Letter Sequence RAI |
---|
|
|
MONTHYEARML0515205442005-06-0303 June 2005 Robinson and Harris, RAI, Potential Impact of Debris Blockage of Emergency Sump Recirculation Pressurized-Water Reactors Project stage: RAI ML0603704602006-02-0808 February 2006 Unit 2, Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0819006492008-07-25025 July 2008 Request for Additional Information, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI RNP-RA/08-0110, Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-10-17017 October 2008 Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0831710522008-11-12012 November 2008 E-mail Transmitting Approval for an Extension Request to the GL 2004-02 Supplemental RAI Response Deadline for the H.B. Robinson Steam Electric Plant Project stage: RAI ML0933102942009-12-0303 December 2009 Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Project stage: RAI ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses Project stage: Meeting ML1013100292010-06-0909 June 2010 Generic Letter 2004-02 Supplemental Response - H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Supplement 2008-03-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARIR 05000261/20240042024-10-0303 October 2024 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 05000261/2024004 ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson ML24079A3062024-03-19019 March 2024 NRR E-mail Capture - Acceptance Review Results for Robinson - Proposed Relief Request RA-23-0300 ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23262B4502023-09-19019 September 2023 NRR E-mail Capture - H. B. Robinson Steam Electric Plant, Unit 2 - Acceptance of License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures Based on Leak-Before-Break Methodology ML23220A2342023-08-0808 August 2023 NRR E-mail Capture - Robinson, Unit 2 - Acceptance Review Results for Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Dukes Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22285A1552022-10-12012 October 2022 NRR E-mail Capture - H. B. Robinson, Unit 2 - Acceptance of License Amendment Request Regarding the Addition of Feedwater Isolation Function to TS 3.3.2 and Removal of Obsolete Content from TS 2.1.1.1 and TS 5.6.5.b ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Dukes Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22146A3652022-05-25025 May 2022 Acceptance of Requested Licensing Action License Amendment Request for Application to Revise Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A3662022-01-12012 January 2022 Acceptance of Requested Licensing Action License Amendment Re2uest for Application to Revise Technical Specification to Adopt TSTF-577, Revised Frequencies for Steam Generating Tube Inspections ML22005A0872022-01-0505 January 2022 Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 ML21286A6612021-10-13013 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21119A2272021-04-29029 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-9, EPID: L-2021-LLR-0024 ML21116A2592021-04-26026 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-8, EPID: L-2021-LLR-0023 ML21116A2582021-04-26026 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-3, EPID: L-2021-LLR-0020 ML21113A1312021-04-23023 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results; IST-RR-5, EPID: L-2021-LLR-0021 ML21110A1462021-04-20020 April 2021 NRR E-mail Capture - Robinson Relief Request Acceptance Review Results: IST-RR-7, EPID: L-2021-LLR-0022 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20353A1302020-12-18018 December 2020 2021 Hbr 50.59 Info Request - E-mail Request- Upcoming 50.59 Inspection (IP71111.17T)- Week of March 1-5, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20063M1942020-02-21021 February 2020 NRR E-mail Capture - Accepted for Review - Robinson Unit 2 One-Time Pressure Relief Valve Test Frequency Extension EPID: L-2020-LLR-0019 ML20085F9312020-02-20020 February 2020 SPRA - Spr Audit Questions - 2nd Batch ML20049A0342020-02-16016 February 2020 NRR E-mail Capture - Accepted for Review - Robinson Unit 2 to Correct Administrative Renewed Facility Operating License Error in the 50.69 LAR EPID: L-2020-LLL-0000 ML20063L4562020-02-0404 February 2020 NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 ML20087N6632020-02-0303 February 2020 SPRA - Spr Audit Questions Redacted ML20027C2042020-01-27027 January 2020 Audit Documents Needed for the Robinson Seismic Probabilistic Risk Assessment Review - FLEX and HRA References ML20015A1892020-01-13013 January 2020 Audit Documents Needed for the Robinson SPRA Review - Fragility Analysis ML20009C0922020-01-0808 January 2020 Audit Documents Needed for the Robinson SPRA Review - Seismic Hazard Analysis ML19365A0482019-12-30030 December 2019 Request for Eportal Access for Audit Review of the Robinson SPRA Supporting Documents 2024-06-24
[Table view] |
Text
From: Marlayna Vaaler Sent: Wednesday, November 12, 2008 11:23 PM To: 'curt.castell@pgnmail.com' Cc: Donnie Harrison; Michael Scott; Leon Whitney
Subject:
Robinson GL 2004-02 RAI Response Date Extension Approval Attachments: ROB GL 2004-02 RAI Extension.doc Curt, Please find attached the subject document. In lieu of sending out a formal letter, I will be adding this e-mal to ADAMS so that we will have an official record of this request and its subsequent approval.
If you have any questions regarding this issue or need further information please don't hesitate to call!
Thanks, Marlayna Marlayna Vaaler, Project Manager ~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Shearon Harris & H.B. Robinson U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Phone: 301.415.3178 Mobile: 440.668.7399 Fax: 301.415.1222 E-mail: marlayna.vaaler@nrc.gov Office Location: O-8E3 Mail Stop: O-8G9 E-mail Properties Mail Envelope Properties (1D658D167B82F54585A33C1A31821B68229C2D9D4F)
Subject:
Robinson GL 2004-02 RAI Response Date Extension Approval Sent Date: 11/12/2008 11:23:02 PM Received Date: 11/12/2008 11:23:00 PM From: Marlayna Vaaler
Created By: Marlayna.Vaaler@nrc.gov
Recipients:
curt.castell@pgnmail.com ('curt.castell@pgnmail.com')
Tracking Status: None Donnie.Harrison@nrc.gov (Donnie Harrison)
Tracking Status: None Michael.Scott@nrc.gov (Michael Scott) Tracking Status: None Leon.Whitney@nrc.gov (Leon Whitney)
Tracking Status: None
Post Office:
HQCLSTR02.nrc.gov
Files Size Date & Time
MESSAGE 36014 11/12/2008 ROB GL 2004-02 RAI Extension.doc 29714
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received:
November 12, 2008
Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - EXTENSION OF THE RESPONSE DEADLINE FOR REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SUPPLEMENTAL RESPONSE TO GENERIC LETTER 2004-02, "POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZED WATER REACTORS" (TAC NO. MC4709)
Dear Mr. Walt:
By letter dated October 17, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML082980355), Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC, the licensee), requested an extension for submitting answers to questions posed in a Request for Additional Information (RAI) dated July 25, 2008 (ADAMS Accession No. ML081900649).
The July 25, 2008, RAIs were in regard to a PEC letter dated March 7, 2008 (ADAMS Accession No. ML080730290), which submitted a supplemental response to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors," for the H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).
The U.S. Nuclear Regulatory Commission (NRC) staff initially requested that PEC respond to these RAIs within 90 days of the date of the original letter, which established a response deadline of October 23, 2008. However, the July 25, 2008, letter included the caveat that "if the licensee concludes that more than 90 days are required to respond to the RAIs, the licensee should request additional time, including a basis for why the extension is needed."
The licensee's October 17, 2008, letter stated that additional time is needed to adequately respond to the RAIs. The basis for this request is that HBRSEP is currently conducting Refueling Outage (RO)-25, which is challenging the resources needed to properly address the RAIs. An extension of 50 days was requested by the licensee to allow completion of preparation of the RAI responses after RO-25. This would result in a new RAI due date of December 12, 2008.
The NRC staff finds PEC's request for an extension to be reasonable based on the above considerations. We now request that you submit the responses to the subject RAIs by December 12, 2008. Please contact me at 301-415-3178 if you have any questions or concerns regarding this issue.
Sincerely,
/RA/
Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-261