MONTHYEARML0515205442005-06-0303 June 2005 Robinson and Harris, RAI, Potential Impact of Debris Blockage of Emergency Sump Recirculation Pressurized-Water Reactors Project stage: RAI ML0603704602006-02-0808 February 2006 Unit 2, Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0603705062006-02-0808 February 2006 Unit 1, Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Bases Accidents at Pressurized-Water Reactors Project stage: RAI HNP-08-015, Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors2008-02-28028 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Project stage: Request RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request HNP-08-037, Second Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2008-03-28028 March 2008 Second Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Supplement ML0819006492008-07-25025 July 2008 Request for Additional Information, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0825402692008-09-29029 September 2008 Request for Additional Information, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: RAI RNP-RA/08-0110, Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-10-17017 October 2008 Request for Additional Time for Response to RAI Pertaining to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0831710522008-11-12012 November 2008 E-mail Transmitting Approval for an Extension Request to the GL 2004-02 Supplemental RAI Response Deadline for the H.B. Robinson Steam Electric Plant Project stage: RAI HNP-09-011, Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2009-01-27027 January 2009 Response to Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML0933102942009-12-0303 December 2009 Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Project stage: RAI ML0935101152009-12-30030 December 2009 Request for Additional Information Regarding Supplemental Responses to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0936406952010-01-0707 January 2010 Notice of Meeting with Carolina Power & Light Company to Discuss Requests for Additional Information Associated with Generic Letter 2004-02 Project stage: RAI ML1005703432010-03-0909 March 2010 Summary of February 22, 2010, Meeting with Carolina Power & Light Company to Discuss Supplemental Responses to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents Project stage: Meeting ML1006203162010-03-10010 March 2010 Summary of Meeting with Progress Energy Carolina, Inc. to Discuss Issues Identified During NRC Staff'S Review of H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Responses Project stage: Meeting HNP-10-023, Response to Request for Additional Information Re Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2010-04-27027 April 2010 Response to Request for Additional Information Re Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement ML1016103482010-06-0101 June 2010 GL 2004-02 Final Response Submittal Date Project stage: Other ML1013100292010-06-0909 June 2010 Generic Letter 2004-02 Supplemental Response - H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Supplement ML1016700282010-06-18018 June 2010 Supplemental Response Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized Water Reactors. Project stage: Other HNP-11-006, Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors.2011-01-31031 January 2011 Updated Response to RAI Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Supplement 2009-01-27
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License ML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published 2024-09-11
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24164A0052024-06-11011 June 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes February 15, 2024, Relief Request RA-23-0300 for Robinson ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML24002A7382024-01-0202 January 2024 NRR E-mail Capture - Request for Additional Information Regarding Dukes August 20, 2023, License Amendment Request for Robinson, Unit 2 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML23011A0152023-01-11011 January 2023 NRR E-mail Capture - Request for Additional Information to Duke'S Request for Robinson to Add Feedwater Isolation Function to TS 3.3.2 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML22222A1082022-08-10010 August 2022 NRR E-mail Capture - Request for Additional Information Regarding Duke'S Request to Remove 4.160 Kv Bus 2 from Surveillance Requirement 3.8.1.16 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22112A1482022-04-22022 April 2022 Correction_H. B. Robinson Steam Electric Plant, Unit 2 - Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 ML22080A0042022-03-18018 March 2022 Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21258A3652021-09-15015 September 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2021011) and Request for Information (RFI) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML20353A1312020-12-18018 December 2020 2021 Hbr 50.59 Info Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation ML20191A2122020-07-0909 July 2020 012 FPTI Notification Letter ML20063L4562020-02-0404 February 2020 NRR E-mail Capture - RAI - Robinson Relief Req Rx Vessel Cold Leg Nozzle Dissimilar Meter Butt Weld Inspection Interval EPID L-2019-LLR-0072 ML20022A1942020-01-22022 January 2020 Emergency Preparedness Program Inspection Request for Information ML19365A0462019-12-18018 December 2019 Audit Documents Needed for the Robinson SPRA Review ML19331A4002019-11-27027 November 2019 Request for Additional Information Regarding Licensing Action to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19288A2942019-10-15015 October 2019 NRR E-mail Capture - RAIs for Robinson Revision to RPV Surveillance Program Withdrawal Schedule ML19283A0372019-09-26026 September 2019 Draft Requests for Additional Information for H.B. Robinson LAR to Revise TS 3.8.2, AC Sources - Shutdown, SR 3.8.2.1 ML19288A2462019-09-26026 September 2019 Request for Additional Information Regarding Change to Surveillance Requirement 3.8.2.1 H.B. Robinson Unit No. 2 ML19204A2682019-07-23023 July 2019 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for the Escw System TS AOT Extension and Removal of an Expired Note in TS Risk Informed LAR (L-2019-LLA-0025) ML19136A2712019-05-28028 May 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19060A0912019-03-18018 March 2019 Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19072A0292019-03-13013 March 2019 50.69 LAR RAIs ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18337A1272018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding the Rts/Esfas Trip Setpoints Modification LAR ML18332A4392018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for EAL Scheme Changes ML18291A6442018-10-17017 October 2018 NRR E-mail Capture - Robinson RAIs - Duke Energy 10 CFR 50.46 Annual Report ML18288A0192018-10-12012 October 2018 NRR E-mail Capture - Robinson RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18264A0282018-10-0909 October 2018 RAI Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization Aad Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18274A2632018-09-28028 September 2018 NRR E-mail Capture - Robinson Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 (EPID L 2018-LLA-0095) and LAR to Adopt TSTF-425 ML18211A6042018-07-30030 July 2018 NRR E-mail Capture - Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L-2017-LLA-0308) ML18206B0612018-07-25025 July 2018 NRR E-mail Capture - Draft Robinson Supplemental RAI - LAR to Revise TS to Add a 2nd Qualified Offsite Power Circuit and Revise UFSAR to Operate LTCs in Automatic Mode (CAC No. MG0276; L 2017-LLA-0308) 2024-07-31
[Table view] |
Text
June 3, 2005 Mr. C. S. Hinnant, Senior Vice President and Chief Nuclear Officer - Nuclear Generation Progress Energy, Inc.
Post Office Box 1551 Raleigh, North Carolina 27602
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NOS. MC4688 AND MC4709)
Dear Mr. Hinnant:
By letter dated March 4, 2005, Carolina Power & Light Company (the licensee, also doing business as Progress Energy, Inc.) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for Shearon Harris Nuclear Power Plant, Unit 1 and H. B. Robinson Steam Electric Plant, Unit 2. The GL requested the licensee perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL.
The NRC staff has completed its preliminary review of your response and has determined it needs additional information requested in the enclosure to complete our review.
This RAI requests additional information about your overall plans and schedules and not any information on detailed plans or extensive analyses. In light of this, please provide the additional information requested in the enclosure within 45 days of receipt of this letter.
If you have any questions, please call me at (301) 415-3025.
Sincerely,
/RA by BMozafari for/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-400 and 50-261
Enclosure:
Request for Additional Information cc w/encl: See next page
June 3, 2005 Mr. C. S. Hinnant, Senior Vice President and Chief Nuclear Officer - Nuclear Generation Progress Energy, Inc.
Post Office Box 1551 Raleigh, North Carolina 27602
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NOS. MC4688 AND MC4709)
Dear Mr. Hinnant:
By letter dated March 4, 2005, Carolina Power & Light Company (the licensee, also doing business as Progress Energy, Inc.) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for Shearon Harris Nuclear Power Plant, Unit 1 and H. B. Robinson Steam Electric Plant, Unit 2. The GL requested the licensee perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL.
The NRC staff has completed its preliminary review of your response and has determined it needs additional information requested in the enclosure to complete our review.
This RAI requests additional information about your overall plans and schedules and not any information on detailed plans or extensive analyses. In light of this, please provide the additional information requested in the enclosure within 45 days of receipt of this letter.
If you have any questions, please call me at (301) 415-3025.
Sincerely,
/RA by BMozafari for/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-400 and 50-261
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC PDII-2 R/F RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdii2 (MMarshall) RidsNrrPMCPatel RidsNrrLADBaxley RidsRgnIMailCenter DCullison/DSolorio RidsNrrDlpmDpr RidsNrrDssaDpr MWebb RidsNrrLAEDunnington Accession No.: ML051520544 *RAI input from SPLB without any major change OFFICE PDIV-1/PM PDIV-1/LA DSSA/SPLB/SP PDII-2/PM PDIV-1/SC PDIII-2/PM PDIII-2/SC NAME MWebb/JHopkins DBaxley DCullison/DSolorio* BMozafari DTerao/
for CPatel GSuh DATE 6/2/05 6/2/05 5/23/05 6/3/05 6/3/05 OFFICIAL RECORD COPY
Shearon Harris Nuclear Power Plant, Unit 1 cc:
Steven R. Carr Mr. John H. ONeill, Jr.
Associate General Counsel - Legal Shaw, Pittman, Potts & Trowbridge Department 2300 N Street, NW.
Progress Energy Service Company, LLC Washington, DC 20037-1128 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Robert J. Duncan II Director of Site Operations Resident Inspector/ Harris NPS Shearon Harris Nuclear Power Plant c/o U. S. Nuclear Regulatory Commission Carolina Power & Light Company 5421 Shearon Harris Road Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-9998 New Hill, North Carolina 27562-0165 Ms. Margaret A. Force Mr. Robert P. Gruber Assistant Attorney General Executive Director State of North Carolina Public Staff NCUC Post Office Box 629 4326 Mail Service Center Raleigh, North Carolina 27602 Raleigh, North Carolina 27699-4326 Public Service Commission Chairman of the North Carolina State of South Carolina Utilities Commission Post Office Drawer 11649 Post Office Box 29510 Columbia, South Carolina 29211 Raleigh, North Carolina 27626-0510 Ms. Beverly Hall, Section Chief Mr. Herb Council, Chair Division of Radiation Protection Board of County Commissioners N.C. Department of Environment of Wake County and Natural Resources P. O. Box 550 3825 Barrett Drive Raleigh, North Carolina 27602 Raleigh, North Carolina 27609-7721 Mr. Tommy Emerson, Chair Mr. Chris L. Burton Board of County Commissioners Manager of Chatham County Performance Evaluation and P. O. Box 87 Regulatory Affairs PEB 7 Pittsboro, North Carolina 27312 Progress Energy Post Office Box 1551 Mr. Terry C. Morton, Mgr, Support Services Raleigh, North Carolina 27602-1551 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Mr. Benjamin C. Waldrep P. O. Box 165, Mail Zone 1 Plant General Manager New Hill, North Carolina 27562-0165 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Mr. John R. Caves, Supervisor P. O. Box 165, Mail Zone 3 Licensing/Regulatory Programs New Hill, North Carolina 27562-0165 Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
H. B. Robinson Steam Electric Plant, Unit No. 2 cc:
Steven R. Carr J. F. Lucas Associate General Counsel - Legal Manager - Support Services - Nuclear Department H. B. Robinson Steam Electric Plant, Progress Energy Service Company, LLC Unit No. 2 Post Office Box 1551 Carolina Power & Light Company Raleigh, North Carolina 27602-1551 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Margaret A. Force Assistant Attorney General Mr. C. T. Baucom State of North Carolina Supervisor, Licensing/Regulatory Programs Post Office Box 629 H. B. Robinson Steam Electric Plant, Raleigh, North Carolina 27602 Unit No. 2 Carolina Power & Light Company U. S. Nuclear Regulatory Commission 3581 West Entrance Road Resident Inspectors Office Hartsville, South Carolina 29550 H. B. Robinson Steam Electric Plant 2112 Old Camden Road Ms. Beverly Hall, Section Chief Hartsville, South Carolina 29550 N.C. Department of Environment and Natural Resources Mr. T. P. Cleary Division of Radiation Protection Plant General Manager 3825 Barrett Dr.
H. B. Robinson Steam Electric Plant, Raleigh, North Carolina 27609-7721 Unit No. 2 Carolina Power & Light Company Mr. Robert P. Gruber 3581 West Entrance Road Executive Director Hartsville, South Carolina 29550 Public Staff - NCUC 4326 Mail Service Center Mr. Chris L. Burton Raleigh, North Carolina 27699-4326 Director of Site Operations H. B. Robinson Steam Electric Plant, Mr. James W. Holt Unit No. 2 Manager Carolina Power & Light Company Performance Evaluation and 3581 West Entrance Road Regulatory Affairs PEB 7 Hartsville, South Carolina 29550 Progress Energy Post Office Box 1551 Public Service Commission Raleigh, North Carolina 27602-1551 State of South Carolina Post Office Drawer 11649 Mr. John H. ONeill, Jr.
Columbia, South Carolina 29211 Shaw, Pittman, Potts, & Trowbridge 2300 N Street NW.
Mr. Henry H. Porter, Assistant Director Washington, DC 20037-1128 South Carolina Department of Health Bureau of Land & Waste Management 2600 Bull Street Columbia, South Carolina 29201
REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS PROGRESS ENERGY, INC.
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NOS. 50-400 AND 50-261 By letter dated March 4, 2005, Carolina Power & Light Company (the licensee, also doing business as Progress Energy, Inc.) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for Shearon Harris Nuclear Power Plant, Unit 1 and H. B. Robinson Steam Electric Plant, Unit 2. The GL requested that addressees perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL. The staff has completed its preliminary review of your response and has determined it needs the following additional information to complete our review:
On page 3 of Enclosure 1 of your GL 2004-02 response you stated that the scheduled date for analyzing the components susceptible to the downstream effects of post-accident debris blockage and the operation with debris laden fluid for Shearon Harris, Unit 1 and H. B.
Robinson, Unit 2 is November 7, 2006. This date is beyond the requested date in GL 2004-02 for reporting to the NRC.
- 1. Please explain why these analyses will not be completed in time to support the September 1, 2005, response and describe the impact of not completing these analyses on your ability to meet the December 31, 2007, corrective action completion date.
- 2. With an incomplete analysis, it is unclear how you will be able to provide the requested information in the GL. Please describe how your September 1, 2005, response will be responsive to the information request in GL 2004-02.