ML14121A507
ML14121A507 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 05/01/2014 |
From: | Vincent Gaddy Operations Branch IV |
To: | Jeremy G. Browning Entergy Operations |
C. Osterholtz | |
References | |
IR-14-301 | |
Download: ML14121A507 (3) | |
See also: IR 05000313/2014301
Text
May 1, 2014
Jeremy Browning, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000313/2014301
Dear Mr. Browning:
During a meeting in the Region IV offices on April 21, 2014, between Mr. Randal Martin,
Superintendent, Operations Training, and Mr. Clyde Osterholtz, Chief Examiner, arrangements
were made for the administration of licensing examinations at Arkansas Nuclear One, Unit 1,
during the week of November 17, 2014.
As agreed during the meeting, your staff will prepare the examinations based on the guidelines
in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff
any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by September 1, 2014. The examination and supporting reference materials identified
in Attachment 3 to ES-201 will be due by September 29, 2014. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines and examination before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and supporting reference materials, or the
submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.
In addition, your support for on-site validation of the examination is required during the week of
October 20, 2014.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402 and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final. Appendix E to NUREG-1021 contains a number of NRC policies and
guidelines that will be in effect while the written examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary senior
J. Browning -2-
operator license applications (Office of Management and Budget (OMB) approval
number 3150 0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Martin has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269, or myself at
817 200-1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-313
License: DPR-51
cc: Electronic Distribution for Arkansas Nuclear One
J. Browning -3-
Electronic Distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/E (Michael.Bloodgood@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Joseph.Nick@nrc.gov)
Accession Number: ML14121A507
SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials CCO
Publicly Avail Yes No Sensitive Yes No Sens. Type Initials CCO
SOE:OB C:OB
COsterholtz VGaddy
/RA/ /RA/
5/1/14 5/1/14