MONTHYEARIR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML19108A2352019-04-18018 April 2019 301 Exam Report IR 05000269/20183012018-07-13013 July 2018 NRC Operator License Examination Report 05000269/2018301, 05000270/2018301, and 05000287/2018301 IR 05000269/20163022017-01-27027 January 2017 NRC Operator License Examination Report 05000269/2016302, 05000270/2016302, and 05000287/2016302 IR 05000269/20153022016-02-0202 February 2016 NRC Operator License Examination Report 05000269/2015302, 05000270/2015302, and 05000287/2015302 IR 05000269/20153012015-07-21021 July 2015 Er 05000269/2015301, 05000270/2015301, and 05000287/2015301; June 8-11, 2015 & June 17, 2015; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations IR 05000269/20143022015-02-0909 February 2015 Er 05000269/2014302, 05000270/2014302, and 05000287/2014302; December 8-11, 2014 & December 17, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML15015A6942015-01-14014 January 2015 Notification of Licensed Operator Initial Examination, 05000269/2015301, 05000270/2015301 and 05000287/2015301 IR 05000269/20133012013-08-0101 August 2013 Er 05000269-13-301; 05000270-13-301; 05000287/2013301; Operating Test June 10 - 12, 2013 & Written Exam July 11, 2013; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000269/20113022011-11-21021 November 2011 Er 05000269-11-302; 05000270-11-302; 05000287-11-302; Operating Test 10/17/2011 - 10/20/2011 & Written Exam 10/26/2011; Oconee Nuclear Station, Units 1, 2, and 3 Operator License Examinations IR 05000270/20103012010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, ML1013306092010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, IR 05000269/20083012008-04-22022 April 2008 Operator Licensing Initial Retake Examination Report 05000269-08-301, 05000270-08-301 and 05000287-08-301 on 03/20/08 for Oconee Nuclear Station - IR 05000269/20073012007-05-0101 May 2007 Operator Initial Examination - 05000269-07-301; 05000270-07-301 & 05000287-07-301 IR 05000269/20063012006-08-0202 August 2006 IR 05000269-06-301, 05000270-06-301 & 05000287-06-301; Duke Energy Corporation; 06/19-28-2006 & 06/30/2006; Oconee Nuclear Station ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2021-07-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 18, 2019 Mr. Ed Burchfield, Jr.
Site Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2019301, 05000270/2019301, AND 05000287/2019301
Dear Mr. Burchfield:
During the period February 26-27, 2017, the Nuclear Regulatory Commission (NRC) administered a retake operating test to an employee of your company who had applied for a license to operate the Oconee Nuclear Station. At the conclusion of the test, the examiner discussed preliminary findings related to the operating test with those members of your staff identified in the enclosed report.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the retake operating test. The entire JPM portion of the operating test and written examination were excused. There were no post-examination comments. One applicant was issued a license commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.
All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
E. Burchfield 2 If you have any questions concerning this letter, please contact me at (404) 997-4528.
Sincerely,
/RA: Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures:
- 1. Report Details
- 2. Simulator Fidelity Report cc: Distribution via Listserv
___ML19108A235_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXG1 GJM1 for NAME AGOLDAU EGUTHRIE DATE 4/17/2019 4/ 18 /2019 E-MAIL COPY? YES NO YES NO
U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket No.: 50-269, 50-270, 50-287 License No.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2019301, 05000270/2019301, AND 05000287/2019301 Enterprise identifier: L-2019-OLL-0041 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2 and 3 Location: Seneca, SC Dates: Operating Test - February 26-27, 2019 Examiners: Andreas Goldau, Chief Examiner, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
2
SUMMARY
ER 05000269/2019301, 05000270/2019301, AND 05000287/2019301; retake operating test February 26-27, 2019; Oconee Nuclear Station, Units 1, 2 and 3; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted a retake examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
The operating test was developed by the licensee.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One applicant was issued a license commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
3 REPORT DETAILS
- 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
- a. Inspection Scope The NRC reviewed the licensees examination security measures while preparing and administering the examination in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. The NRC examiner evaluated one Reactor Operator (RO) applicant using the guidelines contained in NUREG-1021. Evaluation of the applicant and review of associated documentation was performed to determine if the applicant, who applied for a license to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.
- b. Findings No findings were identified.
The licensee developed the operating test. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One RO applicant was issued a license.
A copy of the individual examination report was sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted no post-examination comments.
4OA6 Meetings, Including Exit Exit Meeting Summary On February 27, 2019, the NRC examination team discussed generic issues associated with the operating test with Mr. Ed Burchfield, Vice President-ONS, and members of the Oconee Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary, or if any of the examination material received should be withheld from public disclosure. No proprietary information was identified.
4 KEY POINTS OF CONTACT Licensee personnel E. Burchfield, Vice President - ONS J. Steely, Training Manager P. Fisk, Plant Manager - ONS T. Doss, ILT Exam Team Supervisor D. George, ILT Class Supervisor R. Patterson, ILT Instructor S. Lark, NRC Exam Author NRC personnel A. Goldau, Chief Examiner
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 058000287 Operating Test Administered: February 26-27, 2019 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
Enclosure 2