ML15364A420

From kanterella
Jump to navigation Jump to search
Annual Post-Uprate Monitoring Report for Uprate Project. Part 3 of 18
ML15364A420
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Ecology & Environment
To:
Office of New Reactors
Shared Package
ML15364A396 List:
References
L-2015-299, +reviewed
Download: ML15364A420 (8)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'

2::

Cl)

(,) c:

Ill -

(,)

J "C c:

0 (J

(,)

It=

'(j Cl)

Q.

5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0

28 27 26 25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-10. TPGW-9 Specific Conductance and Temperature.

2-44 (J

~

Cl)...

J 1ii...

Cl)

Q.

E Cl)

I-

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

(,) -"'

80000 Cl) 70000

(,)

c:

Ill 60000

(,)

J

~

"C 50000 c:

0 (J

(,)

40000 It=

'(j Cl) 30000 Q.

20000 10000 0

28 27 -

(J 26

~

Cl)...

J -

Ill...

Cl) 25 Q.

E Cl) 24

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-11. TPGW-10 Specific Conductance and Temperature.

2-45

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'

2::

Cl)

(,)

c:

Ill -

(,)

J "C

c:

0 (J

(,)

It=

'(j Cl)

Q.

100000 90000 80000 70000 60000

=

50000 40000 30000 20000 10000 0

I 28 I

27 26

~

~

-~ -~

~

25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-12. TPGW-11 Specific Conductance and Temperature.

2-46 (J

~

Cl)...

J -

Ill..

Cl)

Q.

E Cl)

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

(,) -"'

80000 Cl) 70000

(,)

c:

Ill - 60000

(,)

J "C

50000 c:

0


W

  • ~

(.)

40000

(,)

""~f'l

!E 30000

(,)

Cl)

Q.

20000 10000 0

27 -

(.)

~

26

~

Cl)...

J -

Ill..

Cl) 25 Q.

E Cl) 24

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-13. TPGW-12 Specific Conductance and Temperature.

2-47

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

!,,)

Cl) 80000 Cl) 70000

!,,)

c:

Ill 60000

!,,)

l "C

50000 c:

0 (J

!,,)

40000 It=

'(j Cl) 30000 Q.

Cl) 20000 10000 0

33 32 31 30 I

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 28 29 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-14. TPGW-13 Specific Conductance and Temperature.

2-48 (J

~

Cl)...

l 1ii...

Cl)

Q.

E Cl)

I-

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'.::

Cl)

(,)

c:

Ill -

(,)

s "C

c:

0 (J

(,)

It=

'(j Cl)

Q.

100000 90000 80000

-.r--

70000

_,.. **~ --

~

60000 50000 40000 30000 20000 10000 0

28 27 26 25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-15. TPGW-14 Specific Conductance and Temperature.

2-49 (J

~

Cl)...

s -

Ill...

Cl)

Q.

E Cl)

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Groundwater Monitoring Station Extent of Saltwater Intrusion (USGS 2011)

Estimated Extent of Saltwater Intrusion (USGS 2011)

Canal Note: 1) Avg = Average: Jun 2013 through May 2014;

2) Std Dev= Standard Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Section 2 9-2014 Figure 2.1-16. Average and Standard Deviation of Specific Conductance Values (µSiem) for Groundwater Stations.

2-50

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2011)

Estimated Extent of Saltwater Intrusion USGS 2011 Note: 1)Avg =Average: Jun 2013 through May 2014;

2) Std Dev= Standan:I Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Figure 2.1-17. Average and Standard Deviation of Temperature (°Celsius) for Groundwater Stations.

2-51 Section 2 9-2014

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'

2::

Cl)

(,) c:

Ill -

(,)

J "C c:

0 (J

(,)

It=

'(j Cl)

Q.

5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0

28 27 26 25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-10. TPGW-9 Specific Conductance and Temperature.

2-44 (J

~

Cl)...

J 1ii...

Cl)

Q.

E Cl)

I-

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

(,) -"'

80000 Cl) 70000

(,)

c:

Ill 60000

(,)

J

~

"C 50000 c:

0 (J

(,)

40000 It=

'(j Cl) 30000 Q.

20000 10000 0

28 27 -

(J 26

~

Cl)...

J -

Ill...

Cl) 25 Q.

E Cl) 24

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-11. TPGW-10 Specific Conductance and Temperature.

2-45

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'

2::

Cl)

(,)

c:

Ill -

(,)

J "C

c:

0 (J

(,)

It=

'(j Cl)

Q.

100000 90000 80000 70000 60000

=

50000 40000 30000 20000 10000 0

I 28 I

27 26

~

~

-~ -~

~

25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-12. TPGW-11 Specific Conductance and Temperature.

2-46 (J

~

Cl)...

J -

Ill..

Cl)

Q.

E Cl)

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

(,) -"'

80000 Cl) 70000

(,)

c:

Ill - 60000

(,)

J "C

50000 c:

0


W

  • ~

(.)

40000

(,)

""~f'l

!E 30000

(,)

Cl)

Q.

20000 10000 0

27 -

(.)

~

26

~

Cl)...

J -

Ill..

Cl) 25 Q.

E Cl) 24

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-13. TPGW-12 Specific Conductance and Temperature.

2-47

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 100000 e 90000

!,,)

Cl) 80000 Cl) 70000

!,,)

c:

Ill 60000

!,,)

l "C

50000 c:

0 (J

!,,)

40000 It=

'(j Cl) 30000 Q.

Cl) 20000 10000 0

33 32 31 30 I

,__~~~~~~~~~~~~~~___.,_~~~~~~~~~~----.~~~~~~~~---- 28 29 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-14. TPGW-13 Specific Conductance and Temperature.

2-48 (J

~

Cl)...

l 1ii...

Cl)

Q.

E Cl)

I-

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 e

(,) -"'.::

Cl)

(,)

c:

Ill -

(,)

s "C

c:

0 (J

(,)

It=

'(j Cl)

Q.

100000 90000 80000

-.r--

70000

_,.. **~ --

~

60000 50000 40000 30000 20000 10000 0

28 27 26 25 24 23 6/1/10 9/1/10 1211/10 3/1/11 6/1/11 9/1/11 1211/11 3/1112 6/1112 9/1/12 1211112 3/1/13 6/1/13 9/1/13 1211/13 3/1/14 6/1/14 c::::::J Interim Operating Period -- Shallow Intermediate -- Deep Figure 2.1-15. TPGW-14 Specific Conductance and Temperature.

2-49 (J

~

Cl)...

s -

Ill...

Cl)

Q.

E Cl)

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Groundwater Monitoring Station Extent of Saltwater Intrusion (USGS 2011)

Estimated Extent of Saltwater Intrusion (USGS 2011)

Canal Note: 1) Avg = Average: Jun 2013 through May 2014;

2) Std Dev= Standard Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Section 2 9-2014 Figure 2.1-16. Average and Standard Deviation of Specific Conductance Values (µSiem) for Groundwater Stations.

2-50

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2011)

Estimated Extent of Saltwater Intrusion USGS 2011 Note: 1)Avg =Average: Jun 2013 through May 2014;

2) Std Dev= Standan:I Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Figure 2.1-17. Average and Standard Deviation of Temperature (°Celsius) for Groundwater Stations.

2-51 Section 2 9-2014