ML18081A192
ML18081A192 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear ![]() |
Issue date: | 03/20/2018 |
From: | David Loveless NRC Region 4 |
To: | Pyle S Entergy Operations |
David Loveless | |
References | |
Download: ML18081A192 (29) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024
[Table view]Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24 Category:Meeting Briefing Package/Handouts MONTHYEARML23348A3572023-12-14014 December 2023
[Table view]Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21242A2792021-08-30030 August 2021 ANO Slides Presentation for 9-1-21 Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 ML19136A2512019-06-13013 June 2019 Handout for the June 13, 2019 Pre-submittal Public Meeting for Planned License Amendment Request Regarding Fuel Handling Accident Analysis ML18176A1312018-06-21021 June 2018 Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML17328A3652017-11-30030 November 2017 Workshop on Sharing Operating Experience from Rigging, Lifting and Load Handling Events - Temporary Overhead Crane Failure at Arkansas Nuclear One Presented to IAEA ML16109A3642016-04-18018 April 2016 Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One ML16015A0622016-01-20020 January 2016 Briefing Notes for 95003 Inspection at Arkansas Nuclear One ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML14356A1852014-12-22022 December 2014 ANO2 Exit ML14329B2092014-11-25025 November 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Flood Protection Deficiencies ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14169A0722014-06-19019 June 2014 Entergy Public Meeting Presentation Slides ML12332A1792012-11-26026 November 2012 Power Point Presentation by Entergy at the November 26, 2012 Meeting (TAC No. ME9706.) ML12306A2912012-11-0101 November 2012 Transmittal Email and WCAP-17128-NP, Revision 1, Flaw Evaluation of CE Design RCP Suction and Discharge Nozzle Dissimilar Metal Welds, Phase III Study, May 2010 ML12278A2552012-10-0909 October 2012 Licensee Slide Presentation, ANO-2 NFPA 805 Application, at the October 9, 2012, pre-submittal Meeting to Discuss the NFPA 805 Application ML12278A2532012-10-0909 October 2012 Licensee Handout, Design Input for Fire Risk Evaluation, at the 10/9/2012 Pre-submittal Meeting to Discuss the NFPA 805 Application ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1218003412012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #4 ML1218003192012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #3 ML1218003122012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #2, Table W-2 ANO-2 Fire Area Risk Summary ML1218003102012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Item #1, Plant Modifications and Items to Be Completed ML1218003062012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Power Point Slides ML12166A5602012-06-12012 June 2012 Licensee Presentation on June 12 & 13, 2012, Meeting License Amendment Request on NFPA 805 Adoption ML1202501112012-01-25025 January 2012 Licensee Slides Arkansas Nuclear One, Unit 1 - Steam Generators Tube to Tube Wear ML1126502692011-09-22022 September 2011 Licensee Handouts for 10/05/2011 Presubmittal Meeting ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1107504262011-03-15015 March 2011 Licensee Slides from 3/15/11 Pre-Sumittal Meeting SWS Room Cooling Required Action ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop ML1016705012010-06-17017 June 2010 Discussion of Screening Criteria - Arkansas Nuclear One (ANO) ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0935005652009-12-15015 December 2009 NRC Handouts Current Status of Arkansas Nuclear One Unit Steam Generators, December 2009 ML0913104172009-05-11011 May 2009 Summary of Meeting with Entergy to Discuss Arkansas Nuclear One 2008 Performance ML0828000612008-10-0101 October 2008 Enclosure 3-Technical Papers 2 - Plant Application of Weld Onlay for Butt Weld Mitigation ML0828300322008-08-31031 August 2008 NRC Presentation Arkansas Nuclear One - Unit One 2023-12-14 Category:Slides and Viewgraphs MONTHYEARML23348A3572023-12-14014 December 2023
[Table view]Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23223A2032023-08-11011 August 2023 (ANO) Unit 1 Licensee'S Slide Presentation for 8/15/23 Public Meeting Pressurizer Heaters ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22124A0692022-05-10010 May 2022 RVCH Penetration No. 1 Relief Request Public Meeting May 10, 2022 (EPID L-2022-LRM-0036) (Slides) ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor 0CAN062101, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling2021-06-15015 June 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling ML21095A2122021-04-0808 April 2021 Pre-Submittal Meeting - ANO-1 LAR Related to RCS Primary Activity and Primary-to-Secondary Leak Rate ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML17328A3652017-11-30030 November 2017 Workshop on Sharing Operating Experience from Rigging, Lifting and Load Handling Events - Temporary Overhead Crane Failure at Arkansas Nuclear One Presented to IAEA ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML15014A0842015-01-14014 January 2015 NRC ANO Unit 1 Stator Drop SDP Evaluation ML14329B2092014-11-25025 November 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Flood Protection Deficiencies ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14169A0722014-06-19019 June 2014 Entergy Public Meeting Presentation Slides ML13142A2272013-05-22022 May 2013 Summary of Public Meeting to Discuss Results of Augmented Inspection at Arkansas Nuclear One ML12332A1792012-11-26026 November 2012 Power Point Presentation by Entergy at the November 26, 2012 Meeting (TAC No. ME9706.) ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1218003062012-06-28028 June 2012 Handouts at the June 29, 2012 NFPA 805 Meeting at the Hq - Power Point Slides ML1202501112012-01-25025 January 2012 Licensee Slides Arkansas Nuclear One, Unit 1 - Steam Generators Tube to Tube Wear ML1126502692011-09-22022 September 2011 Licensee Handouts for 10/05/2011 Presubmittal Meeting ML11221A3212011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 17 ANO-1 Seal Failure ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1107504262011-03-15015 March 2011 Licensee Slides from 3/15/11 Pre-Sumittal Meeting SWS Room Cooling Required Action ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop ML1016705012010-06-17017 June 2010 Discussion of Screening Criteria - Arkansas Nuclear One (ANO) ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0913104172009-05-11011 May 2009 Summary of Meeting with Entergy to Discuss Arkansas Nuclear One 2008 Performance ML0831102062008-11-0606 November 2008 Summary of Meeting with Entergy to Discuss an Open Substantive Crosscutting Issue at Arkansas Nuclear One ML0828000612008-10-0101 October 2008 Enclosure 3-Technical Papers 2 - Plant Application of Weld Onlay for Butt Weld Mitigation ML0828300322008-08-31031 August 2008 NRC Presentation Arkansas Nuclear One - Unit One ML0814306742008-05-22022 May 2008 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One ML0718004262007-06-29029 June 2007 Summary of Arkansas Nuclear One End-Of-Cycle Public Meeting ML0627703242006-10-19019 October 2006 Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Non-Proprietary) ML0619203612006-06-30030 June 2006 Storage Project and Spent Fuel Pool - Meeting Slides Meeting - June 2006 2023-08-11 |
Text
March 20, 2018 Ms. Stephenie L. Pyle, Rug IV Chair Regulatory Assurance Manager Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802
Dear Ms. Pyle:
Thank you for the opportunity to present at the PRA Workshop hosted by RUG IV.
I hope our presentations were well received by your members and our counterparts. As requested, I am enclosing the slides that Rick Deese and I used during our discussions.
Please let me know if we can be of any further assistance.
Sincerely,
/RA/
David P. Loveless, Senior Reactor Analyst Plant Support Branch 2 Division of Reactor Safety
Enclosures:
- 1. Overview of Regulatory Processes Slides
- 2. Communication Protocol Slides
ML18081A192 x SUNSI Review ADAMS: Non-Publicly Available x Non-Sensitive Keyword:
By: DLoveless/dll x Yes No x Publicly Available Sensitive NRC-002 OFFICE DRS/PSB2 DRS/PSB2 C:DRS/PSB2 D:DRS NAME DLoveless RDeese HGepford AVegel SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 3/15/18 3/11/18 3/16/18 3/16/18