ML19197A131

From kanterella
Revision as of 01:14, 16 August 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC-2018-000831 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed. Part 3 of 3
ML19197A131
Person / Time
Issue date: 07/09/2019
From:
NRC/OCIO
To:
Shared Package
ML19197A143 List:
References
FOIA, NRC-2018-000831
Download: ML19197A131 (106)


Text

1 UNITED STATES NUCLEAR REGULATORY COMMISSION

+ + + + +

BRIEFING ON THE STATUS OF SUBSEQUENT LICENSING RENEWAL PREPARATIONS

+ + + + +

WEDNESDAY, APRIL 26, 2017

+ + + + + ROCKVILLE, MARYLAND

+ + + + + The Commission met in the Commissioners' Hearing Room at the Nuclear Regulatory Commission, One White Flint North, 11555 Rockville Pike, at 8:58 a.m., Kristine L. Svinicki, Chairman, presiding.

COMMISSION MEMBERS:

KRISTINE L. SVINICKI, Chairman JEFF BARAN, Commissioner

STEPHEN G. BURNS, Commissioner

ALSO PRESENT:

ANNETTE VIETTI-COOK, Secr etary of the Commission MARGARET DOANE, General Counsel

2 EXTERNAL PANELISTS PRESENT: PAUL AITKEN, Manager, Second License Renewal, Dominion Resources, Surry Po wer Station, Units 1 and 2 SHERRY BERNHOFT, Pr ogram Manager, Long Term Operations, Electric Power Research Institute MICHAEL GALLAGHER, Vice Pr esident, License Renewal Projects, Exelon Generation Co., LLC, Peach

Bottom Atomic Power Station, Units 2 and 3 DAVID LOCHBAUM, Director, Nuclear Safety Project, Union of Concerned Scientists RICHARD REISTER, Director, Light Water Reactor Sustainability Program, U.S. Department of Energy S. JASON REMER, Director, Plant Life Extension, Nuclear Energy Institute

NRC STAFF PRESENT:

VICTOR MCCREE, Executive Director for Operations STEVE BLOOM, Office of Nucl ear Regulatory Regulation MICHELE EVANS, Deputy Directo r, Officer of Nuclear Regulatory Regulation ALLEN HISER, Senior Tec hnical Advisor for License Renewal Aging Management, Division of License

Renewal, Office of Nucl ear Reactor Regulation JOHN PARILLO, Office of Nu clear Regulatory Regulation JEFFREY POEHLER, Office of Nuclear Reactor Regulation

3 BRIAN THOMAS, Director, Division of Engineering, Office of Nuclear Regulatory Research GEORGE WILSON, Director, Division of License Renewal, Office of Nucl ear Reactor Regulation

4 P R O C E E D I N G S 1 8:58 a.m.

2 Good morning and we will begin our topical meeting on 3 subsequent license renewal preparations.

Could I ask the panelists for the first 4 panel to please take their seats?

5 Good morning. Again, thank you all for being here today and 6 to our panelists on both panels for presenting to the Commission this morning.

7 We need for the Commission to entertain a discussion on the 8 status of issues related to subsequent license renewal appl ication and the NRC 9 staff's preparedness to review an application. Since the Commission's action 10 on this matter substantively in 2014, the staff has continued to work on the 11 Guidance and other documents that will guide their reviews of subsequent 12 license renewal applications and the Commission. I think that this is very timely 13 that we meet today to hear a status of the staff's work and also to hear from a 14 panel of outside participants, who will provide us with perspectives both on how 15 that work has developed and also other status updates and information relevant 16 to the topic.

17 Before we begin, I would ask if my colleagues have any 18 opening comments. Okay, thank you.

19 With that, let us then turn to the External Panel. I will simply 20 just do an introduction of each of the panelists and then we can begin. And if 21 you all can hand off to each other in the order in which you are seated, that 22 would be very helpful. Thank you.

23 So we will begin with Richard Reister, director of the Light 24 Water Reactor Sustainability Program fr om the U.S. Department of Energy.

25 We will also hear from Sherry Bernhoft, the Program Manager 26 5 of Long-Term Operations at the Electric Power Research Institute.

1 Following Sherry, we will hear from Jason Remer, Director of 2 Plant Life Extension of the Nuclear Energy Institute.

3 Next we will hear from Michael Gallagher, Vice President 4 License Renewal Projects of Exelon Generation Company.

5 Following that we will hear from Paul Aitken, Manager -- I'm 6 sorry if I have mispronounced anyone's names. I hope you will correct me 7 when you begin your talk. Paul is the Manager of Second License Renewal for 8 Dominion Resources.

9 And we will than hear from Mr. David Lochbaum, Director 10 Nuclear Safety Project Union of Concerned Scientists.

11 Thank you all again for participating in this morning's meeting.

12 Let's begin with Mr. Reister.

13 MR. REISTER: Good morning and thank you for inviting me 14 here today to discuss the Department of Energy Office of Nuclear Energy's 15 program on Light Water Reactor Sustainability or LWRS, as we say.

16 The LWRS program began in 2009 with the recognition that the 17 U.S. Government had a strategic interest in the long-term operation of our 18 existing fleet of nuclear power plants in support of energy security, which 19 includes attributes such as fuel supply, diversity, and grid reliability, and to help 20 avoid or at least defer the high cost of building replacement capacity.

21 The LWRS program has par tnered with industry and the 22 Nuclear Regulatory Commission to closely coordinate our research needs and 23 share costs. Next slide. I guess -- oh, there we go.

24 This graph illustrates the current and projected capacity of 25 existing nuclear power plants with 40-, 60-, and 80-year licenses, accounting for 26 6 publicly announced shutdowns and ongoing new construction. Assuming all 1 plants receive 60-year licenses, the slope of retirements of very steep, about 2 five plants per year in the 2030 to 2035 time frame.

3 The rate of retirements that would occur without subsequent 4 license renewal would clearly present a significant challenge to our electricity 5 supply, infrastructure, and our energy security. Next slide.

6 The key objectives of the light water reactor sustainability 7 program is to extend the life of our existing fleet of operating plants but this can 8 only be accomplished if they remain safe and economic to operate. The LWRS 9 research program has four main technical focus areas: materials, aging, and 10 degradation; advanced instrumentation, information, and control system 11 technologies for improving performance and economics through better use of 12 digital technologies; risk-informed safety margin characterization, which 13 develops advanced modeling and simulation capabilities to better manage 14 safety margins; and reactor safety technologies, which examines severe 15 accident progression and supports improvements to severe accident 16 management guidelines.

17 I will focus on the materials area in more detail, since it directly 18 relates to the licensing topic. Next slide.

19 The LWRS program conducts research that is generally longer 20 term, higher risk than what industry typically performs, along with materials 21 issues typically a focus of licensing. The LWRS address long-term viability or 22 economics of continued plant operation. We believe this federal program, by 23 reducing uncertainty, helps create an environment for industry to make the long-24 term investments necessary to keep these plants operating safely and 25 efficiently.

26 7 As plants age, the potential for material degradation occurs.

1 Our research is focused on being proactive by conducting research on relevant 2 materials. This includes materials harvested from plants and materials that 3 undergo accelerated aging.

4 When possible, mechanistic aging models are developed and 5 validated. The results of our research are used by industry and the regulator 6 to inform an update of their Aging Management Programs. More than half of 7 our research funds are devoted to materials research.

8 For material degradation issues, we cover these five elements:

9 the collection of high-quality data on observed degradation; determining the 10 underlying physical phenomena causing the degradation; development of 11 mechanistic models, based on the physi cal mechanisms rather than just 12 empirical trends; developing improved monitoring techniques by taking 13 advantage of new sensors and advanced data analysis; and investigating 14 mitigation strategies to limit degradation and, if needed, economic repair or 15 replacement with materials less susceptible to degradation. Next slide.

16 The expanded material degradation assessment was a joint 17 DOE and NRC effort to determine knowledge gaps, along with our associated 18 risk significance. This assessment helped us working with EPRI and NRC to 19 determine the key areas of focus of our research in reactor pressure vessels, 20 core internals and piping, concrete, and cables. We believe we made 21 significant progress in our understanding of degradation in these areas. No 22 technical showstoppers to long-term operation have been identified through our 23 research.

24 Our research continues to improve our understanding and 25 reduce uncertainties which can be used to further improve Aging Management 26 8 Programs. Next slide.

1 The embrittlement of reactor pressure vessels has been 2 generally understood and managed for many years. Our research is being 3 conducted on test specimens that hav e undergone accelerated irradiation at 4 test reactors and will soon include samples collected from a shutdown Zion 5 plant. 6 Based on research to date, U.S. reactor pressure vessel 7 embrittlement or hardening of the steel is following predicted trends and 8 appears to be managed well within the 60- to 80-year time period. Continued 9 research will help develop RPV embrittlement models that go beyond 80 years.

10 Next slide.

11 Our research on core internals has focused on conducting 12 microstructural evaluations of both laboratory materials irradiated in test 13 reactors and the examination of materials taken from operating reactors. We're 14 using the results of this research to develop and validate physics-based models 15 of key degradation mechanisms. These models can be used by industry to 16 better understand and manage core internal degradation as plants age. Next 17 slide. 18 We are conducting research on the effects of fatigue and 19 thermal aging on reactor piping materials. Current fatigue models use 20 empirical methods based on testing conducted in air, rather than water. We 21 have developed a thermal fatigue model for reactor pressure vessel structures 22 which will be developed further next year to focus on the dissimilar metal weld 23 transitions at the nozzles. Our current effort is on completing the thermal 24 fatigue model for a PWR surge line pipe. In both models, fatigue life is based 25 on more realistic conditions that can account for actual plant operating history.

26 9 These aging models will be validated based on operat ing experience within 1 vessel materials and service materials. Next slide.

2 Concrete makes up the largest volume of materials used in 3 nuclear power plants. We are conducting research on two forms of concrete 4 degradation, irradiation and alkali-silica reaction, or ASR.

5 ASR effects can appear to be contradictory. When sheer 6 reinforcement is present, the expansion due to ASR results in a pre-stressing of 7 concrete that favors an increase in sheer capacity. In other words, it gets 8 stronger. However, excessive ASR-induced self-pre-stressing may cause 9 reinforcement yielding and failure. Of particular concern is the case of beams 10 or slabs in the absence of sheer reinforcement.

11 Through our research, we hope to provide a better predictive 12 capability for ASR's long-term impact on the structural integrity of large 13 reinforced concrete structures. Generally, our research indicates that concrete 14 structures have significant safety margins during the 60- to 80-year time period.

15 We are also developing advanced nondestructive examination techniques for 16 thick concrete structures. Next slide.

17 In the absence of either mechanical injuries or the presence of 18 unplanned environmental conditions, cables have an excellent history of long-19 term performance. Our research is focused on developing a predictive aging 20 model that will encompass most of the cable types used at U.S. plants.

21 Working in collaboration with the NRC's Office of Research and 22 the Electrical Power Research Institute, we have harvested cables from 23 operating and shutdown plants to help validate our aging models. We are also 24 investigating promising nondestructive ex amination technologies that may help 25 predict remaining useful life. Next slide.

26 10 In summary, DOE research is focused on supporting continued 1 safe and economic operation of our existing fleet. We are proactively focusing 2 on degradation that might occur beyond 60 years of operation.

3 Our research has not identified any technical showstoppers to 4 long-term operation. We are developing improved materials monitoring 5 techniques that will help detect degradation earlier, should it occur. We work 6 with industry so that our research results can be used to update and enhance 7 their Aging Management Programs.

8 Thank you.

9 CHAIRMAN SVINICKI: Sherry, please proceed.

10 MS. BERNHOFT: Yes, thank you. Good morning. I'm 11 happy to be here today to provide an update on the EPRI research efforts to 12 support the technical basis for subsequent license renewal or SLR.

13 Our long-term operations program actually has two purposes.

14 The first purpose is to provide technical information to the utility plant owners, 15 the decision-makers, so they can make informed decisions about plant long-16 term operations. The second purpose of our program is to support and inform 17 the technical basis for the Aging Management Programs. Next slide, please.

18 I last presented to this committee on May 8, 2014. At that time, 19 the conclusion was that the technical basis for aging management is well-20 established and in use. The Aging Management Programs, that is the AMPs, 21 ensure detection of aging effects, provide the technical basis for assessment, 22 and, as needed, corrective actions. This conclusion remains unchanged.

23 The overhead depicts the elements from the EPRI reports that 24 are incorporated into utility Aging Management Programs. The NRC Generic 25 Aging Lessons-Learned Report, or the GALL, or SLR, references over 125 of 26 11 the EPRI Technical Reports as the basis for aging management.

1 With this, research continues working with our research 2 partners, such as the DOE and NRC research to further enhance our ability for 3 aging management and assessment. This includes but is not limited to 4 improved modeling, improved inspection technologies, advances in 5 assessment, and evaluation methodologies and online condition monitoring.

6 In addition, we also look for opportunity to harvest materials where that can add 7 to the database and knowledge as well. Next slide, please.

8 Our research for SLR is built on EPRI's living issue 9 management programs. This approach encompasses decades of research on 10 reactor pressure vessels, metals, concrete, and electrical cables. A former 11 process to review and prioritize our research needs, the collaboration with the 12 Department of Energy, NRC Research and international research partners, 13 coordination under NEI Initiative 03-08 -- 03-08 is the industry standard for 14 inspection assessment and sharing of in formation from th e Aging Management 15 Programs; and technology tr ansfer, which includes supporting the lead plants.

16 The technical basis for the reports are and will continue to be 17 updated based on the research findings, operating experience and inspection 18 results. Next slide, please.

19 As identified, there are four key technical areas for research for 20 the subsequent license renewal. Joint research roadmaps were developed 21 and substantial progress has been made in these four areas. Over the past 22 several years, EPRI and DOE have interacted with the NRC Division of License 23 Renewal and Research Staff, and held a number of deep-dive technical 24 discussions, provided updates to the ACRS License Renewal Subcommittee 25 and full committee, participated in a number of public meetings, and have made 26 12 our Technical Reports available to the NRC staff. Next slide, please.

1 For reactor pressure vessels, the aging management effect to 2 be managed is reduction in fracture toughness of the vessel material due to 3 irradiation. The vessel material properties are assured through periodic 4 removal and testing of surveillance specimens to establish trend correlations.

5 As Rich mentioned, there is a well-established embrittlement trend correlation 6 to predict material properties out to 80 years of operation. However, we 7 recognize additional data will enhance these trend correlations and programs 8 have been established. For the PWRs, which have a higher fluence than the 9 BWRs, EPRI and the industry are working together to implement the PWR 10 Coordinate Surveillance Capsule Program and the Supplemental Program to 11 gain additional data.

12 For the BWRs, there is an existing method to fulfill the 13 surveillance requirements with an integrated program. We ar e working with the 14 BWRs to extend this program for the period of SLR. Next slide, please.

15 For reactor pressure vessel internals, the degradation that 16 occurs is irradiated-assisted stress corrosion cracking or IASCC of the stainless 17 steels as a result of neutron fluence in the operating environment. The EPRI 18 materials programs for PWRs and BWRs have published management 19 guidelines which are referenced in the AMPs. These reports provide the basis 20 for inspection scope, frequency, a ssessment, and repair and replacement 21 criteria. These fall under the NEI Initiative 03-08 that I previously discussed.

22 A recent example is the fall 2016 baffle former bolt inspections.

23 The occurrence of IASCC was anticipated, which is why the guidance was 24 developed. The inspection results were documented and evaluated.

25 Notifications have been provided and interim guidance has already been shared 26 13 with the industry, in addition to a number of technical briefings with the NRC 1 staff and the ACRS. This demonstrates the effectiveness of the programmatic 2 approach under NEI 03-08 and the Aging Management Programs.

3 In collaboration with other research parties, significant progress 4 has been made on the crack growth rate modeling and this data has been used 5 to develop crack growth rate criteria that is being used in the ASME Code.

6 Harvesting of materials have also provided an opportunity for fu rther testing and 7 evaluation.

8 EPRI is leading an international project of which the NRC is a 9 member, that harvested internal materials from the Zorita plant in Spain.

10 Testing of the actual materials to date has confirmed the existing models are 11 conservative for defining AISCC thresholds and crack growth rates. Next slide, 12 please. 13 Moving to the area of concrete, EPRI has performed research 14 on concrete structures for several years and has made significant progress.

15 The main area of study for SLR is the alkali-silica reactions and the irradiation 16 and gamma heating effects.

17 For ASR there is operating experience from a plant in Canada, 18 one in the U.S., and extensive information available from the Department of 19 Transportation.

20 EPRI has published reports on screening for ASR and 21 guidance if ASR is detected. We are publishing a series of white papers and a 22 comprehensive ASR aging management guidance later this year. Research 23 continues on nondestructive methods to detect for ASR and modeling to 24 improve growth rate predictions and structural assessments.

25 Substantial research has been completed on the area of 26 14 assessing the impacts of irradiation effects on concrete. Fundamental work 1 was completed by the DOE program and was used to build a PWR biological 2 shield final element analysis, which is shown on the picture. The model 3 showed that at the projected 80-year fluence level, there is still remaining a 4 significant structural margin and that radiation effects will not an issue for our 5 subsequent license renewal. Next slide, please.

6 Under the area of electrical cables, EPRI has been conducting 7 research for over 25 years to characterize cable insulation material aging and 8 degradation mechanisms. The stressors ar e radiation and temperature for the 9 low-voltage cables and submergenc e for the medium-voltage cables.

10 Based on our research, aging management guidelines have 11 been published and provided to the NRC staff for their information. We also 12 have a well-established cable users group. This group shared operating 13 experience and best practices for cable monitoring and aging management. A 14 detailed joint R&D roadmap was developed and activities are well underway to 15 collect additional data on thermal and radiation age cables and improve 16 technology for cable condition monitoring. Jointly, we have recently harvested 17 cables from the Crystal River Unit 3 plant to confi rm the as-found condition and 18 additional aging tests are planned.

19 The tools and guidance exist for aging management which will 20 provide a reasonable assurance of safety and compliance with the current 21 licensing basis. Continuing research and condition monitoring technology will 22 provide the tools for plant owners for their asset management programs. Next 23 slide, please.

24 So in conclusion, we started off developing detailed joint 25 research roadmaps, we worked in collaboration with our research partners, and 26 15 we have made substantial progress. Based on this work, our conclusions 1 remain unchanged. The technical basis for aging management exists and is in 2 use. We are actively working on technology transfer and support for the lead 3 plants. 4 Thank you for your time.

5 CHAIRMAN SVINICKI: Thank you. Jason, please proceed.

6 MR. REMER: Chairman, Commissioners, thank you. It is a 7 pleasure to be with you this morning. Thanks for the opportunity to share an 8 update on second license renewal or subsequent license renewal. Next slide.

9 What we are going to talk about today is basically how SLR is 10 a bridge to the future; how key safety principles are maintained; how we have 11 optimized the process through this last three years; and what the SLR looks like 12 moving forward. Next slide.

13 As you know, nuclear plants, our 99 nuclear plant s are critical 14 infrastructure. They are the largest and best run fleet of nuclear plants in the 15 world. Everybody uses our technologies. The NRC's rules and guidelines are 16 copied regularly and just pasted into nation's requirements. We have to stay 17 in that leadership position.

18 As you know, we generate around 20 percent of the electricity, 19 over 62 percent emissions-free electricity, 24/7 always on, fuel on-site. No 20 other source of power in our country can provide what nuclear power provides.

21 In addition to millions and millions of dollars for the local economies, it runs 22 entire counties. Where I was from in Russellville, you either worked at the 23 nuclear plant, you knew somebody that worked in the nuclear plant, or your 24 family was working at the nuclear plant. It supported the economy in those 25 small towns and it continues to across America. We are seeing some of the 26 16 shutdown plants, the devastating effect that those shutdowns have on those 1 small plants. Next slide, please.

2 So how does second license renewal fit into the overall horizon 3 for nuclear power? As you see here, we have laid out kind of an initial idea of 4 where we are at today, the current reactors, advanced technology fuel, how that 5 is going to help us, new light water reactors, hopefully we can get them off the 6 ground, SMRs and then advanced reactors. It is clear that second license 7 renewal is a key bridge to the future. We have to keep the technology for our 8 light water reactor fleet alive through technology, suppliers, labor and training.

9 If our current fleet of reactors shuts down and we lose the capabilities to produce 10 these equipments and staffing to run them, we will have to basically start over.

11 We need advanced reactors to come online or SMRs or other non-light water 12 technologies.

13 So it is clear SLR plays a critical role in the future of nuclear 14 power. Next slide.

15 So this slide here is from our May 8, 2014 presentation that I 16 made before you, as Sherry was alluding to. I just pulled it back out. I said 17 let's take a look at that. What's happened in the la st three years?

18 Well, the key principles are still the same for license renewal.

19 The current regulatory process is adequate to ensure acceptable levels of 20 safety. And each plant's licensing basis will be maintained during any license 21 renewal period to the same manner and to the same extent. These are our 22 guiding principles for license renewal, for original operation, and for second 23 license renewal and what might come after that.

24 What we found is second license renewal is not only possible, 25 but it is a solid bridge to the future of nuclear. I remember when I started about 26 17 five years ago back in NEI looking at second license renewal, when you talk to 1 folks about going out to 80 years, they kind of give you a twisted look, like are 2 you serious. And now it is worked through. We have asked the questions.

3 We have got the answers and it is no longer just a dream. It really is reality.

4 Second license renewal is sound. Next slide, please.

5 So the regulation is based on 10 CFR Part 54, which 6 anticipated further rounds of license renewal. It didn't say you could only go 20 7 more years. It anticipates further rounds.

8 The existing processes ensure safe plant operation. 10 CFR 9 50, Appendix B, our quality processes, corrective action, all those things going 10 on 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day at every plant right now. Right as we speak, these 11 processes are maintaining safety.

12 Aging Management Programs, you have heard a little bit about 13 already. They are solid. We've worked them their first round of license 14 renewal. They work. We made them better.

15 Maintenance Rule, active equipment -- we don't talk much 16 about active equipment but our maintenance rule has proven itself to be not only 17 adequate but helping us improve plant performance on a daily basis to ensure 18 that our design basis are maintained.

19 When we started these slides in '14, there were 73 plants that 20 have had license renewal. Now there are 86, 13 more. Back then, 27 plants 21 had entered into the period of the extended operation, greater than 40 years.

22 Right now, there is 42, which if you do the math it comes up to around 128 23 reactor years in the PEO. So there is a lot of information about how these 24 plants are running in the period of extended operation.

25 Reliable, predictable processes. We are not seeing any 26 18 effects. We are seeing plant availability, plant efficiencies at all-time highs.

1 They are maintaining a very high level of operational and safety performance.

2 Next slide, please.

3 So the regulation is sound and the regulatory guidance is 4 sound. We used the GALL process, Generic Aging Lessons-Learned, to help 5 us run through the first round of license renewal.

6 Second license renewal, the GALL has been updated. There 7 has been an extreme amount of work for your staff and our industry as well.

8 We have been heavily involved in that. We have had many, many meetings.

9 I think we actually submitted 300 pages of comments, not because it was so 10 wrong but because it was so big. I don't know if you stacked it up. I think the 11 GALL is you know it is getting close to -- it is nuclear math for sure. A lot of 12 stuff in there. A lot of good stuff. A lot of lessons learned. So we are making 13 it better.

14 We submitted comments. We got the draft. There has been 15 really good cooperation between your staff, DLR in working on the GALL, as it 16 should be. We are going to have the final copy -- we have had the final copy 17 for stakeholder review. We anticipate the final copy coming out later on in the 18 year. 19 We also developed a guideline, NEI 17-01, that helps our plants 20 and utilities prepare adequate license packages, SLR packages. That's NEI 21 17-01. Previously, we have used 95-10. So that is going to be -- that has 22 already been sent to you for evaluation and review.

23 As well as the safety side, on the environmental side, we are 24 working with your staff to make sure we smooth out any rough edges on the 25 environmental review so that those two processes can proceed together. Next 26 19 slide, please.

1 As you have already heard already, research, our associates 2 at DOE and EPRI have both concluded there are no fatal showstoppers for 3 operation beyond 60 years. Given that you continue to maintain your plants at 4 the high level of safety and performance you are doing and you continue to use 5 Aging Management Programs, you continue to learn lessons. These are living 6 products. They are not static products.

7 We also -- not only did we -- you know it is one thing to see a 8 PowerPoint slide of the research that is going on but what we did is we said hey, 9 let's go out and see what's going on at DOE, at the National Labs, at some of 10 our key vendors, at EPRI, at some of our licensees. Let's see what they're 11 doing in this area.

12 So we have hosted seven site visits since 2015. We actually 13 go out in the field. In fact, last week we conducted a site visit at University of 14 Tennessee on concrete. And so that was very helpful. Both the staff and the 15 utilities participated. It has been an extremely valuable process and we have 16 all learned a lot. Next slide.

17 Quickly, we have optimized the process. Your staff have 18 looked through how we can do better. We have come to agree on an 18-month 19 review schedule which I think is not only doable but we can probably beat that.

20 We have looked at ways to improve efficiencies using electronic 21 communications processes, reducing unnecessary meetings, and being 22 disciplined in our schedule and RAI process on both sides, make sure we write 23 good applications, make sure the staff gets the answers they need. Next slide.

24 As you are going to hear in a few minutes, our SLR lead plants 25 are on track. It is very exciting. I think they have to go and do a good job in 26 20 producing the first applications to get through the process and then I think you 1 are going to see many, many mo re applications coming through.

2 We took a survey last year on how many plants might be 3 interested in second license renewal -- next slide -- and this is the data we got 4 back. There is about 20 -- these are sites and so there may be more plants in 5 this but it is 20. It just shows you there is some interest. From what we have 6 heard, everybody that is interested in going forward and can see through this 7 current economic situation I believe would be interested in second license 8 renewal. It is a good deal and it is a good insurance for the future. Next slide.

9 So in summary, our technical data supports second license 10 renewal. The SLR GALL incorporates lessons learned from the first round.

11 We believe the 18-month schedule is reasonable and doable. Our lead plants 12 are on track. We are going to turn in the highest quality applications possible 13 so that your review can be efficient and productive. And the plant safety is and 14 will be maintained throughout the license period.

15 Thank you.

16 CHAIRMAN SVINICKI: Thank you, Mr. Remer.

17 Mr. Gallagher.

18 MR. GALLAGHER: Okay, thank you. Thanks for inviting me 19 to talk here today about Exelon's Peach Bottom second license renewal 20 application. And again, I am Mike Gallagher. I have been with Exelon for 36 21 years. My background is in engineering and operations and I was a senior 22 licensed operator at Limerick Generating Station.

23 Since 2006, I have been the Vice President of License of 24 Renewal, having responsib ility for all the license renewal applications and 25 projects. And over that period of time, we did seven applications for 13 units.

26 21 I was also the Long-Term Operations Integration Committee 1 chairman in the EPRI Long-Term Operations Committee. That was 2009 2 through 2016.

3 And I am currently a member of the NEI SLR Working Group.

4 Bring up slide 1.

5 So Exelon, we believe Exelon well-positioned to be a lead 6 subsequent license renewal applicant. Exelon and its legacy companies have 7 completed 13 applications for its 22 units. We have 13 units in the period of 8 extended operation right now. And our Clinton facility is the only plant not 9 renewed and we are scheduled to submit that application in 2021.

10 We worked with EPRI and NEI on the initial industry roadmap, 11 which ensured SLR readiness by 2019. And Exelon has heavily participated 12 in the SLR GALL reviews.

13 So based on the fact that the license renewal rule is 14 unchanged, our involvement in the GALL SLR review and its similarity to the LR 15 GALL, and our extensive experience in developing license renewal applications, 16 you know I am very confident that we will submit a high-quality application.

17 We understand the staff is developing an 18-month review 18 plan. We think that is very achievable and we will do our part to submit a high-19 quality application so that review can be completed.

20 Go to slide 2, please.

21 So Peach Bottom, we select Peach Bottom as our lead BWR 22 plant and we think that is a great plant to be the lead BWR applicant for Peach 23 Bottom was the 8th license renewal application to be approved in 2003 and 24 original license renewal. And we have been operating in the period of 25 extended operat ion since 2013.

26 22 Peach Bottom runs very well. It is highly reliable. We have 1 not had an automatic scram at Peach Bottom in the last 11 years. We have 2 invested a lot into the plant. We have invested over $1.3 billion in capital 3 improvements in the years 2012 to 2016. We achieved extended power uprate 4 for both units in 2015 and we get high marks from INPO.

5 At Peach Bottom, we have been part of the community for a 6 very long time. Peach Bottom Unit 1 was the construction started in early 7 1960s. And so we have had a lot of employees part of that community for a 8 long, long time. We are committed to the community and as an example here, 9 I just put one of our donations have been to local nonprofits. We have donated 10 over $416,000 last year.

11 If we go to slide 3. So, our approach to subsequent license 12 renewal is similar to the approach that we had for our license renewal project.

13 And we will be consistent with the guidance in the GEIS and the GALL to the 14 maximum extent possible. The way we do that is you can see here we will do 15 the Part 51 review using the GEIS and it is very -- it has been updated. They 16 are very similar to what has been in the license renewal projects.

17 And Part 54, again, we have been very involved in reviewing 18 and commenting on the SLR GALL so we understand what's in it and the 19 expectations and it is basically built off of the original GALLs which went up to 20 Rev. 2. 21 And basically, we will do the integrated plant assessment, the 22 TLA evaluation with the ultimate goal of identifying and establishing the Aging 23 Management Programs.

24 And so one key point that we want to make sure everyone is 25 aware of is the Aging M anagement Programs are the key and so that is how we 26 23 will manage the aging of the in-scope equipment so that we maintain its 1 intended function. A lot of people think that you know you really have to like 2 predict how long things are going to last. Are they going to last 80 years or this 3 or that. That's really not the case and the rule doesn't require it. Really what 4 you want to do is manage the aging. And if you think about it, that's really the 5 right way to go.

6 If you had an analysis that predicted the end of life, you'd still 7 have to monitor it and keep an eye on it all along. So really what we want to 8 do is have effective Aging Management Programs so we can monitor the effects 9 of aging and take appropriate corrective action before there is a loss of intended 10 function.

11 If you go to the next slide, slide 4, this is just the overall process 12 review. You probably have seen this. This is the integrated plant assessment 13 and basically we identified the scope. We identified all the aging effects and 14 materials. And then we do a matchup for all those components to an Aging 15 Management Program and then ensure we have all the Aging Management 16 Programs address the in-scope equipment.

17 Part of this review, you know we do extensive reviews and we 18 are bringing Peach Bottom's application. We are not like just going to send in 19 the original Peach Bottom application with a few addendums. No, we are 20 starting over and we basically do an update to today's standards. It will look 21 more like our LaSalle application, which was our last application, than our 22 Calvert Cliffs application, which was our first application.

23 And in this process, we review all the performance at the plant 24 and our internal operating experience. And just to give you an idea of the 25 extent of reviews, we have -- our operating experience is going to put Peach 26 24 Bottom, so this is basically corrective actions, it is industry operating experience 1 and so on, we have 365,211 items that we are going through to review. Right 2 now, we are about 85 percent done on that and that is to determine -- make 3 sure we have identified any plant-specific aging effects and plant-specific 4 operating experience for our Aging Management Programs.

5 And if you go to the next slide, slide 5, it basically just 6 summarizes the programs. Again, we're not done right now. We're still in 7 process but we are anticipating we will have about 48 Aging Management 8 Programs. These all line up with the GALL, the SLR GALL. So this is just the 9 listing of it and it is quite extensive to ensure that, again, we maintain the 10 intended functions of the in-scope equipment.

11 So in summary on slide 6, you know the GALL, SLR, and the 12 GEIS guidance is comprehensive. We believe it is very clear and has been 13 developed based on learnings from the first renewal research and operating 14 experience and we have been involved in that and reviews of that so we 15 understand it and it has been built off of the first renewal and we understand 16 how to do that.

17 The Peach Bottom SLR application will be consistent to the 18 GALL, SLR, and the GEIS to the greatest extent possible. We will submit a 19 high-quality application that can support an 18-month staff review and we are 20 on track to submit in the third quarter of 2018.

21 CHAIRMAN SVINICKI: Thank you very much.

22 Mr. Aitken, did I pronounce that correctly?

23 MR. AITKEN: Thank you.

24 CHAIRMAN SVINICKI: Thank you. Please proceed.

25 MR. AITKEN: Thank you. Good morning. My name is Paul 26 25 Aitken and I am the manager responsible for the subsequent license renewal 1 project at Surry. I appreciate the opportunity to come and speak to you today 2 about the progress of Dominion's efforts to prepare for the submittal of the 3 application.

4 So what I will do is I will present a brief overview of Surry Power 5 Station, Dominion's industry involvement in preparing for subsequent license 6 renewal and our current schedule fo r submittal of our application.

7 So by way of my background, I was involved with all the first 8 renewals for Dominion, starting with North Anna, Surry, working towards 9 Millstone, and then Kewaunee.

10 So with that, next slide, please.

11 Surry Power Station is a Westinghouse 3-loop pressurized 12 water reactor with an output capacity of nearly 1700 megawatts. Together, 13 these two units are capable of producing 15 percent of Virginia's electricity 14 needs. 15 Surry is located in Surry County, Virginia on the south side of 16 the James River, approximately 25 miles upstream where the river enters the 17 Chesapeake Bay.

18 Unit 1 was originally licensed in 1972, while Unit 2 was licensed 19 in 1973. Surry entered the first period of extended operation in 2012 for Unit 20 and 2013 for Unit 2.

21 Similarly, as Exelon, Dominion has invested nearly $1 billion in 22 capital investments into Surry since the first renewal was issued in 2003. And 23 plans and will continue to invest in Surry to maintain plant reliability for the 24 current and subsequent period of operation. Next slide, please.

25 So I just want to spend a moment and discuss the experience 26 26 of the Dominion team. My project team is composed, in part, with individuals 1 involved with the first Dominion renewals like myself. I also brought others from 2 within the industry who had extensive and current license renewal experience 3 to complement the team.

4 Since the team formed in late 2015, my focus was to become 5 integrated with various industry groups sponsored through NEI and EPRI. As 6 a result of our integration into the various industry initiatives, it has not only been 7 beneficial for Dominion but also for the betterment of the industry. As Mike 8 said, I am currently the Vice Chairman of the EPRI Long-Term Operation 9 Integration Committee, as well as point man for second license renewal or 10 subsequent license renewal within NEI.

11 So as Mike said, Dominion was directly involved with the NRC 12 staff during the public meetings, heavily involved. The meetings were 13 extremely beneficial to the industry and the other stakeholders to better 14 understand the background on the evolving requirements. We worked through 15 the industry questions and concerns and we were able to find common ground 16 with the staff. I thought that was very beneficial.

17 So a key takeaway on how we are able to get this point in the 18 process continues to be the open communication that we have demonstrated 19 over the last couple of years. Next slide, please.

20 I'm sorry. Okay, could we go back two slides where I have 21 data review? I'm sorry, I skipped a slide by accident.

22 So the decision making to operate Surry for an additional 20 23 years was founded on the station's very good operational performance. The 24 investments made in the station as Surry being the first station in the Dominion 25 fleet to reach 60 years. It also made sense for the stakehol ders and customers, 26 27 since Surry Station is one of the lowest cost producers of electricity in the United 1 States. 2 Dominion employs around 900 employees at Surry, coupled 3 with the tax revenues into the local comm unities makes operating 20 additional 4 years very significant.

5 I would also add that pursuing a subsequent license renewal is 6 viewed positively by the State Corporation Commission as a viable energy 7 source for the Commonwealth in the foreseeable future.

8 As a result, Dominion notified t he NRC in late 2015 of its intent 9 to send in subsequent license renewal application in the first quarter of 2019.

10 Based on this announcement, Surry has been identified as one of the lead 11 plants along with Peach Bottom.

12 Okay, next slide -- next two slides, I guess. I think we covered 13 that, right? There we go. I'm sorry for the confusion.

14 So I just want to take a quick look at the levels of support 15 needed to develop a renewal application. Developing an application is the 16 responsibility of each utility but there is also a great deal of collaboration and 17 support required with other entities in the industry. To put this in perspective, I 18 want to provide a quick visual representation of the involvement by many groups 19 and companies currently involved with Surry. Next slide please.

20 Here is what I categorize as the first layer of support. It 21 represents the organizations that you have already heard from today. First, we 22 have the independent research organizations working to address the critical 23 research activities and programs needed for subsequent license renewal. The 24 other support identified reflects utilities like Exelon that we work closely with to 25 provide insights, and we collaborate on industry initiatives, and we peer review 26 28 each other's applications.

1 Lastly, we rely on the leadership at NEI to provide strategic 2 advice, along with facilitation with the License Renewal Executive Working 3 Group, License Renewal Task Force, and the various discipline groups.

4 NEI stands with the industry and ensures there is an alignment 5 on issues as we work together on second license renewal. Next slide.

6 And the last circle reflects the various vendors that are currently 7 supporting Surry. Collectively, the diverse group of supporting organizations will 8 provide Dominion the expertise and support to develop a high-quality 9 application, as we will discuss in the next slide.

10 I believe that subsequent license renewal is really a continuum 11 from the first renewals. The renewal process is stable. It is predictable. And 12 as the regulatory framework remains unchanged, I further believe the renewal 13 of those 86 licenses, as Jason has mentioned, is a testament to the viability of 14 the process.

15 As the lead plant, similar to Exelon, Dominion will provide an 16 application that incorporates the latest GALL requirements and most recent 17 industry guidance. We will also work closely with our utility and industry 18 partners through peer reviews to draw on the collective experience base to 19 develop a high-quality application.

20 We also expect to maintain a high degree of consistency with 21 the GALL, to realize the highest degree of efficiency and expected savings in 22 NRC review time. We will demonstrate how the Aging Management Programs 23 will provide reasonable assurance in effe ctively managing the effects of aging.

24 Based on this approach, the NRC should be in a position to 25 support an 18-month review.

26 29 Let's take a high-level look at the AMPs that we proposed to 1 use. This slide reflects the various Aging Management Programs that will likely 2 be used to manage the effects of aging. My purpose in showing this isn't really 3 to give you an eye test but it is really just to provide a sense of how Surry will 4 align with the GALL.

5 Just to provide a quick perspective, a fair amount of these 6 Aging Management Programs are currently in place from the first renewals and 7 will require some updating to meet the new requirements but the impact should 8 not be overly significant.

9 The remaining AMPs will require some changes or 10 enhancements and/or are considered new or one-time inspections that will need 11 to be created and in place prior to entering the subsequent period of operation.

12 I expect I have very good alignment with the GALL. Next slide, please.

13 So in 2015, NEI published an SLR roadmap to provide 14 information for the public and other stakeholders. The document provided a 15 comprehensive outline on the various initiatives and items that were identified 16 to meet the objective of submitting the lead plant applications, which are shown 17 in the middle there around the 2018-2019 time frame.

18 I don't know if you have seen this document. I have just a prop 19 here but it is very informative and I would encourage you to take some time to 20 read it, if you haven't.

21 The time line shown on the slide is within the roadmap 22 document and the time line provides a high-level illustration of some of the 23 markers along the way to support the lead plant applications. It starts in 2009, 24 when the first plant entered the period of extended operation and continues until 25 the first plant reaches 60 years of operation in 2029. Everything in-between is 26 30 the work that has been completed or is ongoing to support the industry in 1 preparing for the lead plant applications.

2 As you can see, I bubbled our announcement in late 2015, as 3 well as our intended submittal date of the first quarter of 2019. And we remain 4 on target with the industry time line with a planned submittal in early '19. Next 5 slide, please.

6 So as I wrap up, I first want to commend the NRC staff on their 7 efforts over the last couple of years. The staff has worked very hard in 8 developing the SLR GALL and SRP and provided ample opportunity for 9 stakeholder feedback. We have a great starting point for the lead plants, as 10 well as those likely to follow.

11 I want to reiterate that Dominion has been engaged and 12 integrated with the work leading up to the GALL SLR issuance. We have been 13 heavily invested, along with the others in the industry over the last couple of 14 years, to ensure that we have the appropriate guidance and have explored 15 areas for optimization with the staff based on the vast experiences during the 16 first renewals.

17 Finally, we are ready to develop a high-quality application using 18 a very experienced team that will provide a high degree of consistency with the 19 GALL, which should ultimately support an 18-month NRC review schedule.

20 That's all I have. Thank you very much.

21 CHAIRMAN SVINICKI: Thank you.

22 Mr. Lochbaum, please proceed.

23 MR. LOCHBAUM: Thank you and good morning. We 24 appreciate this opportunity to share our perspectives with you and other 25 stakeholders. Slide 2, please.

26 31 I will focus on these issues today. We have some other issues 1 but if we can't sell you on these, we're not likely to convince you about lesser 2 concerns. Slide 3, please.

3 As other presenters have done, I recycled this slide directly 4 from my presentation during the May 8, 2014 Commission briefing. Although 5 35 months have been ripped off the calendar since then, this point remains valid, 6 as do our concerns. Slide 4, please.

7 Our first concerns the one-time evaluations of severe accident 8 mitigating alternatives. For example, because the Limerick plant evaluated 9 SAMAs during initial licensing, SAMAs were not reevaluated for their license 10 renewal application. Slide 5, please.

11 One-time SAMA evaluations rely on three tenuous 12 assumptions that safety innovations will not have emerged, that populations will 13 not have changed, and that costs will not have changed. Slide 6, please.

14 NEI petitioned the NRC to eliminate the need to submit SAMA 15 evaluations with license renewal applications. The NRC denied the petition for 16 reasons including the legal need to consider new and significant information 17 since the original licensing during this major federal action. Slide 7, please.

18 The many reasons the NRC found for denying NEI's petition to 19 remove SAMAs from the initial license renewal application seemed equally valid 20 for subsequent license renewal. One and done seems both illegal and 21 imprudent public policy. Slide 8, please.

22 Our second concern involves the bizarre position and line 23 approach to nuclear safety. Ginna and Point Beach are very similar plants in 24 terms of design and age but because the NRC revised its license renewal 25 standards, Point Beach was required to have an Alloy 600 Aging Management 26 32 Program while Ginna was not. Slide 9, please.

1 If NRC would no relicense Point Beach without an Alloy 600 2 Aging Management Program, 10 CFR 50.100 gives the NRC the authority to 3 require already relicensed Ginna to have this safety justified measure. 50.100 4 also gives the community around Ginna the right to expect equal protection from 5 the NRC. Slide 10, please.

6 If safety warrants that measures x, y, and z be done during the 7 period of extended operation, then the public living around all reactors deserve 8 those protections from undue risk. If such safety measures are not justified, 9 then the owners of all reactors deserve protection from undue costs. Slide 11, 10 please. 11 If I lived around a reactor, I would wish for it to be late in the 12 subsequent license renewal queue in order to obtain protection for my 13 community. If I owned a reactor, I'd wish for it to be early in the subsequent 14 license renewal queue to get through as cheaply as possible.

15 The NRC must stop being regulatory leprechauns by granting 16 wishes. Slide 12, please.

17 The NRC's regulations in 50.100 and 50.109, if followed, would 18 require all relicensed reactors to have the same suite of Aging Management 19 Programs. Subsequent license renewal gives the NRC a second chance to get 20 this right. Slide 13, please.

21 No members of the public attended the final three NRC public 22 meetings in 2012. Two NRC staffers called me to invite me to the November 23 meetings, even if remotely via phone bridge. I declined on grounds that the 24 concerns raised in the May meeting had never been addressed. If my 25 concerns were going continue to be ignored, I would just save myself and the 26 33 staff the charade.

1 I hadn't realized that the staff would address my concerns four 2 and a half years later. I will block out some time in late 2021 to review their 3 take on my concerns today and save some time in 2022, in case they don't get 4 to it as expeditiously next time. Slide 14, please.

5 It turns out the staff's response wasn't worth the wait. True, 6 Point Beach was not required to have an Alloy 600 Aging Management 7 Program. True, it could have endeavored to convince the NRC staff that not 8 having one at all was just as good. Maybe that gambit would have worked but 9 it is also true that it costs Ginna much less to have neither a program nor an 10 acceptable excuse. Slide 15, please.

11 I contended earlier that the NRC is cheating somebody. I 12 contend now and formally request that the NRC Inspector General investigate 13 whether the NRC is violating 50.100 or 50.109, both cannot be met the way the 14 NRC is handling license renewals. Slide 16, please.

15 I have participated in many processes during which public 16 meetings provided two-way communication between the NRC staff and external 17 stakeholders to facilitate progress toward the outcome and I have participated 18 in the license renewal process. Fortunately, that process is atypical but it is 19 unacceptable and must change if the SLR process is to yield a good outcome.

20 One might have thought that the NRC staff would address 21 public concerns in the policy paper put before the Commission. One would 22 have been wrong. The NRC staff waited until two years after the commission's 23 vote on the policy issues before addressing public concerns. Slide 17, please.

24 This is the first car that I bought. It's a 1976 Ford Pinto. I was 25 still in college working towards my nuclear engineering degree at the time. This 26 34 now antique car is newer than Peach Bottom, Surry, Oconee, Point Beach, Nine 1 Mile Point Unit 1, and many other reactors operating today. By the way, I no 2 longer have this car. It's not so much that it aged badly. It was hard to get 3 eight-track tapes anymore. Slide 18, please.

4 We commended the NRC for its knowledge management 5 efforts begun a decade earlier. The Agency's graying staffers were retiring and 6 being replaced by individuals who type with their thumbs on very small smart 7 phones. Slide 19, please.

8 As millennials replace nuclear plant workers, they must try to 9 answer safety questions using owner's manuals of varying degrees of detail and 10 try to understand regulatory requirements that may provide scant insights into 11 their bases. Slide 20, please.

12 Considerable industry and staff resources have been spent in 13 recent years trying to determine whether what was done then needs to be 14 redone now. It is a reflection on a game and not its players. This game is 15 really hard to play, really, really hard. Slide 21, please.

16 And time won't make this game any easier to play unless steps 17 are taken within the SLR process or in parallel to it. Nuclear plant workers and 18 NRC staffers must be given a proper foundation for making safety decisions in 19 the future.

20 Thank you.

21 CHAIRMAN SVINICKI: Thank you all very much for your 22 presentations. We will begin the question and answer period this morning with 23 questions of Commissioner Baran.

24 COMMISSIONER BARAN: Thank you. Well, thank you all 25 for being here and for your presentations.

26 35 There seems to be broad agreement on the key outstanding 1 technical issues that need to be resolved for subsequent license renewal.

2 Richard, your presentation covered DOE's main research 3 areas and schedules and it looks like most of the testing and predictive model 4 development is scheduled to be completed by 2019-2020. How confident are 5 you that the various projects will be completed in those time frames?

6 MR. REISTER: I think we are making good progress on the 7 development of those predictive models and so I am hopeful that we will be 8 successful.

9 And those models aren't really, just to be clear, I don't feel those 10 models are necessary for a plant to submit a subsequent license application.

11 What they are most useful for is predicting long-term degradation so you can 12 anticipate many years down the road what the degradation might be so there's 13 no surprises is the main point. And that is really more of an economic issue 14 than a licensing issue, in terms of being able to get ahead of the degradation 15 and anticipate it in te rms of the maintenan ce of your plant.

16 COMMISSIONER BARAN: And so in your presentation, you 17 said you are not seeing any technical showstoppers that would prevent 18 operation out to 80 years. Of course there is all this research going on still.

19 What level of confidence should the Commission have that 20 none of the ongoing research will reveal a significant problem with plants 21 operating for 80 years?

22 MR. REISTER: Well when I say technical showstoppers, I 23 mean there are no cliff-edge effects that a large portion of a plant would degrade 24 to a point where it would be unec onomic to make the repairs.

25 So the degradation m odels and predictions that we see, based 26 36 on our research, is that it is a gradual process that is manageable by plants.

1 And so they can make repairs or replacements as needed to the equipment.

2 It's passive equipment that you would be monitoring during extended operation.

3 But you know as we have seen, you know some of those 4 repairs might make it uneconomic to continue to operate a plant at some point.

5 But it is a slow process and a manageable process for the most part. That's 6 what I'm trying to say by no showstoppers.

7 COMMISSIONER BARAN: Okay. Well, let me ask the rest 8 of the panel the same basic question. How confident are you that the 9 outstanding technical issues can be addressed with good Aging Management 10 and Maintenance Programs? Anyone want to share their thoughts on that?

11 MS. BERNHOFT: I'll chime in next. You said the key word 12 there, that is having the Aging Management Programs in effect and we talked 13 about the technical basis exists for those now.

14 The continued research really helps with driving out a lot of the 15 uncertainties on how some of the models work, how the aging works. So think 16 of it. You start with a little more conservative approach. Like when we start at 17 management of Alloy 600 we probably did more inspections than were needed.

18 As we gathered data, as we gathered insigh ts from the research, we were able 19 to better focus the inspections to look at the areas of question and concern. It 20 helps with the safety case and it also helps with managing the economics and 21 the outage durations for the plants as we continue to improve our 22 understandings and our models through the research and through gathering the 23 OE. So gathering the inspection result s is also an important element to that.

24 So, it is reducing the uncertainties. And we are also doing a 25 lot of work to improve the inspection technology so you can get faster inspection 26 37 results, better information from your inspections.

1 COMMISSIONER BARAN: Any thoughts?

2 MR. REMER: I think the key is the living Aging Management 3 Programs because we collect OE on every plant, on every event, every 4 situation. And when we start seeing operational experience pile up in a certain 5 area, we look back at our Aging Management Program and ask the question 6 are we monitoring this properly to identify degradation.

7 You combine that with new technology insights and scientific 8 insights and it gives you an extremely high level of confidence that you can 9 operate your plant safely and identify anything that happens early before it leads 10 to degradation.

11 MR. LOCHBAUM: I would just complement what Jason said 12 by the NRC's Generic Communications Program. If something does emerge, 13 the Generic Communications Program writes a Generic Letter or bulletin has 14 been shown to step in and address that surprise or that new evolving issue.

15 That's a complement to the industry's internal efforts.

16 MR. AITKEN: Yes, and I would just add as well I think the 17 GALL provides us what we know today and I think we have a good starting point, 18 as I said in my presentation.

19 And as new information becomes available, there is vehicles to 20 communicate and impose on licensees. And we talked about Generic 21 Communication. We have ISGs, Interim Staff Guidance documents, we have 22 seen a lot of those. So as the information becomes available out of the 23 research area, then we will evaluate and if we have to adjust, we will adjust.

24 But based on what we know today, I think we are on solid footing.

25 MR. GALLAGHER: I'll say ditto with Paul but I mean we 26 38 manage all active equipment and all passive equipment. And the passive 1 equipment is much easier to manage than all the active equipment and we are 2 on top of all that and the pl ant reliability reflects it.

3 COMMISSIONER BARAN: Thanks for all those responses.

4 In terms of -- to kind of follow-on what Jason was saying in terms of having these 5 be living programs, Aging Management Programs, I wanted to kind of turn to 6 and ask folks for their views on where Dave kind of ended his -- or maybe you 7 didn't end your presentation but in your presentation raised this concern about 8 different plants being subject to different revisions of the GALL, based on where 9 they are in timing in their applications.

10 What do others think about that? Is that a problem? Does it 11 make sense for every plant operating beyond 60 years to be using the most 12 recent version of the GALL, including updates as they go so that everyone is 13 using the latest methodologies? Ho w do you all think about that issue?

14 MR. GALLAGHER: Well, I can address that. I think you 15 know I personally don't think it's an issue because the Aging Management 16 Programs have two elements to them that you have to have and one is operating 17 experience, the other is corrective action. So when Jason they are living 18 programs, that is true.

19 You know the example of Ginna not having an Alloy 600 20 program, Ginna has an Alloy 600 program. It wasn't put in place in the license 21 renewal. It was put in place subsequent with ongoing operating experience.

22 And I think if you step back and th ink about it, you wouldn't want 23 to have it any other way. Like the folks that came up with the rule were 24 geniuses because it was built off of where you are now but then had the 25 corrective action and operating experience element to it.

26 39 Because if you step back and say you want to have a static 1 program, you want to have everything in there and then do that, first of all, you'll 2 never get there. And second of all, if that was the case, then once you had 3 approval in that, you wouldn't be required to make any changes to it. And you 4 know we learned throughout the years, th e research, the operating experience, 5 and so on. So you want to have that feedback mechanism and I think it is in 6 there and it is very robust.

7 COMMISSIONER BARAN: Dave, do you have any further 8 thoughts on hearing Mike's response on that?

9 MR. LOCHBAUM: If I owned a plant like Ginna and I wanted 10 to save money down the road, I'd just eliminate my Alloy 600 Aging 11 Management Program because I'm not required to have it. The NRC might not 12 like that but the NRC would have no regulatory hook to make me continue that 13 program. 14 So, again, the whole backfit thing, if it is a justified measure, 15 then it should be required for everybody. If it is not justified, it should be 16 voluntary for everybody. But to have this mishmash of some that is required, 17 some that's not required, makes no sense, legally or morally.

18 MR. GALLAGHER: Just to respond to that, there is a 19 regulatory hook. You have to maintain the intended function of the in-scope 20 equipment. And so if you don't m anage the aging and you have a problem, 21 there is a definite regulatory hook. You know so -- and it is required in your 22 operating experience review program to review that and add it as necessary.

23 So I think there is a regulatory hook and I think it's there.

24 That's why the utilities continue to add the programs and manage the aging, in 25 addition to everything else you have to do.

26 40 COMMISSIONER BARAN: Let me quickly ask about one of 1 the other issues that Dave raised, which was his concern about not performing 2 updated SAMAs as part of subsequent license renewal. And he made the point 3 well costs change over time, safety innovations over time. What do others on 4 the panel think about that concern or that issue?

5 MR. GALLAGHER: Well, I can address that. Limerick is a 6 case example. And we did the Limerick application. You have got to step 7 back and look at what the purpose of the SAMA is. The SAMA is part of the 8 NEPA evaluation in the Environmental Report. So it is kind of a mishmash on 9 purpose. If you want to do updated risk analysis, then there should be 10 requirements to do updated risk analysis. And we do do updated risk analysis 11 on -- you know we update the PRAs frequently and that type of thing and any 12 insights are acted upon.

13 So when you step back and say what was the purpose of the 14 SAMA for the original licensing or license renewal application, it is for the NEPA 15 evaluation.

16 So then when you do, the rule only requires you to do one 17 SAMA analysis, unless there is new and significant information that would drive 18 you to do another. So in the second renewal, we will do a new and significant 19 review to determine whether or not an additional SAMA is needed to be done 20 and there is a process to do that.

21 But the success criteria on whether you need to do that is 22 NEPA. And the NEPA is there a seriously different picture in the environmental 23 consequences. And if you step back and think about SAMA, SAMA only if you 24 implement a SAMA, it only improves your risk because you are implementing 25 something that will reduce risk.

26 41 So it is really a mishmash of purpose and I think the staff -- you 1 know the rule was correct in saying okay, let's do it once to figure out if there 2 any significant seriously different -- it would paint a seriously different picture 3 and in subsequent actions do a new and significant review to see if you have to 4 do that again. So, I thin k it is well covered.

5 COMMISSIONER BARAN: I am a little over on time but I am 6 curious. Do you have a sense, or Paul if you have a sense, do you have a 7 sense if you reran the SAMAs using kind of current data, do think there would 8 be appreciably different results, or no, or you don't have a sense?

9 MR. AITKEN: That's a good question. I think what we're 10 finding is we are evaluating the previous SAMAs that we had. We are also 11 looking at all the SAMAs that other utilities have done and we are running cases 12 on -- we started with maybe 150 to 170 and maybe we have 25 and we are 13 going to go through the process of determining if there is new and significant 14 results. And at this point, we don't anticipate any, even with the population or 15 the dose consequences.

16 COMMISSIONER BARAN: Are you effectively doing an 17 analysis to determine whether an y new or significant changes?

18 MR. AITKEN: Yes.

19 MR. GALLAGHER: Yes, we do a new and significant review, 20 which is very robust and there is technical reviews in that on other SAMAs. And 21 basically, since the Fukushima mods were put in and the Fukushima FLEX 22 equipment, you know you really don't have a lot of significant cost beneficial 23 SAMAs. 24 Now, it is not saying you never have a cost beneficial SAMA 25 but usually, and even in the first renewals, if you look at all the SAMAs that were 26 42 cost beneficial, they are usually very, very small things. You know it is like well 1 if we change these procedures, then -- or if we put a portable battery someplace 2 and have a procedure on how to hook it up, you can reduce the risk. Well you 3 know we do those kind of reviews when we do the PRA updates. So you know 4 that is -- I think it is covered like that.

5 COMMISSIONER BARAN: Okay, I'm over my time but Dave, 6 are there kind of closing thoughts you had on this since you raised this issue?

7 MR. LOCHBAUM: Well the SAMA, many of those cost 8 beneficial SAMA evaluations were not implemented, like the flood alarm in the 9 switch gear room at Indian Point but they are being litigated. You know those 10 are contentions raised in the Indian Point proceeding. So they must be new.

11 They must be significant. They must meet all those criteria because they are 12 still being litigated.

13 The fact that we are going to take that off the table and put it 14 clearly within the purview of the licenses, I don't think that is a sound approach 15 to the issue before the Commission.

16 COMMISSIONER BARAN: Thanks.

17 CHAIRMAN SVINICKI: Thank you.

18 Commissioner Burns.

19 COMMISSIONER BURNS: Thank you. Thank you for the 20 presentations this morning, as we consider this topic or where we are in terms 21 of subsequent license renewal.

22 I had participated in the first round, in the early rounds of license 23 renewal back in the 1990s and I think it is --

24 CHAIRMAN SVINICKI: Does that mean you were one of the 25 brilliant people?

26 43 COMMISSIONER BURNS: Yes, I was looking for that. But I 1 also noticed I will be 100 years old if they get their 80 -- if Peach Bottom or no 2 Surry, if Surry 2 goes to 100 or 80 years of operation, I will be 100. I'm not sure 3 I'll be around.

4 But anyway, but I think --

5 CHAIRMAN SVINICKI: I think with the right Aging 6 Management Program --

7 COMMISSIONER BURNS: Well I think that's maybe too late 8 for that. I don't know. That's a good point.

9 But Surry, I think the interesting thing to recall is that there was 10 sort of a move forward and then sort of reconsideration with respect to renewal 11 to get it to where it is today in terms of the approach actually taken.

12 One question I found the discussion I think very interesting in 13 terms of the differences in GALL reports. And one thing I would reflect on, I 14 might take a different viewpoint in terms of where Mr. Lochbaum does with 15 respect to the legality of differences. I think I would probably take a very 16 different viewpoint. I mean if I actually, if I look back and I can remember doing 17 research over the years in terms of initial regulations. I would love for most 18 regulations to be like they were in the 1950s or 1960s. You just had the darn 19 regulation there and I didn't have to wade through a thousand pages of text like 20 say I have to do on the Fitness for Duty Rule or something like that.

21 But all kidding aside, I think it is an interesting issue in terms of 22 -- and have had it dealt with as a line attorney in terms of enforcement of license 23 conditions, procedures, things like that. So one of my questions, Mr. Gallagher 24 when you said there is an enforcement hook, the thing that came to mind, is that 25 hook the maintenance rule? Is that what you were speaking of? I'm trying to 26 44 get more information where you see that hook.

1 MR. GALLAGHER: Well you have to maintain the intended 2 function of the equipment.

3 COMMISSIONER BURNS: Right.

4 MR. GALLAGHER: So if your equipment was inoperable then 5 there would be some type of reportability issue, some type of regulatory issue 6 associated with it.

7 If it was not maintained operable and you didn't take corrective 8 action, you could go through the correctiv e action Appendix B issues, those kind 9 of things.

10 COMMISSIONER BURNS: Okay.

11 MR. GALLAGHER: So in a broad sense, we have to maintain 12 the equipment that is in scope and we have to maintain its intended function.

13 COMMISSIONER BURNS: Yes.

14 MR. LOCHBAUM: Could?

15 COMMISSIONER BURNS: Sure. Yes, yes. It is an 16 interesting discussion.

17 MR. LOCHBAUM: You wouldn't need a rule at all, you have 18 Appendix B that says you are required to maintain equipment. So why do you 19 have all this nonsense if Appendix B -- I think the reason for all that nonsense 20 that the geniuses came up with is that it avoids waiting for something to break 21 before you step in and fix it under the regulatory hook. It would be nice if you 22 didn't challenged highly reliable safety systems. Building a wall around 23 Fukushima is a little bit too late today.

24 So I think Ginna is not protected to the same extent that Point 25 Beach is, unless something breaks, and then you have a regulatory hook. I 26 45 don't think that's the way NRC wants to regulate safety in the United States.

1 COMMISSIONER BURNS: Okay one of the other aspects of 2 that discussion that I want to delve into a little bit is the challenge of sort of what 3 I will call older FSARs, although when I say older FSARs, we have had 4 provisions that you have to continue, you have to do continual updates of 5 FSARs so you have a USAR, I guess, and continue that.

6 But I would be interested in both from Exelon or from Dominion 7 how do you deal with that issue in terms of the plants that you have, that an 8 earlier plant is probably going to have an FSAR that doesn't look like let's say 9 Watts Bar 1 or 2 FSAR does in terms of perhaps the granularity or the depth or 10 that. Are there particular -- and I am talking, obviously, at a high level. It has 11 been a while since I probably have delved into one of them. But how do you 12 think about that issue in terms of that longer term knowledge management issue 13 when you have got people, maintenance people, operations people and all 14 going back over the years during the period of ex tended operation?

15 MR. GALLAGHER: Well, I mean there's been a number of 16 initiatives over the years. You know we have design basis documents you 17 know DBDs at the sites and that was in the vein of getting all the current 18 licensing basis together.

19 COMMISSIONER BURNS: Right.

20 MR. GALLAGHER: You know the UFSAR, as you said, is 21 maintained and in the context of license renewal we have to have our Appendix 22 A Aging Management Program summaries and commitments in the FSAR and 23 that is put in place right after the license is renewed and then it is updated every 24 two years.

25 So you know I think we are required to maintain the current 26 46 licensing basis and that is what we do.

1 COMMISSIONER BURNS: Okay, let me --

2 MR. LOCHBAUM: Could I just?

3 COMMISSIONER BURNS: Sure.

4 MR. LOCHBAUM: I think the challenge is if I was a plant 5 worker not maintaining the plant because that is pretty clear but if part of that 6 means replacing something because it's worn out, I have to make sure that that 7 replacement part meets the same safety function of the original. And with the 8 documentation light plants, that decision is going to be a little bit harder than it 9 would be at a more recent plant.

10 So I think it is not so much in maintaining the plants the 11 challenge arises it is in if you end up having to replace a component or a 12 structure because it is worn out.

13 COMMISSIONER BURNS: Okay.

14 MR. AITKEN: I would just say that I mean the equipment, if it 15 breaks and it needs to be replaces, there are processes in place. Sometimes 16 we have to reverse engineering things. That's not uncommon but we do 17 maintain our records and we do have information available so we can go back 18 and figure out what is required as part of the licensing basis requirements for 19 that piece of equipment t hat hypothetically failed.

20 So we're not in a vacuum. We do have processes in place and 21 they have been effective and they are evaluated by the NRC.

22 COMMISSIONER BURNS: Okay, let me turn to Mr. Reister 23 from the Department of Energy. Of the four knowledge gaps that were 24 identified in this DOE-NRC expanded materials degradation assessment, is 25 there one that is proving most difficult to fill?

26 47 And to put it another way, is there one that might have a higher 1 uncertainty -- higher level of uncer tainty with respect to the outcome?

2 MR. REISTER: I wouldn't characterize it as higher uncertainty 3 but I think in terms of -- and it is just my personal opinion of what the industry 4 would have to deal with it would be core internals in terms of the need to repair 5 and manage the degradation of core internals. And that could lead to some 6 economic challenges by plants.

7 The other issues, you know reactor pressure vessel 8 embrittlement is more of a long-term issue. And concrete and cables have 9 pretty good performance. I think they are in the period of extended operation.

10 You know cables will have to be replaced and managed but it is not as high a 11 cost or impact compared to core internals.

12 COMMISSIONER BURNS: Okay. And Ms. Bernhoft, is there 13 an area that you think is most challenging in terms of the research that is 14 underway for subsequent license renewal?

15 MS. BERNHOFT: I don't think there is one particular area that 16 is a challenge. I think what is important was touched in is we need to continue 17 to develop the state of the art for the inspection methodology. As the plants 18 continue to age, we do expect things to exhibit aging degradation.

19 You know you used the example of core internals. You know 20 it is closest to everybody's heart right now but as we improve the ability to do 21 the inspections for the core internals, it gives better information to the utilities 22 for their asset management. And that's making the economic decisions is a 23 repair or replacement needed.

24 COMMISSIONER BURNS: Okay. And I think a number of 25 you may have mentioned that there is some international cooperation going on 26 48 in some international work. If you could give me some brief description of what 1 type of work is being done overseas that is contributing to the understanding 2 here, particularly since in terms of outside the U.S., a lot of these countries, I 3 know for example, the French, they are really dealing with first term license 4 renewal. But any research that is worth highlighting.

5 MR. REISTER: Well just as an example, we created an 6 International Committee on Irradiated Concrete. So we collected different 7 countries and France and Japan in particular I think that we are doing work on 8 irradiated concrete and how it was effe cting -- irradiation was effecting the 9 degradation of concrete. So that's just one example where we have an 10 international work.

11 There is some work through the NEA and the IAEA as well.

12 And we also do some bilateral cooperation on various issues.

13 But so we're trying to seek targets of opportunity where there is 14 like-minded research and share that information and not duplicate effort.

15 COMMISSIONER BURNS: Okay, great. Thanks. Oh, go 16 ahead. I'm sorry.

17 MS. BERNHOFT: I can give really just three really quick 18 examples. ERPI is a member of the Material Aging Institute with EDF and 19 TEPCO and some other international members.

20 We do a lot of fundamental work on material characterization.

21 And a project we have going on right there is they built a scale-sized version of 22 a containment concrete or you know the containment model that we'll be doing 23 some testing on.

24 Another is working with the Japanese CRIEPI, which is 25 somewhat equivalent to EPRI. We have done quite a bit of work on the 26 49 modeling for IASCC, a lot of international collabor ation on that.

1 And another quick one is we worked with NRC as well and we 2 have harvested materials from the Zorita plant in Spain. It has 36 effective full 3 power years of operation. It is a small PWR.

4 We have harvested sections of core internals. And we have 5 also just recently worked with them to harvest sections of the biological shield 6 wall. 7 COMMISSIONER BURNS: Okay, thanks very much.

8 Chairman, thank you, Chairman.

9 CHAIRMAN SVINICKI: All right. Well, thank you all for your 10 presentations, for your answers to the questions of my colleagues. It has been 11 a very interesting discussion. I might focus on a few different areas, since we 12 have covered a lot of ground already.

13 Jason, your slide 11 had an anticipated -- has a charge of 14 anticipated submittals per year for subsequent license renewal applications, 15 based on a survey that NEI conducted.

16 How would you characterize the dependence of that type of 17 submittals over years? How dependent is that on the reliance on the 18-month 18 review schedule? If the first few of these were to take three or four years, do 19 you think it would paint a seriously different picture of the follow-on applications?

20 MR. REMER: I think that t he expectation based on our work 21 with your staff over the last three or four years and the success of first license 22 renewal have given people a confidence to say that it is essentially the same 23 process; we are making some improvements; we have upgraded the AMPs.

24 The expectation is that we will be more efficient the second round.

25 So I think if the first lead plants -- of course we had to get the 26 50 lead plants to bite on this idea, right? So the idea that it is going to be better, 1 they were able to take it to their management to get approval to go forward with 2 really a brand new process.

3 I think if it took a long time that there would be a chilling effect 4 in the industry on second license renewal. I think people would be afraid to 5 possibly submit if there was a lot of delay and it wasn't based on something we 6 did wrong.

7 So I think it is very important that we stick to the schedule. It 8 is a published 22-month review schedule right now without hearings. And 9 we're looking at 18 months. I think if we can kind of stay within that pocket, we 10 will be fine. If not, there must have been something that came up that we didn't 11 anticipate.

12 CHAIRMAN SVINICKI: I asked the question, basically, for two 13 reasons. First of all, my understanding of the history is the same as 14 Commissioner Burns. While I appreciate that people have been called 15 geniuses or brilliant or whatever the term was, but the truth was they were 16 hiccups. 17 COMMISSIONER BURNS: I'm not claiming that title.

18 CHAIRMAN SVINICKI: Well no, I know you're not because 19 you are a very humble individual but also you are aware of the fact that there 20 were significant hiccups. And the license renewal processes that exist today 21 is an evolution over some hard lessons learned. I think Calvert came in and it 22 didn't go well and there was a fundamental regrouping. And the Agency re-23 looked at the scope of license renewal. And so there were some very 24 foundational changes that we re made at that time.

25 So I can't be the only person in the room who has had the 26 51 experience that the first or second time you do something, it is not generally 1 your most efficient. But it may be that the broader perspective is that it is not 2 the first or second time that license renewal itself has been looked at. It might 3 be the first or second or the lead applications for subsequent license renewal 4 but there is a tremendous body of experience that is the foundation. It is the 5 initial license renewal.

6 So I don't know which way it will go but I kind of ask it for that 7 reason. The second reason I ask it is that we do have a little bit of this foot 8 race. I think all three members of the Commission now wil l have explored the 9 timeliness of the research results to the initial submittal. So I think we have 10 explored that fully already but the underlying question is are there research 11 results that won't be timely to the initial submittals? And I think we have 12 received answers in the general spirit that that isn't a principle concern right now 13 because the research that is ongoing is going to undergird perhaps some longer 14 term conclusions and the ability to have a better anticipatory knowledge of 15 phenomenology to the relevant and most important Aging Management 16 Programs.

17 So but it is, I think, a significant, I won't say pressure for the 18 NRC, but it is important that we understand th e dependency maybe even for 19 our own planning and resourcing purposes, the dependency in the industry as 20 a whole on the attractiveness of SLR based on keying off that 18-month 21 schedule. There are, of course, separate contested proceedings and 22 adjudicatory processes that, of course, will be available to those who choose to 23 intervene in the process. So that is another element of the license renewal 24 process as we move forward.

25 Moving to another topic it is a little --

26 52 MR. REMER: Can I say one more thing --

1 CHAIRMAN SVINICKI: Sure, Jason, go ahead.

2 MR. REMER: I'm sorry, just to respond is it the reason we are 3 calling them lead plants, rather than pilot plants is that we see it as the first 4 license renewal was a big step and we had to work out the details but second 5 license renewal really follows right along the same path as license renewal.

6 We just made it a little bit better.

7 So that is why they are lead plants and not pilot plants because 8 we don't think there is anything fundamentally different about the first and the 9 second, other than we hav e upgraded the processes.

10 CHAIRMAN SVINICKI: Well and of course the Commission, 11 itself, in its 2014 decision disapproved the staff's proposal that we undertake 12 rulemaking in this area. And the Commission, at that time, on which I served, 13 validated that the current framework was the right framework for follow-on 14 license reviews -- license renewal reviews.

15 So that is consistent with the Commission's policy view of the 16 matter. 17 The staff will present next and I don't mean to steal their thunder 18 but they will talk about developments and comments that they received on 19 various documents under development. And they will indicate that the area 20 that received the most comments from industry on the changes that they put 21 forward were to the reactor vessel material surveillance Aging Management 22 Program. And this has to do with the surveillance capsules.

23 So this isn't my area of expertise and I was reading only a 24 summary of this. Is there any concern that there will not be enough of these 25 surveillance capsules or with these newly instituted -- I was about to call them 26 53 requirements but of course if it's guidance it can't be requirements -- but with 1 the new definition of this, are we going to run out of surveillance capsules?

2 Is there anybody who can address that? I'm not sure what the 3 industry's principle concern was.

4 MS. BERNHOFT: I will take a stab at that.

5 With regard to the Surveillance Capsule Program with the 6 PWRs, yes, there were a number of comments on that particular Aging 7 Management Program and I will let the staff better characte rize some of those.

8 Some of them had more to do with like the timing for harvesting 9 of some of the capsules. And we had quite a few comments on that particular 10 aspect that we felt the timing that they were specifying in the AMP may not have 11 given some of the best value for some of the capsules. And it also had a 12 specification that some people have to capture an 80-year capsule, which in 13 some cases has already been harvested.

14 So the staff was very willing to listen and make some 15 adjustments there. And I think we have ended up in a good place. I'll let Paul 16 speak more to that because he was in strumental in some of those.

17 But with regard to your question on the number of surveillance 18 capsules, EPRI actually started proactively looking at this in about 2010 and we 19 designed two programs working collectively with the PWR community. One is 20 that we delayed the surveillance -- or the harvestin g schedule for 13 capsules 21 so that we could, knowing that plants were going to start talking about 80 years 22 of operation, instead of harvesting them within that 60-year period, we delayed 23 those 13 capsules so that we will collect data out to the 80-year period and they 24 will start to be harve sted about 2021 to 2025.

25 That required license changes or changes in license 26 54 commitments. Those letters have been prepared and submitted to the NRC an 1 approved. So that implements that Coordinated Surveillance Capsule 2 Program. 3 In addition, we took some capsules that had already been 4 irradiated and have reintroduced them into two host plants. One has already 5 been reintroduced. The other is going to be reintroduced later this fall. We 6 will harvest those in about the 2025 time frame also.

7 So there will be additional capsule data coming out for the 8 period of operation.

9 CHAIRMAN SVINICKI: Okay. The staff's information 10 indicated that some licensees may have to test and existing capsule that was 11 previously a standby capsule.

12 Again, it's not my area of knowledge but I think there is benefit 13 in having standby capsules because we will be going into further extended 14 operations and we may have new phenomenology that we wanted to study. So 15 I think that keeping -- this is very inartful terminology -- but keeping some 16 capsules in reserve for the exploration of emergent issues that we can't see 17 today I think is of value. And it was my hope that we weren't going to use this 18 -- I am probably speaking of this in such amateur terms but we weren't going to 19 use up all the capsules for things right now that we're worried about.

20 And so it sounds, Sherry, from your answer like we're not in 21 danger of doing that.

22 MS. BERNHOFT: No, no, we worked hard, knowing this was 23 coming in 2010, to extend out that period for harvesting.

24 CHAIRMAN SVINICKI: Okay and my last question is one that 25 I am sure that Sherry and Richard don't want me to ask. And it may not make 26 55 any sense. So if that is your answer is that my question doesn't make any 1 sense, that's fine.

2 But so we are working on these models for some of the 3 phenomenology in the materials aging area that we know is relevant or we 4 predict is very relevant to these decisions to operate these plants for 60 to 80, 5 80 to 100, whatever it is. Your researchers or researchers often look at once I 6 develop a model, maybe it's just me, but the fun thing to do sometimes is to run 7 it way out for long periods of time and see like what it predicts.

8 Now sometimes what it gives you in the really long periods of 9 time is just junk so it is not really relevant to anything but is there any sense --

10 do you have any kind of curious researchers that right before they go home at 11 night say let me run this; since the computational availability is a lot cheaper 12 than it used to be, I'm going to run out some of these models and see if I could 13 get a general sense of how long is too long to operate the current generation of 14 operating reactors in the United States. Is that question meaningful?

15 MR. REISTER: Well, I think the models that we are trying to 16 develop are physics-based models, as opposed to empirical models. So, it 17 does have the underlying physics of the chemistry and the thermodynamics and 18 the chemical or interreactions that are physics-based.

19 So you can run the models. It doesn't take that hard to run 20 them out into time as long as you want to run them. And there are some 21 phenomena that can occur that become significant in the longer periods of 22 operation.

23 One example, you talked about reactor pressure vessel, there 24 are some concern about late-blooming faces where some of the chemicals, 25 minor materials in the reactor pressure vessel can actually coalesce at periods 26 56 of time beyond 80 years kind of in the 80 to 100 years and actually cause some 1 embrittlement that is not seen with just in the current time frames.

2 And so that is exactly what the models are designed to do is to 3 look out into the future, in the long-term future to see what might happen and 4 try to predict that. And of course part of the modeling would be to take actual 5 materials, either in test reactors that have been accelera ted irradiation or 6 harvested form plants and maybe re-irradiated for those longer periods of time 7 to validate the model and say is that something we are actually seeing.

8 So the physics-based models can actually make those 9 predictions and then you can go back and look and validate it to see is that really 10 going to happen. And you are trying to do that ahead of time to get that 10, 15, 11 20 years ahead of time prediction to anticipate and eliminate surprises.

12 CHAIRMAN SVINICKI: The reactors that you're harvesting 13 from like Zion, though, the lifetimes are the lifetimes of the materials and their 14 exposure during the operating life of plants. And I think also there are reactors 15 around the world where materials have been harvested as well.

16 Did they run long enough to enter into the regimes of the 17 materials' properties where it is te rribly good for validating these models?

18 MS. BERNHOFT: They are good for validation. They're not 19 -- you know you bring up an interesting point. We recently had a workshop on 20 harvesting and one of the comments that was made is that they're good for 21 confirmation but they're not good for prediction.

22 So remember what harvesting is important for, you know you 23 don't have an 80-year plant out there that we can go take apart. That would be 24 a sweet spot.

25 But if you want to validate points on your curve, then they can 26 57 provide a lot of value if it is the right materials and we have a good history of 1 that piece of material, too, as we harvest it. So we spent -- with Zorita we spent 2 a lot of money on really va lidating the history of those core internals when we 3 harvested them. And what they showed is that they showed that our models 4 are conservative right now with regard to IASCC.

5 So one other point on Rich's comment, you know they are right, 6 they are physics-based models. We validate them with points that we can take 7 from test reactor data or from actual physical data and then we also rely on 8 expert elicitation as well.

9 You know one of the things with the IASCC, it is very much an 10 international panel. It has been put together and it takes all of those things, 11 including the expert elicitation as we ll to make sure it makes sense.

12 CHAIRMAN SVINICKI: Okay, thank you all. Well, thank you 13 gain for a good discussion.

14 Do either of my colleagues have any additional questions?

15 No, okay.

16 We will take a brief break while we reset for the NRC staff 17 panel. Let's resume at quarter to. Thank you.

18 CHAIRMAN SVINICKI: All right, thank you. We will 19 reconvene and come back into order her e to hear from the NRC staff panel.

20 We will begin with our Executive Dir ector for Operations, Victor 21 McCree. 22 Victor, please lead off t he staff's presentation.

23 MR. MCCREE: Good morning, Chairman, Commissioners 24 Baran and Burns. It's good to see you.

25 During today's briefing, we will provide updates on a number of 26 58 items associated with subsequent license renewal.

1 As the industry mentioned this morning, we anticipate an influx 2 of subsequent license renewal applications submitted to the NRC in the very 3 near future.

4 We remain committed to our proactive engagement with both 5 internal and external stakeholders so that our review of subsequent license 6 renewal applications will be as or perhaps more successful than our review of 7 the first license renewals.

8 Next slide, please?

9 Today, you will hear from four presenters who will emphasize 10 four key messages.

11 The first is the license renewal framework is the basis for 12 subsequent license renewal.

13 Secondly, that the NRC is ready to accept and review high 14 quality sites subsequent lic ense renewal applications.

15 Third, that we will issue new subsequent license renewal 16 guidance in July of this year following our extensive engagement with 17 stakeholders and a reflection on how best to optimize our reviews.

18 And, fourthly, confirmatory research is ongoing for a number of 19 the key technical issues that were mentioned this morning related to subsequent 20 license renewal.

21 Our first presenter to my right is Michele Evans who's the 22 Deputy Director of Reactor Safety Programs and Corporate Support in the 23 Office of Nuclear Reactor Regulation.

24 Michele will discuss how the established license renewal 25 framework which is contributed to the successful issuance of 87 renewed 26 59 operating licenses is adequate for the review of subsequent license renewal 1 applications.

2 Our second presenter is George Wilson, to Michele's right, the 3 Director of the Division of License Renewal and NRR.

4 George will provide a status of the development of the 5 subsequent license renewal guidance documents which are expected to be 6 issued in July.

7 George will also discuss how we plan to optimize the 8 subsequent license renewal review process in a way that demonstrates our 9 effectiveness, our efficiency and agility.

10 Our third presenter is Allen Hiser. Allen's the Senior Technical 11 Advisor in the Division of License Renewal and NRR.

12 Allen will provide a high level overview of the changes to the 13 guidance documents as compared to the current revision of the Generic Aging 14 Lessons Learned report, or GALL report.

15 He'll also describe how the subsequent license renewal 16 guidance documents were refined to ensure that the aging management 17 programs and activities will support up to 80 years of plant operation.

18 Our fourth presenter is Brian Thomas, the Director of the 19 Division of Engineering in the Office of Nuclear Regulatory Research.

20 Brian will conclude our presentation with a status of the 21 confirmatory research activities that address significant technical issues related 22 to subsequent license renewal and support up to 80 years of safe operation.

23 So, with that, I'll now turn the presentation over to Michele.

24 Next slide, please?

25 MS. EVANS: Thank you, Vic.

26 60 Good morning, Chairman, Commissioners.

1 As Vic mentioned during his opening remarks, we are here to 2 discuss how the staff is preparing to receive subsequent license renewal 3 applications.

4 As you can imagine, many of the activities that were performed 5 to demonstrate our readiness to review a subsequent license renewal 6 application have been derived from our experience with reviewing and 7 processing license renewal applications.

8 This slide illustrates the overa ll regulatory process for safety 9 during the license renewal period where the principle change from the initial 10 40-year operating period is additional aging management of passive long-lived 11 structures and components to ensure safe plant operation during the license 12 renewal period.

13 Next slide?

14 Okay, the regulations in 10 CFR Part 54 established two 15 fundamental safety principles.

16 First, the existing regulatory process is adequate to assure safe 17 plant operation for license renewal.

18 Part 54 establishes additional requirements to address the 19 effects of aging.

20 Second, each plant's current licensing basis must be 21 maintained throughout the license renewal period.

22 The regulations for license renewal focused on ensuring that 23 the long-lived passive structures and components in scope for license renewal 24 are aged-managed so that they will continue to perform their intended function 25 during the 20-year peri od of extended operation.

26 61 The focus of the renewal review is on the aging management 1 programs associated with passive long-lived components.

2 The application reviews for license renewal include the 3 evaluation of both safety and environmental aspects.

4 NRC's review is accomplished through a combination of on site 5 and in office reviews, audits and inspections.

6 Under a renewed operating license, the licensee is responsible 7 for all existing NRC requirements associated with the current licensing basis as 8 well as additional requirements related to aging management.

9 The reactor oversight process verifies that the licensee's 10 programs and processes maintain plant safety for active and passive system 11 structures and components during the entire operating life of the plant.

12 Next slide, please?

13 In SECY-14-0016, the staff provided potential rulemaking 14 options for subsequent license renewal. In response to that SECY, the 15 Commission did not approve the rulemaking options, leaving in place the license 16 renewal rule that has provided an effective basis for ensuring safe operation 17 during the license renewal period and will continue to be an effective basis for 18 subsequent license renewal.

19 The Commission directed the staff to update its guidance 20 documents for subsequent license renewal and to keep the Commission 21 informed on the progress in resolving technical issues as well as the staff's 22 readiness for accepting a subsequent license renewal application.

23 The staff has provided several briefings and products to the 24 Commission including a letter to Congress on subsequent license renewal 25 activities sent by NRR in March of 2016, an NRC and Department of Energy 26 62 Commission briefing in June of 2016 and an Operating Reactors Business Line 1 briefing in July of 2016.

2 Consistent with the license renewal rule, the focus of 3 subsequent license renewal is on the adequacy of additional aging 4 management programs and activities to ensure safe plant operation during the 5 subsequent period of extended operation.

6 Our next presenter, George Wilson, will discuss the 7 development of the subsequent lic ense renewal guidance documents.

8 Next slide?

9 MR. WILSON: Thank you, Michele.

10 Good morning, Chairman, Commissioners.

11 As Michele stated, an important component of the subsequent 12 license renewal application review is determining the adequacy of aging 13 management programs and activities to support operation up to 80 years.

14 To facilitate a more effective and consistent review, the staff 15 developed a General Aging Lessons Learned for subsequent license renewal 16 report which provides guidance for subsequent license renewal applicants, 17 contains the NRC staff's generic evaluation of acceptable aging management 18 programs and establishes the technical basis for confirming the adequacy for 19 the aging management programs.

20 The report also provides acceptable methods to manage aging 21 effects up to 80 years of plant operations, although the applicant may propose 22 plant-specific alternatives.

23 The staff also developed a standard review plan for review of 24 subsequent license renewal applications for nuclear power plants which 25 provides guidance to NRC staff reviewers, ensures quality and uniformity in the 26 63 NRC staff's reviews and presents a well-defined base from which to evaluate 1 applicant programs and activities for the subsequent period of extended 2 operation.

3 Both subsequent license renewal guidance documents were 4 developed using Revision 2 of the license renewal documents as a starting 5 point. 6 The staff published drafts of subsequent license renewal 7 guidance documents for public comment in December 2015.

8 Dr. Hiser will describe other information that was considered as 9 the staff developed the subsequent license renewal guidance documents.

10 Both documents provide transparency to the public for the 11 subsequent license renewal application review process.

12 Over 300 pages of comments were received and evaluated by 13 expert panels consisting of staff from numerous divisions in NRR and Research.

14 The staff also held nine public meetings in 2016 to facilitate 15 discussions of the comments and their resolutions.

16 The staff has completed its disposition of the public comments 17 and revised the documents as appropriate.

18 The staff discussed how the comments were dispositioned as 19 well as the other technical issues related to subsequent license renewal 20 guidance documents during the Subcommittee and Full Committee meetings 21 held with the Advisory Committee on Reactor Safeguards in late March and 22 early April of this year.

23 The final guidance documents will be issued in December of 24 2017 prior to the anticipated receipt of the license renewal applications.

25 Next slide, please?

26 64 As the representatives from the industry indicated, two letters 1 of intent have been sent to the NRC stating that the licensees will submit 2 applications for subsequent license renewal in mid-2018 for Peach Bottom 3 Atomic Power Station and early 2019 for Surry Power Station. However, more 4 applications are expected.

5 The staff continues to emphasize the usefulness of the letters 6 of intent to inform the NRC of the anticipated subsequent license renewal 7 application submittals so that we can adequately budget and plan for the 8 reviews. 9 We encourage the industry to continue to submit the letters of 10 intent so we can pr epare for the reviews.

11 Next slide, please?

12 In the spirit of Project AIM and consistent with the efficiency 13 aspect of our principles of good regulation, a subsequent license renewal 14 optimization working group was developed to evaluate the license renewal 15 application review process and determine areas that could be modified to 16 optimize the overall review process for subsequent license renewal 17 applications.

18 The optimization working groups obtained feedback from NRC 19 staff during internal meetings and also engaged with the industry and public 20 through several public meetings to better understand their experiences with the 21 NRC staff reviews of license renewal applications as well as their ideas on how 22 efficiencies could be gained.

23 We are adopting the recommendati ons of the working group in 24 four key areas.

25 First, the staff will increase the use of portals to review 26 65 documents related to the SLR application and the use of teleconferencing and 1 video conferencing for the discussions with the applicant.

2 This will maximize the in-office review time and will help focus 3 the on site audits.

4 Secondly, the staff will fully develop the safety evaluation report 5 and the environmental impact statement prior to attending on site audits to focus 6 the audits on outstanding issues resulting in reduced staffing and time for the 7 on site audits.

8 This is also intended to minimize the potential for additional 9 rounds of Requests for Additional Information and help further focusing on site 10 audits. 11 Thirdly, the staff will eliminate redundant inspections for 12 subsequent license renewal. This wil l eliminate the scoping and screening 13 activities associated with the preparedness to implement aging management 14 programs which were fully ve tted for the license renewal.

15 Lastly, the staff will hold a public meeting to explain the generic 16 issues associated with the required consultations for the environmental reviews 17 for other federal agencies.

18 This will ensure that the licens ees are aware of the required 19 biological studies necessary to ensure that the consultations with other federal 20 agencies are effective and timely.

21 A license renewal application review is typically performed in 22 22 to 24 months for a high quality application.

23 We project that we can reduce our safety review time by about 24 25 percent by implementing these efficiencies.

25 The overall review time could be achieved in 18 months after 26 66 completing the acceptance review.

1 Of course, this relies on receiving a high quality application with 2 no unusual technical issues or contentions as well as timely responses to any 3 requests for additional information from the licensee.

4 We will continue to look at our processes and schedules as we 5 progress with SLR reviews and apply lessons learned as we go.

6 I will now turn the presentation over to Dr. Allen Hiser. Allen 7 will discuss the staff's process for developing the staff's renewal guidance 8 documents.

9 Next slide, please?

10 MR. HISER: Thank you, George.

11 Good morning. The Co mmission SRM regarding 12 SECY-14-0016 directed the staff to keep the Commission informed on the 13 progress in resolving several technical issues related to subsequent license 14 renewal, identifying the four issues on this slide related to t he reactor pressure 15 vessel, vessel internals, conc rete, and electrical cables.

16 You will hear more about these issues in the next few slides 17 and from Brian Thomas later.

18 Overall, the industry is responsible for developing a technical 19 basis to demonstrate that aging effects for these and other technical issues will 20 be managed for subsequent license renewal.

21 The NRC is carrying out confirmatory research, as Brian 22 Thomas will describe in a few minutes.

23 For those aspects of these technical issues that are not fully 24 resolved on a generic basis, the applications for subsequent license renewal 25 will need to address these issues on a plant-specific basis.

26 67 Next slide, please?

1 To implement subsequent license renewal, the staff has 2 developed two main guidance documents, the GALL-SLR and the SRP-SLR 3 which parallel the Generic Lessons Learned Report Revision 2 and a Standard 4 Review Plan for License Renewal Revision 2 that are used for license renewal.

5 The GALL-SLR report identifies those material environment 6 and aging effect combinations that require aging management, during the 7 subsequent period of extended operation, including identification of appropriate 8 aging management programs.

9 Applicants are responsible for identifying in their applications 10 any additional items that require aging management.

11 Although the GALL-SLR repor t identifies one acceptable 12 approach to manage aging effects, applicants may propose plant-specific 13 alternatives along with sufficient justification that the program will adequately 14 manage the aging effects.

15 While the GALL-SLR report is geared toward use by applicants 16 to identify acceptable aging management approaches, the SRP-SLR provides 17 guidance to the staff for its review of SLR applications.

18 The SRP-SLR ensures a consistent and transparent review of 19 SLR applications by documenting the acceptance criteria and review 20 procedures that will be used by the staff in its reviews.

21 Next slide, please?

22 In order for plants to operate for 60 to 80 years during their 23 subsequent period of extended operation, we needed to determine the aging 24 effects that could occur during the operating period up to 80 years to ensure 25 that these aging effects can be detected in a timely manner and appropriately 26 68 managed. 1 The relevant aging effects could include known mechanisms of 2 age related degradation that are found in new locations or are found to be more 3 severe than previously identified due to exceeding incubation times or activation 4 energies that govern the mechanism.

5 Further, new phenomena that could induce aging represents 6 another area of interest. We need to remain alert to new aging related 7 phenomena that can occur.

8 Because the plants have operated for less than 50 years, other 9 information beyond an exclusive reliance on operating experience is being used 10 to identify the aging concerns for t he operating period up to 80 years.

11 To that end, in 2014, we formed subsequent license renewal 12 expert panels from staff in the Office of Nuclear Reactor Regulation and the 13 Office of Nuclear Regulatory Research to begin developing the guidance 14 documents for subsequent license renewal.

15 These panels started with the Revision 2 versions of the GALL 16 report and the SRP-LR that were developed for license renewal.

17 The panels then reviewed and de liberated on the information 18 contained in various sources as outlined on this slide.

19 We reviewed the information from the expanded materials 20 degradation assessment which Rich Reister described earlier in which NRC, 21 DOE, industry, and international experts identified the areas that they believe 22 will be the most challenging for subsequent license renewal.

23 In addition, we reviewed reports from audits that were 24 performed at several plants that had operated for several years in a period of 25 extended operation.

26 69 These audits were intended to qualitatively assess the 1 effectiveness of the AMPS and to identify unexpected aging phenomena.

2 These audits reviewed all of the AMPS implemented at the 3 plants, including those implemented on a one-time basis to ensure effectiveness 4 of preventive programs such as water chemistry programs as well as aging 5 management programs that implemented on a periodic recurring basis.

6 We also reviewed operating experience from both domestic 7 and international plants within these panels.

8 And, lastly, we considered comments from stakeholders that 9 were collected during public meetings as well as comments from the staff.

10 Next slide, please?

11 In the next several slides, I will describe some of the 12 refinements in the GALL-SLR report and the SRP-SLR as compared to the 13 Revision 2 versions of the GALL report and SRP-LR that are used for license 14 renewal from 40 to 60 years.

15 Two new aging management programs are included in the 16 GALL-SLR report. One program addresses fluence monitoring of the reactor 17 pressure vessel and reactor vessel internals as applied to both time limited 18 aging analyses and aging management revi ew for the vessel and internals.

19 This new program provides a consistent generic approach for 20 existing plant programs that are used to monitor neutron fluence.

21 In addition, a new program to manage aging of high voltage 22 insulators is including the GALL-SLR report.

23 The inclusion of this new aging management program provides 24 a generic aging management approach in lieu of the previous treatment on a 25 plant-specific basis by each applicant.

26 70 This new aging management program is an example of our use 1 of lessons learned from review of prior applications to improve both the 2 applicant's development of its subsequent license renewal application and also 3 the staff's review of the application.

4 The aging management program for reactor vessel internals of 5 pressurized water reactors and the Generic Aging Lessons Learned report 6 utilizes as its basis an industry report that addressed conditions for license 7 renewal at 60 years of plant operation.

8 This program uses a sampling approach to inspect the 9 components that are the leadi ng indicators for degradation.

10 For example, those with the highest neutron fluence or stress 11 levels. 12 The industry has stated that it will submit a similar analysis for 13 80-year conditions in 2020. In the absence of this generic 80-year analysis, 14 GALL-SLR states that each applicant may use its existing program for 60 years 15 as long as they supplement the program with a gap analysis to identify the 16 aging -- the additional aging management activities, if any, that would be 17 necessary to ensure adequate agi ng management for 80 years.

18 We received the most comments from industry on the changes 19 we drafted to the reactor vessel materials surveillance aging management 20 program. 21 The updated guidance for this program ensures that plants will 22 develop sufficient vessel material surveillance data to cover the entire 23 subsequent period of extended operation.

24 Specifically, licensees are expected to test the surveillance 25 capsule that bounds the fluence the vessel would see over 80 years of 26 71 operation.

1 However, we do not want licensees to accomplish this objective 2 by deferring testing of a license renewal capsule that they plan to test to address 3 60 years of operation.

4 Many licensees will need to update their surveillance programs 5 for subsequent license renewal, some by testing an existing capsule that was 6 previously a standby capsule and others by reconstituting samples from tested 7 capsules and reinstalling these samples in a new capsule in the vessel.

8 In this way, we have timely verification that the vessel is 9 operated with appropriate safety margins consistent with NRC regulations and 10 an early indication of any potential concerns.

11 Next slide, please?

12 In the electrical cable area, one program for electrical insulation 13 of inaccessible cables that are underground and not subject to environmental 14 qualification requirements was expanded into three aging management 15 programs to account for aging of cables at low and medium voltages along with 16 instrument and control cables.

17 This change was made to address the differences in both aging 18 effects and testing for t he three types of cables.

19 For concrete, we have made changes to the guidance to 20 address aging management of alkali-silica reaction and irradiation of concrete, 21 both of which are covered by further evaluations that require plant-specific 22 attention.

23 For alkali-silica reaction, the further evaluation identified in 24 Revision 2 of the GALL report for license renewal was updated to include recent 25 operating experience and additional understanding of this mechanism.

26 72 A new further evaluation on irradiation of concrete provides a 1 means for applicants to identify plant-specific conditions that would indicate 2 either a need for aging management or a technical basis for concluding that 3 irradiation of concrete is not a relevant aging issue for the plant.

4 Next slide, please?

5 The guidance documents for subsequent license renewal 6 provide means for applicants to develop adequate programs and for the plant 7 or for the staff to review applications.

8 Most of the relevant aging issues are addressed by generic 9 aging management programs in these documents.

10 For the few remaining issues, the guidance documents identify 11 further evaluations for the applicants to describe and justify their plant-specific 12 proposals to manage the aging effects.

13 In all cases, applicants are responsible to ensure that they have 14 identified the relevant aging issues for their plants, appropriate aging 15 management activities, and adequate just ification for their programs.

16 With the completion and issuance of these guidance 17 documents, the NRC is prepared to review subsequent license renewal 18 applications.

19 I will now turn the presentation over to Brian Thomas who will 20 discuss the confirmatory research activities that are occurring related to 21 subsequent license renewal.

22 Next slide, please?

23 MR. THOMAS: Thank you, Allen.

24 Good morning, Chairman and Commissioners.

25 As Dr. Hiser has outlined earlier, I will provide a status of the 26 73 confirmatory research supporting SLR regulatory decision making focusing on 1 the four key technical issues identified in the 2014-SRM.

2 In that SRM, the staff has made progress -- since that SRM, the 3 staff has made progress in conducting research to resolve the key technical 4 issues. 5 This progress has been accompli shed through a staff research 6 coordination with DOE and EPRI through deep-dive meetings and other 7 meetings on electrical cable aging, concrete degradation, and vessel internals.

8 The progress resulted in enhanced aging management 9 programs which are addressed in the subsequent license renewal guidance 10 documents as Dr. Hiser just discussed.

11 Subsequent license renewal applicants need to address the 12 issues not resolved on a generic basis with plant-specific basis submittals.

13 Data and knowledge from near-term and longer term 14 confirmatory research will be obtai ned to augment SLR guidance as needed.

15 First, I will address research on the reactor pressure vessel 16 embrittlement.

17 As one aspect of maintaining reactor pressure vessel integrity, 18 the NRC requires licensees to monitor the embrittlement of the reactor vessel 19 steel through surveillance programs. These programs are conducted 20 according to the requirements of Appendix H to 10 CFR Part 50.

21 Using the data from these programs as input to a 22 well-established predictive model, information on the future state of the vessel 23 embrittlement can be obtained.

24 For example, surveillance capsule specimens withdrawn and 25 tested over 40 years of operation could have experie nced radiation exposure 26 74 equivalent to that of the vessel wa ll after 60 to 80 years of operation.

1 The graph on the right of the slide shows the U.S. operating 2 experience resulting from t hese surveillance programs.

3 The staff continues to use these data to assess the accuracy of 4 the embrittlement prediction model in the NRC's Regulatory Guide 1.99 5 Revision 2.

6 Allen Hiser discussed a new aging management program 7 included in the GALL-SLR report that will provide a consistent generic approach 8 for existing plant surveillance programs.

9 The capsules from such programs will be removed from their 10 host reactors in the coming decade.

11 Additionally, EPRI has undertaken supplemental surveillance 12 programs to obtain data at high fluence for the PWR fleet.

13 The staff will use the data from these programs to assess the 14 continued validity of the NRC predictive model and to confirm the adequacy of 15 the RPV aging manag ement programs.

16 Next slide, please?

17 The objective of the staff's confirmatory research on reactor 18 vessel internals and primary system components is to independently assess the 19 effects of irradiation on material properties.

20 Irradiation can lead to irradiation assisted stress corrosion 21 cracking, IASCC, loss of fracture toughness, and joint swelling resulting in 22 potential loss of materials performance and component integrity during the SLR 23 period. 24 Materials removed from dec ommissioned plants are being 25 tested through international collaborative programs and at the Argonne National 26 75 Laboratory and are subjected to additional irradiation at the Holden reactor to 1 confirm the current understanding of the aging effects.

2 This additional irradiation will simulate t he irradiation assisted 3 degradation expected in some critical components during the SLR period.

4 The NRC's collaborating with EPRI and with international 5 regulators to obtain data on irradiati on assisted degradation representatives of 6 materials during the SLR period.

7 For example, the Zorita Internals Research Project is 8 examining irradiated material specimens from the decommissioned Zorita plant 9 in Spain, which operated for approximat ely 30 effective full power years.

10 The data from this program will offer insights on the irradiation 11 damage expected during the SLR period.

12 The staff will use the confirmatory research results in their 13 evaluation of the revision to EPRI's MRP-227 report from the Materials 14 Reliability Program entitled Pressurized Water Reactor Internals Inspection and 15 Evaluation Guidelines.

16 The results from this research will also be used to confirm the 17 adequacy of inspection plans and other aging management guidelines.

18 Next slide, please?

19 Degradation of concrete structures is another technical issue 20 that the staff is examining. The NRC's cooperating with the National Institute 21 of Standards and Technology to evaluate the effects of alkali-silica reaction on 22 nuclear power plant concrete structures through the SLR period.

23 This project will assess the effects of ASR and structural 24 performance of concrete under design basis static and dynamic loads for 25 current operating conditions and performance into the license renewal SLR 26 76 periods. 1 The NRC is participating in an international cooperative 2 research program to assess structures subjected to concrete pathologies under 3 the Nuclear Energy Agency.

4 In addition, the NRC is involved in a collaborative program with 5 the technical support organizati ons for the French regulator.

6 The material characterization and structural performance data 7 from our research will inform the review of the plant-specific evaluations and the 8 development of generic guidance for the review of aging management 9 programs.

10 Next slide, please?

11 The staff is coordinating with the Department of Energy on 12 concrete irradiation damage and with EPRI on structural safety performance of 13 concrete under design basis loads to support confirmatory reviews.

14 The staff is also assessing EPRI's approach to evaluate which 15 plant structures and configurations are most susceptible to the irradiation 16 damage. 17 Also, the staff is reviewing models of neutron fluence and 18 gamma dose to determine whether degradation of biological shield concrete is 19 a concern during the SLR period.

20 Based on the reviews, the staff will determine whether 21 additional confirmatory research on irradiated concrete is warranted. The 22 results will inform any necessary future refinements in SLR guidance.

23 Next slide, please?

24 The staff is also evaluating the adequacy of the electrical cable 25 condition assessment techniques in har sh environment qual ification methods.

26 77 The staff has recently begun confirmatory research on aging of 1 cables that mimic up to 80 years of operation.

2 The cable samples harvested from ex-plant and laboratory 3 aged, will be subjected to a loss of coolant accident test to evaluate performance 4 of their intended safety function during and after a design basis event.

5 The staff is assessing synergistic or concurrent thermal and 6 radiation aging processes and evaluating condition assessment methods for 7 detecting changes in electrical, mechanica l, and chemical properties of cables.

8 The industry's performing research to determine the 9 susceptibility of low and medium voltage cables to degradation and potential 10 failure in wet and submerged environments.

11 The staff is coordinating with EPRI in evaluating the need for 12 additional confirmatory research on wet and submerged cables.

13 The NRC is also participating in international cooperative 14 research on cable assessment under the auspices of the Nuclear Energy 15 Agency. 16 This program aims to estab lish the technical basis for 17 assessing the qualified life of electrical cables in light of the uncertainties 18 identified following the initial qualific ation testing.

19 In this and related areas, the staff will likely continue research 20 for the next three to five years to confirm the adequacy of the safety basis for 21 SLR and refinement of the aging management programs.

22 This concludes my presentation and I would like to turn over 23 the presentation to Victor McCree.

24 MR. MCCREE: Thanks, Brian.

25 Chairman and Commissioners, we appreciate the opportunity 26 78 to provide you an overview of our proactive activities to prepare for subsequent 1 license renewal.

2 In light of these activities, we feel that we're well positioned to 3 review subsequent license renewal applicat ions that we'll soon receive.

4 Furthermore, we have confidence that the framework used for 5 license renewal remains sound and is sufficient to facilitate successful 6 subsequent license renewal application reviews.

7 Throughout this process, we've engaged representatives from 8 the industry on the guidance that will be issued in July so that they can get an 9 early start in preparing their applications.

10 We've also captured ideas and recommendations from external 11 stakeholders and used them to optimize our safety review process so that we 12 can be more efficient and effective.

13 We value those exchanges which are ongoing and we'll 14 continue to engage in them so that our subsequent license renewal activity 15 efforts are optimized.

16 As you heard, there are confirmatory research efforts underway 17 on the technical issues that were described today.

18 If any of this changes the basis for our generic guidance, we'll 19 leverage our current well-functioning guidance update process to make 20 appropriate changes including engaging in public communications on such 21 issues. 22 So, with that, we welcome any questions.

23 Thank you.

24 CHAIRMAN SVINICKI: Thank you to each of the staff 25 presenters for that information.

26 79 We will begin, once again, with Commissioner Baran.

1 COMMISSIONER BARAN: Thanks.

2 Well, thank you for your presentations and for all of your work 3 in this area.

4 We talked a bit about reactor vessel internals during the first 5 panel, baffle bolt degradation is an example of an aging management issue 6 related to internals.

7 I think one of Sherry's slides actually had a few baffle bolt 8 pictures on it.

9 The bolts degrade over time due to radiation exposure and 10 differential pressure stresses in the core.

11 Recently, licensees have discovered a surprisingly large 12 number of degrade baffle bolts at four loop PWRs with a down-flow 13 configuration.

14 Although the NRC staff was aware of this degradation 15 phenomenon, the number of bolts with indications of problems was much higher 16 than expected.

17 For example, visual and ultrasonic testing revealed that around 18 a quarter of the baffle bolts at Indian Point Unit 2 showed indications of 19 degradation.

20 Based on Unit 3's shorter run time, the staff predicted fewer 21 degraded baffle bolt indications at Unit 3. But, again, the testing results were 22 surprising. Unit 3 turned out to have more indications of degraded baffle bolts 23 than the older Unit 2.

24 What's the staff doing to understand the gap between what was 25 expected and what actually occurred?

26 80 MR. MCCREE: If we'd have Jeff Poehler --

1 COMMISSIONER BARAN: Sure.

2 MR. MCCREE: -- from the staff take that question.

3 MR. POEHLER: I'm Jeff Poehler, Senior Materials Engineer 4 in the Vessel and Internals Integrity Branch in NRR, Division of Engineering.

5 So, yes, I just wanted to say, yes, at Indian Point Unit 3 there 6 was a larger number of baffle bolts found potentially degraded than at Indian 7 Point Unit 2 by about -- it was about 30 bolts more, 259 potentially degraded 8 bolts versus 227 which is, you know, is a little bit counter to what was predicted 9 based on the operating hist ory of the plants.

10 But, when we looked at the degradation, the actual severity of 11 the degradation at Indian Point 3, although the numbers of bolts were somewhat 12 greater, it appears that the degradation of the bolts is actually less severe.

13 And, if you look at based on removing bolts, when you remove 14 the bolts with indications, if they break, that's an indication of a more advanced 15 state of degradation.

16 So, at Indian Point Unit 2, about 30 percent of the bolts broke 17 upon removal. Whereas, only about 15 percent of the defective bolts or 18 potentially degraded bolts are br eaking at Indian Point 3.

19 So, that's one indicator that the indications may be smaller, in 20 other words, the cracks in the bolts are smaller and not as old or not as 21 advanced.

22 Also, at Unit 3, there was no bolts that were observed to be 23 visually failed. While, at Indian Point Unit 2, there are about 30 bolts that were 24 visually found completely broken before they even began the UT examination.

25 So, based on those indicators, although the numbers appear to 26 81 be larger at Unit 3, we don't necessarily think it's a worse state degradation.

1 And, in order to help us understand this better, the staff is 2 keeping close tabs on some destructive laboratory work that the industry is 3 doing. They've withdrawn quite a few bolts from at least two of the first three 4 plants last year that found large numbers of bolts degraded.

5 So, those laboratory exams are ongoing. We've seen some of 6 the preliminary results and we

're following that closely.

7 And, we're also following closely what the industry is doing as 8 far as developing -- revising their guidance. And, we've already received two 9 interim guidance letters issued by the EPRI Materials Reliability Program that 10 the staff is curr ently evaluating.

11 We held a public meeting two weeks ago to discuss the latest 12 guidance letter.

13 So, we will eventually document our position on that in a 14 publically availa ble document.

15 COMMISSIONER BARAN: Let me ask about the guidance.

16 Are you talking about surveillance requirements guidance?

17 MR. POEHLER: This is guidance that relates to the inspection 18 schedule for both the initial inspections of the baffle formal bolts and subsequent 19 inspection.

20 Once they do the initial inspection, how long do they have to do 21 the next inspection, the follow up inspection?

22 MR. HISER: This guidance impacts directly on the aging 23 management program.

24 COMMISSIONER BARAN: Right.

25 MR. HISER: So, the PWRs have implemented and that are 26 82 addressed in the renewed licenses and will be addressed as well in the 1 subsequent license renewal.

2 COMMISSIONER BARAN: Okay. And, what's the 3 sense -- so, it sounds like that effort's ongoing in terms of updating the 4 inspection guidance.

5 What is the sense about the adequacy of the current inspection 6 schedules, timing and nature of inspection? Is it the view that there are some 7 changes that should be made to the inspections?

8 MR. POEHLER: Yes, well, the staff agrees that, for a certain 9 category of plants, there's seven plants that were in the most susceptible 10 category and those are the plants -- Westinghouse units with four loops and a 11 down-flow configuration and Type 347 stainless steel bolt material.

12 So, that includes the Indian Point units, DC Cook, Salem, and 13 one of the Diablo units.

14 So, it appears that the initial schedule that was originally in the 15 MRP guidance, MRP-227, was a little bi t maybe optimistic for those plants.

16 But, for all the other plants, all the other PWRs, it appears to be 17 right on. We have quite a few other Westinghouse units like two and three loop 18 downflow units that are older units and they seem -- the guidance seems to be 19 appropriate for them, at least as far as the initial inspection schedule.

20 Although, even the latest guidelines from EPRI have moved 21 that up a little bit. Before, they had until 35 effective full power years, now they 22 have to move back to 30.

23 And, some of the other categories of plants are still allowed to 24 go out to 35 EFPY.

25 COMMISSIONER BARAN: So, for the seven plants you're 26 83 talking about there, what you're envisioning, I understand that decisions aren't 1 made on this, what you're envisioning is that initial inspections would start earlier 2 on this and that there may be increased frequency of those inspections?

3 MR. POEHLER: Well, yes. They've already started earlier.

4 In fact, the first interim guidance came out last summer. So, four of those 5 seven plants have already implemented their -- done their baseline initial UT 6 examinations and the other th ree will complete them by the end of this year.

7 One of them is doing it this week and another starts next week 8 and then one in the fall.

9 So, they'll all have done their initial exams. And then, their 10 follow up exams, they've also -- the latest interim guidance from EPRI MRP also 11 puts some limits on how many years they can go before they have to do a follow 12 up. 13 And, they also have to do a plant-specific evaluation to verify, 14 you know, how long they can go. It might be less, it might -- it could be only 15 two years and some plants, like Indian Point has -- not voluntarily, but they've 16 modified their program to do the UT at each subsequent refueling outage until 17 they shutdown.

18 COMMISSIONER BARAN: And, what's the time line for the 19 staff deciding on guidance?

20 MR. POEHLER: As far as reviewing the industry's guidance, 21 we're doing that right now. I don't know if I have an exact date for when we'll 22 be publish our final position on that, but I think it will be this year.

23 We also, in house, we are also reviewing a revision to the 24 MRP-227 guidelines. That's the overall guidelines for all the internals, not just 25 baffle bolts. And so, that is underway and the safety evaluation for that would 26 84 probably be final third quarter of 2018.

1 But, in that, we would also document our position on the EPRI 2 interim guidance for baffle-former bolts because the interim guidance actually 3 modifies the standard guidance.

4 COMMISSIONER BARAN: Thank you. Thank you for that 5 update. 6 Baffle bolts, I think, raise the broader question of how NRC's 7 going to address unexpected new technical issues or results in the context of 8 subsequent license renewal.

9 We know there are outstanding te chnical questions related to 10 operation beyond 60 years, but, as Allen mentioned, new issues are also likely 11 to arise that we aren't currently focused on.

12 How are we going to address those issues in the subsequent 13 license renewal process or, put another way, how do we ensure that aging 14 management programs can adequately address the unknown unknowns?

15 MR. WILSON: A couple of the ways that we do that is, as we 16 get new operating experience and we evaluate new issues, the staff issues 17 interim staff guidance so that industry understands that they have to address 18 the issues.

19 We also, if we would have the applications in house, we would 20 ask RAIs on those issues to the applications that we had in house because the 21 ISGs would be forward looking.

22 We also, one of the things the industry pointed out that is 23 correct, the aging management programs are living. So, we actually have 24 inspection processes that will go back out and look five to ten years in the 25 license renewal.

26 85 We just made a brand new inspection, 7103 Phase IV, which 1 will actually go out and that evaluates the aging management program 2 effectiveness and we evaluate that.

3 It's actually a performance-based inspection review. It starts 4 out with 7103 Phase II which does a baseline inspection and looks at the 5 performance of the licensee.

6 Then the regional management along with headquarters 7 management decides if, like if it was a dual unit site, whether we would go do 8 another full blown team inspection in the second unit or the first unit did fine and 9 we would just send a smaller team out and only focus on those areas.

10 If we see a degrading performance, then there's another Phase 11 III inspection that we could do at the one to two year point that they were in 12 license renewal or we could pull that based on the performance, we would work 13 with the region.

14 So, those are some of the ways that we look at the overall 15 effectiveness of the aging management programs for each individual plant.

16 And, we would expect them to -- everything's in their FSARs and their Corrective 17 Action Programs and they would make adjustments as necessary because they 18 have to keep the aging management programs effective to, you know, prevent 19 long-term degradation and make sure that safety systems can perform their 20 function.

21 COMMISSIONER BARAN: And, I'm going to try not to go as 22 over as I did with the first panel, so let me just close with this.

23 So, you know, Dave Lochbaum on the first panel raised this 24 point about, you know, as time passes and there's more operating experience 25 and lessons learned, we're seeing revisions to the GALL reports and to the 26 86 methodologies and the AMPS.

1 And, he argued that, well, it's a problem that, you know, later 2 plants are basically subjected to or complying with better versions of the 3 guidance than earlier plants.

4 Do you have thoughts about that?

5 MR. WILSON: No, I think they, once again, it's living. And, if 6 you look at the way that a license renewal rule Part 54 was written, let's say like, 7 you know, he brought the alloy 600, if it becomes, after even after we issue a 8 license, a renewed license to a licensee, if there's an SSC that should have 9 been scoped and that we originally didn't scope, then the licensee should look 10 at that, evaluate that, put their Corrective Action Program, and either modify an 11 aging management program or a TLA they have at the site or make a new one 12 which is in accordance with 54.37.

13 So, the regulation has that al ong with the Corrective Action 14 Program, we'll expect the licensee to make those necessary adjustments as 15 new operating experience comes throughout the plan.

16 COMMISSIONER BARAN: Thank you.

17 CHAIRMAN SVINICKI: Thank you.

18 Commissioner Burns?

19 COMMISSIONER BURNS: And, let me follow up -- give a 20 follow up question to that.

21 So, what you're expecting to do is for the licensee to continue 22 to evaluate the aging management program to make adjustments to reflect 23 operating experience, i ndustry-wide experience.

24 So, what is the consequence of the failure to do that? Is that 25 a violation? I don't recall the --

26 87 MR. WILSON: I would have to --

1 COMMISSIONER BURNS: -- provision in Part 54.

2 MR. WILSON: Well, a lot of this falls back into Appendix B 3 Criterion 16, the problem identification and resolution to the Corrective Action 4 Program that a licensee has.

5 As additional information comes in, we would do an expectation 6 that the licensee evaluate to see if they have to do any necessary adjustments.

7 If we did not agree with the licensee and they continue not to 8 make, then we could take enforcement actions under 50.100 and/or 50.109 the 9 backfit or, you know, the orders.

10 But, right now --

11 COMMISSIONER BURNS: On the basis of Appendix B or --

12 MR. WILSON: Correct.

13 COMMISSIONER BURNS: Okay.

14 MR. WILSON: Because --

15 COMMISSIONER BURNS: Because the violation isn't 16 50.109. 17 MR. WILSON: No, well, that would be looking at doing a 18 backfit. 19 COMMISSIONER BURNS: Right, okay.

20 MR. WILSON: So, you were asking what would I do with 21 enforcement, I was just running through --

22 COMMISSIONER BURNS: Okay.

23 MR. WILSON: -- the different scenarios. But, we would first 24 start out hope that the licensees their Co rrective Action Programs, we evaluate 25 then they make the necessary adjustment s in accordance with their programs.

26 88 COMMISSIONER BURNS: Okay.

1 MR. HISER: One of the difficulties --

2 COMMISSIONER BURNS: Go ahead.

3 MR. HISER: One of the difficulties with a lot of the things that 4 Mr. Lochbaum mentioned is that aging management is intended to preserve 5 margin. So, it's to maintain margin against having a safety issue.

6 50.109 puts a very high hurdle on the staff to implement a 7 backfit. You really have to have a safety issue.

8 So, if now you have just a slight degradation in the margin, 9 you're not at the level that you ca n implement a backfit because of 50.109.

10 COMMISSIONER BURNS: Okay. Let me address one other 11 thing and give the staff an opportunity to address.

12 Mr. Lochbaum was, I think, probably, as I would expect and I 13 probably would be disappointed that it took four years for the staff to respond to 14 a comment he made. How woul d the staff respond to that?

15 What is their rationale fo r that or an explanation?

16 MR. BLOOM: Steve Bloom, the Branch Chief in charge of 17 Generic Subsequent License Renewal Operations and Guidance.

18 I don't want to throw anyone under the bus, but before I got to 19 the branch, those meetings happened before that. But, when I got here and I 20 saw that they hadn't been responded to, I made sure that, as we were going 21 along, my staff started looking at those old comments from 2012 and I said, this 22 is -- we have to get something done before we're finished because it's not -- it 23 was not appropriate that we didn't answer him.

24 COMMISSIONER BURNS: Okay, thanks for --

25 MR. HISER: And, part of it, I think, that was with our panel 26 89 process that we took comments like that in. So, it really was until that point that 1 we had resolved the issue. And so, then, we had a response to the comment.

2 COMMISSIONER BURNS: Okay, thanks for that.

3 I think you've recently been before the ACRS on SMR 4 expectancy. When do we expect an ACRS letter on this?

5 MR. WILSON: The letter is completed.

6 COMMISSIONER BURNS: Is it?

7 MR. WILSON: If you would like to see it.

8 COMMISSIONER BURNS: No, that's okay.

9 MR. WILSON: There you go.

10 (LAUGHTER) 11 COMMISSIONER BURNS: So, what did they say and some?

12 I haven't had a chance to --

13 MR. WILSON: Well, they said that the documentation, the 14 guidance documents are good and 71003, t he inspections will ensure the 15 material condition of the plant along with the audits that will be performed during 16 the review.

17 And, we are ready to receive and evaluate a subsequent 18 license renewal, basically is what the letter says.

19 COMMISSIONER BURNS: Okay.

20 One of the -- as we've noted, I think, Commission Baran sort of 21 touched on and we talked about a little bit in the first panel, there is some 22 research underway, ongoing, that will inform, you know, long-term, but also 23 short-term, where we go in terms of our evaluation.

24 We've set objectives, which I think is a good thing in terms of 25 how we -- or how long we anticipate the review would take.

26 90 What do you see -- but, I think as the Chairman noted in one of 1 her comments from the last panel is, while we're in a different place, I think, than 2 we were for the -- when the license renewal rule was first promulgated, because 3 actually we sort of reset the rule in some respects, and we've focused, and I 4 think rightly so, on the aging management mechanisms to the extent that we've 5 had this discussion earlier that the living nature of t he aging management 6 system within the regulatory context, which I think is a good thing.

7 But, you know, again, we have some things that may come up 8 as the research concludes. How do you see -- how do you prepare for that with 9 respect to looking at applic ations that may be underway, that may be in front of 10 us or these initial ones?

11 And, you know, how do you -- how are you planning for or 12 positioning yourself to work through that in the light of what I would say is an 13 ambitious objective to come through?

14 MR. WILSON: So, overall, you know, the -- some of the issues 15 where we're doing confirmatory research, the plants will end up sending a 16 plant-specific evaluation that will evaluate their individual aging management 17 program. 18 We expect them to be a high quality and actually have 19 pre-submittal meetings with the licensee to address something where there's 20 going to be a plant specific evaluation so that we can get a heads up on it.

21 If, during the process as Commission Baran had asked, if 22 something comes up and we get new information, we will have to ask additional 23 RAIs to address the new information, have the licensee explain how they would 24 deal with that new aging phenom ena that we did not have.

25 And then, forward looking, we would an ISG to send out for all 26 91 the future applicants and then make the changes to the SRP and the GALL as 1 necessary once we have written those ISGs.

2 So, we don't anticipate, you know, as we get more and more 3 information, we'll sit back and we'll, you know, if we get -- we'll look at it to see 4 if there's a degradation or a phenomenology that we haven't evaluated and 5 anticipate and starting do that and have industry meetings as stuff comes up 6 with the industry so that they can, based on the frequency as problems arise, 7 so that they can be addressed and put out into the public.

8 So, that's how right now we would address if something came 9 up unexpectedly.

10 COMMISSIONER BURNS: Okay.

11 And, I, you know, I understand that, you know, the staff has had 12 public meetings to discuss, you know, optimization of the review application or 13 the review and the license r enewal application process.

14 And, you know, some of the issues -- and I've heard this term 15 high quality application from both panels. I hope all applications are high 16 quality for whatever activity that the -- a licensee is seeking either approval from 17 as well as our review are all of high quality.

18 But, what is it that we need to align? Is there -- are there things 19 we need to align on with respect to the -- what we consider a quality or a high 20 quality application?

21 MR. WILSON: Well, we can just go by the experience. The 22 industry realized when they submit stuff in, if we don't have questions in that 23 area, that's, you know, what we're looking at.

24 The SRP and the guidance documents provides a baseline of 25 the stuff that we're looking at. The pre-submittal meetings on stuff that would 26 92 take a variance of the GALL or would have something that would be a 1 plant-specific evaluations, we would say we need this, this, and this to go 2 through it.

3 As long as the licensee and the industry is learning from itself 4 as we go through the process and we're learning, you know, as each submittal 5 comes in, we go through the process. They know exactly what we have to 6 have. 7 License renewals itself has already laid down a good basis.

8 They know what they have to give us, to provide us to do a full evaluation of the 9 aging management program.

10 So, we would expect them to take that as a bas eline and then 11 build upon that.

12 COMMISSIONER BURNS: Okay.

13 MR. HISER: And, I think one of the main areas it would be 14 completeness of information. And, in some areas, we end up having to ask 15 Requests for Additional Information repetitively, application after application.

16 And, hopefully, with SLR, some of that information will be built 17 in so we can avoid those RAIs.

18 COMMISSIONER BURNS: Yes, that's a good point. If we're 19 already able to communicate that. You know, part of it, we're communicating 20 it by asking the -- if we find we that we have to ask the question repeatedly.

21 But, I think there probably is, and obviously, we haven't gotten to the point where 22 we have the applications yet, but they're probably is, if we were sitting here, you 23 know, maybe five, seven years or so from now, and I think just as I think, and 24 my recollection as we did with initial license renewal, sort of stepping back and 25 sort of seeing where, you know, where our areas that, you know, for 26 93 improvement, that we can say, hey folks, if you're really serious about this 1 coming in, you really -- we need, you know, to be addressing certain areas.

2 You know, the same token, there may be things we put less 3 emphasis on.

4 So, I think that's a good --

5 MR. WILSON: The licensees also explained to us that for the 6 subsequent license renewal they're going to require a peer check process to 7 where it wouldn't be just Peach Bottom and Exelon submitting something, North 8 Anna, and Dominion would evaluate Exelon's submittal, then it would be the 9 same for coming in.

10 So, that peer check should catch stuff if it's incorrect by the 11 industry on stuff that we had to have additional information --

12 COMMISSIONER BURNS: And make continuous --

13 MR. WILSON: -- and make it a higher quality.

14 COMMISSIONER BURNS: Yes, okay.

15 Thanks. 16 CHAIRMAN SVINICKI: Well, thank you all for your 17 presentations.

18 I might begin by just making a comment regarding Mr.

19 Lochbaum's observation that he had advanced some comments in 2012 and 20 the staff had not responded for some time.

21 I do want to note that the staff, I think, is exemplary in the 22 amount of public meeting and discussion that it conducts. We do often receive 23 and, of course, benefit -- our processes benefit in their design and evolution 24 from the input that we receive.

25 We don't always develop a written response document. It is 26 94 not always required as par t of our processes.

1 What I would hate to see is the staff feel that an expectation is 2 being created that all comment received orally at public meetings required 3 written response within a certain time.

4 I think the inevitable result of that would be that the staff would 5 go out for public dialogue less frequently because there are resource constraints 6 and, therefore, but I take as a very sound observation that four years is a long 7 time to wait for a reaction.

8 But, the staff also had the issues in that time under very active 9 internal deliberation. And, I think perhaps there wasn't a response to give.

10 So, I respect Mr. Lochbaum deeply and I personally have 11 benefitted from talking with him and his insights on these issues which he's been 12 following for a long period of time.

13 But, I don't think that I'm inclined to find fault with the staff in 14 this instance because I think that there's a larger picture here.

15 And so, I don't expect the staff to react to that. But, I do want 16 to say that, you know, it's the great irony of life sometimes. Your instincts are 17 so pure that you want to go out and have public dialogue but it may be that that 18 creates an expectation of, you know , of a formal written response.

19 I think we have a limited subset of our processes that actually 20 do require us to do that within a certain period of time. And, that discipline is 21 very beneficial. But, it's not always a part of our public dialogue.

22 So, I just felt a need to say that. Irrespective of Branch Chiefs 23 transitioning and turning over, I think there was more to that story if the right 24 NRC person had been here.

25 So, I wanted to advance that on the staff's behalf.

26 95 Turning to the subject matter that we were talking about directly 1 today, and I think it was Allen, you mentioned that the NRC formed subsequent 2 license renewal expert panels. Those were comprised of folks from NRR and 3 Research and they began in the initial stages of developing the guidance 4 documents for subsequent license renewal.

5 Since we've talked about the aging management, the 6 inspection process, the living nature of that and the feedback loops, how was 7 inspection expertise at NRC represented in those panels? Is NRR bringing it?

8 Is that the representation of it? Is it through the NRR experts?

9 MR. HISER: Actually, though both NRR and Research. We 10 do have staff that change offices. And so, we have a spectrum of experiences 11 and knowledge really in both offices and that's why we form these panels with 12 the two groups.

13 We did have some folks whose expertise is purely inspection.

14 So, they were involved. And, also, from dealing with the issues with plants and 15 with the industry, I think everybody ends up with a certain level of expertise on 16 inspections.

17 CHAIRMAN SVINICKI: Okay, thank you.

18 It just, based on the responses to some of the other questions, 19 it seemed like that specific expertise was necessary for those panels. So, I 20 appreciate your assurance that that wa s represented in an appropriate form on 21 those. 22 Brian, I was wondering, we've ta lked a lot about the research 23 that's been done, the ongoing research. There is this integrated and 24 coordinated effort.

25 We've had some of the representatives here today. The DOE 26 96 light water reactors sustainability program, EPRI, the industry has talked a little 1 bit about it.

2 Could you describe at a high level what it is that NRC does in 3 its independent confirmatory capacity versus participating in those integrated 4 research programs?

5 And, please don't take from my question that I advocate that we 6 would ever be cost-effective for us to go out and replicate all of the physical 7 research itself.

8 I imagine that we do confirmatory review analyses, our own 9 kind of computational work.

10 But, could you talk at a philosophical level, how do we create 11 that measure of independent assuranc e on these research results?

12 MR. HISER: Yes. Well, we, you know, we work very closely 13 collaboratively with industry and with EPRI and with DOE.

14 We strive to identify what research is being done and I believe 15 EPRI -- I believe Sherry spoke about road maps as well as Jason Remer.

16 We develop road maps, we look to see exactly what's needed.

17 But our focus is on what research is being done, how does it enable us to deal 18 with the degradation phenomena or the issues that we're focusing on?

19 But we also look to identify what are the gaps in the research 20 that is not being done?

21 For example, a good example is the irradiated concrete. You 22 know, Sherry spoke about, and Rich Reister spoke about under the LWR's 23 programs, but we had a lot of analytical techniques, their modeling of the 24 concrete and so forth.

25 We felt very strongly that looking at the irradiated damage on 26 97 the concrete should be addressed. We communicated that. We identified it.

1 And then, the staff itself undertook the effort so we initiated 2 those efforts to seek out the concrete from Zorita through our work with Oak 3 Ridge and through the Spanish regulator, obtain that concrete, harvest the 4 concrete, you know, and focused on characterization of that concrete.

5 And then, also, we discussed that matter with DOE and EPRI 6 and whereby DOE then undertook efforts to help acquire the concrete and the 7 plans to ship that concrete to Oak Ridge, store the concrete. DOE would 8 undertake the economic or the cost associated with that.

9 At which point we will do the reviews of what is being done 10 analytically. We'll do reviews, re-reviews, if you will, of the modeling and so 11 forth. 12 But, we will arrive at a point where we'll decide, do we need to 13 go further based on the information we have in hand?

14 So, there is a hold point, for example, on the irradiated 15 concrete. Do we need to go further and undertake further testing of concrete 16 irradiation, recognizing it's a very involved economic factor there.

17 So, speaking of it in terms of an appendance, this was under 18 our -- under the NRC staff volition that we encouraged the industry to go in that 19 direction.

20 CHAIRMAN SVINICKI: So, it sounds like from your answer, I 21 think this is an important reminder, I proposed the question so focused on the 22 back end and when the results are achieved, what do we do with them?

23 But, I'm widening the aperture based on your response which 24 is that, it is looking maybe at the design of test plans and other things all along 25 the way that allows us to perhaps receive results that we think are going to be 26 98 the most directly relevant to the safety determinations that we need to make 1 rather than allow that all to happen outside of any input from us as the safety 2 regulator.

3 And, at the end of the day, throw the results back over the 4 transom and say, well, you didn't test this in the areas where I think are most 5 relevant to the determinat ion that I have to make.

6 So, it's really that participation along the way.

7 MR. HISER: Yes, yes.

8 CHAIRMAN SVINICKI: Okay.

9 MR. HISER: It's much of that.

10 CHAIRMAN SVINICKI: Okay , thank you for that.

11 And then, the NEI presenter talked about a draft model SLR 12 new and significant assessment approach for SAMA that they've submitted to 13 the NRC, I imagine for endor sement as a guide.

14 And, the intention articulated by NEI would be to improve the 15 environmental review process.

16 Is there any of the staff here at the table that could talk about 17 our understanding of the purpose of that? Is it submitted for possible NRC 18 endorsement? And, if so, what is the general time frame within which NRC 19 staff would look at and react to that document?

20 Okay. Are we not -- serious people are being called all the 21 way from the back of the room. I think people are going to start leaving the 22 room. 23 (LAUGHTER) 24 CHAIRMAN SVINICKI: It did not save you, sir, to sit in the 25 back row. You're having to come all the way up here to the microphone.

26 99 And, if you could please introduce yourself when you -- before 1 you give this answer that you're the only person in the room who knew it.

2 MR. PARILLO: My name is John Parillo. I'm in Division of 3 Risk Assessment in NRR and I was involved in some of the SAMA reviews.

4 I'm actually here filling in for Jerry Dozier who is more involved 5 with this particular issue. He did the SAMA -- well the -- he performed the 6 review for the Limerick which was based on a review of new and significant 7 information.

8 And, we did have a meeting last week or week before 9 discussing this document. I do not know the time frame.

10 CHAIRMAN SVINICKI: Oh, you're really garnering a lot of 11 sympathy, I think, from most of the people in the room.

12 MR. PARILLO: But --

13 (LAUGHTER) 14 MR. PARILLO: What I can tell you about it is that the issue will 15 be on providing new and significant information and that discussion is --

16 CHAIRMAN SVINICKI: Is this to provide maybe for some, if 17 agreed to, consistency of approach to the --

18 MR. PARILLO: Yes.

19 CHAIRMAN SVINICKI: -- look for new and significant --

20 MR. PARILLO: As in how --

21 CHAIRMAN SVINICKI: -- for that --

22 MR. PARILLO: -- in how that --

23 CHAIRMAN SVINICKI: -- a consistent assessment 24 approach?

25 MR. PARILLO: Exactly.

26 100 CHAIRMAN SVINICKI: Okay.

1 MR. MCCREE: Chairman, if I might.

2 CHAIRMAN SVINICKI: I'm glad I'm answering my own 3 questions now.

4 MR. MCCREE: If you would --

5 CHAIRMAN SVINICKI: But, go ahead.

6 MR. MCCREE: We'd be happy to provide the --

7 CHAIRMAN SVINICKI: Okay.

8 MR. MCCREE: -- you and the Commission --

9 CHAIRMAN SVINICKI: That's fine.

10 MR. MCCREE: -- info rmation to address --

11 CHAIRMAN SVINICKI: And, I think just a note, it does, in all 12 seriousness, and I do thank you. That shouldn't have --

13 And, whoever called y ou up, that was mean.

14 (LAUGHTER) 15 CHAIRMAN SVINICKI: Anyway, but thank you for your 16 answer. 17 I will say that, on a more serious point, you know, we focused 18 a lot on the technical review. But, if there is a broad expectation or if the NRC 19 staff has itself articulated that perhaps an 18-month review schedule is going to 20 be achievable, I think the companion environmental reviews, I would imagine, 21 would benefit from the same systematic look and updating of various things.

22 So, although the staff didn't cover this particular submittal in its 23 presentation, it does seem to me to be a complementary type of initiative by the 24 industry to say, hey, what -- how would NRC react to this as the standardized 25 template for doing these assessments?

26 101 And, it would be important for the environmental processes to 1 proceed with the same sort of efficient dispatch as everything else.

2 MR. MCCREE: Thank you for the context and we'll ensure 3 that we understand what NEI is proposing or requesting and that a schedule for 4 review doesn't de-compliment the 18-month review schedule which we believe 5 is achievable.

6 CHAIRMAN SVINICKI: All right, thank you.

7 Michele did you want to -- okay, all right.

8 Just one last thing, and I know we've, on our side of the table, 9 run over, we were chatting in the back that, at some poin t, when there's more 10 people sitting on this side of the table, we're going to have to be a little more 11 disciplined than we're being these days.

12 But -- 13 COMMISSIONER BURNS: Just schedule seven minutes.

14 CHAIRMAN SVINICKI: We'll schedule seven minutes, okay.

15 Well, that's -- we will take that under advisement.

16 (LAUGHTER) 17 CHAIRMAN SVINICKI: Yes, when we've been going to 14 18 and 15 minutes, we're really going to do seven? Okay, well, we'll see how that 19 goes. 20 I wanted to ask about NRR's approach to organizing itself over 21 the longer term for maybe the winding down of initial license renewal 22 applications and moving into subsequent license renewal.

23 The interesting paradigm is that the one is not supposed to be 24 so different from the other. But, the peak resource loading estimated for initial 25 license renewal, there was the CAP 12 policy, it was soft policy, but it meant 26 102 that we budgeted in general to have 12 in house.

1 I think were some peak years where the industry might have 2 sent in 15 or more.

3 But, in any event, I don't think the numbers are predicted or 4 forecast to get that high in any given year.

5 But, of course, we've had a division of license renewal because, 6 you know, to have 12 very active license renewal applications, this is a 7 significant body of work for a group of reviewers.

8 So, over the longer term, as NRR looks at how its organized, 9 Michele and then eventual -- the eventual pe rhaps folding in of the new reactor 10 work is over the longer term, does license renewal continue to merit a 11 standalone organization or is that not determined at this point?

12 MS. EVANS: So, good question.

13 We have been analyzing this over the last few years. We were 14 working toward a restructured NRR which we intend to move forward to put in 15 place in October.

16 The issue of license renewal and whether there should be a 17 standalone division has been vetted and there are different camps on it. But, 18 the -- happy to say, moving forward, where we're headed is a division of 19 materials and license renewal.

20 And, the -- you know, there was a strong view that we needed 21 to keep the resources together to project manage to manage the license 22 renewal, subsequent license renewal effort which will be the case with this new 23 division.

24 But, at the same time, there was a need to the current license 25 renewal division does have some technical resources that are placed in that 26 103 division and those folks clearly work on license renewal technical issues.

1 So, as we're moving forward and in working to be more 2 efficient, effective, agile with our staff, there was a camp that felt like the 3 technical resources should all go into the division of engineering, the various 4 technical side of NRR.

5 So, it turned out that we came up, I think, we've actually -- the 6 staff, in the process of coming up with the new organization, came up with this 7 idea where it would be effective to still have a division of license renewal and 8 predominately the materials engineers, the materials branches support license 9 renewal significantly.

10 And, operating reactors that we would combine those groups 11 together and they'll be on the technical side of NRR under Brian McDermott on 12 his side. And, we would get the both -- the best of both worlds which would be 13 to still have a division director responsible for license renewal and subsequent 14 license renewal.

15 And, at the same time, satisfy some of us who, you know, like 16 the structural, the electrical, the various

-- those technical disciplines, those folks 17 will be back, you know, they'll be in the division of engineer ing and wil l be able 18 to support through like a matrix situation to do the reviews that are necessary.

19 So, it allows us to, you know, use the staff that we do have to 20 do more work in the technical side than just license renewal. They'll be, you 21 know, a knowledge management issue where the people who have done it can 22 educate the folks who haven't had experience in license renewal and then vice 23 versa and will become more able to handle the workload with, you know, overall, 24 our staff numbers have decreased quite significantly in the last two years.

25 We're down by 20 percent, I think, we're, you know, staff-wise.

26 104 So, we're trying to structure ourselves to be able to handle the 1 workload in a better way.

2 CHAIRMAN SVINICKI: Okay.

3 MR. WILSON: In addition, the three materials branches were 4 set up and we had a lot of discussion with NRO to make sure when NRR and 5 NRO merge, the materials branches are actually set up by discipline. So, it'll 6 make the merge seamless. And, they're already divided up.

7 Our expectations is right now, we're doing work for NRO in the 8 materials group. So, we can, you know, all the branches will be doing 50, 52 9 and 54, all work simultaneously.

10 CHAIRMAN SVINICKI: Okay, great.

11 Well, I thank everyone for the presentation.

12 Did either of my colleagues have any additional questions?

13 Commissioner Baran?

14 COMMISSIONER BARAN: Can I ask one more? Am I 15 allowed to do that?

16 CHAIRMAN SVINICKI: Sure.

17 COMMISSIONER BARAN: This is a little bit, if we don't have 18 the right folks at the table for this, that's fine, we can talk about it at a different 19 time, but, when you all were talking a little bit about inspections, I was thinking 20 about maintenance which seems like it's going to be increasingly important for 21 plants that are operati ng past 60 years, if we get to that stage.

22 Is the staff, and I know right now, our inspectors are indirectly 23 assessing maintenance activities through post-maintenance testing and 24 maintenance rule-baseline inspections.

25 Is the staff looking at all or discussing at all whether, you know, 26 105 for -- if we have plants operating the 60 to 80-year time frame, whether we would 1 need any adjustments to our maintenance inspections in that period of time?

2 MR. MCCREE: Commissioner, that's a good question.

3 Licensees are still required to comply with 10 CFR 50.65 on the maintenance 4 rule and Appendix B.

5 The aging management programs are required to remain in 6 place under Part 54. And, in addition to the 71002, the prior to transition to the 7 license renewal period and the 71003 which is team inspection afterwards, 8 inspectors will inspect, are inspecting, aging management programs under 9 various baseline inspection procedures, whether it's the maintenance, heat sink, 10 flooding, problem identifi cation and resolution.

11 There are over a dozen procedures where there's a division of 12 inspection and resource support has explicitly included time and samples to 13 inspect the adequate implementation of aging management programs.

14 So, that's a looking forward activity and it is as important today 15 and for those 47 some odd licensees operating in their period of extended 16 operations. It's as relevant today as it will be in the future or even under 17 subsequent license renewal.

18 Having said that, we will factor in operating experience and 19 other intelligence to enhance our procedures as we need to - to ensure that 20 oversight is effective and it's giving us insights that licensees are effectively 21 managing aging, both in active system s as well as passive systems.

22 COMMISSIONER BARAN: Okay, thank you.

23 CHAIRMAN SVINICKI: Thank you.

24 Did you have anything?

25 All right, again, thank you all for your presentations and we are 26 106 adjourned.

1 (Whereupon, the above-entitled matter went off the record at 2 12:04 p.m.)

3