ML071230773

From kanterella
Revision as of 02:02, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Miscellaneous Correspondence for the Monticello Initial Exam - February 2007
ML071230773
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/2007
From: Valos N
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML070660508 List:
References
50-263/07-301
Download: ML071230773 (19)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE MONTICELLO INITIAL EXAM - FEBRUARY 2007 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, lLllNOlS 60532-4352 January 31, 2007 Mr. J. Conway Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL Dear Mr. Conway The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Monticello Nuclear Generating Plant. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Ms. Shawn L. Halbert, Training Manager. Note that any examination waivers have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-I 021, "Operator Licensing Examination Standards for Power Reactors," during the week of February 19, 2007. The NRC staff will administer the operating tests during the week of February 12, 2007. Please contact Mr. Nicholas A. Valos, at 630-829-9761, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html.

Sincerely, Cynthia D. Pederson, Director Division of Reactor Safety i' Docket No.

50-263 License No. DPR-22 cc: M. Sellman, President and Chief Executive Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA) Commissioner, Minnesota Pollution Control Agency D. Gruber, AuditorPTreasurer, Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division S. L. Halbert, Training Manager Wright County Government Center Minnesota Attorney General's Office and Management System (ADAMS).

ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD:l/www.nrc.qovlreadina-rm/adams.html.

Sincerely, Cynthia D. Pederson, Director Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: M. Sellman, President and Chief Executive Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc. State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA) Commissioner, Minnesota Pollution Control Agency D. Gruber, AuditorITreasurer, Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division S. L. Halbert, Training Manager Wright County Government Center Minnesota Attorney General's Office 0 Non-Sensitiv DOCUMENT NAME: G:\DRS\Work in Progress\MON 01-07 DRS OL.wpd 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, Indhxte In the concurrence box 'C" = Copy wlthoul attlchlencl

'E" = Copy wlth machlencl "N' = t$Q OFFICE Rlll IC Rlll I c Rlll IN Rllli 11 NAME JKweiser:co 87,W NValos $fid HPeterson nfc cpebdrson DATE Ol/@ 107 01/30 107 01130107 Alp Ol/z\ 107 OFFICIAL RECORD COPY J. Conway DISTRIBUTION:

TEB PST RidsNrrDirslrib GEG KGO GLS CSTI CAAl DRPlll DRSlll PLBI TXN

. +**** UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 October 20, 2006 Mr. J. Conway Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

Dear Mr. Conway:

In a telephone conversation on October 11, 2006, between Mr. Joe Ruth, Principal Instructor Operations, and Mr. Nicholas Valos, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Monticello Nuclear Generating Plant the week of February 12, 2007. In addition, the NRC will make an examination validation visit to your facility the week of January 22, 2007. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 6, 2006. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by December 11, 2006.

Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. Mr.

J. Ruth has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Nicholas Valos at 630-829-9761, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htt~://www,nrc.aov/readina-rm/adams.

html. wronori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 See Attached Distribution To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024), and waiver requests (if any) (OMB approval number 31 50-0090) at least 30 days before the first examination date.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 31 50-001 8, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter.

Mr. J. Ruth has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Nicholas Valos at 630-829-9761, or me at 630-829-9707.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/readina-rm/adams.html.

Sincerely, Hironori Peterson, Chief 0 pera t ions Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 See Attached Distribution DOCUMENT NAME: G:\DRS\Work in Progress\MON 10-06 DRS.wpd 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive cc: M. Sellman, Chief Executive Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc. State Liaison Officer, Minnesota Department of Health R. Nelson, President and Chief Nuclear Officer Minnesota Environmental Control Citizens Association (MECCA) Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditormreasurer, Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division S. Halbert, Training Manager Wright County Government Center Minnesota Attorney General's Office ADAMS Distribution:

TEB PST RidsNrrDirslrib GEG KGO CSTI CAAl LSL (electronic IR's only) C. Pederson, DRS (hard copy - IR's only)

DRPlll DRSlll PLBI TXN ROPreDorts@nrc.sov DCT

" Monticello Nu clear Generatina PI ant Operated by Nuclear Management Company, LLC September 2,2005 L-Mi-05-095 RIS 2005-19 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Proposed fnitial License ODeralor Examinations for 2006 - 2009 as Requested bv NRC Requlatow Issue Summarv 2005-19

Reference:

1) NRC Regulatory Issue Summary 2005-1 9, "Preparation and Scheduling of Operator Licensing Examinations, dated August 24,2005. In accordance with the request contained in Reference I , Monticello Nuclear Generating Plant is voluntarily submitting the planned initial licensed operator examination data through 2009. The attached NRC Form 536 provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

This letter makes no new commitments or changes to any existing commitments.

n T. Conway !P ite Vice President, Monti Nuclear Management Company, LLC enerating Plant Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC 2807 West County Road 75 0 Monticello, Minnesota 55362-9637 Telephone:

763.295.5151 0 Fax: 763.295.1454 ENCLOSURE 1 NRC FORM 536 - OPERATOR LICENSING EXAMINATION DATA 1 page follows NRC FORM 636 (bXn5) U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA EXPIRES 08nlRWl APPROMDBY OMB. NO. 11500131 Esllmled burden per res onro lo comply dlh lhls voluntary lnformlio Conedion mqunt 1 hwr. HI Inlomdon dadion b ured lo plan tudgel and msnums & o~alot exrminaian.

Send ~~mmem reaar6na bucdc I rn FIUUIT NRC REGION Monticello Nuclear Generating Plant erclr& lo lk Rewrda and FOlAlPnvuy SSNlces Brlnch 'r-5 F53). U.! Nudear R Jalciy Commrrion Washington OC 2055SWO\ or Inlemc e-clu~l lo 1%dledr(gnh ov. ind lo (he bsk War. otfics'of I~oomrsto ond Regvlaloy Anan. M8B-10202, (315@0131), Wcs of Ma &Idgel. Washmgton.

DC 20503. If a mans used lo Impose 83%%: CDllccoon dces not bsply current& vJd OM8 cofdrd number, lhe NRC M no1 condud or rponror, and 8 perron Is not required lo respond lo. th lnfwmabon cdlccbon I "' ESTIMATED NUMBER OF LICENSEEPREPARED EXAMINATIONS IA. PROPOSED EXAMINATION PREPARATION SCHEDULE 0 1 1 1 I PROPOSEDNUMBER I PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT CY 2008 - CY2008 - CY2007 - CY 2006 - 0 5 6 0 4 6 cy 2009 - NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS -LIMITED PROPOSEDDATES PRIMARY DATE 0 1 1 0 0 0 Oil1 512007 owmooa OI I 1 I 1 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)

SCHEDULE CY 2006 CY 2007 PROPOSED JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEf NUMBER MARCH ESTJMATED NUMBER OF 12 12 CANOIOATES 0 ESTIMATED NUMBER OF NRC-P AEPARED I EXAMINATIONS le. INITIAL OPERATOR LICENSE EXAMINATIONS ALTERNATE DATE I 06/02/2008 I 02/05t2007 i I CM009 - 6 6 I 0 01119/2009 02/02/2009 NRC FORM W (bXxIS1 PRINTED ON RECYCLED PAPER P2Ltr fl,/2&#+/

D,/lb &t!L Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC Committed to NM'C> Nuclear Excellenat May 26,2005 L-MT-05-048 10 CFR 50.40 (RIS 2004-1

0) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Request for Chanqe of Date for Proposed Initial License Operator Examinations for 2006 as Requested by Monticello Nuclear Generating Plant in Response to Requlatory Issue Summary 2004-1 0

Reference:

1 ) NRC Regulatory Issue Summary (RIS) 2004-1 0, "Preparation and Scheduling of Operator Licensing Examinations. In response to Reference 1 on September 9,2004, the Nuclear Management Company (NMC) requested a date of November 6 through 17,2006 to conduct an Initial License Operator Examination for the Monticello Nuclear Generating Plant (MNGP). The NRC approved the date in a letter to NMC on April 18,2005. Due to changes in the schedule for the upcoming Initial Operator License class, NMC is requesting a change to the examination date to January 15 through 26, 2007.

This letter makes no new commitments or changes to any existing commitments.

W U Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC 2807 West County Road 75 Monticello, Minnesota 55362-9637 JUL 29 2008 Telephone:

763.295.51 51 r;" LoQ 46 a 7T/

. +***+ UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 April 18, 2005 Mr. T. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:

Dear Mr. Palmisano:

In a letter (L-MT-04-062) dated September 23, 2004, your staff requested we schedule an initial license operator examination in either December or November 2006. We have tentatively scheduled the requested examination to occur during the weeks of November 6 and November 13, 2006. On-site validation of the examination is tentatively scheduled to occur at the station during the week of October 9, 2006. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. As stated in your letter, your staff will develop the examination.

Your letter indicated that you are training approximately 12 candidates for the examination.

Please inform us if the number of candidates declines below nine as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination. A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Bruce Palagi of my staff at (630) 829-961 1. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/readinq-rm/adams.html.

/?/ Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No.

50-263 License No.

DPR-22 cc: J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc. Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA) Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditornreasurer, Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division S. L. Halbert, Training Manager Wright County Government Center Minnesota Attorney General's Office OFFICE Rlll I Cl Rlll I N Rlll 1/1/ NAME MABies:trhaL-BBPalagi @ HPetepon DATE 04//j/05 04/13 105 041 &/05 Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.qov/readincr-rm/adams.html.

I Sincerely, OFFICE Rlll I Cl Rlll I N Rlll 1/1/ NAME MABies:trhaL-BBPalagi @ HPetepon DATE 04//j/05 04/13 105 041 &/05 Hironori Peterson, Chief Operations Branch Division of Reactor Safety I Docket No. 50-263 License No. DPR-22 cc: J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc. Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA) Commissioner, Minnesota Pollution Control Agency D. Gruber, AuditorTTreasurer, Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division S. L. Halbert, Training Manager Wright County Government Center Minnesota Attorney General's Office ADAMS Distribution:

WDR LMP RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBl JRKI DCT MABI Monticello Nuclear Generatina Plant Operated by Nuclear Management Company, LLC Committed to Nuclear Excellence

$;ZZiz.XY 062 RIS 2004-1 0 September 23,2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Proposed Initial License Operator Examinations for 2005 - 2008 as Requested bv NRC Requlatow Issue Summary 2004-10

Reference:

1 ) NRC Regulatory Issue Summary (RIS) 2004-1 0, 'Preparation and Scheduling of Operator Licensing Examinations.

In accordance with the request contained in Reference 1, Monticello Nuclear Generating Plant (MNGP) is voluntarily submitting the planned initial licensed operator examination data through 2008. The attached NRC Form 536 provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

This letter makes no new commitments or changes to any existing commitments.

Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region 111, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC 2807 West County Road 75 Monticello.

Minnesota 55362-9637 Telephone:

763.295.5151 Fax: 763295.1454 NRC FORM 536 (5-2003) I I EXPIRES 07/31/200' nse to comply with thls voluntary informatto I cdectm nouest 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ? his inbrmatmn cdlectton is used to plan budpel Estimated burden per res ~~ us. NUCLEAR REGULATORYCOMMISS~ON APPROVED BY OME NO 31500131 not condud or sponsor. and a Demon is not reaulred to resvond to, th iJocmatbncdecbon.

OPERATOR LICENSING EXAMINATION DATA Cy 2.005 - PROPOSED NUMBER ESTIMATED NUMBER OF LICWSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRCPREPARED EXAMINATIONS 1 0 cy 2.007 cy 2.008 - - CY 2.oo6 - I 0 1 0 0 0 FAUUTY Monticello Nuclear Generating Plant I 7 6 0 6 5 4 0 4 1 2 0 2 0 0 0 0 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/02/2005 12/04/2006 12/01 E008 ALTERNATE DATE I 06/06/2005 I 11/06~2006 I I 11/03/2008 I I"""" PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES

'Ill CY 2005 CY 2006 JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE MARCH 0 01200 0 0 0 IA. PROPOSED EXAMINATION PREPARATION SCHEDULE le. INITIAL OPERATOR LICENSE EXAMINATIONS IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)

SCHEDULE