Notification of TI-186 Inspection (NRC Inspection Report 05000298-13-405) and Request for Information
ML13157A298
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/05/2013
From: Vincent Gaddy
Operations Branch IV
To: Limpias O
Nebraska Public Power District (NPPD)
References
TI-186 IR-13-405
Download: ML13157A298 (4)


See also: IR 05000298/2013405

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

June 5, 2013

Mr. Oscar A. Limpias, Vice President-Nuclear

and Chief Nuclear Officer

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF TI-186 INSPECTION

(NRC INSPECTION REPORT 05000298/2013405) AND REQUEST FOR

INFORMATION

Dear Mr. Limpias:

From June 25 to June 27, 2013, inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will be onsite to perform the Temporary Instruction (TI)-186, Inspection of

Procedures and Processes for Responding to Potential Aircraft Threats. In order to minimize

the impact to your onsite resources and to ensure a productive inspection, we have enclosed a

request for documents needed for this inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection. Also, in order to

demonstrate compliance with TI-186, we ask that you have the necessary staff members

available to the inspection team to assist in any plant walk-throughs, interviews and/or simulator

demonstrations.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. LuAnn Bray of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Gabriel Apger (Gabriel.Apger@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

O. Limpias -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Cooper Nuclear Station

ML13157A298

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GWA

Publicly Available Non-Sensitive

Category A. Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

OE:OB C:OB

GApger VGaddy

/RA/ /RA/

6/4/2013 6/5/2013

TI-186 INSPECTION DOCUMENT REQUEST

TO: LuAnn Bray

Regulatory Affairs, Cooper Nuclear Station

402-825-5587

FROM: Gabriel Apger

Operations Engineer, NRC RIV

360-403-8178

SUBJECT: INFORMATION REQUEST TO SUPPORT JUNE 25 - 27, 2013, TI-186

INSPECTION, INSPECTION OF PROCEDURES AND PROCESSES FOR

RESPONDING TO POTENTIAL AIRCRAFT THREATS

A. The following information is requested in order to support inspection preparation

activities. Requested materials should be sent either electronically or hardcopy in

order to arrive at the Region IV office no later than June 17, 2013.

  • Electronically: Via email (Gabriel.apger@nrc.gov)

and/or

  • Hardcopy to: Gabriel Apger

18610 Jordan Road

Arlington, WA 98223

Document Request:

  • Procedure(s) that describe actions taken to address potential aircraft threat

notifications onsite. This may include procedures that operations, security,

emergency preparedness, and health physics staff use.

  • Plant specific analyses prepared to support the designed actions you have taken to

address this issue in your procedures. Such analyses were described for support of

site actions in the topical Regulatory Guide 1.214 (dated January 2009).

  • Training materials used to train the various affected groups when contacted with a

potential aircraft threat (licensed operators, operators in training for a license, non-

licensed operators, security, EP, HP, fire brigade, and other support staff, as

examples).

  • If the site has conducted exercises or drills to evaluate the ability of staff to

implement these procedures in the past, provide any documentation summarizing

the results of these events. If any condition reports came out of the exercises/drills,

provide those as well.

-1- Enclosure