 range of gains that is expected for the candidates to enter.

CR JPM e For initial conditions state that Added maintenance was performed on channel A1 for performance plausibility.

For performance step 15 add an Added evaluator cue to state SPDS reads 20 mr/hr.

CR JPM h Update candidate turnover Updated sheet with instructor turnover sheet.

In-Plant JPMs No comments on the In-Plant JPMs Simulator The comments for the dynamic Comments simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.