Letter Sequence Withdrawal |
---|
|
|
MONTHYEARML18352A7482018-12-14014 December 2018 Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Hardened Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) Project stage: Request ML19094A5332019-06-21021 June 2019 Withdrawal of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Project stage: Withdrawal 2018-12-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 June 21, 2019 Mr. Brian R. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION -WITHDRAWAL OF ORDER EA-13-109, "ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE HARDENED CONTAINMENT VENTS CAPABLE OF OPERATION UNDER SEVERE ACCIDENT CONDITIONS" (EPID NO. L-2018-JLD-0170)
Dear Mr. Sullivan:
This letter documents the withdrawal of Order EA-13-109, "Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions," at Pilgrim Nuclear Power Station (Pilgrim), as described below.
By letter dated June 6, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13143A321 ), the U.S. Nuclear Regulatory Commission (NRG, the Commission) issued Order EA-13-109 to Entergy Nuclear Operations, Inc. (Entergy, the licensee). This order requires certain actions at Pilgrim associated with the Fukushima Near-Term Task Force recommendations. Specifically, Order EA-13-109 requires that all licensees that operate boiling-water reactors with Mark I and Mark II containment designs, including Pilgrim, implement requirements for reliable hardened containment vents capable of operation under severe accident conditions at their facilities.
Section IV of Order EA-13-109 (the Order) required that Entergy submit to the Commission for review overall integrated plans by June 30, 2014 (Phase 1, wetwell vent), and December 31, 2015 (Phase 2, drywell vent), describing how Pilgrim will achieve compliance with the requirements of the Order. The licensee provided a plan for compliance with Phase 1 of the Order by letter dated June 30, 2014 (ADAMS Accession No. ML141888731 ). By letter dated November 10, 2015 (ADAMS Accession No. ML15328A053), Entergy submitted to the NRG a certification of permanent cessation of operations for Pilgrim in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.82(a)(1 )(i). In this letter, Entergy provided notification to the NRG of its intent to permanently cease operations at Pilgrim no later than June 1, 2019. By letter dated June 24, 2016 (ADAMS Accession No. ML16187A325),
Entergy requested an extension to comply with the requirements of Section IV of the Order concerning both Phase 1 and Phase 2 until December 31, 2019. By letter dated April 17, 2017 (ADAMS Accession No. ML17032A050), the NRG relaxed the full implementation date for Phase 1 of Order EA-13-109 until December 31, 2019. In that letter, based on the projected shutdown date of the Pilgrim reactor, the NRG staff did not find good cause to extend the designated Order EA-13-109 Phase 2 compliance date of June 30, 2019. Entergy's extension
B. Sullivan . 2.
request letter also stated that the licensee would request relaxation of the Order no later than December 31, 2019, based on the permanently shutdown condition of the plant at that time. By letter dated December 14, 2018 (ADAMS Accession No. ML18352A748), Entergy requested that the Order be rescinded at Pilgrim upon the docketing of the 10 CFR Section 50.82(a)(1) certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel.
Section IV of the Order also stipulates that the NRC's Director of the Office of Nuclear Reactor Regulation may, in writing, relax or rescind any of the conditions of the Order upon demonstration by the licensee of good cause.
By letter dated June 10, 2019 (ADAMS Accession No. ML19161A033), Entergy certified to the NRC that it had permanently ceased operations at Pilgrim on May 31, 2019. In this letter, the licensee also provided notification to the NRC under 10 CFR 50.82(a)(1 )(ii) that, as of June 9, 2019, all fuel has been permanently removed from the Pilgrim reactor vessel and placed in the spent fuel pool (SFP). Further, Entergy confirmed its understanding that, under 10 CFR 50.82(a)(2), the Pilgrim 10 CFR Part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel.
The licensee's December 14, 2018, rescission request letter asserts that good cause exists to rescind the requirements of Order EA-13-109 with respect to Pilgrim because, with the permanent removal of fuel from the reactor vessel, the function of primary containment has ceased. Additionally, according to the licensee, primary containment has no design function regarding protection of the fuel in the SFP, or mitigation of SFP accident scenarios. Therefore, the licensee states that implementation of the Order requirements will no longer have any nexus to reasonable assurance of adequate protection of the public health and safety.
The NRG staff notes that the function of primary containment, as described in Chapters 1 and 5 of the Pilgrim Updated Final Safety Analysis Report, is to: (1) completely enclose the reactor vessel, (2) retain integrity as a radioactive material barrier during and following accidents that release radioactive material into the primary containment volume, and (3) limit the release of fission products in the event of a postulated design basis accident so that offsite doses would not exceed the guideline values set forth in 10 CFR Part 100. Because the licensee for Pilgrim has permanently ceased power operations and removed all fuel from the reactor vessel, as documented in the docketed 10 CFR 50.82(a)(1)(i) and (ii) certifications, and, therefore, is no longer authorized to operate or to emplace or retain fuel into the reactor vessel under 10 CFR 50.82(a)(2), the NRC staff finds that a core damage event and a resulting severe accident are no longer possible at Pilgrim due to the absence of a reactor core. As a result, the ability to operate the primary containment venting system would no longer serve the underlying purpose of Order EA-13-109.
B. Sullivan Based on the above, the NRC staff concludes that the licensee has demonstrated good cause for the withdrawal of Order EA-13-109. Accordingly, the NRC is withdrawing its June 6, 2013, Order EA-13-109 with respect to Pilgrim.
Sincerely, Ho K. Nieh, Director Office of Nuclear Reactor Regulation Docket No. 50-293 cc: Listserv
- .. ML19094A533 *via email OFFICE NRR/DLP/PBMB/PM NRR/DLP/PBMB/LA NRR/DLP/PBEB/BC(A)
NAME PBamford SLent BTitus DATE 3/29/2019 4/5/2019 4/26/2019 OFFICE NRR/DLP/PBMB/BC OE/D NRR/DLP/D NAME JBowen GWilson LLund DATE 4/29/2019 6/10/19 6/14/19 OFFICE OGC-NLO' NRR/D NAME RCarpenter, w/comments HNieh (MEvans for)
DATE 6/14/2019 6/21/19