Follow-up to Interim Report of a Deviation or Failure to Comply
ML18219A008
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 08/06/2018
From: Sharp S
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-Pl-18-047
Download: ML18219A008 (2)


Text

1717 Wakonade Drive Welch, MN 55089 fl Xcel Energy*

RESPONSIBLE BY NATURE 800.895.4999 xcelenergy.com L-Pl-18-047 AUG O6 2018 10 CFR 21.21(a)(2)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Unit 2 Docket No. 50-306 Renewed Facility Operating License No. DPR-60 Follow-up to Interim Report of a Deviation or Failure to Comply

Reference:

1. Letter from Scott Sharp (NSPM), to Document Control Desk (NRG), "Interim Report of a Deviation or Failure to Comply," L-Pl-18-034, dated May 30, 2018 (ADAMS Accession No. ML18150A689)

Northern States Power Company, a Minnesota Corporation, (NSPM), doing business as Xcel Energy, hereby submits this follow-up report to the interim report (Reference 1) submitted pursuant to 10 CFR 21.21 (a)(2) regarding a failed pressure switch manufactured by AMOT; model 4140CR 1E32AA0, purchased from Paragon (formerly ATC) under their 10 CFR 50 Appendix B program.

NSPM returned the pressure switch to Paragon to evaluate. Paragon performed an as-found inspection to verify the part was manufactured to design requirements. Paragon has assurance that there was no manufacturing defect or deviation from design on this part.

Paragon has provided Prairie Island 52 pressure switch units and only one has failed in this manner. As a result, this condition is not reportable under 10 CFR 21.

If there is any question or if additional information is needed, please contact Jeff Kivi at (651) 267-7309.

Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

Scott Sharp Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: Regional Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC