L-11-179, Day Response to NRC Bulletin 2011-011 Mitigating Strategies.

From kanterella
Revision as of 18:34, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Day Response to NRC Bulletin 2011-011 Mitigating Strategies.
ML111930021
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 07/11/2011
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML111930019 List:
References
BL-11-001, L-11-179
Download: ML111930021 (2)


Text

Security Related Information - Withhold Under 10 CFR 2.390 FENOC 76 South Main Street FirstEnergy Nuclear Operating Company Akron, Ohio 44308 Peter p, Sena 11/

President and Chief Operating Officer July 11, 2011 L-11-179 10 CFR 50.54(f)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 60-Day Response to NRC Bulletin 2011-01! "Mitigating Strategies" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response, which was provided on June 9, 2011, within 30 days of the date of the Bulletin.

The attachments to this letter forward the responses requested within 60 days of the date of the Bulletin to provide information regarding mitigation strategies programs for 10 CFR 50.54(hh)(2). The attachments to this letter contain Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation "Security-Related Information - Withhold Under 10 CFR 2.390."

Security-Related Information - Withhold Under 10 CFR 2.390 Attachments Contain Security-Related Information; Upon Separation from Attachments, this Cover Letter is Decontrolled

Security-Related Information - Withhold Under 10 CFR 2.390 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-11-179 Page 2 The attachments include information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Thomas A.

Lentz, Manager - Fleet Licensing, at 330-761-6071.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July _,_,_,2011.

Sincerely, RkP*ct~

Peter P. Sena, III Attachments:

1. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Beaver Valley Power Station Unit Nos. 1 and 2 (BVPS)
2. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Davis-Besse Nuclear Power Station (DBNPS)
3. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Perry Nuclear Power Plant (PNPP) cc: NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (BVPS)

NRC Resident Inspector (DBNPS)

NRC Resident Inspector (PNPP)

Nuclear Reactor Regulation Project Manager (BVPS)

Nuclear Reactor Regulation Project Manager (DBNPS)

Nuclear Reactor Regulation Project Manager (PNPP)

Director BRP/DEP (w/o Attachments)

Site BRP/DEP Representative (w/o Attachments)

Utility Radiological Safety Board (w/o Attachments)

Security-Related Information - Withhold Under 10 CFR 2.390 Attachments Contain Security-Related Information; Upon Separation from Attachments, this Cover Letter is Decontrolled

Text

Security Related Information - Withhold Under 10 CFR 2.390 FENOC 76 South Main Street FirstEnergy Nuclear Operating Company Akron, Ohio 44308 Peter p, Sena 11/

President and Chief Operating Officer July 11, 2011 L-11-179 10 CFR 50.54(f)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 60-Day Response to NRC Bulletin 2011-01! "Mitigating Strategies" The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies," dated May 11, 2011, to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response, which was provided on June 9, 2011, within 30 days of the date of the Bulletin.

The attachments to this letter forward the responses requested within 60 days of the date of the Bulletin to provide information regarding mitigation strategies programs for 10 CFR 50.54(hh)(2). The attachments to this letter contain Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation "Security-Related Information - Withhold Under 10 CFR 2.390."

Security-Related Information - Withhold Under 10 CFR 2.390 Attachments Contain Security-Related Information; Upon Separation from Attachments, this Cover Letter is Decontrolled

Security-Related Information - Withhold Under 10 CFR 2.390 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-11-179 Page 2 The attachments include information that addresses measures that are currently in place. There are no new regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Thomas A.

Lentz, Manager - Fleet Licensing, at 330-761-6071.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July _,_,_,2011.

Sincerely, RkP*ct~

Peter P. Sena, III Attachments:

1. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Beaver Valley Power Station Unit Nos. 1 and 2 (BVPS)
2. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Davis-Besse Nuclear Power Station (DBNPS)
3. 60-Day Response, Mitigation Strategies Programs for Bulletin 2011-01, Perry Nuclear Power Plant (PNPP) cc: NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (BVPS)

NRC Resident Inspector (DBNPS)

NRC Resident Inspector (PNPP)

Nuclear Reactor Regulation Project Manager (BVPS)

Nuclear Reactor Regulation Project Manager (DBNPS)

Nuclear Reactor Regulation Project Manager (PNPP)

Director BRP/DEP (w/o Attachments)

Site BRP/DEP Representative (w/o Attachments)

Utility Radiological Safety Board (w/o Attachments)

Security-Related Information - Withhold Under 10 CFR 2.390 Attachments Contain Security-Related Information; Upon Separation from Attachments, this Cover Letter is Decontrolled