|
---|
Category:E-Mail
MONTHYEARML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review 2023-05-25
[Table view] |
Text
James Noggle -FW: H-3 sources iPECRL Comments 1.xls _Page1JJ From: "Croulet, Donald" <dcroule@entergy.com>
To: "'James Noggle"' <JDN~nrc.gov>
Date: 12/20/05 3:30PM
Subject:
FW: H-3 sources IPEC_RL_Comments_1.xls Jim, At todays Spent Fuel Pool status meeting I inquired about our plans to verify that the Unit 1 south curtain drain was unblocked and functioning and also the Unit 2 containment footer drain system and segregation of its outfall for sampling at manhole 5. I was told that a feasibility study is in progress to determine robotics entry points.From: Croulet, Donald Sent: Tuesday, December 20, 2005 9:46 AM To: 'James Noggle'
Subject:
FW: H-3 sources IPECRLComments_1.xls Jim, This is the last list I have. I will confirm with Bill Axelson. We will send you an updated version as changes occur to this list.From: Lavera, Ron Sent: Tl ursday, December 08, 2005 5:47 PM To: Solanto, Robert; Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Flon Lavera; Ronald Sachatello; T. R. Jones
Subject:
H-3 sources IPEC_RLComments_1.xIs To all This is the known past leakage list that Dennis Quinn and I have compiled, so far. Please let me know about any addtions/deletions/changes.
Thanks Ron<<H-3 sources IPEC RL-Comments-1.xls>>
Js Nogge -FW: H-3 sourcesIPEC RL Comments 1.xls Pag1 From: "Croulet, Donald" <dcroule©entergy.com>
To: "'James Noggle"' <JDN~nrc.gov>
Date: 12/20/05 9:46AM
Subject:
FW: H-3 sources IPECRLComments_1.xls Jim, This is the last list I have. I will confirm with Bill Axelson. We will send you an updated version as changes occur to this list.From: Lavera, Ron Sent: Thursday, December 08, 2005 5:47 PM To: Solanto, Robert; Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs; Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMulli,;
Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones
Subject:
H-3 sources IPEC_RLComments_1 .xls To all This is tne known past leakage list that Dennis Quinn and I have compiled, so far. Please let me knovi about any addtions/deletions/changes.
Thanks Ron<<H-3 sources IPEC_RL_Comments_1.xls>>
Potential Volume H-3 H-3 total for.U2 FSP 3.OOE+05 2.80E-02 3.18E+01 high 1990-1992, 2005 2000 leak from wall from skimmer U3 FSP 3.OOE+05 3.40E-02 3.86E+01 High pump leak onto concrete Noticed in 1990-1994 time frame. Initial leakage not contained/collected.
On going leakage. Containment process U1 West Pool 1.OOE+05 4.OOE-04 1.51 E-01 High implemented.
leakage not contained/collected.
On U1 Other Pools 0.00E+00 High going leakage. Containment process Anecdotal information that it over flowed to the ground on several U2 RWST 3.50E+05 1.68E-01 2.23E+02 occasions in the past No known significant leakage to the U3 RWST 3.50E+05 4.64E-02 6.15E+01 ground.Anecdotal information that the area was U2 CVCS Tanks 0.OOE+00 flooded in the past Anecdotal information that the area was U2 Waste Tanks 0.00E+00 flooded in the past Anecdotal information that the area was flooded by Waste Collection Tank U2 MOB 0.OOE+00 Med water, in the past Overflows of 31 Waste Tank into tank A .pit containing 31 WHUT, and 31-33 pitc cotIng 31r- WHUT+ -n', andl 31,-3.Ve- T- nnL -. m -LC IMe d III IL4LHTS I l 70' UL4c1a y V's.I.
._ 31 WHUT tank area flooded. 32 & 33 U3 Waste Tanks _.O0E+00 Tank areas never flooded.Potential for Tritium contamination of U2 SFP 1990 -1992 Leak [a] 1.83E+04 2.OOE-02 1.39E+0O High soil.U2 RWST Overflow (year?) 0.OOE+00 _ (U2 PAB Sump = 1.OOE-01 0.OOE+00 Med Sump is not lined with stainless steel.Floor was flooded to significant depth in U2 15 Ft. PAB 0.OOE+00 Med late 1970's early 1980's U3 PAB Sump = = 0.OOE+00 U3 to U2 underground waste line -Leaked in 1980s; it was abandoned in abandoned 0.OOE+00 place Known Contamination near the GT U3 to U2 Blowdown Transfer Line High between units.U2 Resin Spill in alleyway next to Resin spill with relative small volume of FSB 0.OOE+00 low water.%J.J- I IJWJI I WV ILI I LIAVI I IAUJ PD;7u-trench from PAB spilling into area Known leakage in the 1977-1985 time below cable tunnel 0.OOE+00 High frame.Known leakage in the 1977-1985 time U3- area between VC, FSB, PAB, frame. Extends to building curtain aka Pigeon Pit, unknown leakage _ 0.OOE+00 drains and storm sewer system.a- assume 25 gallons/day x 2 years= 18,300 gallons _0.E+00L south of U3 Command Post, had Cs 137, Co-60, others. Removed in -1 1980 and stored on hill past met tower O.OOE+Oo High U2 Blowdown (Past) atmospheric Known operation for years, with primary release O.OOE+O0 to secondary leaks.U2 Blowdown (current) atmospheric Known operation for years, with primary release 5.OOE-07 O.OOE+00 to secondary leaks.Contamination of secondary plant -U2 SG Tube Leak Feb 2000 O.OOE+00 drains U3 SG Tube Leak Oct 1989 =.OOE+00 Contamination of secondary plant U3 Operation of Main Steam supply Auxilary steam system drains go to to Auxilary Steam system. 5.OOE-07 O.OOE+Oo High plant drains and storm drain system.Anecdotal information that the area U2 PAB 15' Overflow/Pump to flooded or was pumpted into the transformer yard 1 .OOE-01 O.OOE+Oo High transformer yard, in the past On going -Also during years operating IP-2 Transformer Yard -Turbine hall with known primary to secondary condensate drainage High leakage.U3 RWST base of Hill contaminated Water stream High Source may have been IP-1 leakage IP-3 41' PAB Auxilary Condensate sump pump discharge was aligned to lP-3 41' PAB Sump Pump storm drain system in late 1970's to Dishcharge to storm drain Low early 1980's. Since locked closed.9 9 9 9.1 L £ I.,
1 7- I T-- -I -I-I II.I .. I_________
I __ I __ __ __ _________i i I 1i i i 4 .9 I I 4 8 A .1. A Unit- Site 2 3 tI 1 1 I-r 2 3 2 2 2 1 1 r 2 2 2 2 3 .1 3 -i 3 .4. i 2 3 3 3 2 2 2 3 3 3 2 3 3.I I