Text

{{#Wiki_filter:FENOC 5501 Nonh Stute Route 2 Oak Harbor, Ohto 43449 Mark B. Bezilh 4tg-321-7676 Vice President - Nucles Fax: 419-i2l -7582 April 2, 2018 L-18-094 ATTN: Document Control Desk U.S, Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit No.1 Docket No. 50-346, Liense No. NPF-3 Core Oper4inq Limits Re,port. Cvcle 21. Revision 0 Enclosed is Revision 0 to the Davis.Besse Nuclear Power Station, Unit No. 1 (DBNPS) Cycle 21 Core Operating Limits Report. Submittalof this revision is in accordane with DBNPS Technical Specification 5.6.3, 'CORE OPERATING LIMITS REPORT (COLR)." There are no regulatory commitments contained in this letter. lf there are any questions or if additional information is requircd, please contad Mr. Thomas A. LenE, Manager - Fleet Licensing, at (330) 3156810. Sincerely, Mark B Bezill V

Enclosure:

Cycle 21 , Core Operating Limits Report, Revision 0

      @:        NRC Region lll Administrator NRC Resident Inspector NRR Project Manager Utility Radiological Safety Board

Enclosure Ll8-094 Cycle 21, Core Operating Limits Report, Revision 0 (27 pages follow)

Davis-Besse Cycle 21 COLR Page 1 of 27 Revision 0 FIRSTENERGY NUCLEAR OPERATING COTTPANY DAVI$-BESSE UNIT 1 CYCLE 21 CORE OFERATING LIMITS REPORT Prepared by ,S;u i,# D. B. l(alley 2f23t18 Reviewed by IE J, D. Brown Approved by 'b 16 R. J. IIST OF EFFECTIVE PAGES Page 1 through 27 Rev. 0

Davis-Besse Cycle 21 COLR Page 2 of 27 Revision 0 1,0 Core Operating Limits This CORE OPERATING LIMITS REPORT for DB1 Cycle 21 has been prepared in accordance with the requirements of Technical Specification 5.6.3. The Core Operating Limits have been developed using the methodology provided in Reference 2.0 (1). The licensed length of Cycle 21 is 690 EFPDS. The following cycle-specific core Operating Limits, Protective Limit and Flux -A Flux *Flow Reactor Protection System Allowable Values are included in this report: 1 . SL 2.1.1.1 Reactor Core Safety Limits

2. LCO 3.1.1 SHUTDOWN MARGTN (SDM)
3. LCO 3.1.3 Moderator Temperature Coeffi cient (MTC)
4. LCO 3.1.7 Position lndicator Channels
5. LCO 3.1.8 PHYSICS TESTS Exceptions - MODE 1
6. LCO 3.1.s PHYSICS TESTS Exceptions - MODE 2
7. LCO 3.2.1 Regulating Rod lnsertion Limits
8. LCO 3.2.2 AXIAL POWER SHAPING ROD (APSR) lnsertion Limits
9. LCO 3.2.3 AXIAL POWER IMBALANCE Operating Limits
10. LCO 3.2.4 QUADRANT POWER TlLT (Aen
11. LCO 3.2.5 Power Peaking Factors
12. LCO 3.3.1 Reactor Protection Systems (RPS) lnstrumentation Function 8: (Flux - AFlux - Flow) Allowable Values
13. LCO 3.9.1 Boron Concentration
14. TRM 8.1,3 Rod Program 2.0 References
1) BAW-10179P-4, Rev. 8, "Safety Criteria and Methodology for Acceptable Cycle Reload Analyses", May 2010.

2l Letter, Kevin Hsueh (NRC) to Gary Peters (AREVA),

Subject:

Request for U.S. Nuclear Regulatory Commission Concurrence Regarding the Applicability of Topical Report BAW-2149A, "Evaluation of Replacement Rods in BWFC FuelAssemblies" to Cores Containing Fresh Fuel Assemblies with Stainless Steel Rods, dated February 1,2017.

Davis-Besse Cycle 21 COLR Page 3 ol 27 Revision 0 Table of Contents Paoe Reactor Gore Safety Llmlts Figure 1 AXIAL POWER IMBAIANCE Protective Limits Davis-Besse 1, Cycle 21 5 $HUTDOWN MARGTH {SDir} Table 1 Shutdown Margin Requirements for Davis-Besse, Cycle 21 6 Moderator Tem perature Coefficient (MTC) Table 2 Moderator Temperature Coefficient Limit for Davis-Besse, Cycle 21 7 Poeition Indicator Chan nels Table 3 Absolute Position lndicator (APl) / Relative Position lndicator {RPl} Agreement Limit for Davis-Besse, Cycle 21 I Regulating Rod lnsertion Limits Figure 2a Regulating Group Position Operating Limits 0 to 300 t 10 EFPD, Four RC Pumps Davis-Besse 1, Cycle 21 g Figure 2b Regulating Group Position Operating Lirnits After 300 t 10 EFPD, Four RC Pumps Davis-Besse 1, Cycle 21 10 Figure 2c Regulating Group Position Operating Limits 0 to 300

  • 10 EFPD, Three RC Pumps Davis-Besse 1, Cycle 21 11 Figure 2d Regulating Group Position Operating Limits t

After 300 10 EFPD, Three RC Pumps Davis-Besse 1, Cycle 21 12 AXIAL POWER SHAPING ROD (APSR) lnsertlon Limite Figure 3 APSR Position Operating Limits for Davis-Besse, Cycle 21 13 AXIAL POWER IMBAI-ANCE Operating Limits Figure 4a AXIAL POWER IMBALANCE Operating Limits 0 to 200 t 10 EFPD, Four RC Pumps Davis-Besse 1, Cycle 21 14 Figure 4b ff(lAL POWER IMBALANCE Operating Limits 200 t 10 EFPD to 450 t 10 EFPD, Four RC Pumps Davis-Besse 1, Cycle 21 15 Figure 4c AXIAL POWER IMBALANCE Operating Limits 450 t 10 EFPD to EOC, Four RC Pumps Davis-Besse 1, Cycle 21 1B Figure 4d AXIAL POWER IMBALANCE Operating Limits 0 to 200 + 10 EFPD, Three RC Pumps Davis-Besse 1, Cycle 21 17

Davis-Besse Cycle 21 COLR Page 4 of 27 Revision 0 Table of Contents Paoe Figure 4e AXIAL POWER IMBALANCE Operating Limits 200

  • 10 EFPD to 450 t 10 EFPD, Three RC Pumps Davis-Besse 1, Cycle 21 18 Figure 4f AXIAL POWER IMBALANCE Operating Limits 450
  • 10 EFPD to EOC, Three RC Pumps Davis-Besse 1, Cycle 21 1g QUADRANT POWER TlLT (APT)

Table 4 AUADRANT POWER TILT Limits for Davis-Besse, Cycle 21 2D Power Peaking Factonr Table 5 Power Peaking Factors - Fo for Davi+Besse, Cycle 21 21 Table 6 Power Peaking Factors - Fnm for Davis-Besse, Clcle 21 23 Figure 5 Maximum Allowable Radial Peak for FNan for Dads-Besse, Cycle 21 23 Table 7 Maximum Allowable Radial Peak for FNax for Davis-Besse, Cycle 21 24 Reactor Protectlon System (RPS) I nstrumentatlon Figure 6 Flux-AFlux-Flow (or Power/lmbalance/Flow) Allowable Values Davis-Besse 1, Cycle 21 25 Boron Goncentration Table I Refueling Boron Concentration Limit for Davi+Besse, Cycle 21 26 Rod Program Figure 7 Control Rod Core Locations and Group Assignments for Davis-Besse, Cycle 21 27

Davis-Besse Cycle 21 COLR Page 5 ot 27 Revision 0 Figure 1 A){AL POWER IMBAIINCE Protectire Umits Davisesse 1, Cycle2l This Figure is rfrned toby Technical Specifcation2.1.1.1 120 (44.93, 110.2) (32.32, 110.2) 4 PUMP LIMIT (-+9.04, gg.5) 100 (-44.93, 90.0) (12.3?,,90.0) 3 PUMP LIMIT (41.89, 87.4) (49.04, 79.3) 80 70 (41.89, 67.2) ffi

                                           =

E60 g UHACGEPTABLE frEo UHACCEPTABLE OPERATIOH

  • OPERATIOH o

IJJ E40 tr ACCEPTABLE E OPERATIOH c FOR SPECIFIED

                                            $30                     RC
                                           &                      PUMP o

u20 comBrHATroH fl 10 70 50 .40 20 -10 0 10 20 30 40 50 60 70 80 AXIAL FOV\JIffi TAALAI{CE Oh Required Measured 4 Pumo 3 Pumo Pumps Reactor Coolant FIow to Hnsue Potver I'legatite Positiw Power l',legatite Fositha Lewl lmbalance lmbalance Lewl lmbalance lmbelance Ooenatim Flow, oom Comoliance. oom 1{0.2 -44.03 32.32 90-0 .*4"93 32.32 4 380.000 389.500 49-04 99.5 -{S,04 79.3 3 283.8S0 290.957 a7.4 -4S.04 41.89 67.2 4S-04 41.8S 0.0 -49.04 41.89 0.0 49.04 41.89

Davis-Besse Cycle 21 COLR Page 6 ot 27 Revision 0 Table 1 Shutdown Margin Requirements for Davis-Besse, CycJe 21 Verify SHUTDOWN MARGIN per the table below. REQUIRED SHUTDOWN TECHNI CAL SPECI FICATIONS APPLICABILITY MARGIN REFERENCE MODE 1

  • E 1 %Aldk ** 3.1 .4, 3.1 .5 MODE 2
  • E 1 ToAk/k 3.1 .4. S.1 .5, 3.3.9 MODE 3 e 1 %AUk 3.1 .1 . 3.3.9 MODE 4 E 1 %Aldk 3.1.1, 3.3.9 MODE 5 r 1 %aldk 3.1 .1 , 3.3.9 MODE 1 PHYSICS TESTS
                                              > 1 %aldk                                3.1 .8 Exceptions **

MODE 2 PHYSIGS TESTS E 1 o/oAlu[( s.1 .9 Excentions

  • The required Shutdown Margin capability of 1 %Alr/k in MODE 1 and MODE 2 is preserued by the Regulating Rod lnsertion Limits specified in Figures 2a through 2d as required by Technical Specilication 3.2.1.
  • " Entry into Mode 1 Physics Tests Exceptions is not supported by existing analyses. For example, Regulating Rod Shutdown Margin lnsertion Limits assumptions may not be met and as such requires actual shutdown margin to be > 1 %Aldk via alternate verification or calculation,
      • For the period from 0 to 300 EFPD and for power levels 60 %FP and above, rod insertion limits are established that re$erve an additional 0.5 %Aldk required rod worth to accommodate the future implementation of an update to the SBLOCA model.

Davis-Besse Cycle 21 COLR Page 7 of 27 Revision 0 Table 2 Moderator Temperature Coefficient Limit for Davis-Besse, Cycle 21 These limits are refened to by Technical Specifications 3.1.3

1. Lower Lir:rrit:

MTC at HFP e -3.729x1O4 Akfld"F (-37.29 pcmfF)

2. The following Uoper Limits mav not be exceeded without pfior NR.C approval:

MTC <0.9 x 1e4 Ak/ldoF uv{ren Thermal Power <95% RTP MTC <0.0 x 104 Ak/ldoF when Thermal Power I95% RTP 3, The followino Uooer Limits mav no! Fe excFpded for oJceration in Modes 1 -and 2: 1.0E-O4 g.0E-05 {., rr-r4---rr-E g C' 8.0E-05 I IL li-o  ! o 7.0E-05 u o 6.0E-05 E{

   =il LrJ trt o.s 5.0E-05 I

L \.j o I 4.0E-05 F i I L I o {ra 3.0E-05 I +

                                                                     ----1?---!,r,,  ,!----4-r-rrr (E

l-o E 2.0E-05 "i-o I I E I t I 1.08-05 0.0E+00 0 20 40 60 80 100 Percent Full Power

Davis-Besse Cycle 21 COLR Page I of 27 Revision 0 Tahle 3 Absolute Position lndicator (APl) / Relative Position lndicator (RPl) Agreement Limit for Davis-Besse, Gycle 21 This limit is referred to by Technical $pecifications 3.1.7 The absolute position indicator channels and the relative position indicator channels agree within 3.00%.

Davis-Besse Cycle 21 COLR Page I of 27 Revision 0 Figure 2a Regulating Group Position Operating Limits 0 to 300 +10 EFPD, Four RC Pumps Dails-Besse 1, Cycle 21 This Figurc is refiened to by Technical Specifications 3.2.1 110 fr-ffi fIt II-I] T-fI III_II_TI ffiffi

                                                                                                                           ]

TTI IIII 100 ffiffiffi E 90  !

                      !I t_..1 ffi      ffi                                                                                    fT tlft ffi Unacceptable ffiffi Operation fr80 I E

870 E ffi ffi [J]-I ITIIT IT Tf] gperaton d I E E tr Rstfictcd E60 fTTTTl Fffi ffi E $htildown ff50 F Haryin Limit fr40  ! ffi I E TrT]'rT_l-f EE E fII- tTl ffi ffiffi TT T ] tr ffiffi E o Acceptable ffi ffi T [Tl-T-gH30 Operaton t-.,1 tITIIIIIfI fIfIIfI T] t-T-f-rP'n IE H tr I tr H2a ffi T] I ffi ffi H ffi o- fII II-mt m ffi# 0 E 1

                                                                                                                                    !t 0

02550 75 100 125 150 175 200 225 zffi 275 300 Rod lndex, o6Withdrawn GroupS Group 6 1 Group 7 Itlote 1: A Rod Group overlapof 25+l- 60/0 between sequentialw ithdra,vn groups Sand 6, ard 6 and 7, shall bennintained. hlote 2: hstrurrBnt error is accounted for in these Operating Linits. i.lote 3: It/laxim.rm plotted powerlevelb 100.37%RTP. SDM Limit RlLimit Poucr RI Porcr RI lo0-37 185.70 100.37 300.00 58.00 118.50 100.37 277.40 33.00 4S.50 s0.m 266.50 6.30 0.00 78.OO 251-50 58.O0 246.50 33.00 48.50 6.30 0.00

Davis-Besse Cycle 21 COLR Page 10 of 27 Revision 0 Figure 2b Regulating Group Position Operating Umits After 300 +10 EFPD, Four RC Pumps Dar,is-Besse 1, Cycle2l This Figure is reftned to by Technical Specifcilions 3.2.1 110 TITII IITI I IIIIIIII I rrrrtrlr IIIIIIIIIIITIII IIIIIIIIIIIIII: IIIII IIIII rIII IITI r TIITIIII 100 IIIIITIIIIIIIII IITTIIIIIIITTIT IIIIIII:ITITI:I IIIII TIIII IIIII IIII IIII rrtl r I IIIITIIT IIIITIIT I IlIIIIlTi I IIIII IIIIIIIITIITIII ITIII IIII t TIIIII'I IIIIITTITTIIIII rIITI IIII I IIIIIIrII IIITIIITTIIIITI ITIII IIII I ITIIITII 90 TIII rtt I IIITIIII I IIIIZITT

ITI IIII I ITT'IIIT Unacce ptable IIII I II'IIIII a IIII IIII II7/IIIITI I'TIITII IIII IITT rtr Oponation ffi80 IIITI:ITTTTIIIIITIIIITII IITITTI Operation Re#icted IIIIII-/IIIIIII 7/IIIIIIIIITTIII E IIITII-IIIIT:TIIITIT IIIIIII:IIIIIITIIIII III III ITIIII TITTIIIIIIIIII IIIIIIII 870 IIIITIIIIIIIITTIIITI IIIfIIIIITIIIIIIIIII III III IIIII]IIIII:II I:IIfTIIIIIIII J IIITIIIIIIIITIIIIIII III IIIi!II IlIllfrIIIlItlI TIITITITIIfITTIIIITI I I I lI I I I rrlI II7/ I rl I I I I I I tl I I I I I I I I IIIIIIIIIIIIITTIITII ITIITIITIIIII'IIIIIIITITIIIIITIII IIIIITT:IIIT:ITIIIIT IIIITIIIIITIIII I !IIIIIIIII IIITII E60 rIII rTII rTIT ITIT IIIITIIIII'/IIII IIIIIIIII,.!III ITIIIITIIT/II I i.IIIIIIIT T ITITZ'II IIT I IIIZIIII ITIIIT TTIIII IITIII E IIII IIIT IITIIIIII'IIIIII I rratrrrr IIIIII IIIT rITI IIIIIITT'ITIIII I IIIIII ff50 I!II IIII $hutdown IIII IIITII!!7/IIIII' IIrrr===-rrttlltlltrrzrrl '.IIItrIIllrlt z IIT I rIIII IIITII
                                                                                                                                          !rrlrt rIII    I                                    IIIrIIII           I'TTII'/IIII'III                 III IIIII            IITIII ITIT I I ITII I I tlalgin               IIIIIIII IIITIIII TTIITI,lITIZIIII ITITIf,IIT?rIIIII III IIIII III rTIII TITIIT IIIIII fr40        IIIT I I IIII    !I Limit               ITIIIIII TITIIIIT ITIIITII'AIIIIII tlrrftz.lrrrllr                  III IIIII            IIIIII E          I'II    II                                   IIITITIT           II}IIIZIIITIIT o          IIIT IIIT I I t I IIIIIIIITIIITI                   IIIIIIIIITIf.

Ilrr tlltrar IIITT IIIIT Acoeptable IIT rtl H30 (L IIII IIITI II I taE IIII zaaIIII rITII rIIII Operaton llr III IIIII I ITI IIII ITIII III rII IIII IIIII III IIIII I rrr TIII rIITI IIIII r rrr ITITT I Hzo o-IIIII IIIIT I I I trIr IIIII III IIII IIIII TIIITIIIITTTIII IITITIIIIIIIIIT I rII rIII IIIIT ITIIIITIIIIIIII rIIII IIIII IIIII ITTII T IITII I r ITI IIII rTIII ITITIIIITIIIIII rrrrr 0 t IITI . IIII I't I ITT IIII rITII IIIIIIIIII!IITI I rrl IIIT IIIII IITII 1 I ajTa I ZIII I r r IIIIIIITTITTIII III IIII ITTII TTTIITITITIITTI ITIII I IIII I rrrt I rrrr III I'I IIII IIII 0 0 25 s0 75 100 125 150 175 200 225 250 275 300 Rod lndex, %Withdrawn 1 Group 5 7 1 p 1 GroupT lbte 1 : A Rod C*oup overlap of 25 +l- 5o/o betw een sequentialw lthdrarn groups 5 and 6, and 6 and 7, shall be nsintained, l*,lote 2: hstrunent enor is accounted for in these Operating Linits, l*lote 3: hlhximrm plotted powerlevelb 100.37%RIP. SDM Limit RI Llmlt Poumr R1 Porver RI 1m.37 260.80 100.37 300.00 58.00 191.50 100.37 277.40 33.00 165.50 90.00 266.S) 3.00 0.00 78.00 251.50 58.00 246.50 33.00 185.50 3.O0 0.00

Davis-Besse Cycle 21 COLR Page 11 of 27 Revision 0 Figure 2c Regulating Gmup Position Oper:ating Umits 0 to300 +10 EFPD, Three RC Pumpe Dais-Besse 1, Cycle 21 This Figure is refuned to by Technical Specifcations 3.2.1 110 I IIIIIITIII rrrrrtrrrtrrIIII ITIIIII IIIIIIIIIITIII:II TITIIIITITIITTIIT IITII IIIII I I III IIIIIII ITII IIIITIIIIIIIIIIII IIIIT I I rll IIIIIII ITII IIITIIIIITTIIIIII IIIIT I I rrr llllrrr IIII IIIIIIIIITITIIIII ITIII 100 I I rtt T T III rrlrtrr ITIIIII lrll IIII IIITTIIIITIITIII! ITIIIIITIIITIIIII IIITI rIIII T I rrt ITIIIIIIIIIIIIITI IIITI I III ITTTII TITTTIIIITIIIT TIITIITIIITI::III TIT!I 90 I III rlttrr IIIIIIIIIIIIIT IIIIIIITTIITITIII IIIII I Itt TTTITIIIII IIIIITIIIIITIIIII IIITI I rII TITIITIIITIIII III IITII T III IITIIIITTTIIIIIII I TTI r TTIIITIIIIIIIII:T TTIIIIIIIIIIITITI TIIII IIITI s80 III I III I III rII]IIIITIII rfII IITTTIIIIIIIIIIIT IIITITIITIIIIIIII ITITI rIIIT hirrl B I rtI II./IIIIIIIIIIIIII Bto rrr I ITII I I rI t Unacceptable Operation I' IT IIIIITITITITI TIITTIIIIIITIIIIT 7/IIIIIIIIIIITTTTI TIITIIIITTIIIT III TIIII I I7/TITIIIITIIIIIIIII IITTTIIITIIIIIITIIIIITII E60 IJJ IfII II II II Shutdown II OperEtion E II TITTTTIIIIIII ilaryin Re*ricftd ft50 F Limit II I! TIIII:TIIIIIIIIIITIIIII I I IIIITIIII I IIII'IITI IIIIITIIIIIIIITTII II ITT I IIIITIIII IIITIIIIIII IIII a2'ta ITIIIIII:IIITTIIIT rrrrrrrrrtrrlrrtlr II rt! r II IIT Irrtlrrl

                                                                                                                               -iTITIII E40                      I I

IIITIIIIIII IIIIIII,I}.7 Ttlll IITIIIIIIIIITIIIII IIII tlIIIrIlrlrIr!==aa Z= -II = TT I IIIITIIT rI I IIIIIII'2,I IIIT IIIIIIIII!!EITTIIII II IIII II E o I I rrrrlrtalrl IIIIIZIIITT Itrrrlrrl=.rt:I 1I'I.=-AIIIIIIII II ITII II IIIT IT II H30 r aaaP-laallr= III IITIII II II IIII ll s l)rtl))-t-aIf t1'/-=laaJrrrr IIIIIIITTIT

                                                              =-lI III IIITII IIII ITII rII IIIIII II II II IIII II rtll II II gzo                       TTIIITTIIII IIIIIIIIITI IIII IIII rII ITIIII rtr IIIIIIITIITIIII TIIIIT II rrl                       IIII o                         TIIIIIIIIII                 I IITIIITIIIIII                    I               Acceptable (L                                                     I IITIIITIIIIII                    I ltlrlrrlll IrIIITIII ITIIII rI IIIIII IIIIII TIIIII tI rrrrfrrrltltr IITIITIIIIIII rI                Operation          :IIITTI IIIIIII 1 0    TrIIrIrlt            II IIIIIT            I IIIITIIITITII                    I
                     .:IIIIII             II ITTIII            I TIIITTIIIIIIT                    I                 IIITIT TIIIIIII             II TIIIII            I IIIITIIIIIITI                    I IIIIIITI 0    IIIITIII II IIIIII II IIIITT            r I                                  I 0 25 50 75                                        100 125 150 175 200 225 250 275                                                       300 Rod lndex, odWithdnavun 1

GroupS 7 up 1 GrouP 7 lrlote 1: A Rod Group overhp of 25 +/- 506 between sequentialw ithdrarvn groups 5 and 6, and 6 and 7, shall be nnintained. l-lote 2: hstruncnt enorb acccnrnted forintheseOperating Lirits. l{ote 3: l\Iaxim;m plotted po\r, er levelb 75,37 or6RTP. SD[i Limit Rl Limit Po*er RI Povrrer RI 75.37 '147.30 75.37 300.00 43.10 102.50 75.37 278"10 24.20 32.50 67.00 ?66.50 4.00 0.00 58.00 251.50 d3.00 248.50 24.20 32.50 4.OO 0.00

Davis-Besse Cycle 21 COLR Page 12 at 27 Revision 0 Figure 2d Regulating Group Position Operating Limits Ater 300 +10 EFPD, Three RC Pumps Daris-Besse 1, Cycle 21 This Figure is reftned toby Technical Specifcations 3,2.1 ffi ffi ffi ffi 110 fT-rrrT-ll ffi ffi ffi fT-TT fII] 100 E I ffi ilt tr g0 FI IE fT l Tflrl_ll F n ffi IE ffi ffi80 E IE 8to ts II fT IT] ffi ffi Unacceptable Operation ffi d fll IT IT] Operation I t_r.-fr.l Resfricbd E fT-l E60 ffi I rr.f: E t IJJ ffi ffi I H t.l F ft50 E I'l I tr II ffi E ffi t- Shutdowrt E ffi ffi FffiI+]i LI F rfll H ffi ffi ffiffi iilaruln l'l ll u E40 tr Limit LJ E E E o ffiffi L] fr E I T tl ffi ffi EE ffi m E Ll I H30 t2 E ffi ffi E. H tr E Accephhle gzo !I ET H ffi Operafron ffiffiffi+ffiffiIffi ffi o o-I l...] I ffi fT rrl rt Tt 1 0 I I TIT] TT T III,T: 0 E ffi trtrIJI 0 ?5 50 75 100 125 150 175 200 225 250 275 300 Rod lndex, %Withdrarn 1

                   &oup 5                                                                                         1 Group GrouP 7 i,lotel: ARodGroupoverlapof2S+/-5%betweensequentialwithdranrngroupssard6,andGandT,shallbermintained, l-'lote 2: hstrunrent error is accounted for inthese Operathg Linits.

Itlote 3; It/axim.rm plotted power bvelb 75.37 %RIP. SDM Limit RlLimlt Porer R1 Pouer RI 75.37 2't8.50 75.!7 300.0o

                                           /+3.10     185.50                              75,.t7      278.10 24.20      104.50                             87.00        266.50 1.90        0.00                              58.O0       251.50 43.O0        246.50 24.fr       104.50 1.90        0.00

Davis-Besse Cycle 21 COLR Page 13 of 27 Revision 0 Figure 3 APSR Position Operating Limits for Davis-Besse, Cycle 21 This Figure is referred to by Technical Specificatione 9.2.2 Before APSR Pull: 0 EFPD to 630 t l0 EFPD, Three or Four RC pumps operation* Lower Limit 0 YoWD Upper Limit 100 o/oWD After AFSR Pull: 630 t l0 EFPD to End-of-Cycle Three or Four RC ouFps operatio_n* lnsertion Prohibited (maintain e 99%WD) **

  • Power restricted to 75.37% for 3-pump operation, however, steam generator analyses limits power to 73.46 %RTP.

rt* Reinsertion is allowed only during the end of cycle shutdown when the reactor power is equal to, or less than, 30%RTP.

Davis-Besse Cycle 21 COLR Page 14 of 27 Revision 0 Figure 4a A)OAL POWER IMBALANCE Operating Limits 0 to 200 t 10 EFPD, Four RC Pumps DaUs-Besse 1, Cycle2l This Figure is rebned to by Technical Specification 3.2.3 rr I I I Redricbd Re*icbd I I Region Reglon IT tI IIIIIIT IIII IIITIII IIIT IIIT IITIIIT IITIIT IIII IIIIIII IIIIII rIII IITIITI TIIIIT IIII II IIIIIII IIIIII IIIT II TTITIIT IIIITI IITI IIII II IITIIIT TTIIII IIII IIII \II IIITIII IITIII ITIIIIIIIII lIi IIITII IITIIIIIIII III IIITII IIIITIIIIII rl'l IIIITI ITIITIIITII IIITIIIIIII rl' II. rltrrr ITIIIT IIIIIITIIIT TIIITI IIIIITIIITI A E, TTIIII IIIIITIIIII ut TITIITIIITIII TTIIIIIIIII ITITIIITIITII IIIIIIIIIII o= IIIITIITTTIII lrr rlI o- IIITIII IIIITI IIIIIII rrrllr J III IIII IITTTII III II III III IIII IITT IIIIIII rrr rrr IIII rII IITI t=r Pemirdble ITI II IIIT III IITT IJJ Operadng III II rITI III ITII E IIIIIITIIT II IIII ITII rII III IIII rIII o Reglon IIITIIIIII IITIIIIITI rr II t F Itr UJ rITI IIIIIII IITTIII II II IIII IIIITII III IIIIIII II II IITIITI III ITI IIII II II TITIIII b o III III IITT II rI IIIIIII E III IIT IIII II II TIIIITI III ITI IIII II II IITI IIIITII o II! III IITI II rI ttlr rI II 3' IIII ITIIIII o E IIII IITIIIT \/ o- ITII II II IIIIITI IIII II II II IT IIII II rr IIIIIII IIII tlr 3 III trr IIIIII II o- III III IITIII II 0 -50 .10 20 -10 0 10 20 30 40 50 60 NOAL POWERIMBA]ANCE % LrcE\D NoE 1 : lnshJment enor is accombd 6r ln these Operdin g Limib. RT.L TWRE Nob 2: The Ercore lmbalance Operating Limits are awilable br usewhen the Full lnorc sltbm is non-functional D(@RE Nob 3: llbximum plotbd powerleral is 100.37 %RTP. ----- lserull Poclthp NcA.thr Porlthe Pornr lthrlj6m Powcr lmhllanan {oo-37 17 t5-98 4;2 8.69 92_oo t t 23-94 92.OO -'lE2-16 16-34 80-oo OO 30.It6 -2E-9,1 6(,-m .E7.m 31-OO 60.oo 5..t8 o-oo .37 rXt 31 Il0 o-rxl _?5,49 Iarriln

Davis-Besse Cycle 21 COLR Page 15 of 27 Revision 0 Figure 4b NXIAL POWER IMBALANGE orrating Umits t t 200 10 EFPDto 450 10 EFPD, Four RC Pumpg DaUs-Besse 1, Cycle2l This Figure is retsned to by Tehnicat Specification 3.2.3 1 IIIIITITII ITTITTI IIIIIII IIIIIIIITT IIIITII TIIIIII IIIIIIIITT IITIITI IIIIIIITIIIITI IIIIITIIITI IIIITIIITIII II IIIT rrll IITIIII IIIIIIIITIIIII IIIITIIIII' III=, TFTIIITT IIIIIII IIITIIIITTIITI IIIITIIIIIT IIITIIIIILI rrT.lllllrrrrt I/IIIIIIITI I Irlt III I ,tlI\ III IITII IIIII ReSicbd IIIIIII'7 17,)TIIIIITII I r III rr If Re!ilicbd IITII Irrlllra'tll kglon If IIIIITtfll 'I T"ITIIITIII I f r.'!II III IIIII rlIlftlllrIrl r r:tt I\ rIrt Reglon IIIII II rrlT a,a/, IIIIITI IIIIT I lr\r r\llI TIIII II IIITIIJ I IIIIIIIIIIII I III rr I.\ II IIIIT II llT.lll'/a IIIIIIIIIIII I IITIII IIII III IIIIIITTIIII rI af allr,rr IIITIIIIIIII I ITIII I IIr\I ITI IITIIIIIIIII II l'/al? lta IITIr'IIIIIII t IIIIIT.l III.\ III IITITIIIIIII II III IIIIII , IfILlll IIIIIrrirlf lf I IIIII: tlll rlr IIIIITIIIITI II III ITIIIT I I'II IIII IIIITIIIIIII I IIIIIT r\IIl III IIIIIII IIIII II IIT TIIIII III' IIIIIIITTTIITIII I IIIIII I Irr III IIITTIITIITI II III TIIIII II ITIIIIIIIIIII TII III I IITIII I,III III IITTIIITIIII rI III ITITII III IIIIIIIIIE lIIIIIIIIITIII II'II III TTITIIIIIIII III IIIII' I I' T IIIIIII II}IIII IITITI I I TI IT IT III IIIIIIIIIIII III IIlIlT, I I'/I IITITIIIII IIIIT!IIII ITI Irltl III IIIIIITIIIII III II'IIIJ IA IIITIIIITITIIII IIIII III IIII trr ITIITIIIIIII III lf lIITIII IIII IITIT IIIIII III II III III\t .III Ilr IITITTIIIIII rrt III 17rII7 lfl II rtl IIITII TII II II IIII TII II e IIIIIIIIII III}. II I IIII lrt IIIIIIIITII IITIIIITIIT llrl ltr IITIITIIIII rtr II IIIT TII IT III II ITII TIT II IU IITITIIIII IIIIITIITI IT I ITIT trt IIIIIITIIII IT I ITII III II IIII III II IIII ITI II o II I IIII III IIIIIIIIIITI II lrlr II II IITI III IT = o- II I IIII trr IIIIITITIIIT II IIII II II IIII III II II IIIITI ITI II IIIT II II IIII III II J t IIITII rrl II rrII rI II IIII IIT II I !IIIII rrI II ITII II Ir tlrr rtl II I Pemisdble IIIIII III rr IIIT II lr lrrr rtl II II TTIIIII II IIII t=r IU lrr I I Operating IITI ITI IITIII rrr IIIIII rI IIITIII II IIIIIII II IIII rl rltr F III I o III I Reglon IIIIII rrr IIIIII IIIIIT rIr IITTII II IIIIIII II IIIITIT IIIIII II IIII IU F lrr rlr IIIIII ITIIIT IT IIIIIII II IITI fr IIII III ITII rrI IIIIII IIITII II IIIIIII II IIIIIII II IIIITII II IIII r1 lrlr II IIII rrt III b TII III IIIII rIIIT ITII rrt IIIIII IIII III IIITIT II IIIIIII II IIII E IITII IIII III rrrrtr II IITIIIT II IIII III IIII IIITT II rIII III TIIIII rI IIITIII II IIIIIII II IIII tt !III rII rII e o rrt III IIII IIIII II IIII III IIIIII IIII IIIII II IIIT lrl IITIII TI IIIIIII III rtlr rtr \, o-IIIII It IIIIITI ITIIIT II IIIIIII III tlrr ITI IIIII II IIIIIII ITIIII II TIIIIIT trt IIII IITI *o- IIIII II TIIIIII TIIIII II IIIIIII III IIIIT rt ITTITII ITIIII II TITITII lrr trrr 0 -50 .{0 20 -10 0 10 20 30 40 50 60 00/AL POWERIMBALANCE % LrcE}{) Nob I : lnstrum ent enor is accombd br n $cee Operding Limlb. i RII- TtrRE Nob 2: The E:corc lmbdane Operaling Limib an awilable lbruse when tte Full lncoe slBbm is non-fundional. *** Nob 3: tlaximum plotbdpouorlewl is 100.37%RTP.

                                                                                                                             ---t-
                                       !{cgrthp      Palthr Porucr    lmbalarrcc fnbdencc

{oo_3l7 48,^A 13 27

                                         -2f2-21      2'l_lB 80_oo        90       2A_27 60-oo        OO o-m          OO       31-m

Davis-Besse Cycle 21 COLR Page 16 of 27 Revision 0 Figure 4c N&AL POWER IMBALANCE Operating Limits 450 t 10 EFPD to EOC, Four RC Pumps Da$sesse 1, Cycle?l This Figure is reEned to by Technical Specifcation 3.2.3 IITITIIIIIIIIIII I III I IIIIIIT II I t rrI I IITITII 1 I TIIITITTIIII III II r II I IIIIIIIIIIIII IIT I rII I ITTIIII II t rr TI I IITITI TIIIIIIITI I IIITIIITIIIIIIIF I III r IIIIIII I rrzl I TlIIIITI II I IT r I TITIITIf I I I INIIIII II I IIIIIIITI I T Ili\f III rI ReSlGtd I f If IIlT,ll I \\ IIIIIII II ResfiGtd I IIII'7 I I TII\'III II IT Region I TIIIIZII'"J I I i'ItIr\II II Region II I IrIlT,ala'/ I I I.\IIIII rI I aaal rrlTt r I rIIII\\I II III I rII/IIIIIIIIIIII I III I lrIrrl,\ rI I IIIIIITT rI III r IIT lItTtlllIIIIII I III I III.IIII tr I IIIIIIII IIIIT II IIT I ra /aa; rrrlrrlhtr I III r IIT}.TII \\I I IIIIIIII ITIII I lrr I IlIlrllI T II II III r IT,IIItrIf IIf f lililI II I IIIIIITI ITI III rrr I I'III' IIITIIIIIII IIT rrr I ITI I rlrll rI Iil I TIIITIII IIT rrt II I III I IIIIl'II II I IIIIIITI II t IIT I ,IITT,IIIIIIITIII IT I III I TrIII'IIIIIIIIf III I III I ITIII\II II r ITIIIIII III III II rl rrr r TITTITITII III'IIITT IIIEIII IIT 7,/TII rrrllilr I III I IIIIII T II I IIITIIII I III I IIIIII I II ,l IIIIIIII rrr III III IT ltr IIIIII TIIIIII r rrr t TIIIII\t II I' IIIIIIII ITI II IIII ITTII' IIIT ITIIII I III I IITIIIT II I IIITIITI III III rI IIIT IIIII// III'IITTIII I III r IIIIIII ,lI I TIIIIIII rlr III rIII rlraa rtaT, I III I IIIIIII L'I I IIIIIIIII III IIT II I I ITIIITII III rrt II II IITI IIIIT IIII I III I IIIIIIT II IIII rIIII IIII I III I TITITII II I ! lIIITTII III rlI A II r I ITITIITI IIT III OL IT rIII IIIII IIII ut I III I IIIITII II IITI IIIIT IIII I III I IIIIITI II I I IIIIIIII rII III II IIII IIIII ITII o I III T II I I IIIIIIII III III rr II IIII IIIII IITI rIII IrlII IIII

                                                     =

o- r trr I III I IT r I IIIIIIII II I I ITITIITI rrr ITI II IIII IIIII IIII J I I IIITTIITI III Irt rI IITI IIIII IITI I III III rrrt IIIIT TIII I r rrrrtlrl III rll I I IIIIIIIT II t=r I Pemisible II ITII IIIII IIII lll I I I IIITIIII III rrl II IIII IIIII IIII TIIIIII I OperaUng I trltrtlr ITI III IT IIII IIIIT TIII IIIIIIT F r I IIIIIIII III III II IITI IIIII IIIT IIIIIII o I Region I IITIIIIT III :IT II ITII ITIIT IIIT IIIIIII I I IIIIIIIT III IT IIII ITTII IITT IIIIITI H I I IIITIIIT trI II IIII IIIII TIII IIIIIII I ITII II  ! ITIIITII trr IIII IIIII IIIT IIIITII tr I ITIITIII rrr II I ITII II I IIIITIII III IIII IIIII TTTI IIIIIIT IIII IIITI IITI IIIIIIT b I III IIIT II I III TIII III I IIIIIIII III rII IIII IIIII IIIT lttlrlt E I rII ITII III I ITIIIIII III rIr

                                                      .J rIII IIIII IIII                          o rII  I III                            I IIIIIIII   III IIT rIII IIIII IIII                          e rII  I III                            I IIITIIII   III III r rrrlrtlr III III o

rlrrl lllt \, o- III I III IIIII IIIT T III I IIIITT IIIIII IIIII IITI I III I IIIIIITI IIIITI IITII TIII 3 IIIT IIIII IIII IIII o- IIII 0 0 .{0 2O -10 0 10 20 30 40 50 60 A)ML POWER IMBAI.ANCE % LEGE\I) NoE 1 : lnstum srt enor is accotnbd 6r in these Operding Limlts. FI.'.1 TOORE Nob 2: The Ercore lmbalane Operating LimiB arc amilable lbr use when he Full lncorc sysbm is non-fundional. D(MRE Nob 3: ilbximum plotbd powerlewl is 1 00.37 o6RTP.

                                                                                                             ---)-

Ercorr lgertnp Pclthp Pounr Lnhdlrcr Lnbdmcr 100-37 .7-93 5-49 92-OO 5O 10-s 80-oo 68 t8-35

                                                                                -2t-35        25-tr) o.m        -28.35        25..CO

Davis-Besse Cycle 21 COLR Page 17 of 27 Revision 0 Figure 4d AXAL POWER IMBALANCE Operating Limits 0 to 200 t 10 EFPD, Three RC Pumps Daris-Besse 1, Cycle?l This Figure is reEned to by Technical Specification 3.2.3 1 IITI I IIIT I ITIIIIIIIIT II IIIIIIIIITIII I IIII IITIITI IIIIIII IIIITII I ITTIIIIIIII IIIIIIIIIIT IT IIIIITIIIIIIT r IIII IIIIIII I IIIIII I TTIIII II TIIIIZ'ThIITIII I IIII IIIIIITI TIIIIITIIIIIT IIIIITITIII IT TIIITI}IflIIIII I ITIIIITIII IITTTIIII IIIITI IIIIIIIIIII II IITIITIITTIII I TIIIITIIIT IIIITIIIT IIIIIT IITIII IITIITIIIII II IIITIIIIIIIII I IIIIIIIIII IIIIIIIII IIIIII IIIIII IITIII IIIIIIIITII rt ITTIIEilIIIIT TIIITIIIIIITI I IIIIIITIII I IIIITIIIII IIIIIIIII IIIIII III IIIITT TIIIII ITIIIEl;'IIIII I IIIIIIIITI III IIITII IIIIII IIIIIIIIITIII I IITIIIITII IIT IIIIII IIIIII IIIIIIITTIIII rr IIIIIIIIII IIIIIIIIIT III IIITII III IIIIII IIIIII IIIIIIIIIITIT IIIIII IIII ITTIIIIITI IITIIFiIIIIII I IIIITIIIII IIIIII IITITI IIII IIITIITTII IIIITHIIIII I IIIIIIIIII IIIIII IITIII IIIIII IIII IIIIITIIII ITII IIITII';=;  !!rrr!!!!!!!! ! IIIIIITIII IIIIIT TITIII II IIIII)'/IIZ .IITIIIIITITI r..-.IIIIIIITIT t;

                                                                                        =;;ITTIIII I }IIIIIIIII                                  IITIII II Redrlcbd IIIIZ                     TIIITEilTTTII I IIIITIIIII                                        Regfied TTIIII II Reglon aalT.aL?.al II IIIITI}IIITIIT "IT,J IIIIIITIIIIII JAT,Irl I  IIIt I IIIIII\

IIIIII III Reglon IIIIIT IITITI rr IIIIIII artt'! ITITIIIIIIIIT IIII lTtf,If2ltII IIIITIIIIIIII I IIITIII.III I IIITI}TI'IT III IIIIIII IIII 7,alJlrIIIIf I III I IIIIII} i II ITITII III IIIIIII IITI IIIIf I III I ItIIIIlrt\lI IIIIII ITI rrlrllr IITI I IIITTIIIIII A III trI I IITIIIIIT I IIITII III TIITII IITIIII IIII r trr rrtrrrl 'ITIII E, III III I IIIITIII,I I IIIIII III IITIII III I rr rrrrll l',1 IIIITI III TTIITI UJ IIIIIII IIII IIITI 3 IITITII rITI llr'/I o rII I IIIITIIII IIIIIT III TIIIII IIIIIII IIII II'TI o- III I IIIIIIIII\ IIIITI ttr TIIIII IIIIIII IIIT IITIII I I III III IIT IIIIII IIIIIIT IIII I!TII J I Ir ;TI lrr IIT IIIITI IITIIII IIII IIIII III I II rtI IIT ITI ITIIII ITIIIII IIII IIIII III u

                                                                =           I Permidble                    II rlI III III IIITTI TTIIIII IITT I I rrllrrlrl                            IU          I                              tt III rII III IIITII ITTIIIT ITII I I IIIIITIII                                  III I                                rt   ITITIIIIIIITIII IIITTII IIII I I IIITIIIII IIII r r ltrllltll E rTI I OperaUng Region             ]    ITIIIITIIIIIIII ll IIIIITTTIITITII IIIIIII TITIITT IIII r r rrrrtrrrl o                                          II IIIIIITIIIIIIII IIIIIII     IIII I I IIIIIIIII                        F UJ rl IIIITI!IIIITIII IIIIITI IIIT IIIII                                    fi    IIIIIIIIII            IIIIIII        II IITIITIIIITIIII IITITII IITT IITII                                          IIITIIIIII            I IIIIIT II IIIIIIIIIIIIIII IIIIIII     IITI ll llr                               b             III IIIIIIIII                rt IIIITTIIIIIIITT IIIIIII     IIIT ll tlr                               j co          III IIIIIIIII                II IIIIIIIIIIIIIIT IIITIIT IIII ll                                                     III IIIIIIIII                II IITIITTITIIIIII IIIIIII     IIII ll                                                 III IIIIITIIT II IITIITTTIIITIII IIIIIII     rrlr il IITIIII ITTI ll e

o III ITIIIIIII tr IIITIIIIIITIIII ITTIIITTT II IIIIIITIIIIIITI TIIIIII IIIT ll \/L o-IIIIIITII ltII IIITITTIIIITTTI IIII II IIIIIITII IIIIIITIIIIIITI IIII il IIIIIITII ll IIITIIITIIIIITI III rIII ll $ TIIIIIIIT lt IIIITIIITIIIIII III IITI il o-III IIII t! 0 40 20 -10 0 10 N 30 & 50 60 A)(IAL POWERIMBALANCE % LEGEI\D Nob 1: lnstrumgrtemoris amurbd brin heee Operating Limits. R'.L ]SORE Nob 2: The E:oorc lmbalaneOperating Limitsarearailablebrusewhenhe Full lncore sysbm is non-fundional. -D(@RE NoE 3: ilaximum plotbd powerlercl is 75.37 %RTP.

                                                                                                                                 --)-

hlcgtrthl Pcltlp Pomr tnbCmca 75-17 29 9-54 69-OO -22^gl 77 _17 60-oo -29.-55 2..-57 45-OO 80 3t-m o-oo 80 31-m

Davi+Besse Cycle 21 COLR Page 18 of 27 Revision 0 Figure 4e A)0AL POWER IMBAI-ANCE Operatirrg Limits t t 200 10 EFPDto 450 10 EFPD, Three RC Pumps Dails-Besse 1, Cycle?l This Figure is refiened to by Technical Specification 3.2.3 Restrlcbd Resfricbd Region Reglon J

                                                   =

0c UJ Permisdble OperaUng E Reglon o lrl tE]- 3 o-0 -50 40 20 -10 0 10 20 30 40 50 60 NO,AL POWERIMBALANCE % LreEI\D Nob 1 : Instumentenoris accoutbd br in these Operating Limib. Ft,.L }SOFE Note 2: The Ercorc lmbalaneOperating Limibarearailablebrusewhenhe Full lncore sysbm ie non-fu nclional. D(MRE Nob 3: lrlaximum plotbd powerlerel ig 75.37 oiRTP. Itsgtr$rt PosIthD Porr knbalarrce 75,_37 a-97 aae a9-oo 53 1a_a 80-oo -2f2-97 22-n 45^OO 13 30_57 o-oo .8O-13 30-57

Davis-Besse Cycle 21 COLR Page 19 of 27 Revision 0 Figure 4f I0XI/AL POWER IMBAI-ANCE Operating Limits 450 t 10 EFPD to EOC, Three RC Pumps Daris-Besse 1, Cycle?l This Figure is rebned to by Technical Specification 3.2.3 1 rrl III IIIII IIII IITIIIIIIII rTTII IIIT ITIIIIIIIII I III r rII IIIIII rTII TIITII rIII III IIIII IITI IIIIITIl}:rTT I IIT IITIII IIIT rrt III IIIII ITII IIIIIIII}III IIIII IIII rtlrrrltlrt I ITI I III IIIITI IIII IIrllI IIII I IIIIIITIIITIII IITIIIITIIIT IIITIII IITTI I IIIIIIITI IIITIIIIITIITIIIIIIIITII t IIIIIIIII I IITIIIIITTIIII IIIT II TIII II ITITI I I I lTil T I IIIIIIITT I IIITIIIIIIIIIT rTT ITI IITI II II I I I I I IT1III I TIITIIIII I IIIIIIITIIIIII IIIIIIIIIIIIIITIIITTTIIT I IIIIIIIII t IIIIITIIIIIIII TIITIIITIIIIIII IIIIIIITI I ITIIIIIII I IIIIIITIIIIITI IIIIIIIIIIIIIIIITIIIIIII t IIIIIITII I IIIIIIITITIIII IITIIIITTilT ITI I IT ITIIIIIIiII III t II lrr===-.==== !I: ITIIIIIIIII T II ReCrictd l)\/l)7,rrIII I tllTtallfiaf rll I =f IL. I I aII;tilI III t lr I rl J Rorlristd

                                                'tl)l' rrr                III I ts'I T Reglon          III tlrT,JlJ'l                           III t lN t t                           tugion III aaT.ala'/a III                       rII I II \\ \

TII IIIIII III Itr aT alITrII III IIT ITIIII III III J /'I;'.III rII I rI I I III I II r IIIITI III III il'f IIII A rII I II I TIITII rrI rI, lI,)7 TIIII t III r II I 7 IIIIII III ll/t IITIIIrI III I IT r IIIIII III ut ,,,T,IIIII IIII rrr I II I IITIII IIIIIIIIITIIII IU IITTII rII ITrI al'trrlrl o III

                                                               = f,lilr ITI II II
                                                                  }7;11                 I IIINIT\IIIIIIIIIIIIII IIIITI IIT Jtl aT,artrrr o-                                          II I ITIT III IIIIIIIIIIIII IIIIII lrI 7lal .IITIIII                                             II I                                 ITIII IIrITT IIf tlr .( lllrrrr                       J                    II I                                 ITIII IIIIII III rlr IITIII                                                                                     IIIII IIIIII IIT rII IIIIII                                                                                     rIIII rrr rrr IIITII      III III IIITII trt III
                                                               =

E, UJ Pemisdble IIITT II TIIII II III IIIIII rII rrr Operating E ITIII II III IIITII III III IIIITI rrl o rlrt tHtr Reglon II II IIIII IIIII III rrrrrr rrr H *lllr II rIIII III IIIIII III IIIIII III t III III III ITI trl III IIITII IIIIII IIIIII rII b III III III IIIIII III E III III III TIIIII III III III I II III IIIIII III o III lrr I tr III TTIIII lrr III III I II rrr TIIIII III trt IIIITI III III gB trr I III III t III III lrr III IIIIII ITI III L III I III III IIIIII rII trl 3 o ITI I rII TIIIIT III rII IIT I III IIIIII III ltr o- III I IITITI trr rrt rII I 0 -50 40 0 10 0 10 20 30 &5060 A)(AL POWERIMBAI.ANCE % LreB\D NoE 1 : lnsttrmentenor is acootnH lbrin these Operding Limib. Flt-L rsoRE Nob 2: The Erore lmbalanoe Operatng Limib ar a\ailable br usewhen the Full lncoo systsm is non-fundional. D(@RE Nob 3: lrlaximum plottsdpowerlepl is 75.37 %RTP. ----O-i.lcgrtlrc Poelthc ItlcAethr Podthc Porrcr lmh-l-.rr.- Poncr 75-37 -15..47 12-8r, 7A-A7 J-ao 333 ae oo ,l,l ^74 14, 1A.tn -rll-27

                                        -2e L2        259.                    30_oo        -2.,_29       14 97 a5-m        -36_tls                               a5-oo        -rR-68        2A-12 o-oo       -3a-05        3l      oo               o-oo        -?l,-8l8      2A-12

Davis-Besse Cycle 21 COLR Page 20 of 27 Revision 0 Table 4 QUADRANT POWER TILT Limits for Davis-Besse, Cycle 21 This Table is referred to by Technical Specifications 3.2.4 Frorn 0 EFPD to EOC Steady-state Limit Steady-state Limit QUADRANT for THERMAL for THERMAL POWER TILT as POWER E 60% POWER >60% Transient Lirnit Jtllaximum Limit measured by: (o/o) (%) (o/o) (Yol Symmetric lncore 7.90 4.45 10.03 20.00 Detector System

Davis-Besse Gycle 21 COLR Page 21 of 27 Revision 0 Table 5 Power Peaking Factors - Fo for Davis-Besse, Cycle 21 This Table is refened to by Technical Specifications 3.2.5 Heat Flux Hot Channel Factor Fo Fo shall be limited by the following relationships: Fo s LHRar* (Bu) / [LHftaw

  • Pl (for P s 1.0)
    ,-tlpattow  (Bu) = See the following tables LHRU*g = 6.4265 kwft at2817 tfArrtt for allfuel P                = ratio of THERII/IAL POWER / RATED THERMAL POWER (current fraction of power)

Bu = fuel bumup (MWd/mtU) Note: The measurd Fo ehall be increased by 1.4ilo to account for manufacturing tolerances and further increased by 7.5oh to account for measurement uncertainty before comparing to the limits. The core monitoring system computergenerated FQ values are augmented by the required uncertainties. UOz Fuel (Mark-B{TP) - All Batches exceot Batch 23A LHBru-row kWfr(a) 0 34,000 62,000 Core Elevation (ftI tttlWd/mtU ttIWd/mtU MWd/JrtU 0 17.35 14.95 10.8S 2.506 17.35 14.95 10.85 4.264 17.25 14.85 10.85 6.021 16.8 14.8 11.1 7.779 17.0 14.7 11.1 9.536 16.2 14.3 11.1 12.000 15.4 13.5 10.4 (a) Linear interpolation for allowable LHR between specified burnup points is valid for these tables

Davis-Besse Cyde 21 COLR Page 22 of 27 Revision 0 Table 5 (continued) UOz Fuel (Mark-B-HTP) - Batsh 23A LHReuow kwfl(a) 0 34,000 Core Ele_vation (ft) MWd/mtU MWd/mtU 0 16.95 14.95 2.506 16.95 14.95 4.2M 16.85 14.85 6.021 16.4 14.8 7.779 16.6 14.7 9.536 15.8 14.3 12.000 15.0 13.5 4 uvf/o Gad Fuel (Mark-B-HTPI - All Batches LHRru-tow kWftla) 0 34,000 62,000 Core Elevation (ft) IVIWd/mtU MWd/mtU MWdlmtU 0 15.55 13.45 9.55 2.506 15.55 13.45 9.55 4.264 15.45 13.25 9.55 6.021 15.1 13.2 9.8 7.779 15.3 13.2 9.8 9.536 14.S 12.8 9.8 12.000 13.8 12.1 9.2 I wt% Gad Fuel (Merk-B-HTP) - 4ll Batches LHRn'rPw,ktVlftt"r 0 34,000 62,000 Core Elevation (ftl MWd/mtU ttilWd/mtU ttrMld/mtU 0 14.65 12.65 8.75 2.506 14.65 12.65 8.75 4.284 14.55 12.65 8.75 6.021 14.2 1?,.5 9.0 7.779 14.4 12.5 9.0 9.536 13.7 12.2 9.0 12.000 13.0 11.5 8.4 (u) Linear interpolation for allowable LHR between specified bumup points is valid for these tables.

Davis-Besse Cycle 21 COLR Page 23 of 27 Revision 0 Table 6 Power Peaking Factors - FNan for Davis-Besse , Cycle 21 This Table is refened to by Technlcal Specifications 3.2.5 Enthalov Rise Hot Channel Factors - FNrur FNcr 3 MARP [1 + (1/RH) (l - P/Pm)l (see note below) MARP = MaxlmumAllorable RadialPeak, see MARP Figures and dataTabbs P = THERIIIAL POWER/ RATED THERMAT POWER and P s 1.0 Pm = 1.(D for 4-RCP operation Pm = 0.75 for &RCP operation l/RH = 0.3 Note: The measured FNan shall be increased by 5.0% to account for measurdnent uncertrainty pdor to cornparing to the liniE. The core moniloring system-generated FNan values are augmented by the required uncettainties. Figure 5 Maximum Allowable Radiat Peak for Filaxfor Davis.Besse, Gycle 21

  • j 2.2 2 tu
                                                                                \

i- + q 2.1

                                                                           -)

N

                                                                      \-
                                                                      ?
                                                                                                 \

2.O

                                                                                             )

{-. N-l _/ \

           $.s                                                  \

g \* { \* -\ tt,8 -{+R

r\; -_\,r*

B \

                    \_                                                                          }       \\l             \

T p,-t 'r{t *, L.

                                                                                                    \.

G -l o l.*-

                                                                                    -""\               {
                                                                                   .*!rt!Frq_."
           !r.e                                                                                          \_\_-
                                                                                       >\
           -           {F                     .o                                1-El.5                       x/L{).gg     wrr X/L=0.8 t
                       .- "d.?-..,,.,
                                                    +xlL{.s
                                                                                                           "...4i*.,.

x/L{r.6 d t*rr;:

           "E at {L{.2                                            l- --
                                                                                                                 -r
                       --ilhx/L=0..4
           !.a          -*-alL{.14                  q-alL=Q.1                                                           [\

1.3 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.&) 1.90 Axhl Peak

  • Linear interpolation is acceptable.

Davis-Besse Cycle 21 COLR Page 24 ot 27 Revision 0 Table 7 Maximum Allowable Radial Peak for FNrxfor Davis-Besse, Cycle 21 Axial Axial Axial Height Axial Helght Pe_ek x/L flnches) MARP Llmit Peak IIL finchee) MARP Limit 0.0 0.00 1.88299 0.0 0.00 2.09189 0.1 14,30 1.88398 0.1 14,30 2.03919 0.14 20.02 1,8M28 0.14 20.02 2.O1827 4.2 28.60 1.88{S1 0.2 28.60 1.98801 0.4 57.20 1.88490 0.tl 57.20 1.86840 1.1 0.5 71.$O 1.88439 1.8 0.5 71.50 1.81257 0.6 85.80 1.88451 0,6 85.80 1.73794 0.8 114.40 1.88421 0.8 114.,*0 1.59754 0.88 125.84 1.85239 0.88 125.84 1,54,3it1 0.9 128.70 1.8i!969 0.9 128.70 1.55084 1.0 143-00 1.738/,2 1.0 1f,t.00 1.46874 0.0 0.CIo 1.96511 0.0 0"00 1.99604 0.1 14.30 1.96705 0.1 14.30 1.95702 0-14 20.o2 1.96804 0.14 2A.O2 1.93681 0.2 28.60 1.96825 o.2 28.60 1.90s15 0.4 57.20 1.96936 0.4 57.20 1.79933 1.2 0.s 71.50 1.96984 1.7 0.5 71.50 1.7ffi8 0.6 85.80 1,96919 0.6 85.80 1.87730 0.8 114.40 1.84278 0.8 114.40 1.54415 0.88 125.84 1.78e87 0.88 125.84 1.49290 0.9 128.70 1.78220 0.9 128.70 1.50138 1.0 143.00 1.67994 1.0 143.00 1.42246 0.0 0.00 2.05580 0.0 0.00 1.90606 0.1 14.30 2.05912 0.1 14.30 1.87049 0.14 20.02 2.06036 0.14 20.42 1.85710 0.2 28.60 2.06155 0.2 28.60 1.82954 0.4 57.20 2.06343 0.4 57.20 1.73365 1.3 0.5 71.50 2.01583 1.8 0.5 71,50 1.67902 0.0 85.80 1.93900 0.6 85,80 1.62023 0.8 114.40 1.77W4 0.8 114.40 1.49550 0,88 125.84 1.71670 0.88 125.84 1.44607 0.9 128.70 1.72105 0.9 128.70 1.45590 1.0 143.00 1.61890 1.0 143.00 1.37861 0.0 0.00 2.15314 0.0 0.00 1.82131 0.1 14.30 2.15768 0,1 14.30 1,78903 0.14 20.02 2.15810 0.14 20.02 1.78024 0.2 2S.60 2.1/+&tB 0.2 28.60 1.75713 0.4 57.20 2.ofi12 0.4 57.20 1.67040 1.4 0.5 71.50 1.95015  ?.9 0.5 71.50 1.61847 0.6 85.80 1.87083 0.6 85.80 1.56853 0.8 114.40 1.71630 0.8 114.40 1.44958 0.88 125.U 1.65545 0.88 12s.84 r.40281 0.9 128.70 1.65903 0.9 128.70 1.4134 1.0 143.00 1.57207 1.0 143.00 1.33783 0.0 0.00 2.17ffi7 0.1 14.30 2.12413 0.14 20.02 2.10403 0.2 28.60 2.07451 0,4 57.20 1.94104 1.5 0,5 71.50 1.88067 0.6 85.80 1.80330 0.8 114.40 1.65555 0.88 126.W 1.Ss706 0,9 128.74 1.60415 1.0 143.00 1.51859

Davis-Besse Cycle 21 COLR Page 25 at 27 Revision 0 Figure 6 Fhx-AFlux-Flow (or Porer/lm balance/Flow) Alloarable Value, Davis-Besse 1, Cycle 21 ffi This Figure is rcfened to by Technical Specification 3.3.1 ffi [-ft ffi m [Ilr ffi# ffi tfi'rfi'fliiH1 ffi ffi ffi ffi ffi 4 Pulrrt LIMT

                          .I_IITII     TI  I TTI 7  108 rn-TTrrI-]-rTTl
                                                         +!q+l ffi ffi E]TTI       Tl-I]

ffi ffi ffi+t ffi ffi E ffi ffi ffi 3 PUIvP EXAIIPLE ffi TITTI TTTTII ffi m ITT.II.II E ffi ffi ffi ffi+l# ffi# ffi ffi ffi m n E E IITrrIl fJTTTTTIftr ffi [rr[Ir-r l l_n t E rrt ffi IT I T T TI IT F ffi ffi ffi E ffi T ffi I fffl I I] ft-l I l=TI[m E ffiLIro ffi II I I E ffi s I tt{ACCFTABLE IT{ACCFIAH-E ffi Fftfitli ffi ffi OPBATIOT{ E OPBATIOI{ ffii ffi F ft-T ffi ffi iJ [I_TI-f-rn tTfTN fllTIffr-rr ffi ffiE H ffi E fI-[E ffi E E o ffi FI ffi ffi H E H I Til II tqoFl ACCFTABLE III] E oPHAnOil FOR SPSIHE) RC PItrTP E tr o [il-t-t rlTn-rrl-l-Tl ffiffiffiffi iiffiffi

                                                         =

E ffr[ft ffiffi tl EIIt-Trt.T]fl E ffi ffiffi ffi lril ffim fI-nn ffi frlr E tTl ffi 50 .40 20 -10 0 t0 20 30 40 50 60 ruffiL rcUirR IYBAI-A}ICB  % The 3 pump eram ple curve shows allouable values furan approximately2S% frow reduc{ion frr hree pump operation (2E3,860 gpm) The adual se$ointwill be calculated byfie Reactor Protedion SytEm and will be direcfyproportionaltotre actual reactorcoolantsystem flowwitft flrree pumps. These limib are based on Cyde I and are consenatiw relative to the actral Gytle 21 limiE.

Davis-Besse Cycle 31 COLR Page 26 at 27 Revision 0 Table I Refueling Boron Concentration Limit for Davis-Besse, Cycle 21 This limit is referred to by Technical Specifications 3.9.1 The minimum required boron concentration for Mode 6 shall be sufficient to ensure a K"r of 0.95 or less, plus an additional 1% Ak/k conseruatism allowance for unceilainties.

Davis-Besse Cycle 21 COLR Page 27 o{ 27 Revision 0 Figure 7 Control Rod Core Locations and Group Assignments for Davis-Besse, Cycle 21 This Figure is referred to by Technical Requirements Manual 8.1.3 {-N (xl I 3 4 5 6 T I I 10 11 12 13 14 15 I I I I A 4 6 4 B 2 5 5 2 c 7 I 7 I 7 D 2 5 5 2 E 4 I 6 3 6 I 4 F 5 1 1 5 G (wl 6 7 3 4 3 7 6 H (Y} 5 1 1 5 K 4 I 6 3 6 I 4 L 2 5 5 2 M 7 I 7 I 7 N 2 5 5 2 o 4 6 4 P R Number (z) Gr.ouo No of Rods Function Grouo No of Rods Funetion 1 4 Safety 5 12 Control 2 I Safety 6 I Control 3 4 Safety 7 I Control 4 o Safety I I APSRS Total 61}}