ML15243A188

From kanterella
Revision as of 18:16, 27 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2015 Davis-Besse Nuclear Power Station Initial License Examination Administrative Files
ML15243A188
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/2015
From: Reeser D W
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Shared Package
ML15217A089 List:
References
Download: ML15243A188 (10)


Text

2015 DAVIS-BESSE NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION ADMINISTRATIVE FILES ES-403 Written Examination Grading Quality Checklist Form ES-403-1 Facility:

Davis Besse Date of Exam: 6/22/2015 Exam Level: RO SRO Item Descri tion 1. 2. Answer key changes and question deletions justified and documented

3. Applicants' scores checked for addition errors reviewers s ot check > 25% of examinations
4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, as a licable, +/-4% on the SRO-onl reviewed in detail 5. All other failing examinations checked to ensure that grades are *ustified
6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the a licants Printed Name/Signature
a. Grader
74f dz'Jt;, b. Facility Reviewer(*)

I c. NRC Chief Examiner (*) d. NRC Supervisor

(*) a Initials b c .:n uz... .::Sf Jl-:JP sz. .:sr J"P JZ-(*) The facility reviewer's signature is not applicable for examinations graded by the NRC; two inde endent NRC reviews are re uired. NUREG-1021, Revision 9 Supplement 1 FENOC Facsimile

FE NOCŽ First En ergy N uclea r Operat i ng Company Davis-Besse Nuclear Power Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 -OPERATOR LICENSE EXAMINATION MATERIAL--WHEN SEPARATED FROM ENCLOSURE , HANDLE THIS DOCUMENT AS UNRESTRICTED

-J u ne 26 , 2015 L-15-215 Mr. David Reeser Chief Examiner , Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road , Suite 210 Lisle , IL 60532-4352

Subject:

Davis-Besse Nuclear Power Station , Unit 1 Docket Number 50-346 , License Number NPF-3 10CFR55 Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations Enclosed are the post examination mater i als for the initial licensed operator written examinations that were administered during the week of June 22, 2015. The enclosed items are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Written Examinations and Operating Tests -Implementation" and NU REG 1021, Operator Licensing Examination Standards for Power Reactors (Revision 9 , Supplement 1 ). After the Written Examination was completed , the Applicants participated in a review session to determine if enhancements to the questions were necessary. Results of this review indicate several questions should be evaluated for enhancements (Questions 78 , 89 and 96) prior to reuse. Determinations of these potential enhancements are being tracked by the Corrective Action Program (CR 2015-08657). Post-exam analysis indicates potential generic training program weaknesses (Questions missed by 50 percent or more of the Applicants

Questions 17 , 19 , 36, 47 , 65 , 74 , 78 , 80, 82 , 83 , 87 , 88 , 89 , 96 and 99). Investigations of th e se potential generic weaknesses are being tracked by the Corrective Action Progra m (CR 2015-08655). During the exam review , the applicants provided substantive comments for Questions 78 and 89. Requested modification to the answ er k ey for these questions and supporting documentation is provided in Enclosur e G. JUN 3 0 2015

-OPERATOR LICENSE EXAMINATION MATERIAL--WHEN SEPARATED FROM ENCLOSURE, HANDLE THIS DOCUMENT AS UNRESTRICTED

-Davis-Besse Nuclear Power Station, Unit 1 L-15-215 Page 2 of 2 All individuals signed onto Form ES-201-3, Examination Security Agreement, have not yet completed the post-examination signature.

When Form ES-201-3, Examination Security Agreement, has been completed, it will be forwarded to you, thus completing the necessary documentation for the Davis-Besse Nuclear Power Station, Unit 1 Initial Licensing Examination.

There are no regulatory commitments included in the submittal.

If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent

-Nuclear Operations Training, at (419) 249-2396. Sincerely , Brian D. Boles Site Vice President vaw Enclosure A: Form ES-403-1, Written Examination Grading Quality Checklist Enclosure B: The ORIGINAL Applicant answer sheets, a graded copy and two clean copies of each Applicant's answer sheets Enclosure C: All questions asked by the Applicants during the administrat i on of the examination and the Proctor's responses to those questions.

Enclosure D: The Written Examination Seating Chart Enclosure E: Copies of all Condition Reports generated for this exam Enclosure F: Examination Statistics Enclosure G: Requested modifications to the Written Examination answer key (Questions 78 and 89) with supporting documentation cc: Regional Administrator, NRC Region Ill (w/o Enclosure)

Chief , Operations Branch , NRC Region Ill (w/o Enclosure)

DB-1 NRC/NRR Senior Project Manager (w/o Enclosure)

DB-1 Senior Resident Inspector (w/o Enclosure)

USNRC Document Control Desk (w/o Enclosure)

Utility Radiological Safety Board (w/o Enclosure)

2015 NRC Initial License Examination Student Questions During Exam and Proctor

  • Responses Time Individual Question/Response 0837 .SR.O Question 1 O: Do you swap to the other batteries?

Response:

All necessary actions will be taken per the procedure This clarification was posted on the white board for all students.

0915 .. Question 20: KO Is there a time frame associated with this question, Plant response will be to lower level until the Pressurizer heaters reach cutoff level? Response:

There is enough information to answer the question.

1123 Question 51: 5eo What is the noun name for RE1770A? Response:

Noun name is Clean Waste Discharge Radiation Element Liquid Radiation.

This clarification was posted on the white board and all students.

1240 Question 78: Does answer 8 mean you are going to initiate a shutdown or use procedure?

Response:

Answer 8 means as written. 1310 Question 89: Sf2..0 What are the noun names for RE1822A and RE18228? Response:

Waste Gas System Discharge to Station Vent RE. This clarification was posted on the white and all students.

1455 Question 68: 5-eo On references I only have attachment 5 page 1 of 2. Should I have page 2 of 2 as well?? Response:

Candidate self-corrected before response was given. 1 of 1 Points RO 1 R02 R03 SRO 11 SRO 12 SRO 13 SRO U1 Average Answer 1 1 1 1 1 1 c 1 85.7% 1 D 2 1 B 1 1 1 1 l 85.7% 2 D 3 1 1 B 1 1 1 1 85.7% 3 D 4 1 D B 1 B 1 1 57.1% 4 c 5 1 1 1 1 1 1 1 100.0% 5 B 6 1 A 1 1 1 1 1 85.7% 6 c 7 1 1 1 1 1 1 1 100.0% 7 A 8 c D 1 1 1 A 1 57.1% 8 B 9 1 1 1 1 1 1 1 100.0% 9 B 10 1 1 1 1 1 1 1 100.0% 10 D 11 1 c c 1 1 1 1 71.4% 11 A 12 1 1 D 1 D 1 1 71.4% 12 B 13 1 1 1 1 1 1 1 100.0% 13 A 14 1 1 1 1 1 1 1 100.0% 14 B 15 A 1 A 1 1 1 1 71.4% 15 D 16 1 c 1 c 1 B 1 57.1% 16 A 17 A A 1 A 1 A 1 42.9% 17 c 18 B B 1 1 1 1 1 71.4% 18 c 19 1 D 1 c c 1 c 42.9% 19 A 20 1 c c 1 1 1 1 71.4% 20 D 21 1 1 1 1 1 1 1 100.0% 21 c 22 1 B D 1 1 1 D 57.1% 22 c 23 1 1 1 1 1 1 1 100.0% 23 c 24 1 1 1 1 1 1 1 100.0% 24 c 25 1 1 1 1 D 1 1 85.7% 25 B 26 B c 1 1 1 1 1 71.4% 26 A 27 1 1 1 1 A 1 1 85.7% 27 c 28 1 1 1 1 1 1 1 100.0% 28 c 29 1 c c 1 c 1 1 57.1% 29 D 30 1 1 1 1 1 1 1 100.0% 30 D 31 B 1 1 B 1 1 1 71.4% 31 D 32 1 1 1 1 1 1 1 100.0% 32 c 33 B B B 1 1 1 1 57.1% 33 A 34 B 1 B 1 1 1 1 71.4% 34 D 35 c c 1 1 1 1 1 71.4% 35 A 36 1 D D 1 D D 1 42.9% 36 A 37 1 1 1 1 1 1 1 100.0% 37 c 38 1 1 1 1 1 1 1 100.0% 38 A 39 A D 1 1 1 1 1 71.4% 39 B 40 1 1 1 1 1 1 1 100.0% 40 B 41 1 1 1 1 1 1 1 100.0% 41 A 42 1 B 1 1 1 1 1 85.7% 42 A 43 1 1 1 A 1 B 1 71.4% 43 c 44 1 A 1 1 1 1 1 85.7% 44 B 45 1 1 1 1 1 1 1 100.0% 45 B 46 1 1 1 1 1 1 1 100.0% 46 D 47 1 1 1 D D D D 42.9% 47 c 48 1 1 1 D 1 1 1 85.7% 48 A 49 1 1 1 1 1 1 1 100.0% 49 D 50 A A 1 A 1 1 1 57.1% 50 B 51 1 1 1 1 1 1 1 100.0% 51 D 52 1 1 1 1 1 1 1 100.0% 52 A 53 1 c A 1 1 1 1 71.4% 53 D 54 1 1 1 1 1 1 1 100.0% 54 B 55 1 1 1 1 1 1 1 100.0% 55 c 56 1 1 1 1 1 1 100.0% 56 B 57 1 1 1 1 1 1 1 100.0% 57 B 58 1 1 1 1 1 1 1 100.0% 58 c 59 1 1 1 1 1 1 1 100.0% 59 A 60 1 1 1 1 1 1 1 100.0% 60 A 61 B B 1 1 1 1 1 71.4% 61 A 62 1 1 1 1 1 1 1 100.0% 62 c 63 1 B 1 1 1 1 1 85.7% 63 D 64 1 1 1 1 B 1 1 85.7% 64 A 65 1 1 A D 1 D D 42.9% 65 B 66 B 1 1 c 1 1 1 71.4% 66 D 67 1 1 1 1 1 1 1 100.0% 67 B 68 1 1 1 1 1 1 85.7% 68 B 69 1 1 1 1 1 1 1 100.0% 69 A 70 1 1 1 1 1 1 1 100.0% 70 D 71 1 1 1 1 1 1 100.0% 71 c 72 1 1 1 1 1 1 1 100.0% 72 c 73 1 1 1 1 1 1 1 100.0% 73 A 74 A D A D B D 1 14.3% 74 c 75 c 1 1 1 A 1 1 71.4% 75 D 76 NIA NIA NIA 1 1 1 1 100.0% 76 A 77 NIA NIA NIA 1 1 1 1 100.0% 77 D 78 NIA NIA NIA D D D 1 25.0% 78 B 79 NIA NIA NIA 1 D 1 1 75.0% 79 B 80 NIA NIA NIA B c c B 0.0% 80 D 81 NIA NIA NIA 1 1 1 1 100.0% 81 c 82 NIA NIA NIA 1 A c 1 50.0% 82 D 83 NIA NIA NIA B B 1 D 25.0% 83 c 84 NIA NIA NIA 1 1 1 1 100.0% 84 c 85 NIA N I A NIA 1 1 1 1 100.0% 85 D 86 NIA NIA NIA c 1 1 1 75.0% 86 A 87 NIA NIA NIA B B 1 B 25.0% 87 A 88 I I I c 1 D 1 50.0% 88 B 89 NIA NIA NIA D 1 D D 25.0% 89 c 90 NIA NIA NIA 1 1 1 1 100.0% 90 D 91 NIA NIA NIA 1 1 1 1 100.0% 91 D 92 NIA NIA NIA 1 1 1 c 75.0% 92 A 93 NIA NIA NIA 1 1 1 1 100.0% 93 B 94 NIA NIA N I A 1 1 1 1 100.0% 94 c 95 NIA NIA N I A 1 A 1 1 75.0% 95 B 96 NIA NIA N I A c 1 c c 25.0% 96 A 97 NIA NIA NIA 1 1 1 1 100.0% 97 c 98 N I A NIA NIA 1 1 1 1 100.0% 98 B 99 NIA NIA NIA D D 1 1 .0% 99 B 100 NIA I N I A 1 1 1 1 100.0% 100 A 80.00% 81.33% 80.00% 81.00% 85.00% 90.00% 80.6% ovitran':;;r 8 . 0% % % % .00% 9 . % 83.0% RO Section I I I .00% 76. °/c 71.0% ' on RO 1 R02 R03 SRO 1 3 SRO U1 AVERAGE