Finding | |
---|---|
Title | Failure to Ensure Suitability of Materials for the Reactor Building Northeast Fan Coil Unit |
Description | The inspectors reviewed a self-revealed, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to assure that appropriate measures were established for the selection and review for suitability of application of materials, parts, equipment, and processes that were essential to the safety-related functions of a reactor building fan coil unit. Specifically, on March 9, 2016, the licensee installed a new coil for the reactor building northeast quad fan coil unit, but failed to assure the suitability of application of the materials, parts, and equipment associated with the new coil design in that the new component had measurably higher air resistance across the coil than the previous design. As a result, on August 1, 2017, the fan coil unit failed air flow surveillance testing during the next performance of the test, resulting in the fan coil unit being declared inoperable. Corrective actions to restore compliance included cooling coil cleaning activities, implementation of compensatory measures to restore operability, and generation of a work order to replace the degraded cooling coil. The licensee entered this deficiency into the corrective action program as Condition Report CR-CNS-2017-04701.The licensees failure to assure that the newly designed coil installed in the northeast quad fan coil unit was appropriately reviewed for suitability and adequacy was a performance deficiency. The performance deficiency was evaluated using Inspection Manual Chapter 0612, Appendix B, Issue Screening, dated September 7, 2012, and was associated with the Mitigating Systems Cornerstone. The performance deficiency was more than minor, and therefore a finding, because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in the northeast quad fan coil unit being declared inoperable. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, the inspectors determined that the finding had very low safety significance (Green) because it: was not a design deficiency where the component maintained operability; did not represent a loss of system and/or function; did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time; and did not result in the loss of a high safety-significant, nontechnical specification train. The finding had a cross-cutting aspect in the area of human performance associated with design margins, because the licensee failed to ensure that the organization operated and maintained equipment within design margins, and failed to ensure that these margins were carefully guarded and changed only through a systematic and rigorous process with special attention placed on maintaining safety-related equipment. Specifically, although the new fan coil units air flow immediately degraded from 7950 scfm to 7360 scfm after coil installation in 2016, which significantly degraded the margin to the minimum flow requirements, the licensee did not take action to address the degraded performance until it failed subsequent air flow testing [H.6]. |
Site: | Cooper |
---|---|
Report | IR 05000298/2017003 Section 1R15 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | P Voss C Henderson C Young M Stafford C Jewett L Brookhart E Simpson J Kozal |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |