ML18341A247

From kanterella
Revision as of 19:43, 22 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Mirion Technologies - 10 CFR Part 21.21 Report Re Relays Defect
ML18341A247
Person / Time
Site: Browns Ferry, Fort Calhoun  Tennessee Valley Authority icon.png
Issue date: 12/06/2018
From: Kohan S, Webb S
Mirion Technologies (Canberra)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18341A247 (3)


Text

Mirion Technologies (Canberra), Inc.

800 Research Parkway Meriden, Connecticut 06450 Toll Free 800

-243-4422 Tel. 203-238-2351 www.canberra.com December 6, 2018 U.S Nuclear Regulatory Commission Washington, DC 20555

-0001 MSHD.Resource@nrc.gov

Subject:

10 CFR Part 21.21 Report Name and address of the individual or individuals informing the Commission.

Shelia Webb Stacey Kohan Vice President QA Manager Mirion Technologies (Canberra), Inc.

Mirion Technologies (Canberra), Inc.

800 Research Parkway 800 Research Parkway Meriden, CT 06450 Meriden, CT 06450 swebb@mirion.com skohan@mirion.com 203-639-2000 203-639-2000 Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

US Facilities

Entergy ANO

- Control Room Emergency Ventilation System, CREV (ADM616)

TVA Browns Ferry

- Control Room Emergency Ventilation, CREV (ADM60

6) OPPD Ft. Calhoun

- RM051 Containment Atmosphere Monitor, RM052 Containment Atmosphere Vent Gas monitor, RM062 Aux Bldg Stack

- Gas Basic Components:

CR600CIP Customer Interface Panel connected to ADM606 Rackmount Ratemeter, and in ADM616 Wallmount Ratemeter Containing:

Potter & Bromfield Product Code R10

-E1-X2-J1.0K, Cradle Style Relay with C

-Form contacts Used in Radiation Monitoring Systems to output Alarm and Fault States Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

Mirion Technologies (Canberra), Inc.

(fka Canberra Industries, Inc.)

800 Research Parkway Meriden, CT 06450 Nature of the defect or failure to comply and the safety hazard which is created or would be created by such defect or failure to comply.

These relays exhibited chatter in a de-energized state during a seismic test. If the relay is normally de

-energized and chatters during a seismic event, it may actuate or indicate incorrectly.

The date on which the information of such defect or failure to comply was obtained.

Non-conformance was determined on: July 5, 2018, Technical Evaluation to determine failure to comply was concluded on 5 December 2018.

In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

Mirion Technologies (Canberra), Inc.

800 Research Parkway Meriden, Connecticut 06450 Toll Free 800

-243-4422 Tel. 203-238-2351 www.canberra.com

` These relays are used in a normally de

-energized state in five, safety

-related, radiation monitoring system, installations in the United States, at Entergy ANO, at TVA Browns Ferry, and OPPD Ft. Calhoun.

US Facilities

Entergy ANO

- Control Room Emergency Ventilation System, CREV (ADM616)

TVA Browns Ferry

- Control Room Emergency Ventilation, CREV (ADM606)

OPPD Ft. Calhoun

- RM051 Containment Atmosphere Monitor, RM052 Containment Atmosphere Vent Gas monitor, RM062 Aux Bldg Stack

- Gas The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

- Review previous Radiation Monitoring (Safety Related) projects to determine the extent and possible impact

- Complete, Mirion (Canberra), Reference Product Performance Report, PPR 3883

- Review monitor interconnection with plant systems to identify specifically the relays and plants connections to assess impact

- Each Site, 6 months, June 28, 2019

- Develop mitigations which could include using alternative relay output (CR600TP termination panel for ADM606) and/or change rate meter firmware to normally energize relay

- Mirion (Canberra), 6 months, June 28, 2019 Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

The ADM606 and ADM616 are only being supplied as replacement parts to extend service life of installed monitors.

In the case of an early site permit, the entities to which an early site permit was transferred.

Not applicable

Regards, Shelia Webb Stacey Kohan

Cc: TVA Nuclear Nuclear Assurance and Licensing Attn: Manager, Operating Experience 1101 Market St. Chattanooga, TN 37402

-2801 Fleet Manager, Corrective Action and Operating Experience Entergy Nuclear Operations 1340 Echelon Parkway M-ECH-25 Fleet_OE@Entergy.com,

Subject:

Fleet Manager, Corrective Action & Operating Experience: Part 21

Manager - Nuclear Licensing Fort Calhoun Nuclear Station Omaha Public Power District 9610 Power Lane Blair, NE 68008

Mirion Technologies (Canberra), Inc.

800 Research Parkway Meriden, Connecticut 06450 Toll Free 800

-243-4422 Tel. 203-238-2351 www.canberra.com FCSLicensingMgr@oppd.com