Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML15099A0432015-04-0202 April 2015 Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches ML15099A0422015-04-0202 April 2015 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14213A0992014-07-24024 July 2014 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1104800542011-02-15015 February 2011 Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades ML1104604872011-02-15015 February 2011 Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades ML1035100312010-12-15015 December 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1035001742010-12-15015 December 2010 Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML1029502812010-10-20020 October 2010 Part 21 Notification - Crack Indications in Marathon Control Rod Blades ML1029305052010-10-20020 October 2010 GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades ML1027300632010-09-27027 September 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1027006142010-09-27027 September 2010 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1019403552010-07-12012 July 2010 Part 21 Report for Certain Model 3051N Pressure Transmitters ML1019403092010-07-12012 July 2010 Rosemount Nuclear Notification Under 10 CFR Part 21 for Certain Model 3051N Pressure Transmitters ML1013803962010-05-14014 May 2010 Part 21 Report - Bent Fuel Spacer Flow Wing ML1013700652010-05-14014 May 2010 Part 21 Reportable Condition Notification: Bent Fuel Spacer Flow Wing - GNF2 Fuel ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0808104312008-03-20020 March 2008 Part 21 Report Involving Potential Failure of Certain Rosemount Pressure Transmitters ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0710101252007-04-0909 April 2007 Fairbanks Morse Engine, Part 21 Notification - Diesel Cam Roller Bushing Failures 2023-03-07
[Table view] Category:Facsimile
MONTHYEARML1019403092010-07-12012 July 2010 Rosemount Nuclear Notification Under 10 CFR Part 21 for Certain Model 3051N Pressure Transmitters 2010-07-12
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust 2024-09-18
[Table view] |
Text
EMERSON.Process Management ROSEMOUNTI Nuclear 8200 Market Boulevard Ghanhassen, MN 55317 USA Tel 1 (952) 949-5210 Fax 1 (952) 949-5201 Facsimile No. of Pages: Including cover page Fax Number: (301) 816-5151 To: NRC Operations Center Company;Date: From;E-Mail:
Subject:
Monday, July 2010 Duyen Pham, Quality Manager Duyen.Pham@Emersoncom Phone: (952) 949-5363 Rosemount Nuclear Instruments, Inc. is submitting the attached notification as required by 10 CFR Part 21. Please contact me if you have any questions.
Sincerely, 422 Aa6?4r Duyen Pham Quality Manager Rosemount Nuclear Instruments, Inc.www. RosemountNuclear.com RNll.Info@cEmersonProcess.com ORoeUount Nuclear Instruments, Inc.8200 Market Boulevard Chanhassen, MN 55317 USA Nuclear Tel 1(952) 9951 Fax 1 (952) 949-5201 www. RosemountNuclear.corn 12 July 2010 U.S, Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Document Control Desk Re: Notification under 10 CFR Part 21 for certain Model 3051N Pressure Transmitters Pursuant to 10 CFR Part 21, section 21.21(b), Rosemount Nuclear Instruments, Inc. (RNII)is writing to inform you that a limited number of Model 3051 N pressure transmitters listed in the attachment may exhibit non-linear and non-repeatable performance.
The affected transmitters were shipped from RNII between August 12, 2002 and September 27, 2006.1.0 Name and address of the individual providing the information:
Mr. Marc D. Bumgarner Vice President
& General Manager Rosemount Nuclear Instruments, Inc.8200 Market Boulevard Chanhassen, MN 55317 2.0 Identification of items supplied: Certain Model 3051 N pressure transmitters identified in the attachment.
3.0 Identification of firm supplying the item: Rosemount Nuclear Instruments, Inc.8200 Market Boulevard Chanhassen, MN 55317 4.0 Nature of the failure and potential safety hazard: The Model 3051 N Smart Pressure Transmitter is dedicated for nuclear use consistent with the requirements of 10 CFR Part 21. It is qualified for use in safety related applications per IEEE 323-1983 (mild environment) and IEEE 344-1987 for seismic applications as documented in its associated qualification reports.Procurement and production records indicate that 53 Model 3051N pressure transmitters (Ranges 1, 2 and 3) manufactured between August 2002 and September 2006 have sensor module castings that were not solution annealed, and therefore may contain elevated levels of hydrogen in the sensor module fill fluid. Solution annealing is a heat treatment process for castings.
It is used to homogenize the casting by reducing any segregated elements that include carbon, which can greatly reduce corrosion resistance.
This process also reduces the level of mobile hydrogen in the casting to a point where out gassing is no longer a reliability concern.Page 1 of 2 Elevated levels of hydrogen in the sensor module casting can create a reliability concern because mobile hydrogen can diffuse through the metal into the sensor module fill fluid and may eventually reach gas solubility limits of the fill fluid. When this occurs, gas vapor bubbles may form, primarily under vacuum process conditions, resulting in a sensor output shift. A transmitter with hydrogen bubbles in the sensor module fill fluid will annunciate itself by exhibiting non-linear and non-repeatable performance.
To date, RNII has not received any 3051 N field returns for this issue. However, there have been two confirmed failures related to this issue on a commercially available Rosemnount product using the identical sensor module casting. Additionally, there have been other confirmed failures related to this issue on a commercially available Rosemount product using a similar, but not identical casting. These commercial grade product returns prompted additional internal testing and analysis that indicated a potential reliability concern on 3051 N transmitters that were manufactured with non-solution annealed module castings.As a result, a thorough evaluation was completed and a notification about the potential substantial safety hazard identified on 7/1/10 is being made in accordance with 10 CFR Part 21 to customers that purchased a 3051'N pressure transmitter from the potentially affected population.
5.O The corrective action which is taken, the name of the individual or organization responsible for that action, and the length of time taken to complete that action:*The last shipment of a 3051N transmitter with a non-solution annealed sensor module casting was September 2006.*Following September 2006, all sensor module castings utilized on the 3051 N have been solution annealed.*Procurement drawings for the module castings have been reviewed and the requirement to solution anneal all module castings for a model 3051 N transmitter has been verified.*Model 3051 N pressure transmitters affected by this notification may be returned to RNII for replacement at no charge.6.0 Any advice related to the potential failure of the item: The end user is advised to determine the impact of this potential reliability issue upon its plant's operation and safety, and take action as deemed necessary.
Affected transmitters may be returned to RNII for replacement at no charge.Rosemount Nuclear Instruments, Inc. is committed to the nuclear industry and remains dedicated to the supply of high quality products to our customers.
If you have any questions, or require additional information related to this iss 'ue, please contact: Mike Dougherty (208) 865-1112, Gerard Hanson (952) 949-5233, Bob Cleveland (952) 949-5206, or Matt Doyle (952) 949-5204.Sincerely, Mact mg.arner Vice President
& General Manager*Rosemount Nuclear Instruments, Inc.ROSEMOUNT' Nuclear Page 2of 2 ATTACHMENT:
10 CFR Part 21 Notification
-12 July 2010.Entergy Corp Sales Order Purchase Order Model Number Serial Number Ship Date Site Number 1061163 VY014098 30S1ND2AO2A1AH2BS 1243742 12-Aug-02 VERMONT YANKEE 1,061163 VY014098 30S1ND2AO2A1AH2BS 1243743 12-Aug-02 VERMONT YANKEE 1061163 VY014098 30S1ND2A02A1AH2BS 1243741 12-Aug-02 VERMONT YANKEE 1083248 VY014098 3051ND2A02B1AH2BS 1260592 18-Sep-02 VERMONT YANKEE 1,083248 VY014098 3051ND2AO2BIAH2BS 1260594 18-Sep-02 VERMONT YANKEE 1083248 VY014098 3051ND2AO2BIAH2BS 1260593 18-Sep-02 VERMONT YANKEE 1084239 VY014552 3051ND3A02BIAH2BS 1263277 20-Sep-02 VERMONT YANKEE 1.084239 \VY014552 3051ND3AO2B1AH2BS 1263276 20-Sep-02 VERMONT YANKEE ATTACHMENT:
10 CFR Part 21 Notification
-12 July 2010.Emerson Process Management AG Sales Order Purchase Order Model Number Serial Number Ship Date Site Number 1170729 41607157 3051NG3AO2A1JM6H2BS 1336295 15-Apr-03 KRSKO 1170729 41607157 3051NG3A02A1JM6112BS 1336296 15-Apr-03 KRSKO 1170801 41607158 30S1ND3A02AIJH2BS 1336290 17-Apr-03 KRSKO 1170801 41607158 3051ND3A02AIJH12BS 1336289 17-Apr-03 KRSKO ATTACHMENT:
10 CFR Part 21 Notification
-12 July 2010.EMERSON PROCESS MANAGEMENT SL Sales Order Purchase Order Model Number Serial Ship Date Site Number Number 1094472 34989553 3051NDIA02AIAH2MSIB2 1277316 24-Oct-02 SANTA MARIE DE GARONA 1094472 34989553 3O5INDIAO2A1AH12MB2 1277313 2 4-Oct-02 SANTA MARIE DE GARONA 1094472 34989553 3051NDIAO2A1AH2M5B2 1277317 24-Oct-02 SANTA MARIE DE GARONA 1094472 34989553 3051NDIA02AIAH2M5B2 1277314 24-Oct-02 SANTA MARIE DE GARONA 1094472 34989553 3051ND1A02A1AH2M5B2 1277315 24-Oct-02 SANTA MARIE DE GARONA 1094472 134989553 3051NDIA02AIAH2M5B2 1277312 24-0ct-02 SANTA MARIE DE GARONA ATTACHMENT:
10 CFR Part 21 Notification
-12 July 2010.U Shun Enterprise Co LTD Sales Purchase Model Number Serial Ship Date Site Order Order Number Number Kuosheng Nuclear 1766706 F-119-95 (351-950159023Y) 3051ND3A02A1AB2H2 1710273 27-Sep-06 Power Station ATTACHMENT:
10 CFR Part 21 Notification
-12 July 2010.Korea Hydro and Nuclear Power Co Sales Order Purchase Order Model Number Serial Number Ship Date Site Number 894002 PUC-P-9J230A 3051ND1A02A1AH2B2 1240830 16-Aug-02 Ulchin 5 894205 PUC-P-9J230A 3051N01A02A1AH2B2 1316121 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315786 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315787 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02AIAH2B2 1315780 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315777 1-Apr-03 Ulchin 6 894205 PUC-P-9i230A 3051ND1A02A1AH2B2 1315778 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH282 1316127 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 305IND1A02A1AH2B2 1315775 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315779 1-Apr-03 Uichin 6 894205 PUC-P-9J230A 3051N01A02A1AH12B2 1315791 1-Apr-03 U ,chin 6 894205 PUC-P-9J230A 3051NDIA02A1AH2B2 1316126 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1AO2A1AI-12B2 1315783 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02AIAH2B2 1316119 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02AIAH2B2 1316120 1-Apr-03 Ulchin 6 894205 PUC-P-9i230A 3051NDIA02AIAH2B2 1315794 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315785 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315781 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3O51ND1AO2A1AH2B2 1316122 1-Apr-03 Ulchir, 6 894205 PUC-P-9J230A 30S1ND1AO2A1AH2B2 1316123 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02A1AH2B2 1315793 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02AIAH2B2 1315788 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02AIAH2B2 1316124 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIAO2A1AH2B2 1315782 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1AO2A1AH2B2 1315789 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1AO2A1AHZ22 1316125 1-Apr-03 Ulchin 6 894205 PUC-P-92230A 3051ND1AO2A1AH2B2 1316128 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315784 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315790 1-Apr-03 Ulchin 6 894205 PUC-P-9J230A 3051ND1A02A1AH2B2 1315792 1-Apr-03 Ulchin 6 894205 PUC-P-9i230A 3051NDIA02A1AH2B2 1365414 3-Sep-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02A1AH2B2 1365413 3-Sep-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02A1AH252 1365411 3-Sep-03 Ulchin 6 894205 PUC-P-9J230A 3051NDIA02AIAH2B2 1365410 3-Sep-03 Ulchin 6