Letter Sequence Request |
---|
|
|
MONTHYEARML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures Project stage: Request ML16259A1132016-09-20020 September 2016 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 Project stage: Meeting 2016-09-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 ML16131A7312016-05-10010 May 2016 NRR E-mail Capture - (External_Sender) Question Rvi Inspection Results 2024-01-23
[Table view] |
Text
1 NRR-PMDAPEm Resource From: MATZKE, ERICK P <ematzke@oppd.com>
Sent: Monday, September 12, 2016 3:39 PM To: Lyon, Fred Cc:QUEEN, STEVEN P; WESTRUM, ANDREW N; KNUTH, TYLER G; BLOME, BRADLEY H
Subject:
[External_Sender] Presentati on for tomorrow's meeting Attachments:
FCS LAR Presentation 2016 09 13.pdfHere is the presentation.
Erick Matzke Senior Nuclear Licensing Engineer Omaha Public Power District Fort Calhoun Station, Mail Stop: FC-2-4 9610 Power Lane, Blair NE 68008 402-533-6855
ematzke@oppd.com This e-mail contains Omaha Public Power District's confidential and proprietary information and is for use only by the intended recipient. Unless explicitly stated otherwise, this e-mail is not a contract offer, amendment, or acceptance. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited.
Hearing Identifier: NRR_PMDA Email Number: 3049 Mail Envelope Properties (A238D6A5C1FF1A4393618100BC03701FCF0C4917)
Subject:
[External_Sender] Presentation for tomorrow's meeting Sent Date: 9/12/2016 3:38:30 PM Received Date: 9/12/2016 3:38:46 PM From: MATZKE, ERICK P Created By: ematzke@oppd.com Recipients: "QUEEN, STEVEN P" <spqueen@oppd.com>
Tracking Status: None "WESTRUM, ANDREW N" <anwestrum@oppd.com> Tracking Status: None "KNUTH, TYLER G" <tknuth@oppd.com> Tracking Status: None "BLOME, BRADLEY H" <bblome@oppd.com> Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>
Tracking Status: None Post Office: SEPEX731.oppd.oppd-ds.com
Files Size Date & Time MESSAGE 698 9/12/2016 3:38:46 PM FCS LAR Presentation 2016 09 13.pdf 142577 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Fort Calhoun StationUpcoming License Amendment Request 1
- Introduction/Background*License Changes to be Requested1.USD replaces WSD 2.Higher concrete strength 3.Higher rebar strength 4.Minor clarifications*Anticipated Questions Agenda 2
- FCS will be permanently defueled in November 2016-HELB and other system produced dynamic loads will no longer be of concern*In 2012, two latent engineering errors were discovered at FCS.*A preliminary assessment of the auxiliary building showed design discrepancies.*An operability determination was completed showing the auxiliary building is operable.*Portions of the auxiliary building and intake structure will be required to meet design basis post shutdown.
Background
3 1.Replace the WSD method with the USDmethod from the ACI 318-63 Code for normal operating/service conditions.2.Use higher concrete compressive strengthvalues for Class B concrete based on original strength test data.3.Use higher reinforcing steel yield strengthvalues based on original strength test data.4.Minor clarificationsinclude adding a definition of control fluids to the dead load section.
License Changes to be Requested 4
- Why the change?-WSD can be overly conservative in regard to member capacity.*What is the benefit?-Operability determination efforts for the auxiliary building using USD do not show member overstress.-Reduce or eliminate the need to install future modifications.*Where does this apply?-Auxiliary Building-Intake Structure Replace WSD with USD 5
- Is there precedent?-USD method has been used for the design of reinforced concrete structures with safe, reliable
performance for over fifty years, including its use at many other operating nuclear power reactors.*Arkansas Nuclear One (ANO)*Calvert Cliffs
- Waterford Replace WSD with USD 6
- Why the change?-Extensive test data indicates the concrete is significantly stronger than the original minimum design requirement.*What is the benefit?-4500 psi vs. 4000 psi.-Increases member design strength.
-Lowers interaction ratios.
-Reduces potential modification requirements.*Where does this apply?-Auxiliary Building*Not allowed where structures undergo prolonged exposure to:-high radiation
-excessive moisture
-harsh chemicals Increased Concrete Strength 7
- How is new strength determined?-903 of 912 sample tests were found for the entirety of FCS; 342 apply specifically to the auxiliary building-Rolling averages for 3 and 5 consecutive samples are calculated IAW ACI 318-63 and limited to the 95% confidence level.*Is there precedent?
-"The licensee utilized as-built concrete strength of 4424 psi based on 28 days concrete cylinder strength. The NRR staff had reviewed the licensee's justification for the as-built concrete strength earlier during the review of the operability evaluation and considered the use of 28-days strength acceptable for the reconstituted design-basis calculations."
(ML023290377)-The licensee (D.C. Cook) was licensed to ACI 318-63 as is FCS. (ML023290377)
Increased Concrete Strength 8
- Why the change?-Extensive test data indicates the rebar is significantly stronger than the original minimum design
requirement.*What is the benefit?-43.8 ksivs. 40 ksi.-Increases member design strength.
-Lowers interaction ratios.
-Reduces potential modification requirements.*Where does this apply?-Auxiliary BuildingIncreased Rebar Strength 9
- How is new strength determined?-184 of 202 sample tests were found for the auxiliary building-The new strength is limited to the 95% confidence level.*Is there precedent?
-"On March 11, 2005, the NRC approved a license amendment that revised the design basis as described in the UFSAR to allow the use in
control rod drive missile shield structural calculations of a reinforcing bar (i.e., rebar) yield strength value based on measured material properties, as documented in licensee rebar acceptance tests."(ML052170089)-The licensee (D.C. Cook) implemented the use of yield strength based on Certified Mill Test Report data supported by 95% confidence level.
(ML043640141)Increased Rebar Strength 10
- Should field test data be incorporated when determining concrete strength?-Original field samples were not well controlled. For example, some samples were reported as: *NOT @ AREA PLACED*LOST ON JOB
- DAMAGED AT JOB SITE-Typically field cured samples are not as well maintained as lab cured samples.-ACI 318-63 requires lab tests to validate strength.
Anticipated Questions 11
- Should in situ testing on existing concrete be used to validate concrete strength?-ACI 318-63 requires only lab cured samples to validate strength which are readily available.-Concrete compressive strength continues to increase with age when it is well maintained.-The auxiliary building is inspected under FCS Procedure SE-PM-AE-1001 using a frequency in
line with industry standards.
Anticipated Questions 12
- Why use increased material strengths for the entire auxiliary building rather than increased strengths
specific to each member or area of the building.-Exact rebar placement data was not collected during construction.-Using multiple strength values overcomplicates required analyses.
Anticipated Questions 13 Summary*Portions of the auxiliary building and intake structure will be required to meet design basis post shutdown.*License Changes to be Requested1.USD replaces WSD 2.Higher concrete strength 3.Higher rebar strength 4.Loading clarification Questions?
14