ML11353A026

From kanterella
Revision as of 10:43, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit NYS000198, Email, Kimberly Green to Michael Stroud and Donna Tyner, Subject: Draft Telecon Summaries
ML11353A026
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/10/2009
From: Kimberly Green
Office of Nuclear Reactor Regulation
To: Stroud M, Tyner D
Office of Nuclear Reactor Regulation, Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21567, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML11353A026 (12)


Text

NYS000198 Submitted: December 16, 2011 IPRenewal NPEmails From: Green, Kimberly Sent: Monday, August 10, 2009 7:12 PM To: STROUD, MICHAEL D; Tyner, Donna Cc: IPRenewal NPEmails

Subject:

Draft Telecon Summaries Attachments: Telecon Summary 07-22-09 Buried Piping and Tanks AMP.doc; Telecon Summary 08-05-09 Buried Piping and Tanks Clarification.doc; Telecon Summary 08-04-09 Fire Protection Clarification.doc Mike and Donna, Attached are three draft telecon summaries. Please review and let me know if any changes/corrections are needed.

Thanks, Kimberly Green Safety PM (301) 415-1627

~.i.m.t;?grJ.v.,grggo.@.nr.f.,gQ.Y.

NRCPA00072178

Hearing Identifier: lndianPointUnits2and3NonPublic_EX Email Number: 1540 Mail Envelope Properties (83F82891 AF9D77 4FBBB3997 4B6CB134F948EE87E23)

Subject:

Draft Telecon Summaries Sent Date: 8/10/2009 7:12:19 PM Received Date: 8/10/2009 7:12:21 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"IPRenewal NPEmails" <IPRenewai.NPEmails@nrc.gov>

Tracking Status: None "STROUD, MICHAEL D" <MSTROUD@entergy.com>

Tracking Status: None "Tyner, Donna" <dtyner@entergy.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 275 8/10/2009 7:12:21 PM Telecon Summary 07-22-09 Buried Piping and Tanks AMP .doc 60410 Telecon Summary 08-05-09 Buried Piping and Tanks Clarification.doc 46074 Telecon Summary 08-04-09 Fire Protection Clarification.doc 55802 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRCPA00072179

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 22, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION- BURIED PIPING AND TANKS INSPECTION PROGRAM The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a telephone conference call on July 22, 2009, to discuss consideration of recent operating experience related to the Buried Piping and Tanks Inspection Program for Indian Point Nuclear Generating Unit Nos. 2 and 3.

By E-mail dated July 21, 2009, from Kimberly Green, NRC, to Michael Stroud, Entergy, the staff transmitted questions concerning future inspections of buried piping within the scope of license renewal at Indian Point Units 2 and 3, for Entergy's consideration and discussion during the telephone conference call.

The telephone conference call sought information regarding the proposed aging management program as described in the applicant's license renewal application in light of recent operating experience, and the leak that occurred in February 2009.

The applicant stated that it plans to revise its Buried Piping and Tanks Inspection Program to consider the recent operating experience and will send a letter to the NRC within the next week.

The enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated NRCPA00072180

cc w/encl: See next page NRCPA00072181

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JULY 22, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION- BURIED PIPING AND TANKS INSPECTION PROGRAM The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a telephone conference call on July 22, 2009, to discuss consideration of recent operating experience related to the Buried Piping and Tanks Inspection Program for Indian Point Nuclear Generating Unit Nos. 2 and 3.

By E-mail dated July 21, 2009, from Kimberly Green, NRC, to Michael Stroud, Entergy, the staff transmitted questions concerning future inspections of buried piping within the scope of license renewal at Indian Point Units 2 and 3, for Entergy's consideration and discussion during the telephone conference call.

The telephone conference call sought information regarding the proposed aging management program as described in the applicant's license renewal application in light of recent operating experience, and the leak that occurred in February 2009.

The applicant stated that it plans to revise its Buried Piping and Tanks Inspection Program to consider the recent operating experience and will send a letter to the NRC within the next week.

The enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession Number: G:\ADRO\DLR\RPB2\Indian Point\Safety Review\Telecon Summaries\Telecon Summary 07-22-09 Buried Pi in and Tanks AMP.doc PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NRCPA00072182

NAME DATE 08/DD/09 08/DD/09 08/DD/09 08/DD/09 OFFICIAL RECORD COPY NRCPA00072183

TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JULY 22, 2009 PARTICIPANTS AFFILIATIONS Kim Green U.S. Nuclear Regulatory Commission (NRC)

Jim Davis NRC David Alley NRC John Tsao NRC Keith Hoffman NRC Carol Nove NRC Allen Hiser NRC John Boska NRC Ali Rezai NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)

Alan Cox Entergy Ted Ivy Entergy Charlie Caputo Entergy John Curry Entergy Bob Lee Entergy Sal Zulla Entergy Tom Orlando Entergy Enclosure 2 NRCPA00072184

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CALL HELD ON AUGUST 5, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PROVIDED BY ENTERGY IN A LETTER DATED JULY 27,2009 A representative of the U.S. Nuclear Regulatory Commission (NRC or the staff), Kim Green, and a representative of Entergy Nuclear Operations, Inc., (Entergy or the applicant), Michael Stroud, held a telephone call on August 5, 2009, to discuss clarification needed on information provided in a letter from Entergy dated July 27, 2009.

By letter dated July 27, 2009, Entergy provided an amendment to its Buried Piping and Tanks Inspection Program. In that letter Entergy stated that it plans to use "qualified inspection methods with demonstrated effectiveness." The staff asked Entergy to provide clarification on this statement. Entergy stated that it will provide clarification on the statement by letter.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: See next page NRCPA00072185

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CALL HELD ON AUGUST 5, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PROVIDED BY ENTERGY IN A LETTER DATED JULY 27,2009 A representative of the U.S. Nuclear Regulatory Commission (NRC or the staff), Kim Green, and a representative of Entergy Nuclear Operations, Inc., (Entergy or the applicant), Michael Stroud, held a telephone call on August 5, 2009, to discuss clarification needed on information provided in a letter from Entergy dated July 27, 2009.

By letter dated July 27, 2009, Entergy provided an amendment to its Buried Piping and Tanks Inspection Program. In that letter Entergy stated that it plans to use "qualified inspection methods with demonstrated effectiveness." The staff asked Entergy to provide clarification on this statement. Entergy stated that it will provide clarification on the statement by letter.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession Number: G:\ADRO\DLR\RPB2\Indian Point\Safety Review\Telecon Summaries\Telecon Summary 08-05-09 Buried PipinQ and Tanks Clarification.doc OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME DATE 08/DD/09 08/DD/09 08/DD/09 08/DD/09 OFFICIAL RECORD COPY NRCPA00072186

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 4, 2009, BETWEEN THE U.S. NUCLEAR REGULA TORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PROVIDED BY ENTERGY IN A LETTER DATED NOVEMBER 16, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a telephone conference call on August 4, 2009, to discuss clarification needed on information provided in a letter from Entergy dated November 16, 2007.

By letter dated November 16, 2007, Entergy responded to the staff's RAI 2.3A.3.11-1 regarding the seeping of certain fire protection system components. In that response, Entergy stated that certain Indian Point Unit 1 fire protection system components "are no longer required for compliance with 10 CFR 50.48 since the IP1 operating license was revoked in June 1980 as stated in the October 31, 1980, supplement to the January 31, 1979, fire protection SER." The staff requested that the applicant clarify the referenced statement.

The applicant stated that it would provide the requested clarification in a letter.

The enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: See next page NRCPA00072187

DATE, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 4, 2009, BETWEEN THE U.S. NUCLEAR REGULA TORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PROVIDED BY ENTERGY IN A LETTER DATED NOVEMBER 16, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a telephone conference call on August 4, 2009, to discuss clarification needed on information provided in a letter from Entergy dated November 16, 2007.

By letter dated November 16, 2007, Entergy responded to the staff's RAI 2.3A.3.11-1 regarding the seeping of certain fire protection system components. In that response, Entergy stated that certain Indian Point Unit 1 fire protection system components "are no longer required for compliance with 10 CFR 50.48 since the IP1 operating license was revoked in June 1980 as stated in the October 31, 1980, supplement to the January 31, 1979, fire protection SER." The staff requested that the applicant clarify the referenced statement.

The applicant stated that it would provide the requested clarification in a letter.

The enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession Number: G:\ADRO\DLR\RPB2\Indian Point\Safety Review\Telecon Summaries\Telecon Summary 08-04-09 Fire Protection Clarification doc OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME DATE 08/DD/09 08/DD/09 08/DD/09 08/DD/09 OFFICIAL RECORD COPY NRCPA00072188

TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 4, 2009 PARTICIPANTS AFFILIATIONS Kim Green U.S. Nuclear Regulatory Commission (NRC)

Alex Klein NRC Naeem Iqbal NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)

Kevin Elliott Entergy Enclosure 2 NRCPA00072189