MONTHYEARML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States Project stage: Request ML14007A7122014-01-0707 January 2014 NRR E-mail Capture - Acceptance Review of Grand Guld Nuclear Station License Amendment Request Regarding Technical Task Force (TSTF) -423 End States Project stage: Acceptance Review ML14007A7102014-01-0707 January 2014 NRR E-mail Capture - Acceptance Review of Grand Gulf Nuclear Station License Amendment Request Regarding Technical Task Force (TSTF) -535 Revised Shut Down Margin Project stage: Acceptance Review ML14211A1412014-07-29029 July 2014 NRR E-mail Capture - Grand Gulf Nuclear Station, Unit 1, Request for Additional Information Regarding Technical Specification Task Force Traveler (TSTF) - 423 Project stage: RAI GNRO-2014/00079, Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186)2014-11-13013 November 2014 Request for Additional Information Regarding Request for Adoption of TSTF-423, Revision 1, Change in Technical Specification End States (CE-NPSD-1186) Project stage: Request GNRO-2014/00084, Clarification of Entergy'S Commitment to the Guidance Contained in NUMARC 93-01 Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants2014-11-19019 November 2014 Clarification of Entergy'S Commitment to the Guidance Contained in NUMARC 93-01 Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Project stage: Request GNRO-2013/00065, Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/000652015-01-27027 January 2015 Response to Verbal Request for Additional Information Associated with Letter GNRO-2013/00065 Project stage: Request ML15027A1832015-01-27027 January 2015 NRR E-mail Capture - FW: Grand Gulf Nuclear Station, Unit 1 FOL Page 16f.pdf (MF3175) Project stage: Other ML15007A1832015-04-23023 April 2015 Issuance of Amendment License Amendment Request to Adopt TSTF-423 Technical Specifications End States, NEDC-32988-A Project stage: Approval 2014-11-19
[Table View] |
|
---|
Category:Letter type:GNRO
MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] |
Text
Entergy Operations, Inc.P.o.Box756PortGibson,MS 39150 Kevin MulliganSiteVicePresident Tel.(601)437-7500 GNRO-2015/00008 January 27,2015 u.s.Nuclear Regulatory Commission Attn: DocumentControlDesk Washington,DC20555-0001
SUBJECT:
Responsetoverbal Request for Additional Information associated with Grand Gulf Nuclear Station Letter GNRO-2013/00065 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
REFERENCE:
Letter:
Grand Gulf NuclearStationUnit1, Application for Technical Specification Changes;Technical Specification TaskForce(TSTF)
Improved Standard Technical Specification Change Traveler, TSTF-423, Technical SpecificationEndStates (GNRO-2013/00065)(ML13316B024)
DearSirorMadam:
Entergy Operations Inc.(Entergy)is providing it's responsestotheverbal request for additional informationreceivedfromthe Nuclear Regulatory CommissiononTuesday, January20,2015.The responses are contained in Attachment1ofthis letterandtherevised Technical Specification(CLEAN)pagesare contained in Attachment2ofthisletter.Thisletter containsnonew commitments.Ifyouhaveany questionsorrequire additional information, please contact JamesNadeauat 601-437-2103.Ideclare under penaltyofperjurythatthe foregoingistrueandcorrect.
Executedonthe27thdayofJanuary,2015.
Sincerely,'.KJM/ram ,.£._--------"-----
Attachments:
1.Response to Request For Additional Information Attachment 1 to GNRO-2015/00008 Response to Request For Additional Information Attachment1to GNRO-2015/00008Page1of2 Grand Gulf Nuclear Station's Responses to Request For Additional Informationasreceivedviaphonecallwiththe Nuclear Regulatory Commission Project ManageronTuesday, January 20, 2015.Item1)OnPage3.3-80,Shouldtheline containing"cell containingoneormorefuel assemblies" have been indented?Areviewofthiscleanpage containedinthe submittalandthecurrentpageoftheGrand Gulf NuclearStation(GGNS)
Technical Specification confirmedthislineshouldhavebeenindented.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item2)PartA)Page3.6-31,Should numberingforthe RequiredActionbeCorC.1?
The numbershouldbeC.1.Areviewthecleanpage,as submittedinGGNSLetter GNRO-2013/00065foundthatthe number conventionusedinRequiredActionC.1iscorrectandtheRequiredActionis numbered C.1.No follow-upactionsare warranted.PartB)Page3.6-31, Condition'0'wasadded.Thisnew condition containsthefollowingwording:"ofconditionCnotmet".Isthis just for clarification?Yes.Theintentistoensurethattheuser understandwhichrequiredactionwasnotmet.
No follow-up actions are warranted.Item3)Page3.7-7,Verifythenote insertedatRequiredActionC.1is correctsinceMode3isno longerpartoftheTS?YesMODE3is applicabletothisTSandthenoteis applicableasrequested.
No follow-up actions are warranted.Item4)Page3.7-3,Should"OR"beunderlined,ornot?Yesthe"OR" statementsshouldbe underlined.Areviewofthecleanpage,as submittedinGGNSLetter GNRO-2013/00065,foundthe"OR" statements areunderlinedin Condition"F." No follow-upactionsare warranted.
Attachment1to GNRO-2015/00008Page2of2Item5)Page3.7-8,Wasthe24MFCLAR already approved?The24MFCLARwas amendment197.Doweneedthe change(18to24 months)orhasitalreadybeen approved?We concurthattherequested FREQUENCY change requested for Surveillance Requirement(SR)3.7.3.3was addressedbythe issuance and implementation of License Amendment197andthis request changeisno longer needed.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item6)Page3.7-9,Shouldthesymbolusedbea"degrees" symbol?Yes,thisisa degreesymbol.Areviewofthecleanpage,as submittedinGGNSLetter GNRO-2013/00065,foundthatthe degreesymbolis correctly insertedinRequiredActionB.1.
No follow-up actions are warranted.Item7)PartA)Page3.8-4ActionD,Shoulditbe"Systems C Operating" or"Systems-Operating"?Yes,itshouldbe"Systems-operating".
No follow-up actions are warranted.PartB)Page3.8-4ActionG, Shouldn'tthe36hoursbe deleted?Yesthe36hour Completiontimeshouldbe deleted from Condition GTherevisedpageis contained in Attachment2of GNRO-2015/00008.Item8)Page3.8-27,Topright-isthetitle correct?Shoulditbe3.8.1insteadof3.8.4?Yes,weagreethetitleandTS numbering are incorrectonthecleanpage submitted inGGNSLetter GNRO-2013/00065.Therevisedpageis contained in Attachment2of GNRO-2015/00008.Item9)Page3.8-39,Topright-isthetitlecorrect?Yes,weagreethetitleandTS numbering are incorrectonthecleanpage submitted inGGNSLetter GNRO-2013/00065.Therevisedpageis contained in Attachment2of GNRO-2015/00008.
Attachment 2 to GNRO-2015/00008 Revised (CLEAN)Technical Specification Pages RPS Electric Power Monitoring 3.3.8.2 3.3 INSTRUMENTATION 3.3.8.2 Reactor Protection System (RPS)Electric Power Monitoring LCO 3.3.8.2 APPLICABILITY:
ACTIONSTwoRPS electric power monitoring assemblies shall be OPERABLE for each inservice RPS motor generator set or alternate power supply.MODES 1, 2, and 3, MODES 4 and 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.
CONDITIONREQUIREDACTION COMPLETION TIMEA.One or both inservice A.1 Remove associated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> power supplies with inservice power one electric power supply(s)from monitoring assembly service.inoperable.
B.One or both inservice B.1 Remove associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> power supplies with inservice power both electric power supply(s)from monitoring assemblies service.inoperable.
C.Required Action and C.1-------Note--------
associated Completion LCO 3.0.4.a is not Time of Condition A applicable when or B not met in entering MODE 3.MODE 1, 2, or 3.-------------------
Be in MODE 3.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)
GRAND GULF 3.3-80 Amendment No.__
CRFA System 3.7.3 ACTIONS (continued)
CONDITIONREQUIREDACTION COMPLETION TIME E.Two CRFA subsystems E.1-------NOTE-------
inoperable in MODE 1, LCO 3.0.4.a is not 2, or 3 for reasons applicable when other than Condition entering MODE 3.B.------------------
Be in MODE 3.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F.Two CRFA subsystems F.1-------NOTE-------
Immediately inoperable during LCO 3.0.3 does not OPDRVs.apply.------------------
OR-Initiate action to One or more CRFA suspend OPDRVs.subsystems inoperable due to inoperable CRE boundary during OPDRVs.SURVEILLANCE REQUIREMENTS SR 3.7.3.1 SR 3.7.3.2 SR 3.7.3.3 SR 3.7.3.4 SURVEILLANCE Operate each CRFA subsystem for10 continuous hours with the heaters operating.
Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).Verify each CRFA subsystem actuates on an actual or simulated initiation signal.Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.FREQUENCY 31 days In accordance with the VFTP 24 months In accordance with the Control Room Envelope Habitability Program GRAND GULF 3.7-8 Arne ndment No.-+/--4-§.,+/--+8-T+/--9-+-r_
ACTIONS (continued)
CONDITIONREQUIREDACTION AC Sources-Operating 3.8.1 COMPLETION TIME D.One required offsite circuit inoperable for reasons other than Condition F.AND One required DG inoperable for reasons other than Condition F.-----------NOTE--------------
Enter applicable Conditions and Required Actions of LCO 3.8.7,"Distribution Systems-Operating," when any required division isenergized as a result of Condition D.D.1 Restore required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> offsite circuit to OPERABLE status.OR-D.2 Restore required DG 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to OPERABLE status.E.Two required DGs inoperable.
F.One automatic load sequencer inoperable.
G.Required Action and associated Completion Time of Condition A,B,C,D,E, or F not met.E.1 F.1 G.1 Restore one required DG to OPERABLE status.Restore automatic load sequencer to OPERABLE status.--------NOTE---------
LCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OR 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if Division 3 DG is inoperable 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 12 hours (continued)
GRAND GULF 3.8-4 Amendment No.
DC Sources-Operating 3.8.4 ACTIONS (continued)
CONDITION D.Required Action and 0.1 associated Completion Time for Division 1 or 2 DC electrical power subsystem for conditionA,B, or C not met.E.Division 3 DC E.1 electrical power subsystem inoperable for reasons other than Condition A.REQUIREDACTION
NOTELCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.Declare High Pressure Core Spray System inoperable.
COMPLETION TIME 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Immediately F.Required Action and F.1 Be in MODE 3.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time for Division 3 DC AND electrical
--power subsystem for F.2 Be in MODE 4.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Condition A, B or E not met.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 SR 3.8.4.2 Verify battery terminal voltage is129 V on float charge.Verify no visible corrosion at battery terminals and connectors.
OR Verify battery connection resistance is1.5 E-4 ohm for inter-cell connections,1.5 E-4 ohm for inter-rack connections,1.5 E-4 ohm for inter-tier connections, and1.5 E-4 ohm for terminal connections.
7 days 92 days (continued)
GRAND GULF 3.8-27 Amendment No.
Distribution Systems-Operating 3.8.7 ACTIONS (continued)
CONDITION C.Required Action and associated Completion Time of Condition A or B not met.C.1REQUIREDACTION LCO 3.0.4.a is not applicable when entering MODE 3.Be in MODE 3.COMPLETION TIME 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />sD.One or more Division 3 D.1 AC or DC electrical power distribution subsystems inoperable.
E.Two or more divisions E.1 with inoperable distribution subsystems that result in a loss of function.SURVEILLANCE REQUIREMENTS SURVEILLANCE Declare High Pressure Core Spray System inoperable.
Enter LCO 3.0.3.Immediately Immediately FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and voltage to required AC and DC electrical power distribution subsystems.
7 days GRAND GULF 3.8-39 Amendment No.