ML13059A319

From kanterella
Revision as of 07:07, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2012 ISFSI Annual Radioactive Effluent Release Report
ML13059A319
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 02/26/2013
From: Gustafson O
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, NRC/FSME
References
PNP 2013-016
Download: ML13059A319 (3)


Text

ATTACHMENT INDEPENDENT SPENT FUEL STORAGE INSTALLATION ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT BIG ROCK POINT January 2012 - December 2012 Page 1 of 2 I. FACILITY DESCRIPTION The Independent Spent Fuel Storage Installa tion (ISFSI) is located within the owner-controlled area of the Big Rock Point (BRP) site. The storage of spent fuel at BRP meets the requirements of 10 CFR 72, and the Certificate of Compliance No.

72-1026, issued by the Nuclear Regulatory Commission (NRC).

II. EFFLUENT LIMITS AND CONTROLS The ISFSI operates under effluent control limits as required by 10 CFR 72.104.

However, the design of the sealed storage canisters at the ISFSI precludes any gaseous or liquid effluent releases.

III. RADIOLOGICAL EFFLUENT RELEASES As noted in Section II, by design, ther e are no radioactive liquid or gaseous effluents originating from the ISFSI fac ility. The annual radiological surveillance performed during this reporting period did not indicate any release of radioactivity from the ISFSI.

IV. ISFSI ENVIRONMENTAL MONITORING PROGRAM The BRP Radiological Environmental Moni toring Program (REMP) is described in the Offsite Dose Calculation Manual (ODCM),Section I, Subsection 4.0. The ISFSI Environmental Monitoring Program, whic h is contained within the BRP REMP, consists of thermoluminescent dosimeter s (TLDs) at four locations along the perimeter of the ISFSI site, and three contro l TLDs 10.5 to 12.6 miles from the site.

Quarterly TLDs are read quarterly, as reflected in Section VI. Quarterly measurements are compared to control m easurements to evaluate compliance with 10 CFR 72.104. The results for the ISFSI TLDs and the control TLDs measured in 2012 are summarized in Section VI.

V. SAMPLE ANOMALIES

None.

VI. ISFSI ENVIRONMENTAL MEASUREMENTS

BRP ISFSI Environmental TLD Results (mR)

January 2012 - December 2012 TLD No./Location 1 st Quarter 2 nd Quarter 3 rd Quarter 4 th Quarter BRP-18 / 137 meters NW of ISFSI 18 15 17 17 BRP-19 / 137 meters SW

of ISFSI 20 17 21 19 BRP-20 / 137 meters SE

of ISFSI 21 18 20 23 BRP-21 / 137 meters NE

of ISFSI 17 16 17 17 Control Location - Petoskey

BRP-05 18 15 16 18 Control Location - Boyne City

BRP-06 20 17 17 21 Control Location - Ironton

BRP-07 19 16 19 19 VII. CONCLUSIONS

When compared to the control locations, it is evident that the dose from ISFSI operations during the reporting period does not exceed the limits as defined in 10 CFR 72.104.

Page 2 of 2