ML17238A738

From kanterella
Revision as of 20:29, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection and Structural Capability of the Dresden Units 2 and 3 Tori
ML17238A738
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/06/1972
From: Stiede W
Commonwealth Edison Co
To: Boyd R
US Atomic Energy Commission (AEC)
References
Download: ML17238A738 (1)


Text

.' Regulatory -Fiie Cy. 50-Z37 .

~

Commonwealth Edison Company ONE FIRST NATIONA,L PLAZA* CHICAGO. ILLINOIS Addreu Reply to, POST OFFICE BOX 767 *CHICAGO, ILLINOIS 60690 April 6, 1972 Mr. Roger S. Boyd, Assistant Director for Boiling Water Reactors Division of Reactor Licensing U.S. Atomic Energy Commission Washington, D.c. 20545

Subject:

Inspection and Structural Capability of the Dresden Units 2 and 3 Tori

Dear .Mr. Boyd:

In a letter to you dated March 24, 1972 we indicated that an inspection of the piping supports and baffles in the Dresden Unit 3 torus was scheduled for January 1973. This information was erroneous.

The inspection of the Dresden Unit 3 torus will take place during the first refueling outage for Dresden Unit 3. At the present time, this outage is scheduled to occur in the fall of 1973.

Sho.uld you require any additional information, please let me know.

Very truly yours,

  • ~ /  : ,,-... ]';;? (~ 'I ~(

i::l-;-l:~!/;11... t .G/f. -</-l-u...c~L-1 Waynei../L. Stiede Nuclear Licensing Administrator DOCKETED USAEC 1919