Motion,Submitted by Intervenors Coleman,That NRC Amend Request for Order to Show Cause & Stay Licensing.Seek Addl Contentions Re Cost/Benefit Analysis,Seismic Analysis & Class 9 AccidentsML19209C387 |
Person / Time |
---|
Site: |
Salem |
---|
Issue date: |
08/31/1979 |
---|
From: |
Coleman A, Coleman E AFFILIATION NOT ASSIGNED |
---|
To: |
|
---|
References |
---|
NUDOCS 7910150241 |
Download: ML19209C387 (6) |
|
Similar Documents at Salem |
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARLR-N980595, Comment Supporting Proposed Rules 10CFR50,52 & 72 Re Changes,Tests & Experiments.Pse&G Supports Comments Submitted by NEI in Their Ltr1998-12-21021 December 1998 Comment Supporting Proposed Rules 10CFR50,52 & 72 Re Changes,Tests & Experiments.Pse&G Supports Comments Submitted by NEI in Their Ltr LR-N980588, Comment on Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Util Agrees with General Principle Behind Proposed Rulemaking,But However,Concerned That Proposed Rule Contain Language Open to Interpretation1998-12-14014 December 1998 Comment on Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Util Agrees with General Principle Behind Proposed Rulemaking,But However,Concerned That Proposed Rule Contain Language Open to Interpretation ML18106A8811998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide as Protective Action During Severe Reactor Accidents. Believes That Discussion Contained in SECY-98-061 Should Be Included in Draft NUREG ML18106A8731998-09-15015 September 1998 Comment on Draft NUREG-1633 Re Assessment of Use of Potassium Iodide (Ki) as Protetive Action During Severe Reactor Accidents. Believes That NUREG Should Provide Balanced Discussion on Benefits & Risks of Use of Ki LR-N980284, Comment on PR-50 Re IEEE Std 603-1991 for Salem & Hope Creek Generating Stations.Lack of Adverse Comments to Draft RG Should Not Have Been Construed as Endorsement to IEEE 603-19911998-06-12012 June 1998 Comment on PR-50 Re IEEE Std 603-1991 for Salem & Hope Creek Generating Stations.Lack of Adverse Comments to Draft RG Should Not Have Been Construed as Endorsement to IEEE 603-1991 LR-N980149, Comment on Proposed Rule 10CFR50 Re Industry Codes & Stds. Comments Address Use of Engineering Judgment,Limitations on Use of Later ASME III Code Editions for Weld Leg Dimensions & Seismic Analysis1998-03-30030 March 1998 Comment on Proposed Rule 10CFR50 Re Industry Codes & Stds. Comments Address Use of Engineering Judgment,Limitations on Use of Later ASME III Code Editions for Weld Leg Dimensions & Seismic Analysis ML18102B4361997-07-0707 July 1997 Comment Opposing NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Util Endorses Comments Submitted by Nuclear Energy Inst ML20132A8961996-12-0606 December 1996 Comment Supporting Pr 10CFR50, NRC Draft Ps on Restructuring & Economic Deregulation of Electric Utility Industry ML20084H9251995-06-0202 June 1995 Comment Opposing Proposed Change in State Cooperative Agreements Program Concerning NRC Intention to Reduce Scope of Work.Believes That NRC Should Maintain Environ Monitoring Program & Find Other Ways to Reduce Duplicative Svcs ML20134K5021995-02-24024 February 1995 Transcript of 950224 Enforcement Conference in King of Prussia,Pa Re C Vondra.Pp 1-136 ML20134K4511995-02-0808 February 1995 Transcript of 950208 Enforcement Conference in King of Prussia,Pa Re Plant.Pp 1-93 ML20134K4791995-02-0808 February 1995 Transcript of 950208 Enforcement Conference in King of Prussia,Pa Re V Polizzi.Pp 1-115 ML20134K4971995-02-0808 February 1995 Transcript of 950208 Enforcement Conference in King of Prussia,Pa Re L Reiter.Pp 1-64 ML20080G8321995-02-0606 February 1995 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & low-power Operations for Npp.Encourages NRC to Reevaluate Regulatory Analyses in Light of Higher Costs.Concludes That Addl Rules on Shutdown & Low Power Operations Not Necessary ML20077L8631995-01-0303 January 1995 Comment Supporting Proposed Rules 10CFR2,51 & 54 Re NPP License Renewal.Util of Belief That Proposed Rev Reflect Positive Effort Towards Establishing Regulatory Process Requirements for Continued Operation of Nuclear Facilities ML20132B2281994-08-0202 August 1994 Transcript of 940802 Enforcement Conference in Salem,Nj W/Salem Senior Nuclear Shift Supervisor Involved in 940407 Event ML20067C1591994-02-17017 February 1994 Comments on NUREG/CR-5884 Re Analyses of Decommissioning for Ref PWR Power Station ML18100A5591993-08-26026 August 1993 Comment Opposing Proposed Rule Re Whistleblower Protection ML20126F2721992-12-21021 December 1992 Comment Endorsing Positions & Comments of NUMARC & BWROG Re Draft GL, Augmented Inservice Insp Requirments for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20091Q8661992-01-31031 January 1992 Comment Opposing Draft NUREG-1022,Rev 1, Event Reporting Sys,10CFR50.72 & 50.73,Clarification of NRC Sys & Guidelines for Reporting ML20072T2421991-04-11011 April 1991 Comment Re Proposed Change to 10CFR50.55A Re Inservice Testing of Containment Isolation Valves.Proposed Rule Should Be Revised to Allow Plants within Last 12 Months of Current Interval to Substitute Deferred Rv Shell Exams ML20235T1861989-02-24024 February 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants, Extension of NRC Authority to BOP Portion of Plant & Misapplication of Adequate Protection Std of Backfit Rule ML20195H0331988-11-21021 November 1988 Comment on Proposed Rule 10CFR26 Re Fitness for Duty Program Which Includes Random Drug Testing.Util Strongly Favors 180- Day Period for Implementation of Rule & 360-day Implementation Period for Random Drug Testing ML20153F9681988-08-17017 August 1988 Comment Opposing Proposed Rule 10CFR50 Re Licensee Flexibility During Natl Crisis.Deferral of Issuance of Final Rule Until Proper Implementation Guidance Formulated Encouraged ML20154G1421988-04-20020 April 1988 Comment Opposing Proposed Rules 10CFR50 & 73 Re Policy Statement on Nuclear Power Plant Access Authorization Program.Nrc Should Establish Program Mutually Agreed Upon Between Union & Util,Per Hope Creek & Salem Programs ML20154G4601988-04-18018 April 1988 Comment Opposing Proposed Rule 10CFR50 Re Notification of Inspector Visits to Facility ML18093A6331988-02-0101 February 1988 Comment Supporting Proposed Rule 10CFR50 Re Proposed Policy Statement on Integrated Schedules for Implementation of Plant Mods ML20151B3641987-02-24024 February 1987 Comment Opposing Proposed Rule 10CFR50 Re Licensing of Nuclear Power Plants Where State &/Or Local Govts Decline to Cooperate in Offsite Emergency Planning ML20079N4271984-01-25025 January 1984 Response to State of DE 840120 Motion to Withdraw Petition for Leave to Intervene.Licensee Concurs in Motion.Dismissal of Proceeding Requested.Certificate of Svc Encl ML20079K9311984-01-20020 January 1984 Motion to Withdraw Petition for Leave to Intervene & Request for Hearing Re Extension of Time for Type a Test.Certificate of Svc Encl ML20078P6771983-11-0404 November 1983 Answer to State of DE Atty General 831021 Petition for Leave to Intervene & Request for Hearing on License Amend Re Inservice Integrated Leak Tests.Notices of Appearance & Certificate of Svc Encl ML20078M1551983-10-21021 October 1983 Petition for Leave to Intervene & Request for Hearing on Proposed Issuance of Amend to License DPR-70 Re Inservice Integrated Leak Tests.Affidavit of Mailing Encl ML18087A8331983-04-12012 April 1983 Petition for Order to Show Cause Why Util Should Not Be Restrained from Restarting Facility Until Qualifications for Operation Demonstrated at Public Hearing ML18087A8341983-04-11011 April 1983 Affidavit of DG Bridenbaugh Re Delay of Facility Restart. Full Review of safety-related Equipment Must Be Completed & Appropriate Changes Implemented.Prof Qualifications Encl ML20213E3601983-03-0808 March 1983 Testimony Before Subcommittee on Energy & Environ Re Plant Licensing Concerns ML18086A9691981-10-14014 October 1981 Affidavit Confirming Validity of Util 811009 Response to IE Insp Repts 50-272/81-15 & 50-311/81-14 ML20005B6831981-08-20020 August 1981 Petition for Review of Aslab 810717 Order,Permitting OL Amend,Allowing Installation of New Storage Racks & Increasing Pool Capacity.Notice of Appearance & Affidavit of Svc Encl.Related Correspondence ML20010C1481981-08-14014 August 1981 Response in Opposition to Lower Alloways Creek Township 810803 Petition for Review of ALAB-650.Petitioner Has Raised No Issue Which Warrants Commission Consideration.Certificate of Svc Encl ML20009H2221981-08-0303 August 1981 Petition Supporting Review of Aslab Decision.Case Involves Matter That Could Significantly Affect Environ,Public Health & Safety & Involves,Important Procedural Issues & Public Policy Questions.Certificate of Svc Encl ML18086A5181981-05-15015 May 1981 Answer Opposing AC Coleman 810504 Request for Stay of Initial decision,LBP-80-27,pending Appeal.Request Untimely & Fails to Meet Requirements for Issuance of Stay. Certificate of Svc Encl ML18085A8401981-02-17017 February 1981 Brief Supporting ASLB 801027 Decision Authorizing OL Amend to Permit Storage of 1,170 Spent Fuel Elements in Facility Spent Fuel Pool.All Exceptions Should Be Denied.Aslb Has Adequately Weighed Evidence.Certificate of Svc Encl ML18085A5231981-01-13013 January 1981 Findings of Fact & Conclusions of Law in Support of 801111 Exceptions to ASLB 801027 Initial Decision Re Applicant Proposed Expansion of Fuel Storage.Certificate of Svc Encl ML18085A4091980-12-0808 December 1980 Response to Intervenors Eg & a Coleman Motion for Extension Until 810131 to File Brief in Support of Exceptions.Opposes Motion But Would Not Object to 2-wk Extension.Certificate of Svc Encl ML18085A4081980-12-0404 December 1980 Appeal from ASLB Initial Decision Granting Util Right to Increase Spent Fuel Pool Storage Capacity.Nepa Requires Detailed Analysis of Safety & Health Problems Posed by Reracking.Certificate of Svc Encl ML19340D3431980-11-30030 November 1980 Request for Extension to 810131 to File Brief in Support of Exceptions to ASLB 801027 Initial Decision Re Spent Fuel Pool Proceeding.Certification of Svc Encl ML18085A2791980-11-20020 November 1980 Notice of Withdrawal of Appearance as Counsel for Intervenors Coleman.Intervenors Coleman to Remain Parties to Proceeding.Certificate of Svc Encl ML18085A2501980-11-11011 November 1980 Appeal from ASLB 801027 Initial Decision.Alleges Erroneous Finding of Facts Re Contentions 2 & 6,evaluation of Eia, Acceptance of Pasedag Testimony & Rejection of Benjamin Testimony.Counsel Withdrawal & Certificate of Svc Encl ML18085A2161980-11-0404 November 1980 Exceptions & Appeal from ASLB 801027 Initial Decision. Exclusion of as Benjamin of Sandia Labs Testimony Is Arbitrary Due to Relevant Evidence Re Oxidation That Could Propagate to Older Fuel.Certificate of Svc Encl ML20062J4921980-10-21021 October 1980 Addl Testimony Presented Before ASLB to Correct & Clarify 800710 Testimony Re Loss of Water from Spent Fuel Storage Pool ML18082A7101980-07-11011 July 1980 Reply Findings of Fact & Conclusions of Law in Form of Partial Initial Decision Substituting for Licensee 800613 Findings,In Response to ASLB 800509 Order & ASLB 800626 Question 5 on away-from-reactor Issues.W/Certificate of Svc 1998-09-15
[Table view] Category:PLEADINGS
MONTHYEARML20079N4271984-01-25025 January 1984 Response to State of DE 840120 Motion to Withdraw Petition for Leave to Intervene.Licensee Concurs in Motion.Dismissal of Proceeding Requested.Certificate of Svc Encl ML18087A8331983-04-12012 April 1983 Petition for Order to Show Cause Why Util Should Not Be Restrained from Restarting Facility Until Qualifications for Operation Demonstrated at Public Hearing ML20005B6831981-08-20020 August 1981 Petition for Review of Aslab 810717 Order,Permitting OL Amend,Allowing Installation of New Storage Racks & Increasing Pool Capacity.Notice of Appearance & Affidavit of Svc Encl.Related Correspondence ML20010C1481981-08-14014 August 1981 Response in Opposition to Lower Alloways Creek Township 810803 Petition for Review of ALAB-650.Petitioner Has Raised No Issue Which Warrants Commission Consideration.Certificate of Svc Encl ML20009H2221981-08-0303 August 1981 Petition Supporting Review of Aslab Decision.Case Involves Matter That Could Significantly Affect Environ,Public Health & Safety & Involves,Important Procedural Issues & Public Policy Questions.Certificate of Svc Encl ML18086A5181981-05-15015 May 1981 Answer Opposing AC Coleman 810504 Request for Stay of Initial decision,LBP-80-27,pending Appeal.Request Untimely & Fails to Meet Requirements for Issuance of Stay. Certificate of Svc Encl ML18085A4091980-12-0808 December 1980 Response to Intervenors Eg & a Coleman Motion for Extension Until 810131 to File Brief in Support of Exceptions.Opposes Motion But Would Not Object to 2-wk Extension.Certificate of Svc Encl ML18085A4081980-12-0404 December 1980 Appeal from ASLB Initial Decision Granting Util Right to Increase Spent Fuel Pool Storage Capacity.Nepa Requires Detailed Analysis of Safety & Health Problems Posed by Reracking.Certificate of Svc Encl ML19340D3431980-11-30030 November 1980 Request for Extension to 810131 to File Brief in Support of Exceptions to ASLB 801027 Initial Decision Re Spent Fuel Pool Proceeding.Certification of Svc Encl ML18085A2501980-11-11011 November 1980 Appeal from ASLB 801027 Initial Decision.Alleges Erroneous Finding of Facts Re Contentions 2 & 6,evaluation of Eia, Acceptance of Pasedag Testimony & Rejection of Benjamin Testimony.Counsel Withdrawal & Certificate of Svc Encl ML18085A2161980-11-0404 November 1980 Exceptions & Appeal from ASLB 801027 Initial Decision. Exclusion of as Benjamin of Sandia Labs Testimony Is Arbitrary Due to Relevant Evidence Re Oxidation That Could Propagate to Older Fuel.Certificate of Svc Encl ML18082A5481980-05-23023 May 1980 Proposed Corrections for 800430 Evidentiary Hearing Transcript.Certificate of Svc Encl ML18082A5281980-05-13013 May 1980 Proposed Corrections to Transcript of 800328-29 Evidentiary Hearings.Certificate of Svc Encl ML18082A5261980-05-13013 May 1980 Request for Extension Until 800528 to File Transcript Corrections.States No Objection to NRC Motion for Similar Extension.Transcript Not Yet Received in Licensee Newark,Nj Ofc ML19323A9571980-04-21021 April 1980 Response in Opposition to Webb,Fankhauser & Portion of NRC Testimonies Based on Class 9 Accident Scenarios.Testimony Beyond ASLB Jurisdiction & Should Not Be Admitted Into Evidence.Certificate of Svc Encl ML18082A5011980-04-18018 April 1980 Reply in Opposition to Licensee Response to ASLB 800222 Memorandum & Order,Question 5,re Spent Fuel Pool Gross Loss of Water.Urges to Strike Testimony W/Appropriate Sanctions ML18082A4991980-04-18018 April 1980 Motion to Strike Licensee 800410 Response to ASLB 800222 Memorandum & Order,Question 5,re Spent Fuel Pool Gross Loss of Water.Licensee Should Be Barred from Participation or Compelled to File Testimony Due to Dilatory Conduct ML18082A5021980-04-18018 April 1980 Response in Opposition to NRC Testimony of Wf Pasedag Re ASLB Question 5.Spent Fuel Pool Old Fuel Would Be Involved in Enlargement Case & Would Consequently Increase Radiological Effects.Certificate of Svc Encl ML19305D7371980-04-11011 April 1980 Comments in Opposition to Township of Lower Alloways Creek 800325 Request for Suspension of Issuance of OL Per 10CFR2.206.Urges Denial Due to Untimeliness of Petition & Inadequacy of Allegations Re Noncompliance W/Nepa Rules ML19323D1891980-04-10010 April 1980 Response to ASLB Question 5 Re Gross Loss of Water from Facility Spent Fuel Pool.Loss Will Have No Adverse Consequences on Public Health & Safety Due to Adequate Cooling Achieved in Facility.Prof Qualifications Encl ML19323D5131980-04-0909 April 1980 Forwards Re Webb Technical Rept,In Response to ASLB 800222 Order Re Consequences of Gross Water Loss from Spent Fuel Storage Pool.Certificate of Svc Encl ML19305E7281980-04-0909 April 1980 Response Enclosing DB Fankhauser Testimony in Reply to ASLB 800222 Order Re Consequences of Gross Water Loss from Spent Fuel Storage Pool.Certificate of Svc Encl ML19309A4931980-03-25025 March 1980 Request for Suspension or Moratorium on Issuance of OL for Facility,Pending Conclusion of ASLB Hearing on Safety of Spent Fuel Storage Pool at Unit 1.Notice of Appearance of Cj Valore on Behalf of Intervenor Encl ML18082A1391980-03-25025 March 1980 Intervenor Request for Suspension or Moratorium on Issuance of Ol.Issuance Would Permit Same Enlarged Spent Fuel Pool That Is Subject of Ongoing Hearing ML18082A1301980-03-19019 March 1980 Motion for 30-day Extension to File Testimony Re Consequences of Water Loss from Spent Fuel Storage Pool. Urges Postponement of 800422 Evidentiary Hearing, Accordingly.Notice of Appearance & Certificate of Svc Encl ML18081B0861980-02-14014 February 1980 Request for Taking Official Notice of White House 800212, Fact Sheet,President'S Program on Radwaste Mgt, Due to Relevancy of First Bullet,Page 2 & Third Bullet,Page 6.W/ Certificate of Svc & Fact Sheet ML18081A8881980-01-10010 January 1980 Opposition to Intervenors Coleman 791018 Request for Action Under 10CFR2.206.NRC Fulfilled Statutory Duty Per Endangered Species Act.No New Matters Raised by Intervenors Request ML18081A8171979-12-18018 December 1979 Opposition to Public Advocate of State of Nj 791106 Request to Reopen Intervenors Coleman Contention 9.Appeal Is Proper Procedure If Intervenors Dissatisfied W/Aslb Initial Decision.Certificate of Svc Encl ML18081A7471979-11-13013 November 1979 Response in Opposition to Public Advocate of State of Nj 791030 Supplemental Argument Supporting Motion for Reconsideration of Colemans Contention 13.Colemans Failed to Demonstrate Relevance of Claim.Certificate of Svc Encl ML18081A6971979-10-30030 October 1979 Supplemental Argument on Behalf of Intervenors Coleman to Reopen Coleman Contention 13 Re Reracking of Spent Fuel Pool.Actual Figures of Radiation Exposure During Reracking of Peach Bottom Nuclear Station Never Received ML18081A4181979-10-18018 October 1979 Petition Seeking NRC Issuance of Show Cause Order for Suspension &/Or Revocation of Ols.Operation of Facility Would Threaten Local Existence of short-nosed Sturgeon. Affidavit & Certificate of Svc Encl ML18081A4871979-10-18018 October 1979 Seeks Show Cause Order & Suspension or Revocation of OL for Unit 1 & Stay or Licensing & Suspension or Revocation of CP for Unit 2.No Eia Performed Re Impact on Endangered Fish Species.Certificate of Svc Encl ML18079A9711979-09-20020 September 1979 Applicant Comments on Request of Intervenors Coleman for Issuance of Order to Show Cause for Stay ML18079B0891979-08-31031 August 1979 Opposes Intervenors Coleman 790801 Request That ASLB Reopen Record for Newly Discovered Evidence Re Contentions 2 & 6. Insp Document Has No Relevance & No Significance to Proceeding ML19249B8201979-08-31031 August 1979 Petition to Amend 790802 Motion for Issuance of Show Cause Order & Stay of Licensing Procedure.Adds Addendum 7A & Contentions 8-10.Certificate of Svc Encl ML19209C3871979-08-31031 August 1979 Motion,Submitted by Intervenors Coleman,That NRC Amend Request for Order to Show Cause & Stay Licensing.Seek Addl Contentions Re Cost/Benefit Analysis,Seismic Analysis & Class 9 Accidents ML18081A4141979-08-31031 August 1979 Seeks Denial of Intervenors Coleman 790802 Motion for Reconsideration of Contention 13 Re Release of Radioactive Matl.No Justification for Late Filing.Criteria for Compliance W/Operation Objectives Defined in 10CFR50,App I ML18079B1161979-08-29029 August 1979 Request by Intervenors Coleman That ASLB Accept Addl Argument on ASLB Question 4 Re Consideration of Class 9 Accidents.Nrc Admits That TMI Accident Was Class 9. Certificate of Svc Encl ML18079B1151979-08-27027 August 1979 Response to ASLB Question 4 Re Class 9 Accidents.Tmi 790328 Accident Was Class 9,constituting Successive Failures of Operator Procedures & Equipment.Testimony in Present Proceedings Requires Wide Latitude.Certificate of Svc Encl ML18079B0881979-08-21021 August 1979 Response to ASLB Question 4,submitted on Behalf of Intervenors Coleman.Alleges TMI Accident Was Class 9 Accident.Accident Posed Significant Risk to Health & Safety of Population & Environ.Certificate of Svc Encl ML18079B0611979-08-20020 August 1979 Responds to Question 4 of ASLB 790710 Order.Forwards C Kepford Rept on TMI Accident.Prof Qualifications & Certificate of Svc Encl ML18081A4111979-08-10010 August 1979 Requests That ASLB Order Extension Until 790831 for Response to Intervenors Coleman Request to Reopen Consideration of Contentions 2 & 6 ML18079B0461979-08-0303 August 1979 Forwards Re Webb 790723 Rept, TMI Accident:Was It Class 9 Accident, in Response to ASLB 790710 Question 4 ML19208C3681979-08-0202 August 1979 Requests Issuance of Order to Show Cause & Stay of Licensing Per 10CFR2.202 & 2.206.NRC Has Failed to Act on Info Re PA-NJ-MD Grid,Cost/Benefit Analysis,Expansion of Spent Fuel Pool & Lessons Learned Re TMI ML18079B0851979-08-0202 August 1979 Request by Intervenors Coleman That ASLB Reconsider Dismissal of Contention 13.Intervenor State of Nj Supports Motion.Util Is Obliged Per 10CFR50 to Explore Alternatives to Spent Fuel Pool Expansion ML19225D1441979-08-0202 August 1979 Request That NRC Issue Order to Show Cause & Request to Stay Licensing.Requests Intervenor Status.Submits List of Contentions & Partial List of Resouce Documents.Certificate of Svc Encl ML18079B0871979-08-0101 August 1979 Request by Intervenors Coleman That ASLB Reopen Record Re Contentions 2 & 6.Intervenor State of Nj Supports Motion. Experiences at Northern State Power Co Are Pertinent to Proceedings ML18079A7621979-07-0909 July 1979 Response Submitted by Intervernor Township of Lower Alloways Creek to NRC Motion to Strike Portions of Re Webb & EA Gulbransen Testimony Re ASLB 790418 Order. Affidavit of EA Gulbransen & Certificate of Svc Encl ML18079A8311979-07-0606 July 1979 Request Submitted by Util for Denial of Intervenors Coleman 790625 Request for Reconsideration of Dismissal of Coleman Contention 7.NRC Must Remand Matter to Aslb. Certificate of Svc Encl ML18079A8291979-07-0606 July 1979 Request Submitted by Util for Denial of Intervenors Coleman 790626 Request That ASLB Compel Licensee to Suppl Responses to Interrogatories 1,3 & 6.Questions Have No Relation to Grid Strap Problem 1984-01-25
[Table view] |
Text
..
.
NRC PUBLIC DOCU3ETI ROOh!,
a %
UNITED STATES OF AMERICA co q ,,
NUCLEAR REGULATORY COMMISSION .
p.
-
s e 6 \S-[3 Y v;
,, osikfc
c' In the Matter of a PUBLIC SERVICE ELECTRIC & : Docket No. 50-311 GAS COMPANY Proposed Issuance i of Operating (Salem Nuclear Generating License CPPR-53 Station, Unit No. 2) :
PETITION SEEKING ISSUANCE OF AN ORDER TO SHOW CAUSE REQUEST TO STAY LICENSING - MOTION TO AMEND PETITION Alfred C. Coleman, Jr. and Eleanor G. Coleman (husband and wife) hereby petition the Nuclear Regulatory Commission to amend our Petition Seeking Issuance of an Order to Show Cause and Request to Stay Licensing of the Salem Nuclear Generating Station Unit No. 2.
The authority for this request is granted by the Atomic Energy Act of 1954, as amended (the Act) and.the regulation in Title 10 Code of Federal Regulations, Part 2 730 Motions.
Additional research and investigation has uncovered substantive information which should be considered during your deliberation.
ADDENDUM NO. 7A 7A. The Nuclear Regulatory Commission has failed to require the licensee and/or the manufacture of reactor /
steam generators to retrofit, as a result of testing, evaluating and analysis from " lessons learned" from the 1146 292 mois o Z$q
-
.
1974 incident in Switzerland (Westinghouse Reactor) and Davis-Besse Unit No. 1, Ohio (Licensee: Toledo Edison Co. - Docket No.
50-346).
ADDITT_0NAL CONTENTIONS
- 8. The Nuclear Regulatory Commission has failed to require of the licensee cost-benefit analysis and consideration of alternative conversion of Salem No. 2 to natural gas or coal.
(Final Environmental Impact Statement - Docket Nos. 50-272 and 50-311 - April,1973 - Pages 10 Alternatires,10-1 through 10-17 and 12-9 (12Q) and '.2-16 (12X). The NRC has failed to require in their analysis of " Request fo r Additional Financial Information Concerning Unit No. 2" (NRC request to PSE&G, April 18, 1978 -
~
Olan D. Parr to R. L. Mittl) the alternative of conversion to natural ga's or coal.
C. The NRC has failed to review and compel licensee to explain apparent discrepancies in seismic findings by Dames 4 Moore for PSE&G and Delmarva Power and Light Co. (Summit Nuclear Plant - Delaware) as it relates to the effect of a possible earthquak e . The final Safety Analysis Report reflects there is no earthquake fault in the vicinity of Artificial Island, site of Salem Nuclear Generating Station No. 1 and 2.
This appears to be in contrast to the study and findings
.
1146 293
-
.
of the Univeruity of Delaware which states there is a fault down the middle of the Delaware River. This study is available to the NRC Staff. The NRC Staff order for seismic inspection of 29 reactors failed to include reactor contaiament structure, fuel handling and spent fuel pool facilities. Tais must be deter ,' y prior to licensing Salem Unit No. 2. (Attachment -
Article from "Today's Sunbeam," August 24, 1979) The NRC is already aware of the condition of the containment building (reactor) (cracks - NRC inspection report) and is unable to determine width, depth, r,xtent or cause because of sand blasting by licensee trior to NRC inspection. _
- 10. The NRC has failed to require the licensee to consider evaluate, and analyze the possible effects of a Class 9 accident for the Salem Nuclear Generating Station.
Refer Final Environmental Impact Statement (FEIS) dated April, 1973, page 7-1 paragraph starting with, "The applicant's report has been evaluated, using the standard accident assumptions and guidance issued as a proposed amendment to Appendix D of CFR Part 50 by the Commission on December 1, 1971. Nine classes...."
Durther refer to Table 71, page 7-2 O US), Classification of Postulated Accidents and Occurrences, Cla,s 9 0 Hypothetical sequence of failures more severe than Class 8.0 - Not considered.
1146 294
As a result of a request (under Freedom of Information to NRC) to the NRC, I received correspondence on August 22, 1979 (FOIA-79-288) referring to PSE&G's correspondence dated November 12, 1973, which was submitted as Amendment No. 25 to the applications under Docket Nos. 50-272 and >S-311.
Referring to Exhibit V, Page 1, Board of Directors, Janmery 16, 1968 (Public Service Electric & Gas Company), the chairman stated that,". . .in discussions with the Adv isory Committee on Reactor Safeguards and the staff of the Atomic Energy Commission '(present NRC) it was indicated they were unwilling to recommend that the Atomic Energy Commission issue a _icense at this time for the construction of nuclear units at '.he proposed site of Burlington Nuclear Generating Station because of its proximity to densely populated areas (with emphasis),
and that accordingly the Company (PSE&G) has investigated alternative sites." Further, "...instead on a tract of land of approximately 700 acres, in Lower Alloways Creek Township, Salem County, New Jersey (Artificial Island)."
There is no question that the Staff of the Advisory Committee on Reactor Safeguards and staff of the Atomic Energy Commission did, in fact, consider an hypothetical sequence of
.u-1146 295
failures core severe than a Class 8, an " extraordinary occurrence."
The licensee sendment was considered and accepted by the Staff (AEC-NRC) based on their (NRC) consideration of population density and its effect (Class 9 accident - greater than a Class 8) on the health, safety and welfare of the people living in the vicinity of the then, proposed Burlington Nuclear Generating Stations No. 1 and 2, on the east bank of the Delawat e River on the boundary be-tween Burlington City and Burlington Township, Burlington County, New Jersey.
The change in location, based on population density, to Artificial Island (low population) is an admission on the part of the NRC (previously AEC) of hypothetical accident greater than a Class 8. Even the "so-called" low probability of Class 9 was sufficient to change the siting of the Burlington facilities to Artificial Island, Lower Alloways Creek, Salem County.
Until March 28, 1979 (Three-Mile Island Unit No. 2), an incident or worst-possible-case accident had not been considered possible (Class 9), yet the NRC Staff has concluded, "
...the Staff nonetheless concludes that the accident at Three-Mile Island was a Class 9 accident (NRC Staff Response to Board Question No. 4, dated August 24, 1979, Docket No. 50-272 signed by Counsel for NRC Staff, Barry H. Smith)."
We hereby file a Motion to Amend and add Contentions 8, 9 and 10 because of substantive information received after the original petition was submitted on Augus+ 2,1979.
-
1146 296
- Dates Alfred C. Coleman Eleanor G. Coleman
Seismic safeguards .
-
delay Salem I start "
m computer codes and examining pipe t ny DAVID AI.TANEft hangers and straps for minute cracks, C 3 Sunbeam Staff 1,0WER AI,1,0 WAYS CHEEK-The according to l ublic Service and Electric I
.- =::r
, and Gas (PSE&G) ro spokesman e
$ re+pening of the shut-down Salem I reactor will he delayed one more time, Pat rick Wheeler. Calling the analysis an
' involved and lengthy process," y ,.fy 4 3 ~
,
as cor. par.y e mployees conduct a Wheeler said company technicians and b.
Nuc! car Iteguktory Commission-order. outside consultants were working ed inspection. ' over-time on the protect.
- The reactor shut down in early April, The pipes, for the most part, supply f and had been scheduled to go back into cooling water to the reactor, and range y 4 D operation in June. But a series of I in sire from one inch to three feet in dia-mechanical problems ranging from meter, Wheeler said.
g', broken control rods to torn fuel Company estimates on how much g assembly straps have several times money the shutdawn is costing con-
- g delayed the opening, this time until at sumers ranges from $300,004$500,000 a .
least mid4)ctober, y r,,,,) day, depending on where the replace- '
7 -
Salem I is among 29 reactors in the ment energy is coming from, and how h country being asked to shut down in order to undergo testing in order to much electricity is in demand. /
g determine their ability to withstand The first problem discovered at the rn reactor since it shut down for refueling
, earthquakes. was in May, when company employees
,
-
The move is similar to a NRC-ordered discovered straps used to hold the fuel ,,.A h shutdown of five nucIcar reactors in assemblies in place had accidently
February. 'The NRC ordered the reac. lecome lorn. It was remedied by replac-
,
tors to close down because of errors in ing the assemblies with torn straps with CD computer codes, or because estimates of some that had been scheduled for
,a earthquake probability were too conser. removal. ,
/,
>' vative. In early June, several control rods The analysis will involve checking ~ ,,
were found to have been broke'n, Control
[-. rods regulate the speed'of the fission process within the reactor. When the rods are fully inserted, the process 7 stops. When they are fully withdrawn, .{ ]
the reactor operates at full speed. Alj l The broken control rods were replaced
.
,
uith new ones from the Salem 11 reac- g
/
( In late June, cracks were discovered in the lines that feed water to the steam M~ f [
sem see. ., u.,,, o.,,,,
} generators (boilers) in the reactor. All four pipelines wm recently replaced. EARTIIQUAKE TESTING-The re-opening of Salem I will be The most recent prob.t.n was a mass delayed by an NRC-ordered testing for capability to withstand of highly radioactjve material discover- earth uakes. Ab , PSE&G spokesman Patrick Wheeler poims at ed lodged in a pipe leading from the the type of Pi Pes and the,r i straps which will be examined in the test reactor's core to a large tank containing .
water used during refueling. The piece Ing. The picture, however, shows not Salem I, out its identical twm,
,
of material, teheved to be a resin build- Salem II
-
up caused by a faulty filter, was flushed
.
,
out and removed
"
,