End of Interval Relief Requests Associated with the Fourth 10-Year Inservice Inspection (ISI) Interval
ML14028A579
Person / Time
Site: Oyster Creek
Issue date: 01/07/2014
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-14-001
Download: ML14028A579 (254)


Text

A200 Exelon Way Kennett Square. PA 19348 Exe!Lon Generation www.exeloncorp.com 10 CFR 50.55a RA-14-001 January 7, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

End of Interval Relief Requests Associated with the Fourth 10-Year Inservice Inspection (ISI) Interval In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (a)(g)(5)(iii), Exelon Generation Company, LLC (Exelon) is requesting relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components." These reliefs apply to the fourth 10-year Inservice Inspection (ISI) interval, which concluded on January 14, 2013 for the Oyster Creek Nuclear Generating Station. The fourth 10-year ISI interval complied with the ASME Boiler and Pressure Vessel Code, Section Xl, 1995 Edition with 1996 Addenda.There are no regulatory commitments in this letter.If you have any questions concerning this letter, please contact Tom Loomis at (610) 765-5510.Respectfully, Jame arstow Director -Licensing

& Regulatory Affairs Exelon Generation Company, LLC

Attachment:

Relief Requests R-44, R-45 cc: Regional Administrator, Region I, USNRC USNRC Senior Resident Inspector, OCNGS Project Manager [OCNGS] USNRC ATTACHMENT Relief Requests R-44, R-45 Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class 1 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 1 of 6)1.0 ASME CODE COMPONENTS AFFECTED Code Class:

Reference:

Examination Category: Item Number:

Description:

Component Number: 1 Table IWB-2500-1 B-A, B-D, B-F B1.12, B1.21, B1.22, B1.40, B3.90, B3.100 and B5.10 Relief for the 100% Volumetric Examination of the Class 1 Reactor Vessel Welds, Nozzle to Vessel Welds, Nozzle Inside Radius, and Dissimilar Metal Welds in Nozzles See Table R-44 2.0 APPLICABLE CODE EDITION AND ADDENDA The fourth 10-year Inservice Inspection (ISI) interval program was based on the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)Code,Section XI, 1995 Edition with 1996 Addenda.3.0 APPLICABLE CODE REQUIREMENT ASME Section XI, 1995 Edition with 1996 Addenda, Examination Category B-A, Items B1.12, B1.21, B1.22, and B1.40, Examination Category B-D, Items B3.90 and B3.100, and Examination Category B-F, Item B5.10 require a 100% volumetric examination of reactor vessel welds, nozzle to vessel welds, nozzle inside radius and dissimilar metal welds in nozzles.4.0 IMPRACTICALITY OF COMPLIANCE Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from the Code required 100%volumetric examination of the reactor vessel welds, nozzle to vessel welds, nozzle inside radius, and dissimilar metal welds in nozzles that are listed in Table R-44, on the basis that conformance with these Code requirements is impractical due to component configuration and access restrictions.

Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class I Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 2 of 6)Table R-44 -Limited Weld Coverage Weld Description Coverage Item Att.# Notes NR02 1-574 Reactor Head to Flange 58% B13.40 Al Limited due to Flange Configuration NR02 2-562 Lower Head Circ Weld 65.7% B1.21 A2 Proximity of Skirt and N2 Nozzles NR02 2-563D Upper Intermediate Shell Course 64.3% B1.12 A3 Limited due to Feedwater Spargers, Core Spray Piping NR02 2-563E Upper Intermediate Shell Course 67.6% B1.12 A4 Limited due to Feedwater Spargers, Core Spray Piping NR02 2-563F Upper Intermediate Shell Course 53% B13.12 A5 Limited due to Feedwater Spargers, Core Spray Piping and Surveillance Specimen Bracket NR02 2-564A Lower Intermediate Shell Course 50.7% B13.12 A6 Limited due to Surveillance Specimen Basket and Shroud Repair Hardware NR02 2-564C Lower Intermediate Shell Course 49.4% B1.12 A7 Limited due to Shroud Repair Hardware NR02 2-564D Lower Shell Course Assembly 55.2% B1.12 A8 Proximity of Recirc Outlet Nozzle NR02 2-564E Lower Shell Course Assembly 48.3% B1.12 A9 Limited due to Shroud Repair Hardware and Recirc Outlet Nozzle NR02 2-564F Lower Shell Course Assembly 67.9% B1.12 A10 Limited due to Conical Support and Shroud Repair Hardware NR02 4-562A Lower Head Meridional 52.1% B1.22 All Proximity of Skirt and N2 Nozzle NRO2 4-562D Lower Head Meridional 84.2% B1.22 A12 Proximity of Skirt and N2 Nozzle NR02 4-562F Lower Head Meridional 84.2% B1.22 A13 Proximity of Skirt and N2 Nozzle Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class 1 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 3 of 6)Table R-44 -Limited Weld Coverage Weld Description Coverage Item Att.# Notes NR02 3-565A NMA Recirc Outlet Nozzle 45.2% B3.90 A14 Nozzle Configuration NR02 3-565B N1B Recirc Outlet Nozzle 45.2% B3.90 A15 Nozzle Configuration NR02 3-565C N1C Recirc Outlet Nozzle 22% B3.90 A16 Nozzle Configuration, Insulation Support Ring, and UT Scanner Arm NR02 3-565D N1D Recirc Outlet Nozzle 22% B3.90 A17 Nozzle Configuration, Insulation Support Ring, and UT Scanner Arm NR02 3-565E N1 E Recirc Outlet Nozzle 47.9% B3.90 A18 Nozzle Configuration NR02 6-566A N3A Main Steam Nozzle 52.9% B3.90 A19 Nozzle Configuration NR02 6-566B N3B Main Steam Nozzle 52.9% B3.90 A20 Nozzle Configuration NR02 4-566A N4A Feedwater Nozzle 51.8% B3.90 A21 Nozzle Configuration and Proximity of N6A and N13B NR02 4-566B N4B Feedwater Nozzle 52.5% B3.90 A22 Nozzle Configuration NR02 4-566C N4C Feedwater Nozzle 49.5% B3.90 A23 Nozzle Configuration and Proximity of N6B and N15B NR02 4-566D N4D Feedwater Nozzle 52.5% B3.90 A24 Nozzle Configuration NR02 2-566A N5A Isolation 29% B3.90 A25 Nozzle Configuration and Proximity of N13, N14 and Condenser Nozzle _Insulation Support Ring NR02 2-566A N5A Isolation Condenser 78.9% B3.100 A26 Proximity of N13, N14 and Insulation Support Ring Nozzle Inner Radius NR02 2-566B N5B Isolation 22% B3.90 A27 Nozzle Configuration and Proximity of Insulation Support Condenser Nozzle Ring NR02 2-566B N5B Isolation Condenser 68.8% B3.100 A28 Proximity of Insulation Support Ring Nozzle Inner Radius NR02 2-567A N6A Core Spray Nozzle 28.1% B3.90 A29 Nozzle Configuration and Proximity of N13B and Bio-Shield Access Limitations NR02 2-567A N6A Core Spray Nozzle Inner 44% B3.100 A30 Nozzle Configuration and Proximity of N13B and Bio-Radius Shield Access Limitations Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class 1 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 4 of 6)Table R-44 -Limited Weld Coverage Weld Description Coverage Item Att.# Notes NR02 2-567B N6B Core Spray Nozzle 61.7% B3.90 A31 Nozzle Configuration and Proximity to N15B and N16B Instrument Nozzles, and N4C NR02 2-567B N6B Core Spray Nozzle Inner 60.9% B3.100 A32 Nozzle Configuration and Proximity of the N15B and Radius N16B Instrument Nozzles NR02 1-576 N7A Closure Head Nozzle 76% B3.90 A33 Nozzle Configuration NR02 1-576 N7A Closure Head Nozzle 74% B3.100 A34 Nozzle Configuration (offset)Inner Radius NR02 3-576 N7B Closure Head Nozzle 78% B3.90 A35 Nozzle Configuration NR02 3-576 N7B Closure Head Nozzle 88% B3.100 A36 Nozzle Configuration (offset)Inner Radius NR02 5-576 N8 Closure Head Nozzle 89% B3.90 A37 Nozzle Configuration NR02 6-567 N9 CRD Return Nozzle 69% B3.90 A38 Nozzle Configuration NR02 5-567 N9 CRD Return Nozzle to Safe 67.4% B5.10 A39 Outer Diameter Safe End Configuration End NR02 4-565D N ID Recirc Outlet Nozzle to 70% B5.10 A40 Nozzle Outer Diameter Configuration Safe End Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class 1 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 5 of 6)5.0 BURDEN CAUSED BY COMPLIANCE Due to the component configuration, portions of the code required examination volume could not be completely examined.

The curvature of the radius of the nozzle forging is such that ultrasonic scanning of the weld is interrupted due to loss of contact of the ultrasonic search unit. This limitation affects both transverse and parallel scanning of the code required examination volume.In addition to component configuration, certain weld examinations are further limited by reactor pressure vessel design obstructions such as reactor pressure vessel appurtenances, bio-shield opening limitations, Outer Diameter (OD) contours, and mirror insulation.

Examination coverage percentages are identified in Table R-44, and inspections were performed to the maximum extent practical for the given configuration.

The inspection results for the full penetration reactor vessel welds, nozzle to vessel welds, nozzle inside radius, and dissimilar metal welds in nozzles did not identify any unacceptable indications.

Oyster Creek Nuclear Generating Station requests relief from 100% volumetric examination of the full penetration reactor vessel welds, nozzle to vessel welds, nozzle inside radius and dissimilar metal welds in nozzles due to access limitations imposed by reactor pressure vessel design and/or component configuration.

6.0 PROPOSED

ALTERNATIVE AND BASIS FOR USE No alternate provisions are practical for the subject welds. Examinations were performed to the maximum extent practical with the best available methods at the time of the examination.

7.0 DURATION

OF PROPOSED ALTERNATIVE This relief is requested for the fourth 10-year ISI interval for Oyster Creek Nuclear Generating Station, which ended on January 14, 2013.

Request for Relief (R-44) for Obtaining the Required Percentages During the Fourth Interval for Class 1 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 6 of 6)8.0 PRECEDENTS Similar relief requests have been approved for: 1) The Oyster Creek Nuclear Generating Station (OC-33 and OC-34), in U.S. Nuclear Regulatory Commission Safety Evaluation Report dated February 2, 2005.2) The Limerick Generating Station, Units 1 and 2 (Relief Request RR-34) in a U.S.Nuclear Regulatory Commission Safety Evaluation Report dated January 27, 2009.3) The Peach Bottom Atomic Power Station, Units 2 and 3 (Relief Request 13R-48) in a U.S. Nuclear Regulatory Commission Safety Evaluation Report dated August 27, 2010.

Attachment:

Al Weld: NR02 1-574 Report Number: OCR20-037 Item Number: B1 .40 Outage: 1 R20 (Fall 2004)Coverage:

58%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-5, "Head to Flange" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 58% code required coverage due to the closure head flange configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A magnetic particle (MT) exam and a system pressure test were also completed with no unacceptable indications observed.

Oyster Creek nit-1 Flange Weld 60* NS Exam Volume = 9.8 Sq. In.60° FV S6 Exam Volume = 23.2 Sq. In.60° FV 54 Exam Volume = 5.2 Sq. In.600 NS T-Scan achieved = 3.9 Sq. In.600 FV S6 T-Scan achieved = 22.2 Sq. In.60* FV S4 T-Scan achieved = 5.2 Sq. In.60° NS P-Scan achieved = 3.0 Sq. In.600 FV S6 P-Scan achieved = 10.4 Sq. In.60° FV S4 P-Scan achieved = 2.3 Sq. In.3.1" 5.2"\P-Scans 60°T NS 13.6" V Nominal T and clad from CE Dwg. 232-574 Segments specification

= 5 -5/16" Nominal T = 5 -5/16" Nominal Clad T = 7 / 32"

Attachment:

A2 Weld: NR02 2-562 Report Number: 1 R24-1 01 Item Number: B1 .21 Outage: 1R24 (Fall 2012)Coverage:

65.7%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-3, "Spherical Vessel Head Circumferential and Meridional Weld Joints" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 65.7% code required coverage due to the proximity of the vessel skirt and N2 recirculation inlet nozzles. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

m m m m m m m. m m m mIiI= M 1111M m 2-574 3-574B i0 3-574C 180* >4-562E CO)INSIDE VIEW OUTSIDE VIEW BO'TOM HEAD ASSEMBLY CLOSURE (TOP) HEAD ASSEMBLY Figure 2-2. Oyster.Creek Reactor Pressure Vessel Bottom and Top Heads Plate, Flange Forging, and Seam Weld Locations

[10, 13, 14, 15, 16]O4"O SIR-00-063, Rev. 0 2-15

  • H~HI NR02 4-562D+. beve I 00000 I d I -r t.of WcE Page of s-Report Number 1R24-123

Attachment:

A3 Weld: NR02 2-563D Report Number: 1 R24-105 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

64.3%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 64.3% code required coverage due to the feedwater sparger, core spray piping and core spray risers adjacent to this weld. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Lcxelkbxe specwcn hoo6em loded 2110 Saigle / 3W0 W 0*18 270r 360(EL 65911 EL 636.9" VESSEL FLANGE 3-563 1-563 EL SO54 EL 390.W EL 371.7 TOP OF SIELUJD 1-572 EL 238.1" EL 106-" 3-572 2S6.5'EL 0.0" VESSEL ZERO ELEVATION C-VESSEL DIAMETER AT FLANGE = 213.0" AZIMUTHS = La6 INCHES PER DEGREE

Attachment:

A4 Weld: NR02 2-563E Report Number: 1R24-106 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

67.6%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 67.6% code required coverage due to the feedwater sparger and core spray piping adjacent to this weld. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK 0.90" 180 27O" 36(0........................EL 659.8 VESSEL FLANGE EL 636.9 3-563 1-563 1-572 3-56'.3-572 EL 504.3 EL. 390.0'TOP OF SHROUD EL. 371.7 EL 23&16 EL 106.5" 256-s.EL .0" VESSEL ZERO ELEVATION VESSEL OIAM1SER AT FLANGE = 213.0'AZIMUTHS = L86 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONE DWG. OC-2012-01 REV. 0

Attachment:

A5 Weld: NR02 2-563F Report Number: 1 R24-107 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

53%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 53% code required coverage due to the proximity of the feedwater sparger, core spray piping, and surveillance specimen bracket. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Sxwdiwe sp~weng~f hokoem boded M10 Sulgle / 300 WWo 0*90" 180 360 EL. 659" VESSEL FLANGE EL 63&9ff 3-563 1-563 EL SO43" EL 390.0" TOP OF SHROUD EL 390-W EL 371.7 EL 238.1" EL 106.5" 3-564 3-572 I i I 2S6.5'EL O.0" VESSEL ZERO ELEVATION r" --I VESSEL DIAMETER AT FLANGE = 213.0'AZIMUTHS = 1.86 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONEI DWG. OC-2012-01 REV. 0

Attachment:

A6 Weld: NR02 2-564A Report Number: 1R24-108 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

50.7%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 50.7% code required coverage due to the proximity of a surveillance specimen basket and shroud repair tie rod. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Swevdiode speceoen hoklers WOWe 21(r S~o&i / 30(r Od.o 0* 90~I ..360'EL 659 " VESSEL FLANGE 3-563 1-563 1-572 3-564 3-572 EL 63&90 EL. 504-7 EL 390L0 TOP OF SHROUD EL 3717" EL 238&1 EL 1065" I I N 2S&S' L )l EL 0.(r VESSEL ZERO ELEVATION VESSEL DIAMETER AT FLANGE = 213,0" AZIMUTHS = L86 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONE I DWG. OC-2012-01 REV. 0

Attachment:

A7 Weld: NR02 2-564C Report Number: 1 R24-110 Item Number: B1.12 Outage: 1R24 (Fall 2012)Coverage:

49.4%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 49.4% code required coverage due to the proximity of the shroud repair tie rod. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Someve~oce specim~en hOkdes kooded 21i' Soigle / 3W0 DdW 0 90' 160'270'360o EL 6590" VESSEL FLANGE EL 636.99 3-563 1-563 1-572 3-564 EL 50.3" EL 390.0'TOP OF SHROUD EL 3?Lr I EL 238.1" EL 106.5" 256.S'EL 0.0' VESSEL ZERO ELEVATION C-VESSEL DIAM'ETER AT FLANGE = 213.0*AZIMUTHS -186 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS FSCALE: NONE DWG. OC-2012- 1 REV. 0

Attachment:

A8 Weld: NR02 2-564D Report Number: 1 R24-1 11 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

55.2%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 55.2% Code required coverage due to the proximity of the recirculation outlet nozzle. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Sum*Wwtc'.

specwryef Wc~d'.s &oodd 21(r 5ingW / 3W Dual 0O 90'180" 270' 360..-I I .., ý , , ý , , .EL 659.8 VESSEL FLANGE EL 636.9'3-563 1-563 1-S72 3-564 3-572 EL. S043'EL 390.0'TOP OF SHROUD EL 371.7 EL 238.1'EL 106.5°256.S'EL 0.(r VESSEL ZERO ELEVATION VESSEL DIAMETER AT FLANGE = 213.0 AZIMUTHS = 186 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONE DWG. OC-2012-01 REV. 0

Attachment:

A9 Weld: NR02 2-564E Report Number: 1R24-112 Item Number: B1.12 Outage: 1R24 (Fall 2012)Coverage:

48.3%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 48.3% code required coverage due to the proximity of the shroud repair tie rod and the recirculation outlet nozzle. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK O" 90" 180" 270 S..ýW~once specanean hokiers Wowe 2L10 Swt&I / 3W 0,Wi 360 EL 659.8'VESSEL FLANGE 3-563 1-56.3 1-572 3-564.EL 636.9*EL S04.3 EL. 390.0" TOP OF SHROIJD EL. 390.0' TOPOFSHROUD EL 371.7 EL 23&1 EL 10.W 2S6.5*EL 0.0" VESSEL ZERO ELEVATION r" -'3 VESSEL DIAMET1 ER AT FLANGE = 213.Or AZIMUTHS -18 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONE DWG. OC-2012-O1 I REV. 0

Attachment:

A10 Weld: NR02 2-564F Report Number: 1 R24-113 Item Number: B1.12 Outage: 1 R24 (Fall 2012)Coverage:

67.9%Base Metal and Weld Materials:

Carbon Steel Examination Volume: Coverage per figure IWB-2500-2, "Vessel Shell Longitudinal Weld Joints" UT Exam Type: Automated UT Scanning from Vessel ID Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 67.9% code required coverage due to the proximity of the conical support and shroud repair tie rod. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

OYSTER CREEK Survedlome specv.en hcoderi loaded 2107 S&ngt/ 3Wd Dual 0 91waO 2?0* 364r EL 6S9 8" VESSEL FLANGE EL 636.9" 3-563 1-563 1-Sn2 3-564 3-572 EL. 504-3" EL 3900'TOP OF SHIOUD EL 371.7" t I I EL 23&.1 EL 106.S I 11 256.5 EL 0.0* VESSEL ZERO ELEVATION VESSEL DIAMETER AT FLANGE = 213.0'AZIMUTHS = L86 INCHES PER DEGREE GE NUCLEAR ENERGY OYSTER CREEK RPV EXAM AREAS SCALE: NONE DWG. OC-2012-01 REV. 0

Attachment:

Al 1 Weld: NR02 4-562A Report Number: 1 R24-120 Item Number: B13.22 Outage: 1R24 (Fall 2012)Coverage:

52.1%Base Metal and Weld Materials:

Carbon Steel -Lower Head Meridional Weld Examination Volume: Coverage per figure IWB-2500-3, "Spherical Vessel Head Circumferential and Meridional Weld Joints" UT Exam Type: Manual UT Scanning of Vessel Bottom Head from 01 Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 52.1% code required coverage due to the proximity of the RPV skirt and recirculation N2 nozzle. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

  • HONCHI NO ._________~NR0 4-562A_ _____(41~ ioo~ri ~ a~.~c ~~ii'~,iLo~o,~~i.~ai

&jd 0 p f ~.,cL uoc ~ well~ct WCi to Jc-Report Number: Page24-120'

Attachment:

A12 Weld: NR02 4-562D Report Number: 1 R24-123 Item Number: B1.22 Outage: 1 R24 (Fall 2012)Coverage:

84.2%Base Metal and Weld Materials:

Carbon Steel -Lower Head Meridional Weld Examination Volume: Coverage per figure IWB-2500-3, "Spherical Vessel Head Circumferential and Meridional Weld Joints" UT Exam Type: Manual UT Scanning of Vessel Bottom Head from the OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 84.2% code required coverage due to the proximity of the RPV skirt and recirculation N2 nozzle. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

.--NR02 4-562D 7" ce5.s ;)le 40be 5/ ;7-R N R- P a ./.o.,l ' a, Report Number: IR24-123 Page (- of S

Attachment:

Al 3 Weld: NR02 4-562F Report Number: 1R24-125 Item Number: B1.22 Outage: 1R24 (Fall 2012)Coverage:

84.2%Base Metal and Weld Materials:

Carbon Steel -Lower Head Meridional Weld Examination Volume: Coverage per figure IWB-2500-3, "Spherical Vessel Head Circumferential and Meridional Weld Joints" UT Exam Type: Manual UT Scanning of Vessel Bottom Head from OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 84.2% code required coverage due to the proximity of the RPV skirt and recirculation N2 nozzle. The following sketch contains the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

I*," NRO2 4-562F A'A'A" A A 7 A N 71*9e r\) J, 7---.......-4 -.-II/w.LJ ~V-~. IO Report Number: IR24-125 Page of 5

Attachment:

A14 Weld: NR02 3-565A (N1A)Report Number: 1 R22-126 Item Number: B3.90 Outage: 1 R22 (Fall 2008)Coverage:

45.2%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 45.2% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

HITACHI Reactor Pressure Vessel Coverage TAC Calculation Sheet Oyster Creek N1A -Recirc Outlet CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 75.9 IRS-Scan LKCW IS4) A 9.5 9.5 12.5% 360 3.1%IRS-Scan LKCCW 6$41 A 9.5 9.5 12.5% 360 3.1%600 P-Scan (S61 A 66.4 13.5 17.8% 360 8.9%600 T-Scan (54) A 9.5 9.5 12.5% 360 6.3%600 T-Scan (S6) A 66.4 36.1 47.6% 360 23.8%__ ____ i____ _ _Rev. 0 9/23iQE% Total Composite Coverage =45.2%Comments A -Scanned area 3600. Scanning limited due to nozzle configuration.

Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume. S6-Supplement 6 volume. Weld length in degrees.-~~L w w-9a M.eS r 0 Ln (D 0D 0o///I Oyster Creek'Recirc Outlet 60° 54 Exam Volume = 9.5 Sq. In.600 S6 Exam Volume = 66.4 Sq. In.600 S4 IRS-Scan LKCW achieved = 9.5 Sq. In.600 S4 IRS-Scan LKCCW achieved = 9.5 Sq. In.60° S6 P-Scan achieved = 13.5 Sq. In.600 S4 T-Scan achieved = 4.0 Sq. In.600 S6 T-Scan achieved = 36.1 Sq. In.7.1" 600P II 16.7" 60 0 T I-1 L I' Radial Plate T Nom. = 7.125" r1nr4 T hInrn _ -r ' 01.7r"

Attachment:

Al5 Weld: NR02 3-565B (NI B)Report Number: OCL R22-128 Item Number: B3.90 Outage: 1 R22 (Fall 2008)Coverage:

45.2%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 45.2% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

HITACHI Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek NIB -Recirc Outlet CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 75.9 IRS-Scon LKCW (S4) A 9.5 9.5 12.5% 360 3.1%IRS-Scan LKCCW (S4) A 9.5 9.5 12.5% 360 3.1%600 P-Scan (S6) A 66.4 13.5 17.8% 360 8.9%60" T-Scan (S4) A 9.5 9.5 12.5% 360 6.3%600 T-Scan IS6) A 66.4 36.1 47.6% 360 23.8%% Total Composite Coverage =45.2%Rev. 0 9/23/0ýComments A -Scanned area 3600. Scanning limited due to nozzle configuration.

o/ 7 Note -Rounding methods may affect calculated values. S4-Supplement 4 underclod volume, S6-Supierment 6 volume. Weld length in degrees.

0 C.D C)(D C)0///I Oyster Creek Recirc Outlet 60' S4 Exam Volume = 9.5 Sq. In.600 S6 Exam Volume = 66.4 Sq. In.600 S4 IRS-Scan LKCW achieved = 9.5 Sq. In.60° 54 IRS-Scan LKCCW achieved = 9.5 Sq. In.60' S6 P-Scan achieved = 13.5 Sq. In.600 S4 T-Scan achieved = 4.0 Sq. In.600 S6 T-Scan achieved = 36.1 Sq. In.60°T/P I 60"P I 16.7" 60°T I I Radi,* te T Nom. = 7.125" Clad m. = 0..21875"

Attachment:

A16 Weld: NR02 3-565C (N1C)Report Number: 5076 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

22%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 22% code required coverage due to the nozzle configuration, proximity of the insulation support ring, and optimized UT scanner arm length. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

0 C 0 (A~(D (D CD Oyster Creek RECIRCULATION OUTLET NIC 70' P-Scan Exam Volume -20.88 Sq. In.45" P-Scan Exam Volume -45.03 Sq. In.70" P-Scan achieved -1.28 Sq. In.450 P-Scan achieved -6.86 Sq. In.

(2 C.C--0 (n-4-CD C-)~~1 CD CD 0-u a (a CD K 0-4'I;Oyster Creek RECIRCULATION OUTLET NiC 700 T-Scan Exam Volume -20.88 Sq. In.450 T-Scan Exam Volume -45.03 Sq. In.60* T-Scan Exam Volume -8.59 Sq. In.700 T-Scan achieved -1.37 Sq. In.45° T-Scan achieved -20.39 Sq. In.60" T-Scan achieved -8.59 Sq. In.//I C C11 restricted kby insudotion support ring Insu(ation support ring 2100 3290 NIC C, rn V Ci2 00~11 ~I,, NIC TL auto exam C C-0.Area restric~ted by insutation support ring 960 3170 2210 NiC co c q-n =i Fn-r NIC 70TP auto exam area Q Area restricted by insu~ation support ring 96*3170~221°NiC Cl)oC-)NIC 45° P1 auto exam area 0)0 c5 03) o 0 0viL d OJ F--d~E x 0 0)a 0 UU d.o -P-P L iD d 0-,43--C U 0 c5-0P .0o 0 U u n 4-P 0) CC)k.D OYSTER CREEK R PAGE \ OF \'-

G-Cep 0 0, CD CD (D 0 Inspection Report No.: 005076 Recirculation Outlet Ni-C Oyster Creek, 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 74.5 Area Sq. In. Auto Auto Auto Auto 70' T-Scan 20.88 1.37 1.8% 264 0.7%450 T-Scan 45.03 20.39 27.4% 241 9.2%600 T-Scan 8.59 8.59 11.5% 241 3.9%700 P-Scan 20.88 1.28 1.7% 264 0.6%450 P-Scan 45.03 6.86 9.2% 264 3.4%Inner 15%T P-Scan 8.59 8.59 11.5% 263.6 4.2%70* T-S can 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%1 P-Scan% Total Composite Coverage =22%Comments: Inner 15%T P-Scan area by modeling.Note -Rounding methods may make calculated values appear in error.

Attachment:

Al 7 Weld: NR02 3-565D (N1D)Report Number: 5077 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

22%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 22% code required coverage due to the nozzle configuration and proximity of the insulation support ring. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

&_, 0 0C 0 (D-0-ID 0 CD (D 0 (D I 0-4%Oyster Creek RECIRCULATION OUTLET N1D 700 T-Scan Exam Volume -20.88 Sq. In.450 T-Scan Exam Volume -45.03 Sq. In.60' T-Scan Exam Volume -8.59 Sq. In.70' T-Scan achieved -1.37 Sq. In.450 T-Scan achieved -20.39 Sq. In.60' T-Scan achieved -8.59 Sq. In.I

)0 1)0-0 (D Oyster Creek RECIRCULATION OUTLET N1D 70" P-Scan Exam Volume -20.88 Sq. In.45" P-Scan Exam Volume -45.03 Sq. In.70" P-Scan achieved -1.28 Sq. In.450 P-Scan achieved -6.86 Sq. In.

C)y 0 V) E'c C5 0 0 C5 cc5:3 ofi .E> ---0 0p 0 0-C. 0 75 0) : 0 PAG F IF 0-i z CC a) o OYSTER CREEK k R Z --z PAGE EL OF VC ILI ci) 0 Ln (Y) d+>Jd 0 a) E-0 0~0 4->4-> 0 :3 0 *- -C- c: CC__0>2 -0 c5-P5 U>U u 4- 0 0)i OYSTER CREEK\ R z--. , PAGE "I OF k 0I) Lo)iio d+> d s~ E: 0 oS n 0)Cl 0)0 :-P 0 d d n3-P ~- c ci 1Uf-~ :3 -H 0)-0 4-P 7 5 '-+->~0)0 OYSTER CREEK k R 2-PAGE N 0 OF c Area.C, C restricted b0y insuilction support ring 315.30 215.20~NID NI.D P-Scan inner 15% auto exam area

ýw (214 e 0 CD I 0 CD x-0 0, (0 CD 01 Inspection Report No.: 005077 Recirculation Outlet N1-D Oyster Creek, 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld 'Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 74.5 Area Sq. In. Auto Auto Auto Auto 700 T-Scan 20.88 1.37 1.8% 260 0.7%450 T-Scan 45.03 20.39 27.4% 241 9.2%600 T-Scan 8.59 8.59 11.5% 241 3.9%700 P-Scan 20.88 1.28 1.7% 260 0.6%450 P-Scan 45.03 6.86 9.2% 260 3.3%Inner 15%T P-Scan 8.59 8.59 11.5% 260 4.2%700 T-Scan 450 T-Scan 600 T-:Scan 700 P-Scan 450 P-Scan Inner 15%1r P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 7Q0 P-Scan 450 P-Scan Inner 15%T P-Scan% Total Composite Coverage =22%Comments: Inner 15%T P-Scan area by modeling.Note -Rounding methods may make calculated values appear in error.I I

  • I l I I

Attachment:

A18 Weld: NR02 3-565E (NIE)Report Number: 1R21-199 Item Number: 63.90 Outage: 1 R21 (Fall 2006)Coverage:

47.9%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 47.9% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 CD 0 0 Oyster Creek N1 Nozzle- Recirculation Outlet 60' NS Exam Volume = 20.9 Sq. In.60' FV Exam Volume = 44.1 Sq. In.600 (Inner 15% T) Exam Volume = 9.5 Sq. In.600 NS Coverage achieved = 1.9 Sq. In.600 FV Coverage achieved = 16.7 Sq. In.60' (Inner 15% T) Coverage achieved 4.9 Sq. In./// 60'P 60 0 P 60 0 P II CDI I-----------

0 CD CD 0 0 Oyster Creek N1 Nozzle -Recirculation Outlet 60' NS Exam Volume = 20.9 Sq. In.60* FV Exam Volume = 44.1 Sq. In.600 (Inner 15% T) Exam Volume = 9.5 Sq. In.60' NS Coverage achieved = 2.6 Sq. In.600 FV Coverage achieved = 35.7 Sq. In.600 (Inner 15% T) Coverage achieved = 9.5 Sq. In.// 60°T 60°T 6°I.it1 CD CD CD C)0 CD 0 Oyster Creek N 1 Nozzle -Recirculation Outlet 450 Shear nozzle to vessel proposed scan coverage Rotation skew angle +/-54° to 780 5478 Skew Angle///(I 0 CD CD C)a)CD Oyster Creek N 1 Nozzle -Recirculation Outlet 600 RL P-Scan proposed scan coverage Rotation skew angle +/-580 58°Skew Angle//'I 0 1<0 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = .Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 74.5 Area Sq. In. Manual Manual Manual Manual 60" NS T-Scan _______,_"__

3.5% _ -____ 1.7%60° S6 T-Scan _ ,__" :" 47.9% _ __, 24.0%600 S4 T-Scan .12.8% _ _ _ 6.4%600 NS P-Scan -20.9 2.6% _ .... 1.3%60° S6 P-Scan 44.1 22.4% 11.2%600 S4/IRS Scan 9.5 6.6% 3.3%600 NS T-Scan _ 0.0% 0.0%600 S6 T-Scan "__ _0.0% 0.0%600 S4 T-Scan 0.0% __0.0%600 NS P-Scan 20.9 ____0.0% 0.0%600 S6 P-Scan 44.1 _ _ _ 0.0% 0.0%60=S4/IRS Scan 9.5 0.0% 0.0%i I li% Total Composite Coverage =47.9%0 n Noe-Rudn-etos8yafc.cluae aus Comments:ýNote -Rounding methods may affect calculated values.

Attachment:

A19 Weld: NR02 6-566A (N3A)Report Number: 1R21-142 Item Number: B3.90 Outage: 1 R21 (Fall 2006)Coverage:

52.9%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 52.9% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 CD 0D CD CD 0 Oyster Creek N3 Nozzle -Main Steam 60' RL T-Scan proposed examination coverage 20.2" 60'T 160'T//

0 CD CD C)CD 0)-t 1-0 Oyster Creek N3 Nozzle -Main Steam 60' RL P-Scan proposed examination coverage Rotation skew angle +/-580 605p I Skew Angle///

~1 CA CD CD'0///(Oyster Creek N3 Nozzle -Main Steam 600 NS Exam Volume 20.3 Sq. In.600 FV Exam Volume = 44.3 Sq. In.600 (Inner 15% T) Exam Volume = 9.6 Sq. In.60 NS Coverage achieved = 2.3 Sq. In.60° FV Coverage achieved = 20.8 Sq. In.60° (Inner 15%oT) Coverage achieved = 6.7 Sq. In.£60 0 P 600P I 600P 1 I I CD CD CD 10/t//I I Oyster Creek N3 Nozzle -Main Steam 600 NS Exam Volume = 20.3 Sq. In.60' FV Exam Volume = 44.3 Sq. In.60° (Inner 15% T) Exam Volume = 9.6 Sq. In.600 NS Coverage achieved = 2.6 Sq. In.60' FV Coverage achieved = 36.5 Sq. In.60' (Inner 15%-T) Coverage achieved = 9.6 Sq. In.60 0 T 60°T I 60 0 T---"1'1ýI (D CD C3 CD Oyster Creek N3 Nozzle -Main Steam 45° Shear nozzle to vessel proposed examination coverage Rotation skew angle +/-540 to 78°780 540 Se\NNV Skew Angle NN I'I CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 74.2 Area Sq. In. Manual Manual Manual Manual 60* NS T-Scan -3.5% _ .__, 1.8%60' S6 T-Scan ._.... 49.2% *_24.6%60' S4 T-Scan 12.9% 6.5%600 NS P-Scan 20.3 3.1% : 1.5%600 S6 P-Scan 44.3 2 8.0%, 14.0%600 S4/IRS Scan 9.6 9.0% 4.5%60° NS T-Scan 0.0% 0.0%60_ S6 T-Scan 0,00% 0.0%600 S4 T-Scan "0.0% 0.0%600 NS P-Scan 20.3 0.0% 0.0%600 S6 P-Scan 44.3 , 0.0% 0.0%60°S4/IRS Scan 9.6 0.0% 0.0%% Total Composite Coverage =52.9%Comments: Note -Rounding methods may affect calculated values.

Attachment:

A20 Weld: NR02 6-566B (N3B)Report Number: 1R21-144 Item Number:. B3.90 Outage: 1 R21 (Fall 2006)Coverage:

52.9%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Head or Shell" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 52.9% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 (D CD C3 Cn 0 Oyster Creek N3 Nozzle -Main Steam 450 Shear nozzie to vessel proposed examination coverage Rotation skew angle +/-54° to 780 78°Nen 540 NNV Skew Angle NN SI 0 (1)CD CD 0 CD Oh///Oyster Creek N3 Nozzle -Main Steam 60* NS Exam Volume = 20.3 Sq. In.600 FV Exam Volume = 44.3 Sq. In.600 (Inner 15% T) Exam Volume = 9.6 Sq. In.600 NS Coverage achieved = 2.3 Sq. In.600 FV Coverage achieved = 20.8 Sq. In.600 (Inner 15%-T) Coverage achieved = 6.7 Sq. In.£60°P I 60"P 600P I I 0~\Cý_0 0)to CD I4 Oyster Creek N3 Nozzle -Main Steam 600 RL P-Scan proposed examination coverage Rotation skew angle +/-580 580 SOT Skew Angle QJ 0 CD (D 0 Oyster Creek N3 Nozzle -Main Steam 600 NS Exam Volume =20.3 Sq. In.60' FV Exam Volume = 44.3 Sq. In.60" (inner 15% T) Exam Volume = 9.6 Sq. In.60' NS Coverage achieved = 2.6 Sq. in.600 FV Coverage achieved =36.5 Sq. In.60* (inner 15%-T) Coverage achieved =9.6 Sq. In./I 60 0 T 60 0 T 60 0 T 0..

0 CD 0 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 74.2 Area Sq. In. Manual Manual Manual Manual 600 NS T-Scan '_-___ 3.5% 1.8%600 S6 T-Scan -_. 49.2% .24.6%600 S4 T-Scan 12.9% 6.5%60° NS P-Scan 20.3 3.1% ' 1.5%60° S6 P-Scan 44.3 28.0%._"" 14.0%60° S4/IRS Scan 9.6 ' _ 9.0% '_" 4.5%60° NS T-Scan -10.0% 0.0%60° S6 T-Scan '__J0.0% 0.0%60' S4 T-Scan 0.0% 0.0%60° NS P-Scan 20.3 0.0% 0.0%600 S6 P-Scan 44.3 -_" 0.0% 0.0%60 0 S411RS Scan 9.6 0.0% 0.0%I I I CD H.% Total Composite Coverage =52.9%Comments: Note -Rounding methods may affect calculated values.

Attachment:

A21 Weld: NR02 4-566A (N4A)Report Number: 1R23-117 Item Number: B3.90 Outage: 1R23 (Fall 2010)Coverage:

51.8%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Head or Shell" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 51.8% code required coverage due to the nozzle configuration and proximity of the N6A and N13B nozzles. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

0 SOyster Creek (Feedwater (D 6 o 600 S4 Exam Volume = 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.6 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 26.0 Sq. In.600 S4 T-Scan achieved = 7.6 Sq. In.60° S6 T-Scan achieved = 42.1 Sq. In.//// / 10.2"/600P 060°T Radial Plate T Nom. =7.125" Clad T Nom. = 0.21875 0 AD (D (D C)_0 0 hr Oyster Creek Feedwater 60° S4 Exam Volume = 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.60' S4 IRS-Scan LKCW achieved = 7.6 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.60° S6 P-Scan achieved = 26.0 Sq. In.600 S4 T-Scan achieved = 2.6 Sq. In.60' 56 T-Scan achieved = 39.2 Sq. In./N4A Scanning limited by N13B and N6A nozzles.60°T/P 10.2" 60 0 P 20.0" 60 0 T Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875" N14B to 1660 N6A-0 0 (D 0 of the N6A and N13B nozzles.

HITACHI Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek N4A -Feed Water CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 79.3 IRS-Scon LKCW (S4) A 7.6 7.6 9.6% 306 2.0%IRS-Scan LKCCW (S4) A 7.6 7.6 9.6% 306 2.0%600 P-Scan (S6) A 71.7 26.0 32.8% 306 13.9%600 T-Scan (S4) A 7.6 7.6 9.6% 306 4.1%600 T-Scan (S6) A 71.7 42.1 53.1% 306 22.6%IRS-Scan LKCW IS4) B 7.6 7.6 9.6% 54 0.4%IRS-Scan LKCCW {S4) B 7.6 7.6 9.6% 54 0.4%600 P-Scan (S6) B 71.7 26.0 32.8% 54 2.5%60° T-Scan (S4) B 7.6 2.6 3.3% 54 0.2%600 T-Scan (S6) B 71.7 39.2 49.4% 54 3.7%~0 0 (0-0,~Ji__ _ _ _ _ __ _ _ _ _ _ _ 1 _ _ _ __ _ _ _II_______

I __ _ _ _ _ _ _I _ _ _ _ _ _ _& & I &

  • a% Total Composite Coverage =51.8%Rav 0 W3?1I05 Comments A -Scanned area 220' CW to 1660. Scanning limited due to nozzle configuration.

B -Scanned area 1660 CW to 220'. Scanning limited due to nozzle configuration and nozzles N6A and N13B Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume. S6-Supplement 6 volume. Weld length in degrees

Attachment:

A22 Weld: NR02 4-566B (N4B)Report Number: 1 R23-118 Item Number: 63.90 Outage: 1R23 (Fall 2010)Coverage:

52.5%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 52.5% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

° Creek '(Feedwater co 600 S4 Exam Volume 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.600 54 IRS-Scan LKCW achieved = 7.6 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 26.0 Sq. In.600 S4 T-Scan achieved = 7.6 Sq. In.-1 60° S6 T-Scan achieved = 42.1 Sq. In.//// 60°T/P 10.2"//I 0 Q Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875" HITACHI Reactor Pressure Vessel Coverage HITACHICalculation Sheet Oyster Creek N4B -Feed Water CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 79.3 IRS-Scan LKCW (S4) A 7.6 7.6 9.6% 360 2.4%IRS-Scan LKCCW (S4) A 7.6 7.6 9.6% 360 2.4%600 P-Scan (S61 A 71.7 26.0 32.8% 360 16.4%600 T-Scon (54) A 7.6 7.6 9.6% 360 4.8%600 T-Scan (S61 A 71.7 42.1 53.1% 360 26.5%-u C (0 0~JJ% Total Composite Coverage =52.5%0 9M2/04.Comments A -Scanned area 360'. Scanning limited due to nozzle configuration.

Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume. S6-Supplement 6 volume. Weld length in degreeE

Attachment:

A23 Weld: NR02 4-566C (N4C)Report Number: 1 R23-119 Item Number: B3.90 Outage: 1 R23 (Fall 2010)Coverage:

49.5%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 49.5% code required coverage due to the nozzle configuration and the proximity of the N6B and N15B nozzles. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

0 Oyster Creek SFeedwater (D X_C o 60' S4 Exam Volume 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.6 Sq. in.60° S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 26.0 Sq. In.600 S4 T-Scan achieved = 7.6 Sq. In.600 S6 T-Scan achieved = 42.1 Sq. In.////60T/ 10.2" 060oP S20.0" I 60°T 0 Radial Plate T Nom. =7.125" Clad T Nom. = 0.21875" 0 1<Ln (D (D N)0 Oyster Creek'Feedwater 600 S4 Exam Volume = 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.6 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 15.2 Sq. In.600 S4 T-Scan achieved = 2.6 Sq. In.600 S6 T-Scan achieved = 11.5 Sq. In.//N4C Scanning limited by N15B nozzle.5.0" 60°T/P 39P-Sku~.0 I Radial Plate T Nom. = 7.125" Clod T Nom. = 0.21875" 0 Ln (D (D C)I-I Oyster Creek Feedwater 60° S4 Exam Volume = 7.6 Sq. In.600 S6 Exam Volume = 71.7 Sq. In.60° S4 IRS-Scan LKCW achieved = 7.6 Sq. In.60° S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 26.0 Sq. In.600 S4 T-Scan achieved = 4.0 Sq. In.600 S6 T-Scan achieved = 41.1 Sq. In.//N4C Scanning limited by N6B nozzle.\ /10.2" 60 0 P 15.0" 60°T 7 0 D 0 L Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875" N15B N9 N16B CW to N17B 0-(V 01 N 6Bp Scanning limited due to the roximity of the N6B and N15B nc Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek N4C -Feed Water CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 79.3 IRS-Scan LKCW (S4) A 7.6 7.6 9.6% 291 1.9%IRS-Scan LKCCW (S4) A 7.6 7.6 9.6% 291 1.9%600 P-Scan (S6) A 71.7 26.0 32.8% 291 13.3%600 T-Scan (S4) A 7.6 7.6 9.6% 291 3.9%60' T-Scon ($6) A 71.7 42.1 53.1% 291 21.5%IRS-Scan LKCW (54) B 7.6 7.6 9.6% 35 0.2%IRS-Scan LKCCW (S4) B 7.6 7.6 9.6% 35 0.2%600 P-Scan (S6) B 71.7 26.0 32.8% 35 1.6%600 T-Scan (S4) B 7.6 4.0 5.0% 35 0.2%600 T-Scan (S6) B 71.7 41.1 51.8% 35 2.5%IRS-Scan LKCW (S4) C 7.6 7.6 9.6% 34 0.2%IRS-Scan LKCCW (S4) C 7.6 7.6 9.6% 34 0.2%60° P-Scan (S6) C 71.7 15.2 19.2% 34 0.9%600 T-Scon (S4) C 7.6 2.6 3.3% 34 0.2%600 T-Scan (S6) C 71.7 11.5 14.5% 34 0.7%LO CD 0% Total Composite Coverage =49.5%Rev. 0 iments A -Scanned area 220° CW to 1660. Scanning limited due to nozzle configuration.

B -Scanned area 2160 CW to 2510. Scanning limited due to nozzle configuration and nozzles N6B.C -Scanned area 2510 CW to 2850. Scanning limited due to nozzle configuration and nozzle N15B Jote -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume. S6-Supplement 6 volume. Weld I(

Attachment:

A24 Weld: NR02 4-566D (N4D)Report Number: 1R23-121 Item Number: B3.90 Outage: 1 R23 (Fall 2010)Coverage:

52.5%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 52.5% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 , v Oyster Creek'CD Feedwater rD o 60' S4 Exam Volume = 7.6 Sq. In.60' S6 Exam Volume = 71.7 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.6 Sq. in.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 26.0 Sq. In.600 $4 T-Scan achieved = 7.6 Sq. In.-- 600 S6 T-Scan achieved = 42.1 Sq. In.///// 60°T/P 10.2" 060oP Radial Plate T Nom. =7.125" Clad T Nom. = 0.21875 f Reactor Pressure Vessel Coverage j Calculation Sheet Oyster Creek N4D -Feed Water CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 79.3 IRS-Scan LKCW (S4) A 7.6 7.6 9.6% 360 2.4%IRS-Scan LKCCW (S4) A 7.6 7.6 9.6% 360 2.4%60" P-Scan (S6) A 71.7 26.0 32.8% 360 16.4%600 T-Scan (S4) A 7.6 7.6 9.6% 360 4.8%600 T-Scan (S6) A 71.7 42.1 53.1% 360 26.5%(0 0"16% Total Composite Coverage =52.5%key 0 9/23/0(Comments A -Scanned area 3600. Scanning limited due to nozzle configuration.

Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume, S6-Supplement 6 volume. Weld length in degrees

Attachment:

A25 Weld: NR02 2-566A (N5A)Report Number: 5070 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

29%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated

/ Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 29% code required coverage due to the nozzle configuration, proximity of the N13 and N14 nozzles, and the insulation support ring. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

Oyster Creek o -tF-IL N5A 70* T-Scan Exam Volume -26.29 Sq. In.Ln C+ T-Scan Exam Volume -44.36 Sq. In.60" T-Scan Exam Volume -8.37 Sq. In.70" T-Scan achieved -2.67 Sq. In.'U 45" T-Scan achieved -22.61 Sq. In.60" T-Scan achieved -8.37 Sq, In.C) 2&.25/ 825 I --- .75 *(0 (U 60"T 01 4 *T o 1 60°T)-6 Eyster Creek M 4Aitflp,ýN5A l< 70' P-Scan Exam Votume -26.29 Sq. In Ln C- "45' P-Scan Exam Votume -44.36 Sq. In to () \70' P-Scan achieved -2.31 Sq. In.450 P-Scan achieved -20.57 Sq. In.rO;Tz-I--13.05 iiI -2.75-1 45-P (0D (0 t)ICN o 45o I, t Oyster 1 tf N5A Creek CD)-,a p co M0 60' T-Scan S6 Exam VoLume -79.02 Sq, In.60* T-Scan S6 achieved -41.18 Sq. In.I Oyster LT"-+N5 A Creek n-3 ro;7 C)-,a p U0 (0 60' T-Scan S4 Exam Volume -8.37 Sq. In.60" T-Scan S4 achieved -8.37 Sq. In.I IOyster il N 5A 0 Creek ED LA CD-3 (D (0 60* T-Scan S4 Exam Votume -8.37 Sq. In.60* T-Scan S4 achieved -0.67 Sq. In.NC Olyster Creek S13 1124ii-F N5A I,<(0"3 60* T-Scan S6 Exam Volume -79.02 Sq. In,-60' T-Scan S6 achieved -28.39 Sq. In.ro R).//p 4 (Di (U 0 t )o IL C)-Y 0L)(-)00 6 06 E> Q)E cii d £C x u dL d u u'%D %l QLn C)Page -of ?Z-Oyster Creek, 1R20 0 Oyster'L-P-&ý N5A Creek LA~-3 X-ICD 60° P-Scan S6 Exam Votume -79.02 Sq. In.60 P-Scan S6 achieved -29.71 Sq, In, I IN C)<z: <E n LV z z d E-- -P-0~ci.53 d R R_.CF 0 0 c0 KL LA 00-Cu~JI OYSTER CREEKýGE 1 ý OF. Z7-G, C-N5A TL auto exam a~rea~3020 2140 A Ni 3 A Ns 5 A Insu~ti~ton suipport rin~g N5A 70TP a~uto exa~m (area.I C)<T~KU LF z, 0 0 0 0)0 (ýU CD m GJ)C 0 0-i3 0 0 0-I ci 15 0 LF)NlJ-C-<1 LU)z<E 00)0 x 0)0 4->13 I:5 dF<E Co z--.-<E 4 LP0 z cc)CD mY 0~)C U.)u 0 UO 0 C1 C):5 0 4->d<F O0 , co O(U 4Z CREEK 3 McManual 60T (W 0 -8.0")P1, P2 EManual 60T P1, P2 per (W 0 -20.25")scan sheet 301,80 88" 214,80 N14 NI 3 A 1 352,8°1 N 5 A In N5A manucdexmorc exam area 0 0 (n (D C)(D o 0-o Inspection Report No.: 005070 Iso Condensor N5A Oyster Creek, 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 79.02 Area Sq. In. Auto Auto Auto Auto 700 T-Scan A 26.29 2.67 3.4% 88 0.4%450 T-Scan A 44.36 22.61 28.6% 88 3.5%600 T-Scan A 8.37 8.37 10.6% 88 1.3%70* P-Scan A 26.29 2.06 2.6% 88 0.3%450 P-Scan A 44.36 20.57 26.0% 88 3.2%Inner 15%1" P-Scan A 8.37 8.37 10.6% 87 1.3%700 T-Scan 450 T-,3can 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T" P-Scan 70°_T-Scan_

450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan% Total Composite Coverage =10%Comments:

A -Automated exams limited do to t.e proximity of the N13, N14 pads, the insulation support ring and the nozzle configuration.

Inner 15%T P-Scan area by modeling.Note -Rounding methods may make calculated values appear in error.

C 0 0 (D (D 2.'U Oyster Creek, Unit-1 ISO CONDENSOR N5A Fall 2004.ODE CROSS-SECTIONAL AREJ TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 88.8 Area Sq. In. Manual Manual Manual Manual 600 T-Scan S4 A 9.8 7.8 11.0% 96.0 1.5%/,_600 T-Scan S6 A 79.0 36.8 41.4% 96.0 5.5%IRS P-S3can S4 A 9.8 9.8 11.0% 96.0 1.5%600 P-Scan $6 A 79.0 28.9 32.5% 96.0 4.3%600 T-Scan S4 B 9.8 0.7 0.8% 63.0 0.1%60' T-Scan S6 B 79.0 28.4 32.0% 63.0 2.8%IRS P-Scan S4 B 9.8 9.8 11.0% 63.0 1.0%60 P- B 79.0 28.9 32.5% 63.0 2.8%600 T-ScXan S4 600 T-Scan S6 IRS P-Scan S4 600 P-1'can$6 600 T-Scan S4 600 T-sican S6 IRS P-Scan S4 60amP-crana6

% 1 otal Composite Coverage =19%/o Comments.

A'" Scanning limited due to nozzle configuration.

B -Scanning limited due to the proximity of the N13 and N14 pads.Note -Rounding methods may make calculated values appear in error.

Attachment:

A26 Weld: NR02 2-566A (N5A) Inner Radius Report Number: 5046 Item Number: B3.100 Outage: 1 R20 (Fall 2004)Coverage:

78.9%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated

/ Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 78.9% code required coverage due to the proximity of the N13 and N14 nozzles and the insulation support ring. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

Q C M LIA C+R-)C)-U p (D 0~t)Ej Oyster Creek~N5A Zone 1 Code required exam volume -1,67 Sq. In.Zone 2A Code required exam volume -2.37 Sq. In.Zone 1 Code exam volume achieved -1.67 Sq. In, Zone 2A Code exam volume achieved -2.37 Sq. In, Z2A ODBRI Z2A ODBR Z1 PLATE 0 8 d x 09 0?CD CO 0 0<1 N 0-)q-H 0 ci-115 17-0 4->Ol<1 Li-z.D Jd Cu 0 4->-0~0 oc 0 c-0 N- +->Ln\ li H>c 3L E d CC c5J K- C b 0 OC S/ ci Nb<ID L r'-

b cu x Cu 0.b L-)KI bJ 0--)<-F 0~15 L_.<::E LI z'a 0 0 a: z (n (D ()D Report No.: 005046 Oyster Creek, Fall 2004 Weld N5A-IRS CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 100% Area % Auto Auto Auto Auto Auto CW A 100% 100% 100.0% 88 12.2%Auto CCW A 100% 100% 100.0% 88 12.2%% Total Composite Coverage = 24.4%Manual CW B 100% 100% 100.0% 158.6 22.0%Manual CCW B 100% 100% 100.0% 158.6 22.0%% Total Composite Coverage = 44.1%Manual CW C 100% 33% 33.0% 113.4 5.2%Manual CCW C 100% 33% 33.0% 113.4 5.2%% Total Composite Coverage = 10.4%% Total Composite Coverage =% Total Composite Coverage = 78.9%Comments:

A -Examined accessible length automated Exam volume determined by modeling, 100% assigned volume.B -Examined accessible length manually.

Exam volume determined by modeling, 100% assigned volume. Plate and ODBR C -Examined accessible length manually.

Exam volume determined by modeling, 33% assigned volume.C -Manual scan from plate and ODBR surfaces.

Coverage claimed for ODBR scans only due to insulation support ring interferences.

Note -Rounding methods may make calculated values appear in error.

Attachment:

A27 Weld: NR02 2-566B (N5B)Report Number: 5071 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

22%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section Xl, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 22% code required coverage due to the nozzle configuration and the proximity of the insulation support ring. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

Oyster Creek ID tfi l N5B 1< 70° T-Scan Exam Volume -26.29 Sq. In.Ul+ 450 T-Scan Exam Volume -44,36 Sq. In.(U 60° T-Scan Exam Volume -8.37 Sq. In.n to 70° T-Scan achieved -2.67 Sq. In.(U X" 45" T-Scan achieved -22.61 Sq. In.60° T-Scan achieved -8.37 Sq. In.R)C) 20.25/ 13.50 I --8.25/t-/ 2.75 D 71 PQ 601 I6T I O yster Creek n N5B c+ "70* P-Scan Exam Volume -26.29 Sq. In.450 P-Scan Exam Volume -44.36 Sq. In.C)(U 70' P-Scan achieved -2.06 Sq. In.(45° P-Scan achieved -20.57 Sq. In.S"13.05/ ~8.00,/V!, /-2.7 (0 --4i ,7 0 P (D 1 + 4 1o r17 (, 45*P N5B TL auto exam area N5B a ((1720~70 I 165*CD rJn tImAe M restricted by insulation support ring 0 N513 70TP axuto exa~m a~rea N lB (-m (-O-LO 1730 7 oJ 166" C,, rn o 3 Area restricted by intsula~tion support ring K)N513 45c* P1 aiuto exam area N 5 B U k-D LID 173°70 CIU 166" Dr CM7, Area restricted~

intsulation support ring K.'N5B P-Scan inn~er 15% auto exam area-N 5 B (-Co 173,40 6.60<0,, LF)OJ 1666" Areat restricted~

by insulation support ring Co C 0 o CD 0"13 0 Inspection Report No.: 005071 Iso Condensor N5B Oyster Creek, 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 79.02 Area Sq. In. Auto Auto Auto Auto 700 T-Scan 26.29 2.67 3.4% 194 0.9%450 T-Scan 44.36 22.61 28.6% 195 7.7%600 T-Scan 8.37 8.37 10.6% 195 2.9%70' P-Scan 26.29 2.06 2.6% 194 0.7%450 P-Scan 44.36 20.57 26.0% 194 7.0%Inner 150/6%- P-Scan 8.37 8.37 10.6% 193.2 2.8%70* T-Scan 450 T-Scan 600 T-Scan 70' P-Scan 450 P-Scan Inner 15%r P-Scan 700 T-Scan 450 T-Scan 600 T-Scan 700 P-Scan 450 P-Scan Inner 15%T P-Scan% Total Composite Coverage =22%Comments: Inner 15%0" P-Scan area by modeling.Note -Rounding methods may make calculated values appear in error.

Attachment:

A28 Weld: NR02 2-566B (N5B) Inner Radius Report Number: 5047 Item Number: B3.100 Outage: 1 R20 (Fall 2004)Coverage:

68.8%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Automated

/ Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 68.8% code required coverage due to the proximity of the insulation support ring. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

.Oyster Creek C lk- N5B Zone 1 Code required exam votume -1.67 Sq. In, Zone 2A Code required exam volume -2,37 Sq. I Zone 1 Code exam volume achieved -1.67 Sq. In, rnZone 2A Code exam votume achieved -2.37 Sq. Ii iii --13.35 Z2A ODBR (0p -Z2A PLATE ID Z2A PLATE ,' Z2A ODBR Zi PLATE 0 ZI PLATE 0b It _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _1.1.

LI C3)0 15 L._§1 0_t_>6 ,15.-H C5 ci)E 6 x (1)0-H 15 6_(Y)pq LZ z7 C)OYSTER CREEK PAGE Lý OF. /5 C))\6 o Aj--P d mo Lf4' d 0 x 0 Cu p-4->00 OYSTER CREEK PAGE ') OFJ ,15 CD E K TjX L.._0§-ksD©N L) m Lf-oJ H-OYSTER CREEK PAGE OF /5 b/1 o x mm 4F->L -d z _-0+CU d N p-.q mLP-OYSTER CREEK AGE '0OF /

(D z 013_L:E)Report No.: 005047 Oyster Creek, Fall 2004 Weld N5B-IRS CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 100% Area % Auto Auto Auto Auto Auto CW A 100% 100% 100.0% 192.2 26.7%Auto CCW A 100% 100% 100.0% 192.2 26.7%% Total Composite Coverage = 53.4%Manual CW B 100% 33% 33.0% 167.8 7.7%Manual CCW B 100% 33% 33.0% 167.8 7.7%% Total Composite Coverage = 15.4%% Total Composite Coverage =% Total Composite Coverage =% Total Composite Coverage = 68.8%Comments:

A -Examined accessible length automated Exam volume determined by modeling, 100% assigned volume.B -Examined accessible length manually.

Exam volume determined by modeling, 33% assigned volume.B -Manual scan from plate and ODBR surfaces.

Coverage claimed for ODBR scans only due to insulation support ring interferences.

Note -Rounding methods may make calculated values appear in error._0 0

Attachment:

A29 Weld: NR02 2-567A (N6A)Report Number: 1R23-115 Item Number: B3.90 Outage: 1R23 (Fall 2010)Coverage:

28.1%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 28.1% code required coverage due to the nozzle configuration, proximity of the N13B instrument nozzle and nozzle window (bio-shield) access limitations.

The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

0 (0 (A (DJ 0l I.Oyster Creek" Core Spray 600 S4 Exam Volume = 7.4 Sq. In.600 S6 Exam Volume = 58.9 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.4 Sq. In.600 54 IRS-Scan LKCCW achieved = 7.4 Sq. In.600 S6 P-Scan achieved = 30.5 Sq. In.600 S4 T-Scan achieved = 7.4 Sq. In.600 S6 T-Scan achieved = 39.5 Sq. In.60°T/P I 11.5" 60 0 P//~~~1 19.6" 60 0 T (D 0 Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875" 97-N14B N13B N4A N6A 1800 LO (D 0 O IHITACHI Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek N6A -Core Spray CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 66.3 IRS-Scan LKCW (S4) A 7.4 7.4 11.2% 158 1.2%IRS-Scan LKCCW ISM4 A 7.4 7.4 11.2% 158 1.2%600 P-Scan (S61 A 58.9 30.5 46.0% 158 10.1%60' T-Scan IS41 A 7.4 7.4 11.2% 158 2.4%60° T-Scan $S61 A 58.9 39.5 59.6% 158 13.1%% Total Composite Coverage = 28.1%t0 Ray 0 91'2 :5 Comments A -Scanned area from 1 inch CW of nozzle N13B CW to 180l Scanning limited due to nozzle configuration, proximity of the N13B and the N6A nozzle window configuration.

Examined from the N4A nozzle window Note -Rounding methods may aff ect calculated values. S4-Supplement 4 underclad volume. S6-Supplement 6 volume. Weld length in degreeE

Attachment:

A30 Weld: NR02 2-567A (N6A)Report Number: 1 R23-115 Item Number: B3.100 Outage: 1 R23 (Fall 2010)Coverage:

44%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 44% code required coverage due to the nozzle configuration, proximity of the N13B Instrument nozzle, and nozzle window (bio-shield) access limitations.

The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

0 C)(D 0 0 (0 Oyster Creek Core Spray 600 S4 Exam Volume = 7.4 Sq. In.600 S6 Exam Volume = 58.9 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.4 Sq. In.60° S4 IRS-Scan LKCCW achieved = 7.4 Sq. In.600 S6 P-Scan achieved = 30.5 Sq. In.600 54 T-Scan achieved = 7.4 Sq. In.600 S6 T-Scan achieved = 39.5 Sq. In.60°T/P I 11.5" 60 0 P/~ I~~~1 19.6" 60 0 T Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875" N14B N13B N4A N6A 1800_0

Attachment:

A31 Weld: NR02 2-567B (N6B)Report Number: OC1R22-124 Item Number: B3.90 Outage: 1 R22 (Fall 2008)Coverage:

61.7%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 61.7% code required coverage due to the nozzle configuration, proximity of the N15B and N16B Instrument nozzles, and the N4C feedwater nozzle. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

Oyster CreeK Core Spray 600 S4 Exam Volume = 7.6 Sq. In.600 S6 Exam Volume = 60.6 Sq. In.600 S4 IRS-Scan LKCW achieved = 7.6 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.6 Sq. In.600 S6 P-Scan achieved = 31.0 Sq. In.600 S4 T-Scan achieved = 7.6 Sq. In.600 S6 T-Scan achieved = 38.0 Sq. In./29~P-8i~ew 11.2" 16.2" 60 0 P 60 0 T 600T/P----1 Radial Plate T Nom. = 7.125" Clad T Nom. = 0.21875"

('0 LC)T examinations proximity of 600 T-scan Manual U restricted due to the N4A feedwater nozzle 0n M*Restricted Area 110' Az.-1-572 Vý , HITACHI Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek N6'Aj Core Spray CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 68.2 IRS-Scan LKCW (S41 A 7T6 7.6 11.1% 360 2.8%IRS-Scan LKCCW (S4) A 7.6 7.6 11.1% 360 2.8%600 P-Scan (S6) A 60.6 31.0 45.5% 360 22.7%60* T-Scan (S41 A 7.6 7.6 11.1% 360 5.6%600 T-Scan ($61 A 60.6 38.0 55.7% 360 27.9%____ _I____I __ _% Total Composite Coverage =b1./7 Rev. 0 9/23/0O Comments A -Scanned area 3600. Scanning limited due to nozzle configuration.

Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume, S6-Suppiement 6 volume, Weld length in dewrees,

Attachment:

A32 Weld: NR02 2-567B (N6B)Report Number: OC1R22-123 Item Number: B3.100 Outage: 1 R22 (Fall 2008)Coverage:

60.9%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 60.9% code required coverage due to the nozzle configuration, proximity of the N15B and N16B Instrument nozzles. The following sketches contain the limitations.

No unacceptable indications were noted. A system pressure test was also completed with no unacceptable indications observed.

N 168B N15B if)0 0 Iu4 4 7

  • A z. 2 9 4
  • A .N 241" A .30*Az.I-- rnManual UT exams restricted due to F to the proximity of N15B and N16B MM, nozzles.1 1 -5721 HITACHI Reactor Pressure Vessel Coverage Calculation Sheet Oyster Creek N6B -Core Spray CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Required Exam Percent Weld Length = 360 Area sq. in. Area Scanned of Area Weld Length Percent Exam Volume = 68.2 IRS-Scan LKCW (S4) A 7.6 7.6 11.1% 360 2.8%IRS-Scan LKCCW (S4) A 7.6 7.6 11.1% 360 2.8%600 P-Scan (56) A 60.6 31.0 45.5% 347 21.9%600 T-Scon (S41 A 7.6 7.6 11.1% 360 5.6%600 T-Scan (S6) A 60.6 38.0 55.7% 360 27.9%% Total Composite Coverage =60.9%Rev.O 9/23/04 Comments A -Scanned area 360°. Scanning limited due to nozzle configuration.

N -R6 Note -Rounding methods may affect calculated values. S4-Supplement 4 underclad volume, S6-Supplement 6 volume. Weld length in degrees.

Attachment:

A33 Weld: NR02 1-576 (N7A) Closure Head Nozzle Report Number: OCR20-076 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

76%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Nozzle / Head OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PD1 program.Limitation

==

Description:==

The completed examination was limited to 76% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

3ý6 3 Oyster Creek, Unit-1 N7A Closure Head Nozzle Fall 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 68.7 Area Sq. In. Manual Manual Manual Manual 600 T-Scan S4 A 9.8 9.8 14.3% 180.0 3.6%600 T-Scan S6 A 58.9 36.8 53.6% 180.0 13.4%IRS P-Scan 34 A 9.8 9.8 14.3% 180.0 3.6%600 P-Scan S6 A 58.9 28.3 41.2% 180.0 10.3%Exam Volume = 59.1 600 T-Scan S4 B 6.4 6.4 10.8% 180.0 2.7%60° T-Scan S6 B 52.7 47.5 80.4% 180.0 20.1%IRS P-Scan 34 B 6.4 6.4 10.8% 180.0 2.7%60° P-Scan $6 B 52.7 46.0 77.8% 180.0 19.5%600 T-Scan S4 600 T-Scan S6 IRS P-Scan :34 600 P-Scan S6 608 T-Scan S4 600 T-Scan $6 IRS P-Scan :34 600 P-Scan $6% i otal Composite Coverage =I t)"/o Comments:

A -Top side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.

B -Bottom side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.

Weld length in degrees. IRS examination coverage determined by modeling.Coverage sheet modified for offset nozzle configurations.

Note -Rounding methods may make calculated values appear in error.

0 160*I .6" wei 7.8 ATr N8 T.0"J 801P Ks Oyster Creek Unit-1 N7A Bottom Side Coverage 60* NS Exam Volume = 14.9 Sq. In.60" FV S6 Exam Volume = 37.8 Sq. In.60" FV S4 / 15%T IRS Exam Volume = 6.4 Sq. In.60" NS T-Scan achieved = 10.2 Sq. In.60° FV S6 T-Scan achieved = 37.3 Sq. In.60' FV S4 T-Scan achieved = 6.4 Sq. In.60° FV P-Scan achieved = 9.8 Sq. In, 60" FV 56 P-Scan achieved = 36.2 Sq. In.Inner 15%T IRS-Scan achieved = 6.4 Sq. In. (By modeling.)

0)TIP Nominal T = 5 -5/16" Nominal Clad T = 7/32" 80TP NS 6(TNS II. P el-p Top Side Coverage 60' NS Exam Volume = 17.3 Sq. In.60° FV S6 Exam Volume = 41.6 Sq. In.60° FV S4 / 15%T IRS Exam Volume = 9.8 Sq. In.60* NF$ T-Scan acrhieved

= 3.8l So. In.60" FV S6 T-Scan achieved = 31.8 Sq. In.60' FV S4 T-Scan achieved = 9.8 Sq. In.60° FV P-Scan achieved = 4.6 Sq. In.60I FV S6 P-Scan achieved = 23.7 Sq. In.Inner 1 5%T IRS-Scan achieved = 9.8 Sq. In. (By modeling.)

20.r" I Oyster Creek Unit-I, 2004 Page :2 Of R

Attachment:

A34 Weld: NR02 1-576 (N7A) Closure Head Nozzle Inner Radius Report Number: OCR20-114 Item Number: B3.100 Outage: 1 R20 (Fall 2004)Coverage:

74%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Nozzle / Head OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 74% code required coverage due to the offset nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0)140 11W.Oyster Creek Unit-1 N7A Bottom Side Coverage 60° NS Exam Volume = 14.9 Sq. In.60* FV S6 Exam Volume z 37.8 Sq. In.60" FV S4 / 15%T IRS Exam Volume = 6.4 Sq. In.60" NS T-Scan achieved = 10.2 Sq. In.60" FV S6 T-Scan achieved = 37.3 Sq. In.60" FV S4 T-Scan achieved = 6.4 Sq. In.60* FV P-Scan achieved = 9.8 Sq. In.60" FV S6 P-Scan achieved = 36.2 Sq. In.Inner 15%T IRS-Scan achieved = 6.4 Sq. In. (By modeling.)

7.-OTTNS YB-,-, WP No C S..1 Top Side Coverage 60' NS Exam Volume = 17.3 Sq. In.60" FV S6 Exam Volume = 41.6 Sq. In.60' FV S4 / 15%T IRS Exam Volume = 9.8 Sq. In.6'0 NM T-.Sn

= 5.0 Sq. In.60" FV S6 T-Scan achieved = 31.8 Sq. In.60° FV S4 T-Scan achieved = 9.8 Sq. In.60" FV P-Scan achieved = 4.6 Sq. In.60" FV S6 P-Scan achieved = 23.7 Sq. In.Inner 15%T IRS-Scan achieved = 9.8 Sq. In. (By modeling.)Oyster Creek Unit-I, 2004 Nominal T = 5 -5/16" Nominal Clad T = 7/32" 11.1";S.r 509 I n.W-Page ~~:2~.o Of A4 C C--Oyster Creek, Unit-1 N7A Closure Head Nozzle Fall 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 100. Area in %. Manual Manual Manual Manual IRS CW =A 100 74 74.0% 360 37.0%IRsccw A 100 74 74.0% 360 37.0%IRS CW I IRSCCW IRS CW IRSCCW IRS CW IRSCCW IRSc I I IRSCCW IRS CW IRSCCW IRS CW IRSCCW% Total Composite Coverage =74%Comments:

A -Examination limited due to offset nozzle configuration.

Weld length in degrees. IRS examination coverage determined by modeling.Note -Rounding methods may make calculated values appear in error.

Attachment:

A35 Weld: NR02 3-576 (N7B) Closure Head Nozzle Report Number: OCR20-075 Item Number: B3.90 Outage: 1 R20 (Fall 2004)Coverage:

78%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Nozzle / Head OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 78% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 (D (D)W C 0-'07 Oyster Creek Unit-1 N7B Bottom Side Coverage 60° NS Exam Volume = 10.6 Sq. In.60' FV S6 Exam Volume = 25.2 Sq. In.60a FV S4 / 15%T IRS Exam Volume = 4.6 Sq. In.60" NS T-Scan achieved = 6.1 Sq. In.60° FV S6 T-Scan achieved = 24.9 Sq. In.60° FV S4 T-Scan achieved = 4.6 Sq. In.60° NS P-Scan achieved = 5.7 Sq. In.60" FV S6 P-Scan achieved = 23.9 Sq. In.Inner 15%T IRS-Scan achieved = 4.6 Sq. In. (By modeling.)

15.4'r-'T K 10 4.60"P 6.7'5.9.WOP NS7.rw'I s 8.0*I1.7" 60.P I Top Side Coverage Q0 60" NS Exam Volume = 11.9 Sq. In.CD 60' FV S6 Exam Volume = 29.5 Sq. In.600 FV S4 115%T IRS Exam Volume = 6.8 Sq. In.60° NS T-Scan achieved = 3.9 Sq. In.60° FV S6 T-Scan achieved = 26.4 :3q. In.0 60° FV S4 T-Scan achieved = 6.8 Sq. In.J 60' NS P-Scan achieved = 3.5 Sq. In.60° FV S6 P-Scan achieved = 19.9 Sq. In.Inner 15%T IRS-Scan achieved = 6 8 Sq. In. (By modeling.)

16.81 Nominal T = 5 -5/16" Nominal Clad T = 7/32" N

ý3 3 Oyster Creek, Unit-1 N7B Closure Head Nozzle Fall 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 48.2 Area Sq. In. Manual Manual Manual Manual 600 T-Scan ;4 A 6.8 6.8 14.1% 180.0 3.5%60* T-Scan S6 A 41.4 30.3 62.9% 180.0 15.7%IRS P-Scan S4 A 6.8 6.8 14.1% 180.0 3.5%600 P-Scan S6 A 41.4 23.4 48.5% 180.0 12.1%Exam VolIme = 40.4 60* T-Scan 84 B 4.6 4.6 11.4% 180.0 2.8%60° T-Scan S6 B 35.8 31.0 76.7% 180.0 19.2%IRS P-Scan ,S4 B 4.6 4.6 11.4% 180.0 2.8%600 P-Scan $6 B 35.8 29.6 73.3% 180.0 18.3%600 T-Scan 84 600 T-Scan S6 IRS P-Scan.134 600 P-Scan S6 60° T-Scan S4 60° T-Scan S6 IRS P-Scan S4 600 P-Scan 86% Total Composite Coverage =78%Comments:

A -Top side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.

B -Bottom side of offset nozzle. Examined 1800 length. Scanning limited due to nozzle configuration.

Weld length in degrees. IRS examination coverage determined by modeling.Coverage sheet modified for offset nozzle configurations.

Note -Rounding methods may make calculated values appear in error.

Attachment:

A36 Weld: NR02 3-576 (N7B) Closure Head Nozzle Inner Radius Report Number: OCR20-115 Item Number: B3.100 Outage: 1 R20 (Fall 2004)Coverage:

88%Base Metal and Weld Materials:

Carbon Steel Nozzle Inner Radius Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 88% code required coverage due to the offset nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

3 0 CA C-)C)-P Oyster Creek Unit-1 N7B Bottom Side Coverage 60° NS Exam Volume = 10.6 Sq. In.60* FV S6 Exam Volume = 25.2 Sq. In.60" FV S4 / 15%T IRS Exam Volume = 4.6 Sq. In.60° NS T-Scan achieved = 6.1 Sq. In.60° FV S6 T-Scan achieved = 24.9 Sq. In.60' FV S4 T-Scan achieved = 4.6 Sq. In.60' NS P-Scan achieved = 5.7 Sq. In.60° FV S6 P-Scan achieved = 23.9 Sq. In.Inner 15%T IRS-Scan achieved = 4.6 Sq. In. (By modeling.)

1,0.4 10 4'GTP 679 T 9", 7.1 K6I TNS Ur I 11.1'I"13 Top Side Coverage (a 60° NS Exam Volume = 11.9 Sq. In.( 60' FV S6 Exam Volume = 29.5 Sq. In.600 FV S41 15%T IRS Exam Volume = 6.8 Sq. In.600 NS T-Scan achieved = 3.9 Sq. H.60' FV S6 T-Scan achieved = 26.4 3q. In.o 60' FV S4 T-Scan achieved = 6.8 S I. In.\J-- 60° NS P-Scan achieved = 3.5 Sq. In.60° FV S6 P-Scan achieved = 19.9 Sq. In.Inner 15%T IRS-Scan achieved = 6 8 Sq. In. (By modeling.)

16 8*Nominal T = 5 -5/16" Nominal Clad T = 7/32" N ACp%Oyster Creek, Unit-1 N7B Closure Head Nozzle Fall 2004 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 100. Area in %. Manual Manual Manual Manual IRS CW =A 100 88 88.0% 360 44.0%IRSCCW A 100 88 88.0% 360 44.0%IRS CW I IRSCCW IRS CW I IRSCCW IRS CW I IRSCCW IRS CW I IRSCCW IRS CW I IRSCCW IRS CW I IRSCCW% Total Composite Coverage =88%Comments:

A -Examination limited due to offset nozzle configuration.

Weld length in degrees. IRS examination coverage determined by modeling.Note -Rounding methods may make calculated values appear in error.

Attachment:

A37 Weld: NR02 5-576 (N8) Closure Head Nozzle Report Number: 1 R21-166 Item Number: B3.90 Outage: 1 R21 (Fall 2006)Coverage:

89%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 89% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

Oyster Creek Unit-1 N8 60: NS Exam Volume = 6 9 Sq. In.60' FV S6 Exam Volume = 19 8 Sq. In 60° FV S4 / 15%T IRS Exam Volume = 4.2 Sq. In.Nominal T and dlad from CE D.g. 232-574 Segments speficaon

= 5 -5116'Nozzle details from CE Dwg. 232-576 Nominal T = 5 -5/16" Nominal Clad T =7 1 32" 0 0 Oyster Creek 01R21 N8 Closure Head Nozzle Fall 2006 CODE CROSS-SECTIONAL AREA TOTAL CODE COVERAGE Percent Weld Length = 360. Required Exam Area Scanned of Area Weld Length Percent Exam Volume = 30.9 Area Sq. In. Manual Manual Manual Manual 600 T-Scan S4 A 4.2 4.2 13.6% 360.0 6.8%608 T-Scan S6 A 26.7 23.8 77.0% 360.0 38.5%IRS P-Scan S4 A 4.2 4.2 13.6% 360.0 6.8%600 P-Scan S6 A 26.7 23 1 74.8% 360.0 37.4%600 T-Scan S4 600 T-Scan S6 IRS P-Scan S4 60_ P-ScanS6 S6 60° T-Scan S4 60' T-Scan S6 IRS P-Scan S4 600 P-Scan S6 60° T-Scan S4 _60* T-Scan S6 IRS P-Scan S4 600 P-Scan _6% Total Composite Coverage =89%Comments:

A -Examined 360' length. Scanning limited due to nozzle configuration.

Weld length in degrees. IRS examination coverage determined by modehng.Note -Rounding methods may make calculated values appear in error.Z0.

Attachment:

A38 Weld: NR02 6-567 (N9) CRD Return Nozzle Report Number: OC1 R22-143 Item Number: B3.90 Outage: 1 R22 (Fall 2008)Coverage:

69%Base Metal and Weld Materials:

Carbon Steel Nozzle Examination Volume: Coverage per figure IWB-2500-7, "Nozzle in Shell or Head" UT Exam Type: Manual UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section XI, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 69% code required coverage due to the nozzle configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 (D C)Oyster Cree 'CRDH Nozzle 600 S4 Exam Volume = 7.2 Sq. In.600 S6 Exam Volume = 49.2 Sq. In.600 S4 IRS-Scon LKCW achieved = 7.2 Sq. In.600 S4 IRS-Scan LKCCW achieved = 7.2 Sq. In.600 S6 P-Scan achieved = 33.0 Sq. In.600 S4 T-Scan achieved = 7.2 Sq. In.60 S6 T-Scan achieved = 36.3 Sq. In.23~ S..~60°T/P 12.2" 16.3" 60 0 P 60 0 T I I 3 Places 7 I--~-1 L4 C'b 1-a Radial Plate T Nom. = 7.125" rkdrTKturn -fl 'ý.~;

Attachment:

A39 Weld: NR02 5-567 (N9) CRD Return Nozzle Safe End Report Number: 1 R24-131 Item Number: B5.10 Outage: 1 R24 (Fall 2012)Coverage:

67.4%Base Metal and Weld Materials:

Carbon Steel Nozzle to Stainless Steel Safe End Examination Volume: Coverage per figure IWB-2500-8, "Similar and Dissimilar Metal Weld in Components, Nozzles, and Piping" UT Exam Type: Manual UT Scanning from Nozzle OD Surface Performed per the requirements of ASME Code, Section Xl, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 67.4% code required coverage due to OD safe end configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

Report No.Site: Oyster Creek Unit: 1 Project: 01R24 HITACHI 1 R24-131 System: CRDR 4th Interval/3rd Period Component No: NR02 5-567

Description:

N9 CRDR NOZZLE SAFE END Page 9of It HITACHI Coverage Calculations Weld Inpoection Data Weld Type Dual Access Limitation Type Confia"tY @ Weld C/L 0.650 Examination Box length 1.200 Weld length (Actual) 15,501 UT Volumetric Coverage Calculation Form Station: Oyster Creek U1 Component Number: NR02 5-567 Report Number: 1 1 R24-131 Date: 11/11/2012 Configuration:

Noz to SE Diameter(Nom):

I System 225 Loss Volume Data. Tne rnaci ý .of: ti nrrarcns Lie. tn",c. uttiocurie to CC) -zrruic a.~. t-p.4rs noop ,;.rnflz.O LraO Omeor CD p-., conrlgurai;.n Thrus resuuiting in 'rig nt srict triang ic or IeCtar~gid bnOýPeS o; is ls coveiag e Tnus~ co~frnofl gesometric

ýhapes mill be usea for determininlg volunras th~at have, not been cxamnlnso..

Code Required Volume cubic inches 4.0 Data Sht # Axial Scan Identifier 45 SW Dnstream 45 SW Upstream 60 RL Dnstream 60 RL Upstream 45 RL Dnstream 45 RL Upstream Clrc Scan Identifier 30 SW Clockwise 30 SW Counter Clockwise 38 RL Upstream 38 RL Dnstream Insert "1" for each Scan All uuwnn1;IiU vuMuWium~ýR ixiu .uuu Lu .uniuon !LK-enu].IimnuniutIne ae n t LIU Length Demnh Mtm WedLenut 0 affected Lenath 0.8 0.22 1 15.50 0.5 0.22 1 15.50 0.35 0.22 1 15.50 0.9 0.22 1 15.50 0.8 0.22 1 15.50 0.5 0.22 1 15.50 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 Lenoth Deoth Multiplier*

Weld Length 0 o0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 0 0.22 0 15.50 Loss Volume 2.73 1.71 1.19 3.07 2.73 1.71 0.00 0.00 0.00 0.00 0.00 0.00 Loss Volume 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Comments Total Number of scans Total Aggregate Volume in cubic inches 10 iu.Total Aggregate Volume of Loss Coverage in cubic inches Resultant loss coverage in % 32.58% Select which coverage applies Examination Coverage obtained 67.42% 1 X ASME Code Coverage GEH Procedure Coverage Page p°of II Prepared Date: I1 If-Customer Reviewed By: Date:

Attachment:

A40 Weld: NR02 4-565D (N1 D)Report Number: 5123 Item Number: 65.10 Outage: 1 R20 (Fall 2004)Coverage:

70%Base Metal and Weld Materials:

Carbon Steel Nozzle to Stainless Steel Safe End Examination Volume: Coverage per figure IWB-2500-8, "Similar and Dissimilar Metal Weld in Components, Nozzles, and Piping" UT Exam Type: Automated UT Scanning from Vessel OD Surface Performed per the requirements of ASME Code,Section XI, Appendix VIII: Yes, the examination was performed to requirements contained in ASME Section X1, Appendix VIII per the PDI program.Limitation

==

Description:==

The completed examination was limited to 70% code required coverage due to the nozzle OD configuration.

The following sketches contain the limitations.

No unacceptable indications were noted.A system pressure test was also completed with no unacceptable indications observed.

0 LU (D 00///I Radial Plate T Nom. 7.125" Clad T Nom. = 0..21875" Oyster Creekp Recirc Outlet 600 S4 Exam Volume = 9.5 Sq. In.600 S6 Exam Volume = 66.4 Sq. In.600 S4 IRS-Scan LKCW achieved = 9.5 Sq. In.60* S4 IRS-Scan LKCCW achieved = 9.5 Sq. In.600 S6 P-Scan achieved = 13.5 Sq. In.600 S4 T-Scan achieved = 4.0 Sq. In.600 S6 T-Scan achieved = 36.1 Sq. In.16.7" 60 0 T I 60 0 T/P 7.1" 60°P I I oý b 01 Wall Thickness Profile Sheet Component ID Number: NR02 4.-65D INIDJ 1.5"-I 1.5" I M3 Crown Height: EL~US Crown Width:/.x NOZZLE UPST Component:

SAFE-END DNST Component:

Nominal Diameter: Weld Length: HEQ 600 RL 450 RL 450 S 600 RL 450 RL 450 S 450S, 45°RL, 80-RL Supplement 10 Examination Coverage Thickness Taken from 1996 Data ,I A ý011ý0, Ki ý ý,, ANII 0 GE Nuclear Energy Non-Machined Area k.-_ Vje~rmt- JPG ile [DCOI .NI NR02 4-565D (N1D) NOZZLE to SAFE-END 46. .

SUMMARY

NUMBER: 005123 PAGE 19 of 12 Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and Class 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 1 of 6)1.0 ASME CODE COMPONENTS AFFECTED Code Class:

Reference:

Examination Category: Item Number:

Description:

Component Number: 1 and 2 Table IWB-2500-1 Table IWC-2500-1 B-J, B-M-1, C-B, C-F-l, C-F-2 B9.11, B12.40, C5.81, C9.11, C2.21, C5.11 Limited Code Coverage on Piping Weld Examinations See Table R-45 2.0 APPLICABLE CODE EDITION AND ADDENDA The fourth 10-year Inservice Inspection (ISI) interval program was based on the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)Code,Section XI, 1995 Edition with 1996 Addenda.3.0 APPLICABLE CODE REQUIREMENT ASME Section Xl, 1995 Edition with 1996 Addenda, required 100% volumetric examination of Class 1 and 2 welds as defined by Table IWB-2500-1 and Table IWC-2500-1.4.0 IMPRACTICALITY OF COMPLIANCE Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from the 100% volumetric examination requirements of Class 1 and 2 welds as defined by Table IWB-2500-1 and Table IWC-2500-1 for the welds specified in Table R-45, "Limited Weld Coverage," on the basis that conformance with these Code requirements is impractical due to component configuration and access restrictions.

Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 2 of 6)Table R-45 -Limited Weld Coverage Weld Description Coverage Item Figure Notes NQ-2-0215 Weld -Branch to Pipe 25% C5.81 1 Examined from Pipe side only due to Pipe Branch Configuration NE-5-0002 Safe End to Elbow 50% B9.11 2 Examined from Elbow side only due to SE Taper NE-5-0022A Safe End to Elbow 50% B9.11 3 Examined from Elbow side only due to SE Taper NG-D-0002 Elbow to Pipe 50% B9.11 4 Examined from Pipe side only due to Elbow Taper NE-2-0061 Pipe to Valve V-14-0167 50% B9.11 5 Examined from Pipe side only due to Valve Configuration NE-2-0256 Pipe to Valve V-14-0037 50% B9.1 1 6 Examined from Pipe side only due to Valve Configuration NE-2-0255 V-14-0036 to Pipe 50% B9.11 7 Examined from Pipe side only due to Valve Configuration NE-2-0257 V-14-0037 to Pipe 50% B9.1 1 8 Examined from Pipe side only due to Valve Configuration NE-2-220 Valve to Pipe 50% B9.1 1 9 Examined from Pipe side only due to Valve Configuration NE-2-240 Valve to Pipe 50% B9.11 10 Examined from Pipe side only due to Valve Configuration NE-5-206 Valve to Pipe 50% B9.11 11 Examined from Pipe side only due to Valve Configuration NE-5-214 Valve to Pipe 50% B9.11 12 Examined from Pipe side only due to Valve Configuration NU-1-0001 Valve to Pipe 50% B9.11 13 Examined from Pipe side only due to Valve Configuration ND-10-0005 Pipe to Valve V-16-0063 50% B9.11 14 Examined from Pipe side only due to Valve Configuration ND-10-0009 Pipe to Valve 50% B9.11 15 Examined from Pipe side only due to Valve Configuration NG-A-0007 Valve to Elbow 50% B9.11 16 Examined from Elbow side only due to Valve Configuration NG-A-0006 Elbow to Valve 50% B9.11 17 Examined from Pipe side only due to Valve Configuration NG-A-0014 Elbow to Pump 50% B9.11 18 Examined from Elbow side only due to Pump Configuration NG-A-0018 Elbow to Valve 50% B9.11 19 Examined from Elbow side only due to Valve Configuration NG-B-0006 Valve to Elbow 50% B9.11 20 Examined from Elbow side only due to Valve Configuration NG-B-0012 Pump to Elbow 50% B9.11 21 Examined from Elbow side only due to Pump Configuration NG-B-0005 Pipe to Valve V-37-20 50% B9.11 22 Examined from Pipe side only due to Valve Configuration NG-B-0016 Elbow to Valve 50% B9.11 23 Examined from Elbow side only due to Valve Configuration NG-C-0005 Valve to Elbow 50% B9.11 24 Examined from Elbow side only due to Valve Configuration NG-C-0012 Pump to Elbow 50% B9.11 25 Examined from Elbow side only due to Pump Configuration Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 3 of 6)Table R-45 -Limited Weld Coverage Weld Description Coverage Item Figure Notes NG-C-001 6 Elbow to Valve 50% B9.11 26 Examined from Elbow side only due to Valve Configuration NG-C-0004 Pipe to Valve 50% B9.11 27 Examined from Pipe side only due to Valve Configuration ND-10-0020 Valve V-16-0061 to Pipe 50% B9.11 28 Examined from Pipe side only due to Valve Configuration 29 Deleted ND-1-0029 Elbow to Valve 50% B9.11 30 Examined from Elbow side only due to Valve Configuration 31 Deleted NE-2-0124 Pipe to Valve V-14-0170 50% B9.1 1 32 Examined from Pipe side only due to Valve Configuration NE-2-0254 Pipe to Valve V-14-36 50% B9.11 33 Examined from Pipe side only due to Valve Configuration 34 Deleted NU-4-0002 Tee to Valve 50% B9.11 35 Examined from Tee side only due to Valve Configuration NG-B-0017 Valve to Pipe 50% B9.11 36 Examined from Pipe side only due to Valve Configuration NG-A-0019 Valve to Pipe 50% B9.11 37 Examined from Pipe side only due to Valve Configuration ND-1-0209 Valve V-16-0001 to Pipe 50% B9.11 38 Examined from Pipe side only due to Valve Configuration ND-1-0208 Elbow to Valve 50% B9.11 39 Examined from Elbow side only due to Valve Configuration MV-5-001 Flange to Tee 50% B9.11 40 Examined from Tee side only due to Flange Taper Configuration ND-10-0008 Valve to Elbow 50% B9.11 42 Examined from Elbow side only due to Valve Configuration NG-D-0004 Pipe to Valve 50% B9.11 43 Examined from Pipe side only due to Valve Configuration NG-D-0005 Valve to Pipe 50% B9.11 44 Examined from Pipe side only due to Valve Configuration NG-D- Pump to Elbow WOL 52% B9.11 45 Examined from Elbow side only due to Overlay and Pump Configuration 0011 R1 NG-D-0015 Elbow to Valve 75% B9.11 46 Examined from Elbow side only due to Valve Configuration NG-D-0016 Valve to Pipe 75% B9.11 47 Examined from Pipe side only due to Valve Configuration NG-D-0022A Pipe to Safe End 75% B9.11 48 Examined from Pipe side only due to Safe End Configuration NG-E-0006 Pipe to Valve 75% B9.11 49 Examined from Pipe side only due to Valve Configuration NG-E-0007 Valve to Elbow 50% B9.11 50 Examined from Elbow side only due to Valve Configuration NG-E-0016A Elbow to Valve 50% B9.11 51 Examined from Elbow side only due to Valve Configuration Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 4 of 6)Table R-45 -Limited Weld Coverage Weld Description Coverage Item Figure Notes NG-E-0017 Valve to Pipe 50% B9.11 52 Examined from Pipe side only due to Valve Configuration NU-2-0001 Pipe to Valve 50% B9.11 53 Examined from Pipe side only due to Valve Configuration NZ-3-0082 Valve to Elbow 75% B9.11 54 Examined from Elbow side only due to Valve Configuration ND-10-0021 Pipe to V-16-0061 50% B9.11 55 Examined from Pipe side only due to Valve Configuration NU-3-0006 Valve V-17-54 to Pipe 50% B9.11 56 Examined from Pipe side only due to Valve Configuration NU-4-0003 Tee to Valve 50% B9.11 57 Examined from Tee side only due to Valve Configuration NZ-3-0005 Valve to Tee 39% B9.11 58 Examined from Tee side only due to Valve and Tee Configuration NZ-3-0023 Pipe to V-20-0150 50% B9.11 59 Examined from Pipe side only due to Valve Configuration NZ-3-0024 Valve to Tee 48% B9.11 60 Examined from Tee side only due to Valve Configuration NZ-3-0028 Elbow to Valve 50% B9.11 61 Examined from Elbow side only due to Valve Configuration NZ-3-0029 Valve to Elbow 50% B9.11 62 Examined from Elbow side only due to Valve Configuration NZ-3-0032 Tee to Valve 44% B9.11 63 Examined from Tee side only due to Valve Configuration NZ-3-0033 Valve to Elbow 50% B9.11 64 Examined from Elbow side only due to Valve Configuration NZ-3-0052 Valve to Tee 43% B9.11 65 Examined from Tee side only due to Valve Configuration NZ-3-0056 Valve to Elbow 50% B9.11 66 Examined from Elbow side only due to Valve Configuration NZ-3-0070 Valve to Tee 44% B9.11 67 Examined from Tee side only due to Valve Configuration NZ-3-0076 Pipe to Valve 50% B9.11 68 Examined from Pipe side only due to Valve Configuration NZ-3-0077 Valve to Elbow 45% B9.11 69 Examined from Elbow side only due to Valve Configuration NZ-3-0081 Pipe to V-20-0023 50% B9.11 70 Examined from Pipe side only due to Valve Configuration RF-2-0115 Valve to Pipe 87% B9.11 71 Examined Limited due to Valve and Pipe Configuration NZ-3-0004 Pipe to Valve V-20-0015 50% C5.11 72 Examined from Pipe side only due to Valve Configuration V-1-173 EMRV Valve Body Weld 82% B12.40 73 Limited Coverage due to Welded Pilot Valve and Name Plate Valve Body Interferences (B-M-1)CD-14-OO1B/

Hemi Head to Nozzle 50% C2.21 74 One sided Examined from Hemi side due to Nozzle Configuration (C-B)211-C-6 Weld Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 5 of 6)Table R-45 -Limited Weld Coverage Weld Description Coverage Item Figure Notes CD-14-001B/

Hemi Head to Nozzle 50% C2.21 75 One sided Examined from Hemi side due to Nozzle Configuration (C-B)211-S-6 Weld Request for Relief (R-45) for Obtaining the Required Percentages During the Fourth Interval for Class 1 and 2 Component Inspections In Accordance with 10 CFR 50.55a(g)(5)(iii)(Page 6 of 6)5.0 BURDEN CAUSED BY COMPLIANCE The required ASME Code coverage is impractical for the subject welds since the components would require design modification that would impose a significant burden to Exelon Generation Company, LLC. At Oyster Creek Nuclear Generating Station, qualified PDI ultrasonic examination techniques have been used as required.

There are no single sided examination procedures available for examination of austenitic piping welds and there are no qualified procedures for examination of cast materials; therefore, many welds may only be examined for 50% of the required examination volume. Other limitations are due to plant design/condition that would require changes to the plant installed condition to allow greater coverage.The inspection results for the limited weld examinations listed in Table R-45 did not identify any unacceptable indications.

6.0 PROPOSED

ALTERNATIVE AND BASIS FOR USE No alternate provisions are practical for the subject welds. Examinations were performed to the maximum extent practical with the best available methods at the time of the examination.

7.0 DURATION

OF PROPOSED ALTERNATIVE This relief is requested for the fourth 10-year ISI interval for the Oyster Creek Nuclear Generating Station, which ended on January 14, 2013.8.0 PRECEDENTS Similar relief requests have been approved for: 1) The Creek Nuclear Generating Station (OC-35), in U.S. Nuclear Regulatory Commission Safety Evaluation Report dated February 2, 2005.2) The Limerick Generating Station, Units 1 and 2 (Relief Request RR-35) in a U.S. Nuclear Regulatory Commission Safety Evaluation Report dated January 27, 2009.3) The Peach Bottom Atomic Power Station, Units 2 and 3 (Relief Request 13R-49) in a U.S.Nuclear Regulatory Commission Safety Evaluation Report dated August 27, 2010.

System: GE NUCLEAR ENERGY Cont. Spray Plot Sheet Site: Project: Oyster Creek Unit: 1 JR20 Report Nu .8657 Component ID Number: NQ-2-0215 Configuration:

BRANCH Each Scan below is weighted 25% for a total of 100% coverage.Two directional coverage is required for axial scan.PIPE Circ Scan CW = 0.0%Circ Scan CCW = 0.0%Axial Scan Upst = 0.0%Axial Scan Dnst = 100%Code Coverage achieved is 25%Chad Olson Initials:

Examiner: 1/ 11/3/2004 e Lae i Ri Level: Date: GE Reviq-m~d Byw Level: Date: Utility Reviewed By: Date: e 6 o B:Date: Page 6 of 6 GE NUCLEAR ENERGY Wall Thickness Profile Sheet Site: Oyster Creek Project: 1R20 Unit: I Report No.: 005294 System: Iso. Cond._________

_______________________

_______________

.1.Component ID Number: NE-5-0002 Position 0.90*180*1."15 Ii 2M3 270°I 4- I 4-NIA NIA NIA WA 2 0.88 WA WA WA 3 0.92 WA WA WA 4 0.8 WA WA N/A Crown Height: Crown Width: Nominal Diametei Weld Length: Flush 1.3" 10 In.33.50 In.Safe End Elbow UPST Component:

DNST Component:

5 10.64 WIA NAV NAV T&C's taken from previous data report no. OCR19-047 dated 10/12102.6OV. Paul Valden II 11/13/2004 0-- -ll X Initials:

Examiner:

Level: Date: GE Reviewed By: Level: Date: Ut ility Review: Date: ANII Revie,- Date: Page 4 of I GE NUCLEAR ENERGY Wall Thickness Profile Sheet Oyster Creek Unit: I Report No.: 005296 1R20 System: Iso. Cond.Crown Height: FLUSH Crown Width: 1.3" SAFE END ELBOW UPST Component:

DNST Component:

Nominal Diameter 10 in.Weld Length: 33.50 in.T&C's taken from previous data report no. OCR19-048 dated 10/12/02.0>6)V__ Paul Valden Initials:

Examiner: II 11/13/20 Level: Date: Utility Review: Date: ANII Review'! Date: Page 4 of 4

  • GE NUCLEAR ENERGY System: Recirc Wall Thickness Profile Sheet Site: Project: Oyster Creek IR20 Unit: I Report No.: 005334 Component ID Number: NGD-0002 Position 0*900 180*270°.1 I 1.35 N/A N/A N/A 2 1.3 N/A N/A NA 3 1.25 N/A NA NWA 4 N/A N/A MA NIA IIII Crown Height: Crown Width: Nominal Diameterl Weld Length: FLUSH 2.0" 26 In.84 In.ELBOLV PIPE UPST Component:

DNST Component:

FLOW 5 N/A N/A N/A N/A--- 2-//\\ /X /\/PbI,,ajj pXM pg*VIov.L DrIrA, i-- nils James ft 119/2004 lni~is. Examiner:

Level: IDate: GE Rev Level: Date: Utility Review: Date:// /74 ANII Review(/ Date: Page 4 of 4 Ip 'GE ENERGY NUCLEAR Wall Thickness Profile eet Site: Project: Oyster Creek 01R21 Unit: 1 Report No.: IR21-100 System: Iso-Cond Position 0. 90" 180° 270*1 0.58 MA WA WA 2 0.54 NIA WA WA 3 0.58 WA NA WA 4 WA WA WA N/A Component ID Number: NE-2-0061 WELD Crown Height: Flush Crown Width: /-3" Nominal Diameter 10-V Weld Length: 34.01iVALV UIPST Component:

O NST Component:

FLOW 5 MA MIA MA WA-N(=- a -oci .THIjCJ4AJ1.3 AtAO CCIJ.bQI -rAKsxI " 04 ~Tro I S2Iinbuer U 1 OZV200 _--V Drawn by: Level: Date: GE Reviewed By: Level: Date: tqili ýReview: Date: ANII Review: Date: Page I of 4

__ "GEENERGY NUCLEAR System: iso-Con Wall Thickness Profile bet Site: Project: OIR21 Unit: 1 Report No.: 1R21-10-4 Component 1D Number: NE-2-0256 WELD Position 0. go, 180s 270*1 0.6 N/A I/A N/A 2 0.58 V/A N/A ./A 3 0.56 MIA WA WIA 4 0.58 NWA W/A N/A Crown Height: Crown Width: Nominal Diameter Weld Length: Flush 1E5D 5.UPST Component:

DNST Component:

FLOWN WA IVIA W/A IVA.~-THciA~t~

t'A~CO#J'IQjP -GA9K. reAOt QQo0 DA1V~9 Troy Steinfauer Drawn by: 10t21/20 _ _e Level: Dale: GlEReviewed By: Level: Date:Date: ANII Rp"W -Date: Page I of,

__" GE ENERGY NUCLEAR Site: Project: Oyster Creek OIR21 Unit: I Report No.: IR21-103 System: Iso-Cong Position 0. 90G 180" 270" 1 N/A N/A N/A N/A 2 0.56 N/A IWA N/A 3 0.55 N/A N/A N/A 4 0.55 N/A N/A N/A Component ID Number: NE-2-0255 WELD Crown Height: f/ust Crown Width: 0.5 Nominal Diameter 10.0-~ 15"~ E~1 VALVE UPST Component:

&P oe DNST Component:

5 0.60 W/A NIA NAV Weld Length: FLOW Sp VALV J-Ae- M~ 7"- -AM~P8Af4t6 AWD d-h)rxi ia,ý j~Cv 00 DT Troy tawinbyur He a0 :eZ20B : Date: Drawn by: Level: Date: 48r~viewdBy:

-Level: Date: Date: ANII eview: Date: Page I of GE ENERGY NUCLEAR System: Iso-Con Wall Thickness Profile Sheet I site: I Project: Oyster Creek OIR21 Unit: I Report No.: 1R21-.10 Posion 0° go 180° 270 I N/A NIA N/A NIA 2 0.56 N/A N/A NA 3 0.56 NIA MA NA 4 0.58 1NA WA /A Component ID Number: NE-2-0257 WELD Crown Height: BOusA 1.5"1.5"1 UPST Component:

DNST Component:

FLOW-'Crown Width: OX Nominal Diameter Weld Length: 5 0.58 NAII W/A MIA'I ,Y-"JCKJ4&4 A#4,0 Cw~JTM(CJ6k TAKIW gao 2ooa QO AT S Troy steinbaur Drawn by:# 10/21/2006

..Level: Date: CýEAOvlewed

'By: Level: Date: ' ýRevlew: Date: ANII Review: I Date: Page I of 4

  • GE ENERGY NUCLEAR Wall Thickness Profile Sheet Site: Project: Oyster Crek OIR21 Unit: 1 Report No.: 1R21-108 System: ISO-Cond Component ID Number: NE-2-220 WELD 1.5" Position 0. 90g 18O 270°W AA NA WA WA 2 WA WA WA WA 3 0.85 WA WA /A 4 0.7 WA WA WA Crown Height: Crown Width: Nominal Diameter F0-0h VALVE UPST Component:

PiE DNST Component:

5 0.8 WA W(A WA Weld Length: FLOVV vALv V(4;0L u L q5 S V~ "pw AAO C*ojlý'J 1141 60cIIi ~A InAocr" A- 321 Troy S.einbau # M 91 2006.. 0.. ..3.. Pa e i4 de Drawn by: Level: Date: evee B2 y Level Dae UdW~Revi'ew:

Date: ANII Review.te Page I of _

GE ENERGY NUCLEAR Wall Thickness Profile Sheet Site: Project: Oyster Creek OIR21 Unit: 1 Report No.: IR21-107 System: Iso-Cond Position 0° 90" 180 270°1 WA N/A /A WA 2 WA N/A WA WA 3 07" WA WA WA 4 0.67" NA WA IA Component ID Number: NE-2-240 WELD 1.5" w 2115 ROuAf Crown Height: Crown Width: Nominal Diameter Weld Length: VALVpi UPST Component:

DNST Component:

FLOW 5 089" WA WA MIA pilk-2a-14 FluaD ý+eAl>-I,1A I ',ýCQ)kTtIcICa4&*

AAJ Cewryv& 'r*XL#4 Fllai I10k) Dqir4 80A"It do p A- 1a Trov Steinbauer II 0/1/200 Drawn by: Level: Date: Levie Byw: J Level: Date: -,-Uli4 Review: ANllJePgewK Date: Page 4 of .Date:

ENERGY NUCLEAR System: Iso-Con Site: Project: Oyster Creek OIR21 Unit: 1 Report No.: IR21-112 Component ID Number: NE-5-206 WEL Crown Height: RLuam Crown Width: Nominal Diameter Weld Length:-1.5.. 1.VALVE UPST Component:

DNST Component:

FLOW;PIPE VALVE Tod Gi4de 4/J420 Drw by evl Dt: eiwe Y e 'ev Date: Drwnby Lve Dt G Rvewd yLevel: Date: Utility Review. Date: ANI Review: Page of~

SGE ENERGY NUCLEAR Sitew Project: Oyster Crook OIR21 Unit: I Report No.: 1R21-113 System: Is-Cond Posion 0. 90g 180 270'1 0.73 NA N/A N/A 2 0.84 N/A MIA /A 3 0.8 NA MIA NA 4 NA N/A NA NA Component ID Number: N-5.214 WELD Crown Height: Crown Width: Nominal Diameter 109 Weld Length: 340=1.5" 1 .5 FLOW'5 N/A W/A W/A N/A-;4AL V r&o"AL Troy S beinbar ev D0/19/200t Drawn by: Level: Date: 3& "1NIC4..K1b 4,O liiil DATA.'0- d,1" 4 0 GE Reviewed By: Level. Date: g4Review:

Date: ANiReview:

L/IE-#- ec Date: Page A of Wall Thickness ProfileSheet

  • 01"'IGE ENERGY NUCLEAR Oyster Creek Unit: 1 Report No.: oIR21 IR21-206 Site: Project: System: Shutdown Cool Position 0 90W 180* 270°1 WA WA WA WA 2 WA WA WA WA 3 0.67 WA WA WA 4 0.67 WA WA WA Component ID Number: NU--1 WELD ifi M2 1 -1[51 Crown Height: Crown Width: Nominal Diameter Weld Length: UPST Component:

DNST Component:5 0.79 WA W(A IVA VAI. Vt: I J Troy Steinbauer L# 1k/20/20 -_ .."IV"'Drawn by: Level: Date: GE Reviewed Byý/' Level: Date: APDage4 V 4 Page A of -4 Review: Date:

---101GE ENERGY NUCLEAR Wall Thickness Profile Sheet site: Project: Oyster Creek OIR21 Unit: I.Q1.Report No.: 1R21-2 System: Clean-Up Detmin Position 0. gO. 180° 270'1 .44 N/A N/A N/A 2 .43 N/A N/A N/A 3 .48 N/A N/A N/A 4 .48 N/A N/A N/A Component ID Number: ND-10-0-00 Crown Height: FLUSH Crown Width: .7 Nominal Diameter Weld Length: 2.0'UPST Component:

DNST Component:

5 N/A M/A N/A N/A P I i~E\J Lt\IF-~- j~g'~ ~Drawn by: Level: Date: GE Reviewed By. Level: Date: rltRevieOw:

Date: Page I of I

."O'W/GE ENERGY NUCLEAR System: an-Uo Detain Component ID Number: ND-1O-OOOg WELD Crown Height: Crown Width: Nominal Diameter Weld Length:----------

ILE:et Site: Oyster Creek Unit: I Report No.: Project: OIR21 IR21-025 Ell UPST Component:

i.DNST Component:

FLOWn n Thickness and Profile taken from 1991 data.Drawn by: Level: Date: G ee y,/ Lvl ae Date. AN6 eview:./ Date: Page of It Review:

GE ENERGY NUCLEAR System: , fif Site: Project: Report No.: IR21-178 Oysier Creek OIR21 Unit: I Position 0. 90* 180° 270°1 1.08" W/A W/A W/A 2 1.08" W/A W/A NWA 3 1.26" NWA W/A WA 4 1.1" WA WVA WIA Component ID Number: NG-A-O7 WELD-1.5 .." C 1.5 1, Li _EJ Crown Height: Crown Width: Nominal Diameter Flush Iii: ILE0 VALVEN Co UPST Component:

DNST Component:

FLOW 1.24" MA 5 WA WIA Weld Length: FLo~j "(2 -A0-4I TICKNE-LS AA40 O ,rowa -rAKk#4~~I Ic~f07 Troy Stinf( IIi 10_2/20 Drawn by: Level: Date: Reviewed:

Level: Date: Ili Review: Date: ANII Review: Date: Page !, of I GE ENERGY NUCLEAR Wall Thickness Profile t~haet I Site: Project: Oyster Creek 01R21 Unit: I Report No.: 1R21-177 System: Rx Recir Position 0. 90° 180, 270*1 1.06 N/A N/A N/A 2 1.1" N/A N/A N/A 3 1.12" N/A N/A N/A 4 1.08" N/A N/A N/A Component ID Number: NH.--0006 WELD Crown Height: fElish Crown Width: //3" Nominal Diameter 2=Weld Length: 12E-1.5-" -1 ý.5" -FPST Component:

DNST Component:

FLOW;5 1.05" N/A I NAV N/A FL & non-bt, A O0, 4S*! I'O4L 6eAL* VJCkIC0ý4 AMD C.OJQJO(Jf, T-rAKA:N %~~I:b1 JIVI P4Ar j Troy Steinbavlr

!! 10/24/200i to-Z7_Drawn by: Level: Date: Reviewed B Level. Date: Date: AN 4levrew" Date: Page 4 of I 0 ENERGY NUCLEAR Site: Project: Oyster Crook 01R21 Unit: 1 Report No.: IR21-179 System: Rx Recirc Poaton 0. WO 18o 270*1 WA IVA WA WA 2 1.12 WA WA WA 3 1.24 N/A NA NA 4 1.24 WA WA WA Component ID Number: NG-A-O014 WELD Crown Height: Crown Width: Nominal Diameter Weld Length: 1."1.5" -UIPST Component:

I DNST Component:

5 1.24 Nf/A N/A NAV PLAMP RAlm.ELBOW Cot-MY.94 FfVM IqI Pp;EVotS £MAr R-15(v Todd Ginder Drawn by: Le a0/25/200ev Date: Levl: Dat: G eiwdB: O Lvl ae Review: Date: ANII Review. Date: Page I of4 GE ENERGY NUCLEAR Wall Thickness Profile SheetI Site: Project: Oyster Creek OIR21 Unit: 1 Report No.: IR21-180 System: Rx Recir Position 0. 90° 180° 270" 1 1.30 WVA WlA WVA 7- 1.12 NWA NWA WA 3 1.06 W/A NWA N/A 4 1.08 WA WA WA Component ID Number: NG-A.O018 WELD Crown Height: Flush Crown Width: 1.3 Nominal Diameter a.Weld Length: 82.0"-1.5". 1.5" m ELBOW VALT opoet UPST Component:

DNTCmoet 5 WA MA WA MA Thickness and profile taken from 1994 data.4oF~L~"\ /VALVEI I j Kurl n m i 10/27/200 Drawn by: Level: Date: Date: ANIlI Review: Date: Page I of 4 Level: Date: i Review:

_ GE ENERGY NUCLEAR Wall Thickness Profile S aeet -Site. Oyster cree I Project: 01R21 Unit: 1 Report No.: lR21-194 System: Rx Recirc Posibon 0. 90 180* 270*1 WA N/A NIA NIA 2 1.08" WA N/A NA 3 1.24" N/A N/A NA 4 1.28" N/A N/A NIA Component ID Number: NG-B-000 WELD Crown Height: Rush Crown Width: lie Nominal Diameter Weld Length: I20 1.5" 1.5" _toiiC 6 1,28" W/A M/A WNA 0 L4s°S//VAL-V~'\ /Drawn by: Level: Date: GE By Level: Date: iDate ANII Review: ReDate: Page I of I GE ENERGY NUCLEAR Profi.. S-eet.Wall Thickness Profile S Site: Project: Oyster Creek 01R21 Unit: I Report No.: 1R21-185 System: Position 0. 90" 180" 270°1 WA WA N/A MIA 2 1.35 MA N/A N/A 3 1.40 NA MA NA 4 1.35 N/A M(A NA Component ID Number: Crown Height: Crown Width: Nominal Diameter Weld Length: NG-S-0012 WELD 1.701" 2W fix-1.5-" -1 1 1.5" UPST Component:

iDNST Component:

5 1.35 NAV NAV N/A Thickness and Contour taken from 1989 data.(0 0"JZ L LIS__ __IN~//J'\ /F -n/- --I Drawn by: Level: Date: GE Reviewed By: Level: Date: Utility Revidw: I Review:.Page I of 4

  • GE ENERGY NUCLEAR Site: Project: Oyster Creek OIR21 Unit: I Report No.1R21-183 System: Rx Reci Positon o° 90" 1800 270o 1 1.05" WA WA WA 2 1.05" NA WA WA 3 1.10" WA WA WA 4 WA WA WA WA Component ID Number: NG.B-OW5 WELD Crown Height: Crown Width: Nominal Diameter Weld Length: Egg.PIPE VALE UPST Component:

DINISTComponent:

5 WA WA W/A WA Thickness and Contour taken from 1994 data.q 5 0C.4~~1/< 5Kurt Baum an l10/24/20

--X 1/O*7yt -31_______

69 ____Drawn by: Level: Date: GE Reviewed By:O" Level: Date: Utility Reviek Dat A611 Review: Date: Page 4 of4 O GEENERGY NUCLEAR System: Rx Recir Site: Project: Oyster Creek 01R21 Unit: 1 Report No.: 1R21-185 Powtion 0° 90g 10" 270" 1 1.26 WIA W/A WA 2 1.32 N/A WA WA 3 1.22 N/A WA WA 4 1.12 MA WA WA Component ID Number: NG-B-0016 WELD 1.5" 1.5 Crown Height: Crown Width: Nominal Diameter Weld Length: 82-0h ELO VAL UPST Component:

DNST Component:

FLOWA 5 MA NIA WA MA (J2I L45~o 'L[14al,5\ /L 10/25/200 Drawn by: Level: Date:Level: Date: Review: Date: Date: Page I of I GE EEYWall Thickness Profile Ahcet site: E ENERGY NUCLEAR Project:... .ql I PrIo ect: Oyster Creek OIR21 Unit: I Report No.: 1R21-190 System: Position 0. 9go 180° 270'1 N/A W/A N/A WA 2 1.04 N/A NWA NWA 3 1.06 WA W/A NIA 4 1.20 WVA NWA WA Component ID Number: NG-C-O05 WELD Crown Height: FLUSH Crown Width: 1L.Nominal Diameter ILE Weld Length:°- I UPST Component: .DNST Component:5 1.24 WA NAV WA'TAýFN fZMi i iAkz m9^IO4SAT R- 113 DTadd Gbn Drawn by: Level: Date: viewed By. Level Date: Review.Date: ANII Review: Date: Page I of I

  • GE ENERGY NUCLEAR Wall Thickness Profile Sheet site: Project: oyster Cree Q=B~Unit: 1 Report No.: 1R21-192 System: Rx Recirc Position 0. go0 180s 270'W M/A W/A WA WA 2 1.40 WA WIA N/A 3 1.52 W/A WA N/A 4 1.48 NIA WA W/A Component ID Number: NG-C-0012 WELD Crown Height: E/s Crown Width: .375" Nominal Diameter Weld Length: I C- 15" F371 EELSO UPST Component:

I DNST Component:5 1.48 WA WA WA CL'JC--Drawn by: Level: '~tj GE Revlo Level: Date.Date: ANII Review: j Page , Review.Date: 4 of 4

___GE ENERGY NUCLEAR System: Rx Recir Site: Project: Report No.: Oyster C OIR21 Unit: I Position 0. 90. 1800 270" 1 1.25 WIA WA NWA 2 1.23 WA WMA WA 3 1.18 N/A WA NWA 4 1.10 W/A W A WA Component ID Number: NG-C-O016 WELD Crown Height: Crown Width: Nominal Diameter Weld Length: UPST Component:

.NST Component:

IiFLOWV 5 WA t W NIA WA qS 11 (Q Ge It F- -_Dura wun by: Le Dte: Drawn by: Level:Dae 1-1._- , / , c. :z- ,, Date: AN Reviewa Date: Page I of I GE Reviewed By: Level: Date: , Review:

O GE ENERGY NUCLEAR Site: Project: Oysteor Creek OIR21 Unit: 1 Report No.: IR21-189 System: Rx Recarc Postuon 0. 90 180" 270" 1 1.08 N/A N/A N/A 2 1.08 N/A N/A N/A 3 1.12 NIA N/A N/A 4 1.08 N/A N/A N/A Component ID Number: NG-C-O4 WELD Crown Height: E/uah UPST Component:

1NST Component:

Crown Width: 1U Nominal Diameter 2.0 Weld Length: i2.0 5 1.12 NIA NAV N/A Todd Ginber Drawn by: TAY~aý FPOA ýc"9i- PkeJ KqS Dxrý R-/i 10/2d/200 Level: Date: Revie y Level. Dt Date: ANII Review. $//,,2 -"06 Date: Page I of A HITACHI Wall Thickness Profile Sheet System: 215 Component ID Number: ND-10-0020 Position I O° 90* 180° 2 70*1 N/A N/A N/A N/A Site: Ouster Creek Unit: 1R22 Report No.: Project- OC 1 R22 I 0C1R22-079 1.5' 1 .5" Valv.e Pipe UPST Component:

DNST Component FLOW 2 N/A N/A N/A N/A 3 0.583 N/A N/A N/A 4 0.427 N/A N/A N/A Crown Height: Crown Width: Nominal Diameter: Weld Length: Toper 0.?7" 6.0Y'21.0'5 0.429 N/A N/A N/A V 3 qLVE ci-1 o R1e E I'A Dickey Michael Drown by: HI 11/4/2008 4 ~ A44JLI Level Dote: ( eviewed B; -- -vel: ate: Utility Review: Level: Date:01eiw vl o: Dote: ANII Review: Date: Page 4 of 4 HITACHI Wall Thickness Profile Sheet L .............

I Site: Oyster Creek Unit: IR22 Report No.: Project: OC I R22 OCIR22-090 1 .5 5" =System: 225 Component I1 Number: ND-1-0029 WELD Position 90*180" 270°4 4- --1 0.48 N/A N/A N/A 2 0.50 N/A N/A NA 3 0.60 NIA WA WA 4 WA N/A /A /A Ctown Height: Crown Width: Nominal Diameter: Weld Length: Flush 0.70" 6._ " 2125" ELBOW VALVE UPST Component:

.DNST Component 7.FLOW;5 N/A N/A N/A N/A__________

I _________

_________

.3. _________

1 _________

.2. __________________________________________________________________

THICKNESS

& CONTOUR TAKEN FROM PREVIOUS DATA REPORT #R-022, OCTOBER 12, 1998.( VALVE 0b rPau by:ctia LL Dote: Dote: Utility Review, Dote: ANII Review: Dn wn by: Level: Dote: reee B ei Dote: Poge 4 of 4 Wall Thickness Profile Sheet Crown Height Crown Width: Nominal Diameter: Weld Length: Flush 8.0"" 26.0" PIPE UPST Component VALVE DNST Component:

FLOW 0-PROFILE TAKEN FROM PREVIOUS DATA REPORT #R-094, 10/06/1994

'4\~ .)~

HITACHI Wall Thickness Profile Sheet ,N I Site: Oyster Creek Unit: 1R22 Report No.: 0C1R22-098 Project: OC 1R22 System: 2._11 Component ID Number: NE-2-0254 WELD Position 0 1 90, 180" 1 270*1 15" --E-L F~1 1 1 0.58 N/A N/A N/A l I l I 2 0.58 N/A N/A N/A 3 0.56 N/A N/A N/A 4 0.58 N/A N/A N/A Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 0.438" 10.0o'34.0" PIPE .VALVE UPST Component:

i DNST Component5 1 W, A N/A N/A N/A T&C TAKEN FROM PREVIOUS DATA REPORT #R-945, 10/29/2000 Paul blecho 11 111612008 Dote ied:)rv: Doe UtltyRviw Drawn by-. Level: Date: G6 Pviewed By,ý' 'tevel: ae Utility Review: Date: ANII view.,-.,.--ff//_ D , at e Date: Page 4 of _

0 C 34 FIGURE 34 -DELETED 34 Wall Thickness'ý Profile Sheet Ste: Project-1 ." -Crown Heit Crown WtdthK It UPST Component DNS7 Comp~onent Nomwnol Diameter.Weld Length: VALVE#W%(j~U'TE" Tccike i1om Picuila 4, D414 Q fi ( Oi k M ca el Wall Thickness Profile Sheet Crown Height Crown Width: Nominal Diameter: weld Length: Flush 1.6'26.0. '82.0_" Valve UPST Component DNST Component No. R-160, 10/13/1994.

E7~N Aj/v4Lv5?/,1///

Wall Thickness Profile Sheet Report, 0C1R22-108 Crown Height: Crown Width: Nominal Diameter: Weld Length: Tapered 1.4'26.0'83.0" Valve UPST Component piope DNSI Component voýl Ve-\-I'--400Is .5 4S. th Wall Thickness Profile Sheet Site: Oyster Creek Project: OC IR22 Unit: 15"[i Crown Height: 0.05" Crown Width: 0.75" VALVE UPST Component:

PIPE DNST Component Nominal Diameter: 6.0" Weld Length: 21.0" I() /.S J. Mike Sullen Drawn by.

Wall Thickness Profile Sheet Unit: I M3 Crown Height Crown Width: Nominal Diameter: Weld Length: 0.0.5" 0.801_, 6.0" 21.('.ELBOW UPST Component:

VALVE DNST Component FLOW W 7U15 q5'~ *rI Wall Thickness Profile Sheet Unit- I Crown Height: Crown Width: Nominal Diameter: weld Length: 0.0s,~0. 80" 4.0" 14. 0" LIPSI Component Tee DNST Component70'likeAp From Peuiots Dc,4c iQ) HITACHI 5ystem: 215 Wall Thickness Profile Sheet Site: Project: Oyster Creek 1R23 Unit: 1 Report No--IR23-058 1 iiiiiii -I -Component ID Number: ND-1O-0008 WELD Position 1." 1.5"2 EYI"-0°90°180°270*1 N/A N/A WA N/A 2 N/A N/A N/A N/A 3 .60 N/A N/A N/A.55 N/A N/A N/A Crown Height: Crown Width: Nominal Diameter: weld Length: Flush 0.9in 6.0 in 21.0 in Value i Elbow UPST Component:

DNST Component FLOW-5.55 N/A N/A N/A FL;JJ f L k6'ý E , t.;) C- X " (- ; -T -T " t v,.-? iýý .'-' J- P. f. ý ; -ý, =ý r-ý- , 6 b k -:,t Mark Hulborn 4=kI 11,21 -4'Drawn by: Level: Dote: Review Dt S U R Date: ANII Review: Dote: Page 5 of 5 HtITACHI-Wall Thickness N-/Profile Sheet I--~ I System: MU-V -V -V -* -Component ID Number: ; 0-MWEL O" 90*1W0k 2?0" Site: cyster Cie UnA: Rtpcwt IR2"14 1.5" ME UPSTCOmponent Component I 2.20 W/A WA WA Crowntieighl 2 LIS WA WA WA I L16 WA WA NWA 4 2.31 WA NWA WA Crown Width Nominal Dameter: LitD.IU 5 1JO WA WA WA Weld Lengtk._________

_______________________________________________________________

I Drown by. Levet Dote: ~ pE# vedr 16 11-7 Date: Utdity Review, Dote AMII Review. Date________~~~~~~~~o I__ _ of A__ _ _ _ _ _ _ 1 _ _ _ _ _ _ _

Wall Thickness Profile Sheet 1.511 Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 1.4 in 26.0 in 84.0 in Pipe UPST Component-Valve DNST Component:

IAIý%-/a-223 Coverage Calculation Scanned area Upstream -2.34"sq -(1.2x.9)/2

Dnstream -2.34" sq -((1.5x.91+(.7x.9)/2]

CCW -2.34" sq -(1.5x.9)=CW -2.34" sq -(1.5x.9) =1.80" sq.67"sq.99" sq.99" sq 4.45" sq Total 00ge Arke Code Box = 2.6x.9 = 2.34" sq Actual Box = 2.34" sq -(.45x.9")/2

= 2.13" sq Total Code Coverage = 2.13 x 4 scans 8.52"sq Total Area Scanned = 4.45"sq therefore 4.45/8.52 x 100% = %52 nes Setzer 0 1 11/I 7/2010 Drown by. Level: Dote: Page 29 ofZ HITACHI System: 223 Wall Thickness I,-Profile Sheet Site: Project: Oyster Creek 1R23 Unit: 1 Report 1R23-077-I-Component ID Number: NG-D-0015 WELD Position 1.5" 1 .5"' 2 0.90°180°270".4- .4-I 1 1.33 N/A N/A W/A 2 1.33 N/A N/A N/A 3 1.18 N/A N/A N/A 4 1.13 N/A N/A N/A Crown Height: Crown Width: Nominal Diameter: weld Length: Flat 1.2 in 26.0 in 83.0 in Elbow Valve UPST Component DNST Component FLOW1 5 1.16 N/A NWA N/A'4;T EL13OW VAiL VC.FLOW NG --005 F 4? Jack Reisewitz li 1119/2010

/____ ____//_______________1]

_____Drown by: Level: Date: GE e edBy: Level: Date: Utility Review: Date: .Date: Page 4 of 4 HITACHI System: 223 Wall Thickness Profile Sheet Site: Project: Oyster Creek 1R23 Unit Report IM 1R23-078 i -Vý Mond I Component ID Number: Position NG-D-0016 WELD 1.5" 1.5" w'l D-n n2n 0.90*180°270" 1-1 N/A N/A N/A N/A 2 1.18 N/A N/A N/A 3 1.22 N/A N/A N/A 1.10 N/A N/A N/A Crown Height Crown Width: Nominal Diameter: Weld Length: Flush 1.5 in 26.0 in 82.5 in Valve i DNST Pioe UPST Component DNST Component5 1.12 N/A N/A N/A Thicknesses and contour taken from previous data.4-\-FLOW/NG-L- OO0,.- ', Jack Reisewitz II11/9/2010/14-/

Drawn by. Level: Date:

Bw. Level: Date: Utility Review: Dote: A evie& Dote: Page 4 of 4 HITACHI System: 223 Wall Thickness Profile Sheet 2 Site: Project: Oyster Creek IR23, Unit I Report Nk&--1R23-079-4.T Component ID Number: NG-D-0022A WELD Position 1 .5" ;"1.5" II 90, 180°2 70'1~1.06 N/A NWA NWA 2 1.06 N/A N/A N/A 3 1.12 N/A N/A N/A 4 1.14 N/A N/A N/A Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 1.3 in 26.0 in 82.0 in Pipe UPST Component:

Safe End DNST Component 5 N/A N/A N/A N/A FLOW o Taken from previous data. See report number R-081.'PLLOW-'RE-7PE Zi,4SE EfiZ&~i~L K,'\..7../\4~\I I Mark Hilborn 111 11/11/2010ed By_____ _______el:

Drawn by: Level: Dote: G eievel Date: Utility Review: Dote: ANI Date: Page 4 of 4 Wall Thickness Profile Sheet Crown Height: Crown Width: Nominal Diameter: Flush 2.0 in 26.0 in 82.0 in Pipe Valve UPST Component:

ONST Component Weld Length: IT P0E VALVe 6o~i 60\ \/\ ,.'\ \\N. / N V V \4/~~-0 Wall Thickness Profile Sheet Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 1.5 in 26.0 in 83.5 in Valve UPST Component:

Elbow DNST Component 4HITACHI Wall Thickness Profile Sheet Site: Project: Oyster Creek JR23 Unit I Report N'a 1R23-084 I _________________________________________________________________________________________

System: 223 Component ID Number: NG-E-0016A WELD Position 1 .5"1.5""-II l-i 1 : I-1 E@90, 180* I 270°1 1.30 N/A N/A I N/A 2 1.30 N/A N/A N/A 3 1.18 N/A N/A N/A 4 1.13 N/A N/A N/A Crown Height Crown Width: Nominal Diameter: Weld Length: Flush 1.5 in 26.0 in 84.5 in Elbow Valve UPST Component:.

DNST Component 5 NA I N/A N/A N/A FLOW 0_____ J. _____ I _____ I _____ i _____ I Taken from previous data. See report number: R-16R-034.

/~\ i\ -~/~ -J o Serth L 1119/2010

_s/, " Drawn by. Level: Date: " viewed By!. Level: Date: tilit Review: Date: Date: Page 4 of 4 HITACHI system: 223 Wall Thickness

-Profile Sheet Site: Project: Oyster Creek 1R23 Unit: 1 Report No'-IR23-085 I .1-Component ID Number: NG-E-0017 WELD Position 1.5" _i1.5" 00 90, 1800 270'1 NWA NWA N/A N/A 2 1.08 WA NA NA 3 1.20 NA NA NA 4 1.04 WA NA NA Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 1.5 in 26.0 in 82.0 in Valve__e i UPST Component:

DNST Component 5 1.02 N/A N/A N/A Token from previous data. See report number: R-16R-016.

(~Q'~k~L.~\,i )\/'-7// /~..< 1/A /-1 r/ ___ ~ Joseph Serth 7,-/ Drawn by: 11 11/9/2010 Level: Date: ,,eviewe-d By: Level: Date: l Review: Date: ANII *:ofDte: Page 4 of 4

.,j HITACHI Sstern: 214 Wall Thickness Profile Sheet Crown Height: Crown Width: Nominal Diameter: Weld Length: Flush 1.3 in 14.0 in 44.0 in PiSpe UPSTr Component Valve DNST Component VLOVJ PxT F-VALA.W Iall Thickness Site: Oyster Creek Unit: I Report NL...HITACHI Profile Sheet Project: 1R23 1R23-141 System: 21..2 1.5" 1 .5" Component ID Number: NZ-3-0082 WELD Position 00 90° 180° 2700 II Efl 2 4 f 1 1.0 N/A N/A N/A Crown Height: Flush i 2 N/A NA N/A N/A Crown Width: 0.9 in Valve Elbow 3 .545 N/A N/A N/AC UPST Component:

DNST Component-Nominal Diameter:

8.0 in 4 .485 N/A N/A N/A __I__ _Weld Length: 27.5 in 5 .480 N/A N/A N/A FLOW V~~EE.E L.& ~Mark Hilborn 111I 11/11/12010 V4,ý Ak l7 / 6 0 Drown by: Level: Dote: G Reviewed B6 Level: Dote: Utility Review: Date: ANII Review: Dote: Page 4 of 4 HITACHI Wall Thickness Profile Sheet Site: Project.Oyster Creek 0CIR24 Report Nc.Unit: I IR24-081_NW 4th Interval/3rd Period System: 215 Position 0 ° 90 ° 1800 2700 1 .435 N/A N/A N/A 2 .424 N/A N/A N/A 3 .540 N/A N/A N/A 4 N/A N/A N/A N/A Component ID Number: Crown Height: Crown Width: Nominal Diameter: Weld Length: ND-10-0021 1.5 1.5"--* =Flush 1.0_'62 21.2._5 Pipe Valve UPST Component DNST Component 5 NIA N/A NIA N/A IF4 Ld pI.p a~Wd~Z 1 Ad4;o~o.kjA-Jack Reisewitz Initials:

Drawn by: i! 10/21/2712012o Jj.r.-I Level: Date: GE Reviewed By Level Date: t ity Review.Date: ANII Review: Date: Pagej. of, ITACHI Wall Thickness

  • 4 I Site: Oyster Creek Profile Sheet Project OCIR24 Unit I Report 1R24-146 4th Interval/3rd Period System: Position 0° 90° 180° 270°1 N/A N/A N/A N/A 2 N/A N/A N/A N/A 3 .826 N/A N/A N/A 4 .721 N/A N/A N/A Component ID Number: NU-3-0006 I I1 E%Crown Height Crown Width: Nominol Diometer: Weld Length: Flush 1.3 14 Valve N ipe UPSI Component:

DNST Component:

.732 1 N/A N/A I N/A 44 5 456 ISO F EL QI- ===-David Hancock I1 112/2012 C I Initials:

Drown by: Level: Dote: GE Reviewed By: Level: Dote: i Utility Review: Dote: (ANlReview.oe Dote: Page I Of (

Site: QytekCekýUnit I Report NCN,,)4th interval/3rd Period Wall Thickness.;-..ITAOH2 Profile Sheet project t/alve Component 10 Number: NU-4-0 0 0 3 Crown Height: Crown Width: Nominal Diameter: weld Length: FIush 1.10" 14 44.5 vColvoe DNST Component:

tee UPST Component:

T & C takenrfrom previous data TEE VALVif Ks~vs-i W00--I--FLOW 42 David H ancock initials:

Drawn by: q 32012 vel: Level: Date B Date: Utility Review: Date:ýANII Review: Page 2 ot HITACHI UT Volumetric Coverage Calculation Form Station: Oyster Creek Unit: 1 Component Number: NZ-3-0005.r+nr K -, ,m I 4 D ")A- 1 I ..LJu, ~ I* I Date: 11/11/2012 Coverage Calculations Weld Insoection Dta eConfiguration:

Valve to TEE Weld Type Single Sided DiametertNomr:

8" Limitation Type [ Valv j Svern. J22 Y @ Weld C/L [ .seo Examination Box length 1 Weld length (Actual) .Loss Volume Data. Thu majomJy of lmitationis are troie , to OD ccnriruradion sucn .= tapers. noop skrin,.aii an.o otner OD p~n corifiguraiin.

Thus rtsuLting in 'right side inangie or rectangle snipes of Icss coverg:e.

These common gometrc shapes will be used tor determining volumes that have not Dcen examned.Code Required Volume cubic inches 7.6 Data Sht # Axial Scan Identifier 45 SW Dnstream 45 SW Upstream 70 RL Dnstream 70 RL Upstream 45 SW Dnstream 70 RL Dnstream Clrc Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert "1" for each Scan 1 Determinina volumes loss due to limitation

-all dimensions are in Inches Lenoth Denth Multiole Wald Lonath Conmmants 0 0.00 0 0 1.4 0.19 1 28 0 0.00 0 0 1.4 0.19 1 28 0 0.19 0 28 1.4 0.19 1 10 1.4 0.19 1 10 0 0.19 0 10 0 0.19 0 10 0 0.19 0 10 0 0.19 0 10 0 0.10 0 10 t Dt Mulfiplier' Weld Length 0.7 0.19 1 28 0.7 0.19 1 28 0 0 0 28 0 0 0 28 0 0 0 28 0 0 0 28 0 0 0 28 0 0 0 28 Loss Volume 0.00 7.45 0.00 7.45 0.00 2.66 2.66 0.00 0.00 0.00 0.00 0.00 Comments Total Number of scans 6 Total Aggregate Volume 45.472 in cubic inches Resultant loss coverage in %1 60.84% 1Select which coverage applies Examination Coveraae obtained 39.1§% X ASME Code Coverage GEH Procedure Coverage Total Aggregate Volume of Loss Coverage in cubic inches 27.864 Page ( of 7 Prepared By: ,-Date: Ii" Customer Reviewed By:_Date:

ýýAITACHI Wall Thickness Site: Profile Sheet Project Oyster Creek 0CIR24 Report Nc Unit:

4th Interval/3rd Period System: 212 Position 0° 90° 180' 270'1 N/A N/A 1.16 N/A 2 N/A N/A 1.10 N/A 3 N/A N/A .58 N/A 4 N/A N/A .59 N/A Component ID Number: NZ-3-0005 Crown Height Crown Width: Flush.90 15 1.5" UPST ComponentF DNST Component FLOW" Nominal Diameter: 28 5 NIA NINA .64 NINA Weld Length: rI4 Troy Huhe Initiols:

Drawn by: 11 1116/2012*

Level: Dote: GE Reve d Level: Dote: Utility. Review: Dote: ANII Review: Date: Page 2- of 7 IITACH I Wall Thickness Profile Sheet Component ID Number: NZ-3-0023 System: 212 Position 0° 90° 180° 2700 1 .45 N/A N/A N/A 2 .45 N/A N/A N/A 3 .49 N/A N/A N/A 4 .54 N/A N/A N/A Crown Height Crown Width: Nominal Diameter: Weld Length: , ____ Report j Site: Oyster Creek Unit: 1R24"158t Project 0CIR24 4th Interval/3rd Period UPST Component:

DNST Component FLOW;.05.80 8.27.._5 5.64 NIA NIA N/A ELZOID______ \IAL-vR Initials: Troy Huhe Drawn by: It 11/7/2012 Level: Dote: GE Reviewed By: (_,) Level: Dote: y Review: C/Dote: ANII Review:. Dte: Page 2- of 1 C1 HITACHI UT Volumetric Coverage Calculation Form Station: 0yster Creek Unit:1 Component Number: 1[R24-159 Report Number: NZ-3-0024 Date: 11/8/2012 Coverage Calculations Weld Inspection Data Weld Type Sin le Sided Limitation Type Valve 1" Q Weld C/L o.58 Examination Box length 1.4 Weld length (Actual) 27.6 Configuration:

Vavle to TEE Diameter(Nom):

8" System: z2 Loss Volume Data.The mn3 1 3:.iy of limitations ore those annruut~u to OD coni~uriticn v-uic as t~pvis. nozop siatn,zi~e ara clinci CD Pzz.ronlrguratron.

Thu.s rusuiting ii 'right s~ae tilangie Lo; rectangle shapes" 0f loss cove~rage Th-ce common geoiletric shapes will Le useu for determining volumes that have not been esamionec.

Code Required Volume cubic inches 7.5 Data Sht # Axial Scan Identifier 45 SW Dnstream 70 SW Dnstream 45 SW Upstream 70 SW Upstream Circ Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert " 1" for each Scan 1 .11, r% k U "I It... Uu 1A I..Comments oetarminlno volumes lons due tM limitation

-all dimensions am In Inches 0 0.00 0 27.6 1.4 0.19 1 5 1.4 0.19 1 27.6 1.4 0.19 1 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 Legh tler* Weld Length 0.7 0.19 1 27.6 0.7 0.19 1 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 Loss Volume 0.0 1.3 7.3 7.3 0 0 0 0 0 0 0 0 0N Comments Total Number of scans 6 Total Aggregate Volume 44.8224 in cubic inches Total Aggregate Volume of Loss Coverage in cubic inches Resultant loss coverage in %1 52.11% ISelect which coverage applies Examination Coverage obtained 1 47.89% X ASME Code Coverage GEH Procedure Coverage Page c of Prepared By: Date: Customer Reviewed By:_Date:

0)"ITACH1I System: 212 Wall Thickness Site: Oyster Creek Unit I Report Pr 0R24-159 Profile Sheet Project 0CIR24 4th Interval/3rd Period Component ID Number: NZ-3-0024 1 1. -Position 0. 90° 180° 270°1 .65 N/A N/A N/A 2 .51 N/A N/A N/A 3 .58 N/A N/A N/A 4 .64 N/A N/A N/A Crown Height Crown Width: Nominol Diometer: Weld Length: Flush.80 Valve ITee UPST Component:

DNST Component FLOW.---.65 1 N/A N/A NIA 27.625 vpuvcýpp.4:ý-V-z I 70 4 Troy Huhe Initials:

Drown by: II 11/7/2012 fA&,44 e44,-Level: Dote: GE Reviewed By: "ir / I-1 o-it--Level: Dote: Utility Review: Dote: ---ANII Review: (. Dote: Page 2- of 7 Sr-IITACHI Wall Thickness Profile SheetSite: Project Oyster Creek 0C1R24 Unit I Report No.: 1R24-160 4th Intervall3rd Period==mom System: 212 Position 0. 90 180, 270'1 N/A N/A N/A .51 2 N/A N/A N/A .52 3 N/A N/A N/A .51 4 N/A N/A N/A .53 Component ID Number: Crown Height: Crown Width: Nominal Diameter: Weld Length: NZ-3-0028 1.5" .5 EL 2:4 Flush.90 27 Elbow Valve UPST Component:

DNST Component N/A NIA NIA.56 rL~k3L~VAL-V6;-Cl-7cL L~~459% 7WL I~N.Troy Huhe Drawn by:/1 11171202 Level: Date: G;E Rviwe By: Lvl 11 I1a. 21-Date: Utility Review: Date: " I Reiew Date: Page -Z_ of, hiTrACHI Wall Thickness Profile Sheet System: 212 Position 0. 90° 180' 270°1 N/A N/A N/A .64 2 N/A N/A N/A .53 3 N/A N/A N/A .53 4 N/A N/A N/A .53 Component ID Number: NZ-3-0029 Site: Oyster Creek Unit: Report No.Project 0CIR24 4th Interval/3rd Period 1.5" 1.51" UPST Component:

DNST Component Crown Height Crown Width: Nominal Diameter: Weld Length:.o0.90 8.0 NIA N/A NIA.52 27.625 V ALV-XI~Lc~~)FhLW-z T7- Troy Huhe initials:

Drown by: , 1/7201 Level: Dote: GE Reviewed By Level: Date: Utility Review: Dote: ANII Review. Dote: Page 2 -of

&HITACHI UT Volumetric Coverage Calculation Form Station: Oyster Creek Unit: Component Number: NZ-3-0032

.Report Number: 1R24-162 Date: 11/8/2012 Coverage Calculations Weld Inspection Data Confiouration:

TEE to Valve Weld Type Sin Ie Sided Diameter(Noml:

a" Limitation Type System: 212 r @ Weld CL I06 Examination Box length [ .4 Weld length (Actual) [ 8.5 Loss Volume Data. Tne m~jo:G.iy ot liminawons ae mose au,iotcu ito i zig,,hution sien as ,per..,,p skrlni.3j=

anss cin= OD prt contiguratlon.

Thus resulting in 'ogrit side tnlangic or rectangle s.hapes" of loss cc vcrage. Th.se common geometnc shapes will be used lor determining volumes trial have not been exantifled Code Required Volume cubic inches 9.2 Data Sht # Axial Scan identifier 45 SW Upstream 70 SW Upstream 45 SW Dnstream 70 SW Onstream Circ Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert "1" for each Scan 1 1 1 1 Determinina volumes loss due to limitation

-all dimensions are In Inches'Deth Weld Len.th 1.4 0.23 1 6.7 1.4 0.23 1 6.7 0 0.00 0 27.6 0 0.00 a 27.6 0 0 0 27.6 1.4 0.23 1 27.6 1.4 0.23 1 27.6 0 0 0 27.6 0 0 0 27.8 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 Lenopth Mulliolie' Weld Lenoth 0.7 0.23 1 27.6 0.7 0.23 1 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 0 27.6 0 0 027.6 Comments Loss Volume 2.16 2.16 0.00 0.00 0.00 8.89 8.89 0.00 0.00 0.00 0.00 0.00 Comments Total Number of scans Total Aggregate Volume in cubic inches 6 Total Aggregate Volume of Loss Coverage in cubic inches Resultant loss coverage in %1 56-26% Select which coverage applies Examination Coverage obtained 3.74 X ASME Code Coverage GEH Procedure Coverage Page 6 of 7 Prepared By:_______.A Date:- 21 -Z Customer Reviewed By:_Date:

t'ITACHI Wall Thickness Profile Sheet Site: Project System: Report No Oyster Creek Unit I 1R24-162 0CIR24 4th Intervali 1.5" 1.5" 2 4 EI 3rd Period 212 Position 0 ° 90 ° 180 ° 270 °1 N/A N/A N/A N/A 2 N/A N/A N/A N/A 3 .69 N/A N/A N/A 4 .66 N/A N/A N/A Component ID Number: Crown Height Crown Width: Nominal Diameter: Weld Length: NZ-3-0032 Flush.90 28.5 Tee Valve UPST Component:

DNS Component:

5.66 NIA NIA NIA Thx~1"-4/ Troy Huhe Initials:

Drawn by: II 11/I 27 120--Level: Date: GE Reviewed By: T ev Date: Utility Review: 7 Date: ANII Revie'w "' Y Date: Page 2 of 7 HITACHI Wall Thickness N I Ste: Oyster Creek Profile Sheet Project 0CIR24 Unit: Report N.IR24-163 d o 4th Interval/3rd Period System: 212 Position 00 900 180* 2700 1 N/A N/A N/A N/A 2 N/A N/A N/A N/A 3 .57 N/A N/A N/A 4 .54 N/A N/A N/A Component ID Number: NZ-3-0033 Crown Height Crown Width: Nominal Diameter: Weld Length: Flush.90 8.0 27.25 1.5" 1.5"1 Valve iElbow UPST Component:

iDNST Component:

5.50 1 NIA I NIA I NIA-Fýuý.411111-7-n 4 Troy Huhe Initials:

Drawn by: 1- 111712012 Level: Date: GE Reviewed By: i2 Il--o-(t..

Level: Date: Utility Review: Dote: '---ANII Review: Date: Page of (

__ .HITACHI UT Volumetric Coverage Calculation Form Station: Oyster Creek U nit:I rfnmnnnant Mf mh~r I k17-A4-AAF9

..... .....DIn-rf klnJh~ r I i g,'.-1RR Date: 11/11/2012 Coverage Calculations Weld Insoection Data Configuration:

Valve to TEE Weld Type Single Sided Diameter(Nom)7 8'Limitation Type Valve ASystem 212 Y@ Weld CIL 0.83 Examination Box length 1500 Weld length (Actual) 28.50 Loss Volume Data. "In majoiLy of hmnations arc those anrioutea to OD contigu r~uor sucin as tapers, hoop s5.nnka c ana oeri .," 00 p3f1 configurauon.

Thus resulting in ýrignt sode tnanGie or stapes'" of lo,;s coveiage.

These common geometric shapes wil be used for Oetermining volumes that have not been examined.Code Required Volume cubic inches 11.8 Data Sht 0 Axial Scan Identifier 45 SW Dnstream 45 SW Upstream 70 RL Dnstream 70 RL Upstream 45 SW Dnstream 70 RL Dnstream Clrc Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insertl 1" for each Scan Determinina volumes loss due to limitation

-all dimensions are In Inches Lenath Depth Multioll Weld Lenoth 0 0.28 0 28.5 1.5 0.28 1 28.5 0 0.28 0 28.5 1.5 0.28 1 28.5 0 0.28 a 28.5 1.5 0.28 1 5.5 1.5 0.28 1 5.5 0 0.19 0 28.5 0 0.19 0 28.5 0 0.19 0 28.5 0 0.19 0 28.5 0 0.19 0 28.5 Length Deoth Multioller Weld Length 0.75 0.28 1 28.5 0.75 0.28 1 28.5 0 0 0 28.5 0 0 0 28.5 0 0 0 28.5 0 0 0 28.5 0 0 0 28.5 0 0 0 28.5 Loss Volume 0.00 11.97 0.00 11.97 0.00 2.31 2.31 0.00 0.00 0.00 0.00 0.00 Comments Total Number of scans 6 Total Aggregate Volume 70.965 in cubic inches Resultant loss coverage in % Select which coverage applies Examination Coverage obtained X ASME Code Coverage GEH Procedure Coverage Total Aggregate Volume of Loss Coverage in cubic inches Page ¢ of 7 G- Prepared By: , J': Date: _ I ZI 17-- 1 t Customer Reviewed By:_Date:

H1IITACHI Wall Thickness Profile Sheet ZJ System: 212 Component ID Number: Crown Height: Crown Width: Nominol Diameter: Weld Length: NZ-3-0052.05 1.0 8 28.5 Report1R N.16, c Site: Oyster Creek Unit: 1_RprN IP tR24-166rR Project 0C1R24 4th Interval/3rd Period 1.*5" 1.5" UPST Component:

DNST Component:VA&e-FLc 4ýý7-u-Initials: Tray Huhe Drawn by: Level: Dote: GE Reviewed By: Level: Dote: Utility Review Dote: .ANI Review:.Date: Page Z of 7 HITACHI Wall Thickness Profile Sheet I Site: Project I System: 212 Oyster Creek OCIR24 1.5" EL Position 0. 90° 180° 270O 1 N/A N/A N/A N/A 2 N/A N/A N/A N/A 3 .67 " N/A N/A N/A 4 .495 N/A N/A N/A Component ID Number: Crown Height Crown Width: Nominol Diameter: Weld Length: Unit I Report No.: 1R24-168 4th Intervaol/3rd Period NZ-3-0056-Ib, [-~ 1.5" 11 E1-.05 1.00 82 27.25 " Vakve Elbow UPST Component DNST Component FLOWD 5.49 " NIA NIA NIA ICN I-----4--, .,v Chad Olson Initials:

Drawn by: 11 11/6/2012 to eiwd y 11 e l:(Dote Level: Dote: GE Reviewed BY. 6 ~ Dote: Utility Review: Dote: C/ 7) /ANII Review: Date: Page Z of HITACHI Coverage Calculations Weld Insoection Data Weld Type Single Sided Die Limitation Type V e Y (a Weld CIL 0 Examination Box length 1.300 Weld length (Actual) 27.50 UT Volumetric Coverage Station Creek Unit.Component Number: NZ-3-0070 Calculation Form Reprt Number: 1R2 Date. 11/11/2012 Confiouration:

Valve to TEE ameterlNom):

8" system 212 Loss Volume Data. Tne rniajo!r'jo liiat riraonr i a~a 111- UX.W.1, to Ga Cz. ~italln S'-Lt tic.~s.hop Ir uno omo.r GD pa configuraton.

Thus resulting in 'ngnt sio. tftangi. or rectangie snrpes" or iass coverage.

These common geormenc sniapes will be used tor determining volumes that have riot been examined Code Required Volume cubic inches 7.2 Data Sht # Axial Scan Identifier 45 SW Dnstream 45 SW Upstream 70 RL Dnstream 70 RL Upstream 45 SW Dnstream 70 RL Dnstream Clrc Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert "1" for each Scan 1 1 1 ueianmnUU1W.n uuuams uw miun- all uiiiuiiaiuii ais-L MIA11mm11011 Lenath Depth MutJli 3 ll Weld Lenoth 0 0.20 0 27.5 1.3 0.20 1 27.5 0 0.00 0 27.5 1.3 0.20 1 27.5 0 0 0 27.5 1.3 0.2 1 5.0 1.3 0.2 1 5.0 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 Lenath Depth Mulipe Weld Lenoth 0.65 0.20 1 27.5 0.65 0.20 1 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 Comments Comments Loss Volume 0.00 7.15 0.00 7.15 0.00 1.30 1.30 0.00 0.00 0.00 0.00 0.00 LOss Volume 3.58 3.58 0.00 0.00 0.00 0.00 0.00 0.00 C>Total Number of scans Total Aggregate Volume in cubic inches 5 Total Aggregate Volume of Loss Coverage in cubic inches M A-Resultant loss coverage in %1 56.06% Select which coverage applies Examination Coverage obtainedI 4 X ASME Code Coverage GEH Procedure Coverage Page a of 7." Prepared By::l Date:_____

11-- V Customer Reviewed By: Date:

I1TACH I Wall Thickness Profile Sheet Component ID Number: NZ-3-0070 Site: Project Unit I Oyster Creek 0C1R24 Report 1R24-169 4th Interval/3rd Period System: 212 Position 0° 900 180' 2700 1 .71 N/A N/A N/A 2 .52 N/A N/A N/A 3 .60 N/A N/A N/A 4 .65 N/A N/A N/A Crown Height Crown Width: Flush.80 2 4I Valve Tee UPST Component:

DNST Component FLOW" Nominal Diameter: 5.72 N/A N/A NIA Weld Length: 27.5 VW L-vj e-T:7LOC,_,ý Iýz Troy Huhe Drown by: 11 111812012 G R Level: Dote: GE ReviewedBy Iel It. Da. te Level: Date: Utility Review: Date: -ANII Review: Date: Page Z of' Report N ..Unit: 1 1R24-170';4

~h'I~ITACH I Wall Thickness Profile Sheet*m Site: Oyster Ce I Project .CIR24 4t.5" rv~ d i System: 212 Component ID Number: Crown Height Crown Width: Nominal Diameter: NZ-3-0076 Flush.70 UPST Component:

Valve DNST Component I Weld Length: 27.5--.FLOW 1LV1/4.FWcw\J A,ýý C-_7 *L L Initials: Troy Huhe Drawn by: Level: Date: GE Reviewed By: VLveI: H0 Dote: ii, Review Dote: ANIN Review .L/ Dote: Page 2of i.C'..

HITACHI Coverage Calculations tWeld Insoection Data Weld Type Single Sided Limitation Type V Y" Q Weld C/L 0 Examination Box length 1.200 Weld length (Actual) [ 7.50 UT Volumetric Coverage Calculation Form Station:i yster Creek Unit: I Component Number: NZ-3-0077 Report Number:, 1R24-171 Date: 11/11/2012 Configuration:

Valve to TEE Diameter(Nom:

8a" System: 212 Loss Volume Data. Tne majoi iy of limitaons are those attributed to OD corfmi.;iaon sucl as tauts r, oop smizn e and omner OD Pan contigurahon Thus resulting in 'ngnt syoe tiangie of rtctangl1 shapes" of loss coverage.

These common geometric shapes will be used fot determning volumes that have not buen examined Code Required Volume cubic inches 6.1 Data Sht N Axial Scan Identifier 45 SW Dnstream 45 SW Upstream 70 RL Dnstream 70 RL Upstream 45 SW Dnstream 70 RL Dnstream CIrc Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert "1" for each Scan...... f,,,,--'rt" ... .................

T"Y "" ,T,'l'f,'lr'lr Determining volumes loss dun to limitation

-all dimensions Are In Inrhes 0 0.18 27.5 1.2 0.18 1 27.5 0 0.18 0 27.5 1.2 0.18 1 27.5 0 0.18 0 27.5 1.2 0.18 1 5.0 1.2 0.18 1 5.0 0 0.19 0 27.5 0 0.19 0 27.5 0 0.19 0 27.5 0 0.19 0 27.5 0 0.19 0 27.5 Le~nJoth Denth Mu'iioll' Weld Length 0.8 0.18 1 27.5 0.8 0.18 1 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 0 0 0 27.5 Comments Comments Loss Volume 0.00 5.94 0.00 5.94 0.00 1.08 1.08 0.00 0.00 0.00 0.00 0.00 LOss Volume 2.97 2.97 0.00 0.00 0.00 0.00 0.00 0.00 Total Number of scans 6 Total Aggregate Volume 3 in cubic inches Resultant loss coverage in %1 55.04% e Select which coverage applies Examination Coverage obtained X ASME Code Coverage GEH Procedure Coverage Total Aggregate Volume of Loss Coverage in cubic inches'U'Page > of 7 DPrepared By: --~Date: I1 1-*11 2-Customer Reviewed By: Date:

Q)-M TACHI Wall Thickness Profile Sheet Site: Project Oyster Creek 0C1R24 Unit: Report NoV 1R24-171 4th Interval/3rd Period System: 212 Position 0° 90° 180° 2700 1 .67 N/A N/A N/A 2 .53 N/A N/A N/A 3 .55 N/A N/A N/A 4 .49 N/A N/A N/A Component ID Number: Crown Height Crown Width: Nominol Diameter: Weld Length: NZ-3-0077 Flush.7 27.5 1.5"1.5" Ell R fl UPST Component DNST Component FLOW" 5.49 NIA NIA NIA\/Iwg 12wZ--7nti Troy Huhe Initials:

Drown by: L1 11/8/2012 L Level: Date: IGE ReiwdB Level: Dote: Utility Review:...~Date: .. -ANII Review. Date: Page z- of 7 HITACHI Wall Thickness Profile Sheet Site: Project: Oyster Creek 0CIR24 Unit Report N \q 4 0 1R24-172 4th Interval/3rd Period L- -------------

I System: 212 Position 0. 90 180' 270°1 .48 N/A N/A N/A 2 .45 N/A N/A N/A 3 .54 N/A N/A N/A 4 1.0 N/A N/A N/A Component ID Number: Crown Height Crown Width: Nominal Diometer: Weld Length: NZ-3-0081"1.5" Flush 1.0 PIValve UPST Component DNST Component 5 NIA NIA N/A NIA 27.5 FLOW~T-LQCý-4 V&L\,c Troy Hyhe Drawn by: It 111812012 Level: Dote: GE Reviewed B'. Level: Date: t~i ýtyReview.

Date: ANII Review: Date: Page of r6 HITACHI UT Volumetric Coverage Calculation Form Station: Oyster Creek Unit: Component Number: 1 R24-192 Report Number: RF-2-0115 Coverage Calculations Weld Inspection Data Weld Type Dual Access Limitation Type Confi Y @ Weld C/L Examination Box length Weld length (Actual)Date: 11/19/2012 Confinuration:

Vavle to Pipe Diameter(Nom):

18" System: 422 Loss Volume Data. The n.uo;, of .rn~rubOIl arv ,IttID.Avu a CD ..",liun as ..efs. hOup s r :nd Gird C. paa connigurai.an Thus resulting in'rignt slde triangle of rectangle shapus" of loss coverage These commoni geometric shapes will be used for dletemininng volumes that have not bern exanined Code Required Volume cubic inches 30.4 Data Sht # Axial Scan Identifier 45' Scan UPS & DNS Clrc Scan Identifier 45 SW Clockwise 45 SW Counter Clockwise Insert "1" for each Scan 2 u^hma= I^ee (,^

Qeks in na vo unnes oss Hue w maggon -a mians ons gie ... ... -Lenth Depth Multiplier Weld Lenath 0.6 0.80o 0.5 57 1.6 0.333 1 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 Lenohe Ooth jutt Weld Length0 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 10.2 0 0 0 1 10.2 Comments Configuration Loss Attachment Loss Comments No Loss No Loss--- --.- I--Loss Volume 10.3 5.4 0.0 0 0 0 0 0 0 0 0 0 Loss Volume 0 0 0 0 0 0 0 0 Total Number of scans Total Aggregate Volume in cubic inches 1 "1.Total Aggregate Volume of Loss Coverage in cubic inches M.'Resultant loss coverage in %Select which coverage applies Examination Coverage obtained I 7.0 I X ASME Code Coverage GEH Procedure Coverage Page $ of(Prepared By::, , Date: 0- ff. J I?- -Customer Reviewed By: Date:

HITACHI System: 422 Wall Thickness Site: Profile Sheet Project: Oyster Creek 0C1R24 Unit I Report Noa" 1R24-192 r==m Component ID Number: RF-2-0115 Position 0.900 180'2700 1.5" 1.5" 01 2 4 1 NIA N/A N/A N/A 2 N/A 1.05" N/A N/A 3 NA 1.00" N/A N/A 4 N/A 1.10" N/A N/A Crown Height Crown Width: Nominal Diameter: Weld Length: 0.05", 1.10"*18.0"'57.0" Valve Pp UPST Component:

DNST Component:-FL-OW-0 5 N/A [ N/A INIA N/A (CxJr--&A&l&

'RO-r-4'Cie Paul! Valden 11 11117/2012 49 Dote: ,- ANII Reviewr. Date: Page 2 of 6 (6i I Wall Thickness Profile Sheet 1.511 Crown Height: Crown width: Nominal Diameter: Weld Length: 0.05"1 0.90" 27.4" PIPE UPST Component:

VALVE DNST Component 0 ~-7~-1 60 (1ý-6 C7r414:6j

/::-40/' &.Vlok/jS 647-a (Qu ,<46 le!d /Z -r ý 4 --) z ý j ý f- P re , 6 1 -',1- zc<)o H1IITACHI Wall Thickness Profile Sheet Component ID Number: V-1-173 EMRV System: Site: Oyster Creek Project 0CIR24 2 3 212 Position 0. 90° 180° 270°1 1.43 N/A N/A N/A 2 1.43 N/A N/A N/A 3 1.55 N/A N/A N/A 4 N/A N/A N/A N/A Unit ReportN.1R24-199 4th Interval/3rd Period El S15" 4~Crown Height Crown Width: Nominal Diameter: Weld Length: 0.15"_1.50'12 37.75 Valve Flange UPST Component:

I DNNST Component:

FLOW 5 NIA NIA NIA NIA 4(L KJ.~46-- -= V -I- ^i3£tl,?V V-1-T173 Jack Reisewitz Initials:

Drown by: II 11111/2012: -Level: Date: GE Reviewed By: Level: Date: Utility Review: Dote: ý-"Nl Review. Dote: Page 1. of(

Wall Thickness Profile Sheet Crown Height: Crown Width: Nominal Diameter: Weld Length:.05 in 2.0 in 8.0 in 29.5 in Hemi Head UPST Component Nozzle DNST Componentý, Tj-" P HITACHI Wall Thickness Profile Sheet System: 211 Crown Height: Crown Width: Nominal Diameter: Weld Length:.05 in 2.2 in 12.0 in 42.5 in Nozzle UPST Component:

Hemi Head DNST Component a N Aj 0;V 1Z