Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2(TAC ME6018 and ME6019)
ML111040153
Person / Time
Site: Palisades, Arkansas Nuclear, Waterford  Entergy icon.png
Issue date: 04/13/2011
From:
Entergy Operations
To:
Plant Licensing Branch IV
Kalyanam N, NRR/DLPM, 415-1480
References
TAC ME6018, TAC ME6019
Download: ML111040153 (20)


Text

NFPA 805 LICENSE AMENDMENT REQUESTS Pre-Application Meeting with NRC Staff April 13, 2011 Arkansas Nuclear One (ANO) 1&2 Palisades (PLP)

Waterford 3 (WF3) 1

Agenda

  • Introductions
  • Fleet Project Management Approach
  • LAR Submittal Forecast
  • 805 PRA Peer Review Status
  • 6850 Alternative Treatments
  • Site Specific p Updates p

- ANO-1 & 2

- PLP

- WF3

  • Summary Dial-In: 800-369-3325 with Participant passcode: 56518 followed by #

2

Introductions

  • Corporate Team

- Licensing - Dave Mannai, Bryan Ford

- Engineering Manager - Luis Terrazas

- Fleet Project Management - Andy Thomas, Doug Kibler

- Corporate PRA - Deepak Rao

- NFPA 805 Technical Lead - Jessica Walker

  • Site Teams

- ANO

  • Engineering Director - Jaime McCoy
  • Fire Protection/PRA - Jessica Walker

- PLP

  • Engineering Manager - Jim Miksa
  • Licensing - James Kuemin
  • Fire Protection - Tom Swiecicki

- WF3

  • Engineering Manager - Rex Putnam
  • Licensing - David Ferris
  • Fire Protection - Dennis Kunas 3

Fleet Project Management Approach

  • Integrated Fleet (corporate and site) Project Team
  • Bi-Monthly Executive Stakeholder Briefs
  • Weekly Fleet Project Team Meetings
  • Active Project Risk Management Program
  • Dedicated Fleet and Site Schedulers 4

LAR Submittal Forecast

  • ANO 1&2, PLP, and WF3 - June 29, 2011
  • Submittals will meet acceptance criteria (LIC-109)
  • Challenges 5

805 PRA Peer Review Status

  • Conduct Internal Events Peer Review

- Complete

  • Closure / disposition of Internal Events Peer Review

- F&Os will be resolved prior to LAR Submittal

  • Conduct Fire PRA Peer Review

- Complete (Palisades Draft Report)

  • Closure Clos re / disposition of Fire PRA Peer Review Re ie

- F&Os will be resolved prior to LAR Submittal 6

6850 Alternative Treatments Treatment ANO-1 ANO-2 PLP WF3 Transient combustible HRR. Use a lower HRR for a postulated transient fire. Instead of using the HRR for transients as shown in NUREG/CR-6850, Table E-1, Case 8, the HRR for Case 7 is used. The basis for this is X X X X described in the ERIN Fire Factors report submitted to the EPRI/NEI Review Group.

Transient Combustible Ignition Frequency - Use of a weighting factor applied to transient fires to reflect the reduced probability of a fire impacting critical targets based on procedural controls and the reduced likelihood X X X X of transient type fire conditions existing in close proximity to targets of concern (submitted to methodology review committee).

Treatment of Ventilated Panels for Non-Suppression Probability. X X Credit for reduction of zone of influence for panels with limited ventilation, used to support Multi-Compartment X X Analysis.

Hot Short Probability Reduction for Outside of a Panel Configuration (ANO-2 only) X 7

ANO--1& 2 - Current Status ANO Major Project Milestones ANO-1 ANO-2 Milestone Status Status Table B-1 Fundamental FP Elements In Progress In Progress Internal Events PRA COMPLETE COMPLETE Fi PRA Fire I Progress In P I Progress In P Table B NSCA Methodology In Progress COMPLETE Table B NSCA Fire Area Compliance In Progress In Progress Fire Risk Evaluations In Progress In Progress Table F Non-Power Operations In Progress In Progress Table G Radioactive Release COMPLETE COMPLETE 8

ANO--1&2 - Challenges ANO

  • Challenges
  • Gaps
  • Technical Issues 9

ANO--1&2 - Items for Approval ANO

  • 3.3.5.2 Metal conduits and cable trays

- ANO uses PVC in underground and embedded applications

  • 3.5.16 Firewater dedicated for Fire Protection use

- ANO uses the fire water system for other functions 10

ANO--1&2 - Modification Overview ANO

  • Independent AFW pump/piping/valves/controls
  • Primary Control Station
  • Electrical cable re-route/fire wrap
  • RCP trip circuit backup power supply
  • Detection system upgrade
  • Modifications for Table B-1 Issues
  • NFPA 10 fire extinguisher type and location changes
  • NFPA 15 update non-UL listed modules

PLP - Current Status Major Project Milestones Milestone Status Table B-1 Fundamental FP Elements In Progress Internal Events PRA COMPLETE Fire PRA In Progress Table B NSCA Methodology COMPLETE Table B NSCA Fire Area Compliance In Progress Fire Risk Evaluations In Progress Table F Non-Power Operations In Progress Table G Radioactive Release COMPLETE 12

PLP - Challenges

  • Challenges
  • Gaps
  • Technical Issues 13

PLP - Items for Approval

  • 3.5.16 Firewater dedicated for Fire Protection use

- PLP uses the fire water system for other functions

  • 3.11.4. Through Penetration Fire Stops Unsealed conduits 5 feet or longer 14

PLP - Modification Overview

  • Independent AFW pump / piping / valves / controls
  • Independent breakers for 2400 VAC Safeguards & Startup Transformers
  • Primary Coolant Pump breaker trip pushbuttons
  • Detection system upgrade
  • 2400 VAC b breaker k control t l power ffuses
  • Bypass switches for AFW & ECCS systems 15

WF3 - Current Status Major Project Milestones Milestone Status Table B-1 Fundamental FP Elements In Progress Internal Events PRA COMPLETE Fire PRA In Progress Table B NSCA Methodology In Progress Table B NSCA Fire Area Compliance In Progress Fire Risk Evaluations In Progress Table F Non-Power Operations In Progress Table G Radioactive Release In Progress 16

WF3 - Challenges

  • Challenges
  • Gaps
  • Technical Issues 17

WF3 - Items for Approval

  • None 18

WF3 - Modification Overview

  • Electrical circuit modifications
  • Suppression system upgrades
  • Detection system upgrade 19

Summary

  • All Entergy sites plan to meet June 29, 2011
  • Action Items
  • Closing Remarks 20