Crystal River Annual Assessment Crystal River Annual Assessment Meeting Meeting Reactor Oversight Program Reactor Oversight Program -- CY 2007 CY 2007 Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region II Region II Crystal River Florida Crystal River Florida April 8, 2008 April 8, 2008 Enclosure
Purpose of Todays Meeting A public forum for discussion of the licensee A public forum for discussion of the licensees s performance performance
NRC will address the licensee performance issues NRC will address the licensee performance issues identified in the annual assessment letter identified in the annual assessment letter
Licensee will be given the opportunity to respond to Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of the information in the letter and inform the NRC of new or existing programs to maintain or improve new or existing programs to maintain or improve their performance their performance Enclosure
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks z Break z NRC available to address public questions Enclosure
Region II Organization Victor McCree Acting Regional Administrator Charles Casto Acting Deputy Regional Administrator Joseph Shea Acting Director of Reactor Projects Harold Christensen Deputy Director Marvin Sykes Branch Chief Crystal River Resident Inspectors Thomas Morrissey Rogerio Reyes Project Engineers Son Ninh Jeffrey Hamman Kriss Kennedy Acting Director of Reactor Safety Davis Ayres Acting Deputy Director Regional Specialists Enclosure
NRC Performance Goals z Safety: Ensure adequate protection of public health and safety and the environment z Security: Ensure adequate protection in the secure use and management of radioactive materials Enclosure
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Enclosure
Examples of Baseline Inspections z Equipment Alignment
~80 hrs/yr z Triennial Fire Protection
~200 hrs every 3 yrs z Operator Response
~125 hrs/yr z Emergency Preparedness
~80 hrs/yr z Rad Release Controls
~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program
~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr Enclosure
Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue Enclosure
Action Matrix Concept Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Enclosure
National Summary of Plant Performance Status at End of CY 2007 Licensee Response 87 Regulatory Response 8
Degraded Cornerstone 8
Multiple/Repetitive Degraded Cornerstone 1
Unacceptable 0
Total 104 Enclosure
National Summary z Performance Indicator Results (at end of CY 2007)
Green 1942 White 8
Yellow 2
Red 0
z Total Inspection Findings (CY 2007)
Green 759 White 9
Yellow 5
Red 0
Enclosure
Crystal River Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2007)
Dec 31, 2007) 4100+ hours of inspection related activities Resident Inspector daily inspections Emergency Preparedness (EP) inspection Special Nuclear Material accountability and control inspection Radiation Protection (RP) and Inservice Inspections (ISI)
Component Design Basis Inspection PWR Containment Sump Inspection Fall 2007 refueling outage inspections: Daily Resident Inspector, Containment Sump, RP and ISI inspections Enclosure
Crystal River Assessment Results (Jan 1 - Dec 31, 2007) z Crystal Rivers performance was within the Licensee Response Column of the NRCs Action Matrix.
zz All findings were of very low safety significance (Green).
All findings were of very low safety significance (Green).
zz All Performance Indicators (PI) were Green All Performance Indicators (PI) were Green Enclosure
Crystal Rivers Annual Assessment Summary Progress Energy operated Crystal River Unit 3 in a Progress Energy operated Crystal River Unit 3 in a manner that preserved public health and safety.
manner that preserved public health and safety.
All Cornerstone Objectives were met.
All Cornerstone Objectives were met.
NRC plans only baseline inspections at Crystal River NRC plans only baseline inspections at Crystal River for CY2008.
for CY2008.
Enclosure
Licensee Response and Remarks Dale Young Site Vice President Crystal River Unit 3 Enclosure
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs Enclosure
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)
Enclosure