University of Texas at Austin - Summary of Site Visit and Request for Schedule for Completion of the Reactor Analyses Renewal of Facility Operating License No. R-129 for the University of Texas at Austin Research Reactor
ML18262A182
Person / Time
Site: University of Texas at Austin
Issue date: 10/18/2018
From: Geoffrey Wertz
Research and Test Reactors Licensing Projects Branch
To: Charlton W
University of Texas at Austin
Wertz G, NRR/DLP, 415-0893
References
EPID L 2017-RNW-0032
Download: ML18262A182 (4)


Text

October 18, 2018 Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758

SUBJECT:

UNIVERSITY OF TEXAS AT AUSTIN -

SUMMARY

OF SITE VISIT AND REQUEST FOR SCHEDULE FOR COMPLETION OF THE REACTOR ANALYSES RE: RENEWAL OF FACILITY OPERATING LICENSE NO. R-129 FOR THE UNIVERSITY OF TEXAS AT AUSTIN RESEARCH REACTOR (EPID NO. L-2017-RNW-0032)

Dear Dr. Charlton:

The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the University of Texas at Austin (UTA) application for the renewal of Facility Operating License No. R-129, dated December 12, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12156A097), as supplemented by letters dated February 21, 2012 (ADAMS Accession No. ML12061A009), and March 8, 2018 (ADAMS Accession No. ML18072A103).

The NRC staff completed its review of the UTA staff responses to our requests for additional information (RAI), provided by UTA letter dated March 8, 2018, and discussed its findings with yourself and other UTA staff during a site visit conducted on August 14 and 15, 2018. At the conclusion of the site visit, the NRC staff provided its assessment of the neutronic and thermal-hydraulic analyses, provided in the March 8, 2018, letter, and explained that some aspects of the analyses were not acceptable, along with the basis for the NRC staffs determination. Furthermore, the NRC staff understood that UTA staff planned to obtain technical support from the Department of Energy to support completion of the neutronic and T-H analyses.

In order to more effectively manage its resources, the NRC staff requests that UTA staff provide a schedule for the submission of the updated neutronic and T-H analyses, within 30 days from the date of this letter for the schedule. In addition, it may be useful to include a few project milestones within the schedule to provide the NRC staff with a better understanding of the projects progress.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.30(b), Oath or affirmation, UTA must execute its response in a signed original document under oath or affirmation. The response must be submitted in accordance with 10 CFR 50.4, Written communications. Information included in the response that is considered sensitive or proprietary, that UTA seeks to have withheld from the public, must be marked in accordance

W. Charlton with 10 CFR 2.390, Public inspections, exemptions, requests for withholding. Any information related to security should be submitted in accordance with 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements.

If you have any questions, or need additional time to respond to this request, please contact me at (301) 415-0893 or by electronic mail at Geoffrey.Wertz@nrc.gov.

Sincerely,

/RA/

Geoffrey A. Wertz, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129

Enclosure:

As stated cc: See next page

University of Texas Docket No. 50-602 cc:

Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, TX 78756 Dr. Gregory L. Fenves The University of Texas at Austin Office of the President 110 Inner Campus Drive, G3400 Austin, TX 78712-3400 Maurie McInnis Executive Vice President and Provost The University of Texas at Austin 1 University Station, G1000 Austin, TX 78712 DeAnn Walker, Director Office of the Governor Office of Budget and Policy P.O. Box 12428 Austin, TX 78711 Mr. Paul Whaley, Associate Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Larry Hall, Reactor Supervisor Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611

ML18262A182 *via email OFFICE NRR/DLP/PRLB/PM* NRR/DLP/PRLB/LA* NRR/DLP/PRLB/BC NRR/DLP/PRLB/PM NAME GWertz NParker AAdams GWertz (AAdams for)

DATE 9/19/2018 9/19/2018 10/18/2018 10/18/2018