Y07 Annual Assessment Slides
ML081010395
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/08/2008
From:
NRC/RGN-II
To:
References
Download: ML081010395 (17)


Text

Crystal River Annual Assessment Crystal River Annual Assessment Meeting Meeting Reactor Oversight Program Reactor Oversight Program

--CY 2007 CY 2007 Nuclear Regulatory Commission Nuclear Regulatory Commission

--Region II Region II Crystal River Florida Crystal River Florida April 8, 2008 April 8, 2008 Purpose of Today's MeetingA public forum for discussion of the licensee A public forum for discussion of the licensee

s s performance performanceNRC will address the licensee performance issues NRC will address the licensee performance issues identified in the annual assessment letter identified in the annual assessment letterLicensee will be given the opportunity to respond to Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of the information in the letter and inform the NRC of new or existing programs to maintain or improve new or existing programs to maintain or improve their performance their performance Agenda Introduction Review of Reactor Oversight Process National Summary of Plant Performance Discussion of Plant Performance Results Licensee Response and Remarks NRC Closing Remarks Break NRC available to address public questions Region II OrganizationVictor McCreeActing Regional AdministratorCharles CastoActing Deputy Regional Administrator Joseph SheaActing Director of Reactor Projects Harold Christensen Deputy Director Marvin SykesBranch Chief Crystal RiverResident InspectorsThomas MorrisseyRogerioReyes Project Engineers Son Ninh Jeffrey HammanKrissKennedy Acting Director of Reactor Safety Davis AyresActing Deputy Director Regional Specialists NRC Performance Goals Safety: Ensure adequate protection of public health and safety and the environment Security: Ensure adequate protection in the secure use and management of radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Examples of Baseline InspectionsEquipment Alignment ~80 hrs/yr Triennial Fire Protection ~200 hrs every 3 yrsOperator Response ~125 hrs/yrEmergency Preparedness ~80 hrs/yrRad Release Controls ~110 hrs every 2 yrsWorker Radiation Protection ~90 hrs/yrCorrective Action Program ~250 hrs every 2 yrs Corrective Action Case Reviews ~60 hrs/yr Significance Threshold Performance Indicators Green: Only Baseline Inspection White:May increase NRC oversight Yellow:Requires more NRC oversight Red:Requires more NRC oversight Inspection Findings Green:Very Low safety issue White:Low to moderate safety issue Yellow:Substantial safety issue Red:High safety issue Action Matrix ConceptLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.

DegradedCornerstoneUnacceptablePerformance Increasing Safety Significance Increasing NRC Inspection Efforts

Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions National Summary of Plant Performance Status at End of CY 2007Licensee Response 87Regulatory Response 8Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone1 Unacceptable 0Total104 National Summary Performance Indicator Results (at end of CY 2007)Green 1942White 8Yellow 2Red 0 Total Inspection Findings (CY 2007)Green 759White9Yellow 5Red 0 Crystal River Inspection Activities (Jan 1 (Jan 1 --Dec 31, 2007)

Dec 31, 2007)4100+ hours of inspection related activities Resident Inspector daily inspectionsEmergency Preparedness (EP) inspectionSpecial Nuclear Material accountability and control inspectionRadiation Protection (RP) and InserviceInspections (ISI)Component Design Basis InspectionPWR Containment Sump Inspection Fall 2007 refueling outage inspections: Daily Resident Inspector, Containment Sump , RP and ISI inspections Crystal River Assessment Results(Jan 1 -Dec 31, 2007) Crystal River's performance was within the Licensee Response Column of the NRC's Action Matrix. All findings were of very low safety significance (Green).

All findings were of very low safety significance (Green). All Performance Indicators (PI) were Green All Performance Indicators (PI) were Green Crystal River's Annual Assessment SummaryProgress Energy operated Crystal River Unit 3 in a Progress Energy operated Crystal River Unit 3 in a manner that preserved public health and safety.

manner that preserved public health and safety.All Cornerstone Objectives were met.

All Cornerstone Objectives were met. NRC plans only baseline inspections at Crystal River NRC plans only baseline inspections at Crystal River for CY2008.

for CY2008.

Licensee Response and Remarks Dale Young Site Vice President Crystal River Unit 3 Contacting the NRC Report an emergency(301) 816-5100 (call collect) Report a safety concern: (800) 695-7403 Allegation@nrc.gov General information or questionswww.nrc.govSelect "What We Do"for Public Affairs Reference Sources Reactor Oversight Processhttp://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Roomhttp://www.nrc.gov/reading-rm.html Public Document Room1-800-397-4209 (Toll Free)