ML14108A311
ML14108A311 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 04/18/2014 |
From: | Lieb R A FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-14-107 | |
Download: ML14108A311 (25) | |
Similar Documents at Davis Besse | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARL-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024
[Table view]Submittal of Core Operating Limits Report, Cycle 24, Revision 0 L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 12022-05-10010 May 2022 Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 L-20-085, Core Operating Limits Report, Cycle 22, Revision 02020-03-30030 March 2020 Core Operating Limits Report, Cycle 22, Revision 0 L-20-063, Submittal of Core Operating Limits Report, Cycle 21, Revision 32020-02-26026 February 2020 Submittal of Core Operating Limits Report, Cycle 21, Revision 3 L-19-245, Core Operating Limits Report, Cycle 21, Revision 22019-10-23023 October 2019 Core Operating Limits Report, Cycle 21, Revision 2 L-19-162, Submittal of Core Operating Limits Report, Cycle 21, Revision 12019-06-20020 June 2019 Submittal of Core Operating Limits Report, Cycle 21, Revision 1 L-18-094, Core Operatinq Limits Report, Cycle 21, Revision 02018-04-0202 April 2018 Core Operatinq Limits Report, Cycle 21, Revision 0 L-18-024, Core Operating Limits Report, Cycle 20, Revision 12018-01-18018 January 2018 Core Operating Limits Report, Cycle 20, Revision 1 L-16-166, Core Operating Limits Report, Cycle 20, Revision 202016-05-27027 May 2016 Core Operating Limits Report, Cycle 20, Revision 20 L-15-387, Core Operating Limits Report, Cycle 19, Revision 22016-01-11011 January 2016 Core Operating Limits Report, Cycle 19, Revision 2 L-15-045, Core Operating Limits Report, Cycle 19, Revision 12015-03-12012 March 2015 Core Operating Limits Report, Cycle 19, Revision 1 L-14-107, Core Operating Limits Report, Cycle 192014-04-18018 April 2014 Core Operating Limits Report, Cycle 19 L-12-213, Core Operating Limits Report, Cycle 182012-06-0202 June 2012 Core Operating Limits Report, Cycle 18 L-10-083, Core Operating Limits Report for Cycle 172010-06-23023 June 2010 Core Operating Limits Report for Cycle 17 L-08-317, Core Operating Limits, and Pressure and Temperature Limits Report2008-12-16016 December 2008 Core Operating Limits, and Pressure and Temperature Limits Report L-08-228, Core Operating Limits Report, Revision 1, Supports the Implementation of License Amendment 278, Measurement Uncertainty Recapture (Mur) Power Uprate2008-07-14014 July 2008 Core Operating Limits Report, Revision 1, Supports the Implementation of License Amendment 278, Measurement Uncertainty Recapture (Mur) Power Uprate L-08-136, Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report2008-04-29029 April 2008 Cycle 15 and Refueling Outage 15 Inservice Inspection Summary Report L-08-028, Core Operating Limits Reports for Cycle 16, Revision 02008-01-24024 January 2008 Core Operating Limits Reports for Cycle 16, Revision 0 ML0611502732006-04-21021 April 2006 Core Operating Limits Report for Cycle 15 ML0335807152003-12-17017 December 2003 Core Operating Limits Report and Reload Report for Cycle 14 2024-04-16 Category:Letter MONTHYEARIR 05000346/20244032024-09-27027 September 2024
[Table view]Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06 |
Text
FENOC-FirstEnergy Nuctearlirating Company55Al North State Route 2Oak Harbor, Ohio 43449 419-321-7676nqnd A Lbb , Fax: 41gn1-7ffi2 Vi co Prcsi dent, ^lrclear April 18, 2014 L-14-107 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Core Operatinq Limits Report, Cvcle 19 Pursuant to the requirements of Davis-Besse Nuclear Power Station (DBNPS)Technical Specification 5.6,3,'CORE OPERATING LIMITS REPORT (COLR)," FirstEnergy Nuclear Operating Company hereby submits the DBNPS Cycle 19 COLR,Revision 0.
There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at (330) 315-6810.Sincerely, Ua#/Raymbnd A. Lieb
Enclosure:
FirstEnergy Nuclear Operating Company, Davis-Besse Unit 1, Cycle 19, Core Operating Limits Report, Revision 0cc: NRC Region lllAdministrator NRC Resident InspectorNRC Project Manager Utility Radiological Safety Board