Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML17228A0482017-08-14014 August 2017 Final 10 CFR Part 21.21 Report Re Defect of Manual Flow Controller Used at Fort Calhoun Nuclear Station ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML13191A5712013-06-28028 June 2013 10CFR21 Interim Report - Linear Indications/Cracks in Flange Forging, Model N-E13DM Pressure Transmitter ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers LIC-12-0092, Omaha Public Power District, Submittal of Part 21 Notification - Identification of Defect2012-07-0606 July 2012 Omaha Public Power District, Submittal of Part 21 Notification - Identification of Defect 2018-10-19
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML18341A2472018-12-0606 December 2018 Mirion Technologies - 10 CFR Part 21.21 Report Re Relays Defect ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17228A0482017-08-14014 August 2017 Final 10 CFR Part 21.21 Report Re Defect of Manual Flow Controller Used at Fort Calhoun Nuclear Station ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML16035A2542016-01-26026 January 2016 Canberra Industries, Inc. - Interim 10 CFR Part 21.21 Report Regarding Modification Kit for Manual Flow Controller, Relay, Time Delay, Motor, Pump ML15341A3282015-12-0101 December 2015 Part 21 Report Regarding Improper Silver Plating During Refurbishment of AK-25 Type Circuit Breakers, Per Fort Calhoun, Unit 1 ML15205A2932015-07-20020 July 2015 Potential Part 21 Report Regarding Bradley Failure to Document Design Change, Per Fort Calhoun Station ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15014A0612015-01-0808 January 2015 Notification of Potential Part 21 Re Failure of Sbm Type Switches ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML14071A4772014-02-26026 February 2014 Report of Potential Defect Per 1OCFR Part 21 Primary Disconnect Assembly ML13346A0272013-10-0808 October 2013 Ultra Electronics Nuclear Sensors & Process Instrumentation, 10 CFR21 Final Report - Linear Indications/Cracks in Flange Forging, Model Ne 13DM Pressure Transmitter ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13191A5712013-06-28028 June 2013 10CFR21 Interim Report - Linear Indications/Cracks in Flange Forging, Model N-E13DM Pressure Transmitter ML13190A3612013-06-28028 June 2013 Part 21 Interim Report - Linear Indications/Cracks in Pressure Transmitter Flange Forging ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13091A3872013-03-28028 March 2013 Part 21 Report - Foxboro Power Supply Potential Failure Due to Defective Tie Wraps and Holders ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2432012-10-0505 October 2012 Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars ML12199A2222012-07-11011 July 2012 Part 21- Failed Auxiliary Contactor Affecting Diesel Generator LIC-11-0034, Part 21 Notification - Identification of Defect2011-04-19019 April 2011 Part 21 Notification - Identification of Defect ML1108100642011-03-21021 March 2011 Notification of Potential Part 21 Re Defective KPR-14G-125 Relays Discovered During Bench Testing ML1009200932010-03-25025 March 2010 10 CFR21 Notification of a Potential Weld Defect ML0930603952009-10-30030 October 2009 Transnuclear, Inc. - Submittal of Thirty Day Written Report of a Potential Deviation and Failure to Comply Associated with Unsubstantiated Certified Materials Test Reports for Certain Small Parts Utilized in Products Fabricated ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0732000862007-11-0909 November 2007 Notification of Potential Part 21 Report Conval Valves Weld Qualifications ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves 2018-12-06
[Table view] |
Text
MIRION Mirian Technologies (Canberra), Inc.
800 Research Parkway Toll Free 800-243-4422 Tel. 203-238-2351 TECHNOLOGIES Meriden, Connecticut 06450 www.canberra.com August 14, 2017 U.S Nuclear Regulatory Commission Washington, DC 20555-0001 MSHD.Resource@nrc.gov
Subject:
Final 10 CFR Part 21.21 Report
- Name and address of the individual or individuals informing the Commission.
Shelia Webb, President - Spectroscopy Division Mirian Technologies (Canberra), Inc.
800 Research Parkway Meriden, CT 06450 swebb@mirion.com 203-639-2563
- Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Facility: Fort Calhoun Nuclear Station, Omaha Public Power District Basic Components: Quantity 1, 7068423 Modification Kit for Manual Flow Controller, OPPD PO 00185091, CAN SO 40342 Quantity 2, 602958-001 Relay, Time Delay, OPPD PO 00185167, CAN SO 40197 Quantity 2, 602627-001 Motor, Pumps, OPPD PO 00191479, CAN SO\ 43245
- Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Mirian Technologies (Canberra), Inc.
800 Research Parkway Meriden, CT 06450
- Nature of the defect or failure to comply and the safety hazard which is created or would be created by such defect or failure to comply.
These commercial grade items were not properly dedicated. Due to actions taken there is no safety hazard created.
- The date on which the information of such defect or failure to comply was obtained.
November 06, 2015
- In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
These components are intended to be used as replacement parts in the Containment Air Radiation Monitoring System, RM-050/051/062, Fort Calhoun Nuclear Station, Omaha Public Power District PAGE 1 of2 CANBERRA
MIRION Mirian Technologies (Canberra), Inc.
800 Research Parkway Toll Free 800-243-4422 Tel. 203-238-2351 TECHNOLOGIES Meriden, Connecticut 06450 www.canberra.com U.S Nuclear Regulatory Commission Washington, DC 20555-0001 PAGE 2 of2
- The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
OPPD FTC isolated the parts after notification CANBERRA performed a thorough review of the dedications and provided all available part, testing and QA records to OPPD FTC for their review.
OPPD FTC reviewed and approved the dedications.
CANBERRA revised its CGDP process for dedications so this type of deficiency will not recur.
- Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
No additional advice is provided.
- In the case of an early site permit, the entities to which an early site permit was transferred.
Not applicable
- Regards, Shelia Webb President, Spectroscopy Division Ref: Interim 10 CFR Part 21.21 Report, January 26, 2016 (ML16035A254)
Cc: Manager - Nuclear Licensing Fort Calhoun Nuclear Station Omaha Public Power District 9610 Power Lane Blair, NE 68008 FCSLicensingMgr@oppd.com CANBERRA