2007 Annual Radioactive Effluent Release Report for Period from January 1, 2007, Through December 31, 2007
ML080600157
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 02/27/2008
From: Schwarz C J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML080600157 (3)


Text

Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 February 27, 2008 10 CFR 72.44(d)(3)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Big Rock Point Dockets 50-1 55 and 72-043 License No. DPR-6 2007 Annual Radioactive Effluent Release Report - Biq Rock Point

Dear Sir or Madam:

In accordance with 10 CFR 72.44(d)(3), Entergy Nuclear Operations, Inc. is submitting the annual radioactive effluent release report for Big Rock Point for the period from January I, 2007, through December 31,2007. Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.

Site vice President Palisades Nuclear Plant Enclosure (1 ) CC Administrator, Region Ill, USNRC BRP Decommissioning Inspector, USNRC NMSS Project Manager, USNRC ENCLOSURE INDEPENDENT SPENT FUEL STOWAGE INSTALLATION ANNUAL RADIOACTIVE EFFLUENVEQEASE REPORT BlG ROCK POINT January "iihr~ugh December 01,2007 I. FACILITY DESCRIPTION The Independent Spent Fuel Storage Installation (ISFSI) is located within the owner-controlled area of the Big Rock Point (BRP) site. The storage of spent fuel at BRP meets the requirements of 10 CFR 72, and the Certificate of Compliance No. 72-1 026, issued by the Nuclear Regulatory Commission (NRC). II. EFFLUENT LIMITS AND CONTROLS The ISFSI operates under effluent control limits as required by 10 CFR 72.1 04. However, the design of the sealed storage canisters at the ISFSl precludes any gaseous or liquid effluent releases.

Ill. RADIOLOGICAL EFFLUENT RELEASES As noted in Section II, by design, there are no radioactive liquid or gaseous effluents originating from the ISFSl facility. The annual radiological surveillance performed during this reporting period did not indicate any release of radioactivity from the ISFSI.

IV. ISFSl ENVIRONMENTAL MONITORING PROGRAM The BRP Radiological Environmental Monitoring Program (REMP) is described in the Offsite Dose Calculation Manual (ODCM),Section I, Subsection 4.0. The ISFSl Environmental Monitoring Program, which is contained within the BRP REMP, consists of thermoluminescent dosimeters (TLDs) at four locations along the perimeter of the ISFSI site, and three control TLDs 10.5 to 50 miles from the site. Annual TLDs are read annually and quarterly TLDs are read quarterly as reflected in Table 1. Annual and quarterly measurements are compared to control measurements to evaluate compliance with 10 CFR 72.104. The results for the lSFSl TLDs and the average of the control TLDs measured in 2007 are summarized in the following table.

There were no sample anomalies for 2007. Page 1 of 2 V. ISFSl ENVIRONMENTAL MEASUREMENTS BRP iSFSl Environmental TLD Results (mR) January 1,2007 - December 31,2007 VI. CONCLUSIONS TLD No./Location BRP-18 / 137 meters NW of ISFSl BRP-19 / 137 meters SW of ISFSl BRP-20 / 137 meters SE of ISFSl BRP-21 1137 meters NE of ISFSl Summary of Control Locations Based on the above measurements performed during the reporting period, it is concluded that the dose from ISFSl operations does not exceed the limits as defined in 10 CFR 72.104. Page 2 of 2 1 Quarter 10.4+1.0 12.620.6 13.4 t 0.6 10.4 + 0.6 16.1 + 2.3 2"' Quarter 14.3k1.5 16.9k1.5 16.4 + 1.5 14.3 + 1.4 19.8 + 5.0 3'"uarter 10.1rt1.1 13.5+1.1 14.8 + 1.2 10.5 + 1.1 15.3 + 4.0 4'"uarter 12.3 + 0.6 12.6 + 0.5 20.0 + 1.2 40.4 + 1.5 20.1 + 2.8 Annual 47.9 + 1.3 59.3 + 2.9 61.2 + 1.2 45.2 + 2.6 73.3 + 7.1