MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0862017-03-16016 March 2017 2017-03 Final Outlines 2023-09-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations ML23018A0192022-11-22022 November 2022 CNS-2022-11 Public Forms NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022028, 10 CNS-2022-06 Post Exam Comments2022-07-0505 July 2022 10_CNS-2022-06 Post Exam Comments ML22228A2602022-06-21021 June 2022 11_CNS-2022-06 Public Documents ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML21230A3522021-06-30030 June 2021 CN-2021-06-DRAFT Outline Comments Rev 0 ML21230A3492021-06-25025 June 2021 CN-2021-06 Draft Written Exam ML21230A3502021-06-25025 June 2021 CN-2021-06 Final Outlines ML21208A4192021-06-25025 June 2021 CN-2021-06 Post Exam Analysis ML21230A3252021-06-25025 June 2021 CN-2021-06 Public Forms ML21230A3472021-06-25025 June 2021 Initial Licensing Retake Examination Material Cover Letter ML21208A4222021-06-25025 June 2021 CN-2021-06 Final Written Exam ML21208A4212021-06-25025 June 2021 CN-2021-06 Final Op Test ML21230A3462021-06-25025 June 2021 CN 2021-06 Draft Written Comments kdc-rev1 Final ML21230A3512021-06-25025 June 2021 CN-2021-06-DRAFT Op Test Comments kdc-rev1-final ML21055A1822021-02-24024 February 2021 CNS2021301-Corp Notification LTR of NRC Retake Initial Operator Licensing Examination 05000298/2021301 kdc1 NLS2021019, CN-2021-06 Draft Outlines2021-02-22022 February 2021 CN-2021-06 Draft Outlines ML20288A2042020-10-12012 October 2020 CN-2020-09-Post Exam Comments ML20324A0402020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam Comments ML20324A0362020-09-29029 September 2020 CN-2020-09-DRAFT Op Test Comments ML20324A0442020-09-29029 September 2020 CN-2020-09-Public Forms, Exam Assignment Tickler ML20324A0422020-09-29029 September 2020 CN-2020-09-FINAL Outlines ML20324A0412020-09-29029 September 2020 CN-2020-09-DRAFT Written Exam ML20324A0372020-09-29029 September 2020 CN-2020-09-DRAFT Op Test ML20324A0392020-09-29029 September 2020 CN-2020-09-DRAFT Outlines ML20324A0382020-09-29029 September 2020 CN-2020-09-DRAFT Outline Comments ML20288A1962020-09-29029 September 2020 CN-2020-09-FINAL Op Test ML20288A1982020-09-29029 September 2020 CN-2020-09-FINAL Written Exam ML20241A2502020-08-0404 August 2020 CN-2020-04 Post Exam Comments ML20241A2412020-08-0404 August 2020 1-CN-2020-04-Draft Outlines 1-2-3 ML20241A2422020-08-0404 August 2020 2-CN-2020-04 Draft Outline Comments 1-2-3, Written Exam Outline ML20252A1102020-08-0404 August 2020 11-Public Forms ML20241A2432020-08-0404 August 2020 3-CN-2020-04-Draft Written Exam ML20241A2442020-08-0404 August 2020 4-CN-2020-04 Written Exam Comments ML20241A2482020-08-0404 August 2020 8-CN-2020-04 Final Written Exam ML20241A2462020-08-0404 August 2020 6-CN-2020-04 Operating Test Comments Final 1-2-3 ML20241A2472020-08-0404 August 2020 7-CN-2020-04 Final Outlines ML20241A2492020-08-0404 August 2020 9-CN-2020-04 Final Operating Test, Cooper Nuclear Station, Administrative Topics Outline ML20241A2452020-08-0404 August 2020 5-CN-2020-04-Draft Operating Test 1-2-3 NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations NLS2018019, Preparation and Scheduling of Operator Licensing Examinations2018-04-0404 April 2018 Preparation and Scheduling of Operator Licensing Examinations ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 NLS2017037, 2017-03 Post Exam Comments & Analysis2017-03-24024 March 2017 2017-03 Post Exam Comments & Analysis ML17122A0872017-03-16016 March 2017 2017-03 Final Written Exam ML17122A0842017-03-16016 March 2017 2017-03 Proposed Written Exam ML17122A0852017-03-16016 March 2017 2017-03 Final Operating Test ML17122A0812017-03-16016 March 2017 2017-03 Proposed Outline Comments ML17122A0832017-03-16016 March 2017 2017-03 Proposed Written Exam Comments 2023-09-01
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: Cooper First Exam Date: October 29, 2012 Written Exam Outline (August 6, 2012)
Comment Resolution 1 No comments. N/A Administrative JPM Outline (August 6, 2012)
Comment Resolution (8-7-12)
SRO A4: Verify that admin JPM is different than the The 2009 admin JPM Radiation Control admin JPM on the 2009 initial SKL0345029, Approve licensing exam. Radioactive Discharge-Release Permit (Task # 341013O0303) addresses liquid radwaste discharges. The 2012 admin JPM SKL0345025, Release Rate 1
Determination Based On Drywell Curie Content And Vent Flow Rate (Task # 200150P0501) addresses determining a gaseous release from the drywell.
Conclusion:
These are different tasks and different JPMs.
Control Room / In-Plant System JPM Outline (August 6, 2012)
Comment Resolution Simulator JPM b (Sb): Verify whether or not this is JPM (Se) from the 2009 exam is:
the same JPM as Simulator JPM e (Se) on the 2009 SKL0342131 Transfer of 4160V initial licensing exam. Se from 2009 may be a Bus IG from DG2 to Emergency subset of Sb. Transformer (Task #
245056G0101). This JPM addresses transferring the load off the DG to another bus.
1 JPM (Sb) on the 2012 exam is:
SKL034-21-14, DG2 Shutdown from Control Room (Task #
264023O0101). This JPM addresses unloading and securing the DG.
Conclusion:
These are different tasks and different JPMs.
Simulator JPM g (Sg): Verify whether or not this is JPM (Sg) is a subset of JPM (Sc) the same JPM as Simulator JPM c (Sc) on the 2011 that was on the 2011 exam. JPM 2
initial licensing exam. (Sg) is being replaced with SKL034-20-18, Perform APRM OBDI 202 - IOLE Process
Gain Adjustment (With A Valid CTP Available With Two RR Loops Operating) This is a Safety Function category 6 task. This is a Direct from Bank (D) JPM.
Conclusion:
The new JPM will be different than the 2011 JPM Sc.
Sg: On the RO outline (ES-301-2), it says it is a New JPM (Sg) is being replaced with JPM (N). The SRO outlines say it is Direct from SKL034-20-18, Perform APRM Bank (D). Resolve. Gain Adjustment (With A Valid CTP Available With Two RR Loops Operating) This is a Safety Function category 6 task. This is a Direct from Bank (D) JPM. This JPM is not an Engineered Safety 3 Feature (EN) JPM. As a result, the SRO-U will not perform JPM Sg but will perform JPM Sb which is an EN JPM. The SRO-I will no longer perform JPM Sg but will perform JPM Sb.
Conclusion:
Both the RO and SRO outline contain JPM Sb as a Direct from Bank (D) JPM.
Simulator Scenario Outline Comments (August 6, 2012)
Comment Resolution Scenario 1: In the Scenario Outline, it says that all Event 9 is a failure of one control control rods fully insert following the scram. Three rod to scram. The outline has 1 paragraphs later, it says that one control rod fails to been revised to state that one fully insert. Resolve. control rod fails to insert on the scram.
Scenario 3: For Event 7, would it be expected that The SLC control switches are the ATC injects SLC? The ATC is addressing located on the reactor control driving in rods, so it would seem more likely that the panel (Panel 9-5) and it is a BOP would complete this. normal task for the ATC to inject SLC. The task only takes a 2
minute to perform so the ATC is not unduly distracted from driving in control rods. Every time this activity is performed in ILT or LOR, the ATC performs it.
Scenario 4: Recommend splitting Event 6 into 2 Event 6 has been split into 2 3 events: one for the Major Transient, one for the events as the comment states.
Component Failure response. OBDI 202 - IOLE Process