|
---|
Category:Environmental Monitoring Report
MONTHYEARL-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-014, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 L-2022-070, 2021 Annual Radiological Environmental Operating Report2022-05-0303 May 2022 2021 Annual Radiological Environmental Operating Report L-2022-031, Annual Radioactive Effluent Release Report2022-03-0101 March 2022 Annual Radioactive Effluent Release Report L-2021-243, Errata Corrections to FPL Letter L-2021-043 Re 2020 Annual Radioactive Effluent Release Report2021-12-16016 December 2021 Errata Corrections to FPL Letter L-2021-043 Re 2020 Annual Radioactive Effluent Release Report L-2021-099, 2020 Annual Radiological Environmental Operating Report2021-05-10010 May 2021 2020 Annual Radiological Environmental Operating Report L-2021-043, 2020 Annual Radioactive Effluent Release Report, January 2020 Through December 20202021-02-23023 February 2021 2020 Annual Radioactive Effluent Release Report, January 2020 Through December 2020 L-2020-079, 2019 Annual Radiological Environmental Operating Report for Turkey Point Units 32020-05-0707 May 2020 2019 Annual Radiological Environmental Operating Report for Turkey Point Units 3 L-2020-032, 2019 Annual Radioactive Effluent Release Report2020-02-27027 February 2020 2019 Annual Radioactive Effluent Release Report ML19221B5832019-07-25025 July 2019 Biological Opinion for Turkey Point Nuclear Plant Units 3 and 4 License Renewal ML19206B3492019-06-18018 June 2019 Required Turkey Point Annual Monitoring Data 3 - tn_1999_2018_022819 ML19151A7292019-05-31031 May 2019 Public Comment from Laura Reynolds on the Dseis for the Turkey Point SLRA L-2019-017, Submittal of 2018 Annual Radioactive Effluent Release Report2019-02-27027 February 2019 Submittal of 2018 Annual Radioactive Effluent Release Report L-2019-020, Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information2019-01-23023 January 2019 Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information ML18227A9572018-08-15015 August 2018 Submit Environmental Monitoring Report No. 10, January 1, 1977 Through December 31, 1977 ML18227A9612018-08-15015 August 2018 Submit Semiannual Environmental Report No. 7, January 1, 1976 Through June 30, 1976 ML18187A0302018-07-23023 July 2018 Cooling Tower Retrofit Is Feasible and Cost-Effective L-2018-054, Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report2018-02-16016 February 2018 Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report ML18066A5622018-02-16016 February 2018 2017 Annual Radioactive Effluent Release Report L-2017-083, Submittal of 2016 Annual Radiological Environmental Operating Report2017-05-11011 May 2017 Submittal of 2016 Annual Radiological Environmental Operating Report L-2017-029, Submittal of 2016 Annual Radioactive Effluent Release Report2017-02-28028 February 2017 Submittal of 2016 Annual Radioactive Effluent Release Report L-2017-028, Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction2017-02-22022 February 2017 Submittal of Special Report of Containment Tendon Corrosion Protection Medium Volume Reduction L-2016-106, Annual Radiological Environmental Operating Report for 20152016-05-12012 May 2016 Annual Radiological Environmental Operating Report for 2015 ML18187A0262016-03-22022 March 2016 FPL Faces Lawsuit Over Leaky Nuclear Cooling Canals at Turkey Point L-2016-029, Submittal of Radioactive Effluent Release Report for 20152016-02-26026 February 2016 Submittal of Radioactive Effluent Release Report for 2015 L-2015-102, Transmittal of 2014 Annual Radiological Environmental Operating Report2015-05-11011 May 2015 Transmittal of 2014 Annual Radiological Environmental Operating Report L-2015-038, 2014 Annual Radioactive Effluent Release Report for the Period January 1, 2014 Through December 31, 20142015-02-25025 February 2015 2014 Annual Radioactive Effluent Release Report for the Period January 1, 2014 Through December 31, 2014 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 12 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 12 of 18 ML15364A4182014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 1 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 2 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 2 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 5 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 5 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 8 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 8 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 9 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 9 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 10 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 10 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 11 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 11 of 18 ML15364A4232014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 6 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 13 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 13 of 18 L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 14 of 182014-08-31031 August 2014 Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 14 of 18 ML15364A4202014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 18 ML15364A4372014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 18 of 18 ML15364A4342014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 16 of 18 ML15364A4212014-08-31031 August 2014 Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18 2024-07-25
[Table view] Category:Letter
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles IR 05000250/20243012024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24087A1992024-04-0505 April 2024 Achp Section 106 Letter Re Notice of Availability of the Final Environmental Impact Statement for Turkey Point Units 3 & 4 Subsequent License Renewal Application ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24087A2012024-04-0505 April 2024 Letter to Talbert Cypress, Miccosukee Tribe of Indians of Florida; Re., Section 106 Letters for Turkey Point ML24087A2002024-04-0505 April 2024 Letter to Miami-Dade County Office of Historic Preservation Re Section 106 on Turkey Point Units 3 & 4 EIS ML24096A2142024-04-0505 April 2024 Ltr. to David Hill, Principal Chief, the Muscogee (Creek) Nation, Re., Section 106 Letters for Turkey Point ML24072A2832024-04-0101 April 2024 Ltr to Dianne Strand-Notice of Avail.-Final Site-Specific Supp. 5a, 2nd Renewal to the GEIS for License Renewal L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-03-28028 March 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections 2024-09-25
[Table view] |
Text
NUCLEAR REGULATORY COMMISSION HPC FORM 195 Uese OgOQT e-A I NRC DISTRIBUTION FoR I ART 50 DOCKET MATERIAL
. ~ FILE NUMBER TO: FROM: DATE OF DOCUMENT Florida Power & Light Company 5/10/77 Mr Donald Elliot Miami, Florida DATE RECEIVED Wi ST Tucker 5/16/77
. +ETTER 0 NOTOR IZE D PROP INPUT FORM NUMBER OF COPIES RECEIVED QCIRIGINAL GCOPV DESCRIPTION Q NCLASSIFIED ENCLOSURE
/ zi6a~
Ltr. trans the following: Consists of the Groundwater Monitoring
! t Program Data Report No ~ 59 'for the May, 1977 monitoring period fo~ t$ e E- series wells ~
including.'the results of +e transmissivity-test for the quarter endi~ March, 1977 ~ ~ ~ ~
!~~~iI"-',(t.~!'7)
(1-P) (e-P) ': 'Pj~g",jul j'I,',iUIJL" H>NT &ma ~
Turkey Point Units 3 & 4 RJL SAFETY "FOR ACTION/INFORMATION ASSIGNED ADi g
-PR~OCT MANA E L ~
N PROJECT MANAGER'XC LXC ASST ASST 0
'
I, ....
iSYSTEMS'SAFETY INTERNAL DISTRI BU PION PLANT'YSTEMS ' SITE SAFE TEDESCO '"
~
-NRC--PDR NEMN':
'. 4CHROEDER
- N 0 OELD 'h'4';r'PPOLXTO GOSSICK 6 STAFF ENGINEERING ENV 0 MIPC MACARRY ERNST CASE BOSNAK BALLARD HANAUER SIEIWEXL OPERATING REACTORS YOUNGBLOOD HARLESS PAWLXCK STELLO SX TECH PROJECT MANAGEMENT REACTOR SAFE OPERATING TECH GAMMXLL BOYD ROSS EISENHUT STEPP
"
P COLLINS NOVAK HULMiAN HOUSTON ROSZTOCZY PETERSON CHECK B E SITE ANALYSIS MELTZ VOLLMER HELTEMES AT&X BUNCH SKOVHOLT SALTZMAN J COLLINS RUTBERG KRECER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR' n) NA~TLA8 ~
TIC: REG V IE ULR KSON OR NSIC: LA PDR SLB: CON ULTANTS!
CRS CYS %8~/ E T NRC FORM 19d Q-76)
J P.O. BOX 013100, MIAMI, FL 33101
+ply<
g".==
FLORIDA POWER & LIGHT COMPANY j)E$'~4 May 10, 1977
+~0 y Mr. Donald Elliot gy PN.
Operating Reactors of Nuclear Reactor Regulation
~acgk'"ZL'ffice U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Elliot:
Re: Groundwater Monitoring Program, Turkey Point Docket No." 50-250/251, Control No. *8728 Enclosed please find the Groundwater Monitoring Data Report No. 59 for the May 1977 monitoring period for the E-series wells.
\
Also enclosed are the results of the transmissivity test for the quarter ending March 1977.
Sincerely, W. S. Tucker, Manager Environmental Affairs Enc.
PEOPLE... SERVING PEOPLE
Jy rq lf (9'.
if'g>
'l c ~P,~
C i' C l(
'la I.
TURKEY POINT COOLING CANAL SYSTEM UARTERLY TRANSMISSIVITY TEST E SERIES WELLS FOR THE MONTH OF APRIL, 1977 HEAD DRAW PUMPING RATE WELL DESIGNATION DATE OF TEST DOWN IN FT. GPM E-1 4/19/77 .15 170 E-2 4/19/77 0.25 170 E-3 4/19/77 0.35 170 E-4 4/19/77 0.55 170 E-5 4/19/77 0.78 153 E-6 4/19/77 0.55 162 E-7 4/20/77 0.62 181 E-8 4/20/77 0.53 176 E-9 4/20/77 ~Well Blocked E-10 4/20/77 1.25 171 E-ll 4/20/77 0.59 181 E-12 4/20/77 0.65 181 E-13 4/20/77 1.08 181 E-14 4/20/77 0.45 181 E-15 4/20/77 0.40 171 E-16 4/20/77 1.15 180 E-17 4/20/77 .20 175 E-18 4/20/77 .27 183 E-19 4/20/77 .81 171 E-20 4/20/77 .22 175 E-21 4/20/77 .18 175 E-22 4/20/77 .37 167 E-23 4/20/77 .17 183
APR 28.1gy Env'I Affairs
FLO!iIDA POWLB B. LIGHT '. CO. RFPORT SEQUENCE NO, ~>
'I DATE SUBMITTED l
>>
I
- ". GROUNDWATER. MONITORING DATA
'OR
- -'.;-.".:. TURKEY:::.POINT - E PA SELLS (E-SERIES} SHEET.( of.4
~ l, SURFACE 'IYATER'.LEVEL'URFACE iYATER FIELD MEASUREhIENT REFERENCL UEASUR AT
" KLEV'EPTH YlELL NO. DATE Ti!ME LO COhOUCTIV NOTES DEPTH'=; ELEV. TEMP. RESIDUAL Y(ATER ELEVATION DEPTH ELEY. ITY 0 DELOY( (FT,PiS'ELOiV (FT,,hlSL) CIILORINE SAMPLE
{ FT.,hiSL) REF.,(rr) CELOV/ (F T.,hISL) >>CCIlOÃIOS REF.,( PGII Chl) PPM:
IOQQ :.)j'.,)gr>> gg>>gg v~c~i~>> rgb> -'-:~20)4J
,f4/gj
-86.56
-56':56 gf cg
+So 2. 33 Q: /g: i%/ pl jff$g/ 4'Pg-'pg 'j,i.'~~j: O:$ i'I7.,'67".; '+Ps, pp'$,: >gjap<:
~S:: f74 y ~r3~ r$< pg6Q~. '576 (~ $ 4@;
'N h
~
~g H>gag ~ '!"!.I>> '.
pp-;-'$>~~, Zb%" 9%lVP' lP5$
h
'< .'>>!~c "g w:6'0>>"i g-,gP;
- 2. Ol':-.'. .'gH F!'ÃgiP54 %C ';>>>>-'-':<XP";:
5:f 59.5.$
p
'
gEm Q6'7,.'6S
- 7. 37.: b!'>>7 'r'6gl', 45 ~~'<>>>>',.~+>> F/2.0!> 'IP;:6:5 SjVP) 8%~Mi5:i~ H
.$ 2-",65 jg Ã$ g P'j !!I All'>>
~
A/9~
gj7~iE'.
>> '>>
63 m,
L "Gw~~~ Vga. 6,52':::2V ";"3@i'g4'F~@ $ g'EQi
~ .. W $ X>>g y '>>t~
g
( Q p
FLGRI DA POWER 8I LIGHT CO. REPORT DIITE SEQUENCE SUBMITTED ~//
NO. ~>
GROUNDWATER MONITORING DATA FOR TURKEY POINT - E PA WELLS (E-SERIES) SHEET 2 of 4 SURFACE WATER LEVEL SURFACE WATER FIELD MEASUREMENT WELL NO. DATE TIME RE W~E DEPTH ELEV. DEPTH ELEV.
MEASUR D AT COIZNCTIV TEMP. RESIDUAL WATER NOTES ELEVATION GELPW DEPTH ELEV. ITY oC (FT.P.IS GELPW (FT.,MSL) CHLORINE SAMPLE (FT.,MSL) GELOVl (FT.)ASL) LIICRONIOS REF.,(FT) REF.,( RFF.. FT.l PER CIBI) 2.04 /42/ //<7 '15@~3"
- - -
40 57.96 60 4.25 3/5 / OS@ /5u/ 20 t5.77 4O 35.7 60 -55.77 420 39 0Ejg 3E2$
40 35.8 5 +3E 3/I/77 60'8 C5 5'g@ 3-9l E-I 0 4.I 9 8 AS 20 5.81 ssso a., d.P 40 -55.8I Ebon wXu 60 -55.8f dSuu Mil E-II 4.25 // jb Su/ 20 -l5.77 40 35.77 E-I 2 5.56 /<7 20 I 6.4 6O .
-56'
FLORIDA POWER 8 Ll GHT CO. REPORT SEauENCE No.
DATE SUBMlTTED GROUNDWATER MONITORING DATA FOR TURKEY P01NT - EPA WELLS (E-SERIES) SHEET - 3 of 4 SURFACE WATER LEVEL SURFACE WATER FIELD MEASUREMENT WELL NO. DATE TIME DEPTH ELEV. DEPTH ELEV. MEASUR D AT COROUCTIV ITT TEMP RESIDUAL WATER NOTES ELEVATION BELOW (F T PIS BELOW (FT.,MSL) DEPTH ELEV. oc CHLORINE SAMPLE (FT,MSL) REF.,(FT.) REF.,( BELOW (F T.IMSL) hIICROIIHOS aaJr E-,is f/'I~ 3.96 3,/1 877 Bio/ jgi: g ':20:. l6.04 Pjg+
I'ER Chl) 9' PPM 4O: =,Z6.0i ENg 60:;: '56,0. 5Pp g. g8'.
E-14'/i ~uo7 347 Z P :--'-':,: 2o -i,e;ss goy 8"D
."..':4o'.'-3'6.5355ioo >p gb':-,:.::;
"-:. '; 60.,:.'- -'.56.53 EPdg B5'j9 V ~+ 3.63 9,Og Oi5I/ :20:,: -1837 'g 0.'
'40 '3637 ~No ~g-F-le g/g7/0
'."::" "'"':- ...60":- -'5637 grs 4.83 IZZ g 0/ .20,::, 45.17 Z+~ g5 5iG:: v
.'-".,-;-:;.'.:=",'.0'55.17,
,6O...55,17. Mq 2~j E 17 /27 oz 2 31 /,ES 0,6$ 20; '-'17.69 P+g ig+P 'Oig-.. v
- ":::":-::: 40 37 6'9 i5OioO os'o/
60, 57. 69 5~y g+
E-16 /2 3.23 Zi& Pg5 .: 2O 16.77 <Zoo gP gii9,, u
- 'o -367 MeR5, 60 -S6.77 sou W3
4 I)
/
h r
FLORIDA POWER 8I LIGHT CO. REPORT SEQUENCE NO.
DATE SUBMITTED GROUNDWATER MONITORING DATA FOR TURKEY POINT - 'EPA WELLS (E-SERIES) SHEET 4 of 4 SURFACE WATER LEVEL SURFACE WATER FIELD MEASUREMENT REFERENCE MEASUR D AT WELL NO. DATE TIME DEPTH ELEV. DEPTH ELEV. COIIIICTIV TEMP. RESIDUAL WATER NOTES ELEVATION DEPTH ELEV. ITT oC BELOW (FT.PS BELOW (FT.,MSL) CHLORINE SAMPLE (FT.,MSL) REF(FT.) REF.,( BELOW (F T.PlSL) MICROMHOS tER CM) PPM 3.6I 40 56.5 5@58 E-20 g7 /loo 4.04 20 596: $y//g
-35.96 60 55.96 E.2I <g /0 5.2.4 2/ 20 6.76 /'/'gg/1/y
-..36.76 5584@
6.7
/Oy 2.41 l/7/ 60'0 -I7.59 8dug
-5759 /de//g
-57.'59 $ yyyy 4.29 ~
45.71 40 -55.71 /8
I' P. O. BOX 013100, MIAMI, FL 33101 Q
6
-
mm FLORIDA POWER & LIGHT COMPANY May 10, l977 Mr. Abe Kreitman, Director Groundwater Divi'.:ion, Resouxce Planning Department South Florida Water Managem nt District P. O. Box V LUest Palm'Beach, Florida 33402
Dear Mr. Kreitman:
Re: FPL/FCD Cooling Canal Syst: em Agreement.
Turkey Po'int Plant.','a'de Count Enclosed are the laboratory analyses of the groundwater samples taken for the March and April 1977 monitoring Period Sincerely, N. S. Tucker, Manager Environmental Affairs Enc ~
cc: 'llr . Donald -'El'li'ot, USNRC, (Do'cket, 'No. 50-250/25l)
(Control No. 8728)
PEOPLE... SERVING PEOPLE
- GROUNDWATER MONITORING PROGRAM FCD WELL SERIES TURKEY POINT FLORIDA CHLORIDE DATA OF MARCH, 1977 WELL DESIGNATION SAMPLE DATE DEPTH IN FT. CHLORIDE IN PPM G-6 2/24/77 2/24/77 456 G-21 2/25/77 2,261 G-27 2/24/77 59'7'9'7'5'9'9' 10,333 G-28 2/25/77 5,622 G-35 2/25/77 8,585 ID-A 2/26/77 17,932 ID-B 2/26/77 18,387 ID-C 2/26/77 34'9'0'8) 18,007.
ID-D 2/26/77 17,324 ID-E 2/26/77 16,537 59'7'0'9'5'0'0'8'5,"95616,564 2/24/77 L-2 2/25/77 17,703 L-3 2/25/77 16,868 2/25/77 14,360 L-5 2/25/77 13,981 L-6, 2/25/77 17,961 X-1 2/26/77 19,147 X-2 2/26/77 19,375
0
- 1%,
I cOUt'JDWATER l IONITORING PROGRAM FCD -WELL SERIES TURKEY POINT, FLORIDA CHLORIDE DATA OF APRXL, 1977 WELL DESXGNATION SE&1PLE DWL'E DEPTH "XN FT; CHXORIDE XN PPH ID-A ID-B ID-C
'D-D 3/26/77 3/26/77
,3/26/77 3/26/77
'8i630 19,226 18,779 17,288 ID-E 3/26/77 22'9'9'0'0'8'9'7'09 L31-1 3/25/77 17,139 L31-2 3/25/77 17,437 L31-3 3/25/77, 18,034 L31-4 3/25/77 16,-543 L31-5 3/25/77 15,798
'8 L31-6 3/25/77 18,332
'0 X-2 3/30/77 20,418
GB Z Nd glAVA J/61 llNfl OHISSpagpg zt~swnooo o~~iaozv