ML18117A383

From kanterella
Revision as of 08:07, 15 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revision 24 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5E, Table of Contents
ML18117A383
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/06/2018
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18117A343 List: ... further results
References
TMI-18-047
Download: ML18117A383 (5)


Text

TMI-1 UFSAR APPENDIX 5E 5E-i REV. 18, APRIL 2006

APPENDIX 5E

GILBERT ASSOCIATES, INC., PRELIMINARY REPORT

TO METROPOLITAN EDISON COMPANY

ON STRUCTURAL INTEGRITY TESTING OF THE REACTOR BUILDING STRUCTURE

FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1

This Report Contains:

24 pages of text 7 tables 22 figures

TMI-1 UFSAR APPENDIX 5E 5E-ii REV. 18, APRIL 2006 November 5, 1969 GAI REPORT NO. 1710

PRELIMINARY REPORT ON STRUCTURAL INTEGRITY TESTING OF REACTOR BUILDING STRUCTURE FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1 METROPOLITAN EDISON COMPANY

Gilbert Associates, Inc.

525 Lancaster Avenue Reading, Pennsylvania

TMI-1 UFSAR APPENDIX 5E 5E-iii REV. 18, APRIL 2006 TABLE OF CONTENTS

1. PURPOSE
2. DESCRIPTION OF CONTAINMENT STRUCTURE

2.1 LOCATION

2.2 GEOMETRY

AND PRINCIPAL ELEMENTS

2.3 MATERIALS

2.3.1 Liner

2.3.2 Mile Steel Reinforcement

2.3.3 Concrete

2.3.4 Tendons

2.4 DESIGN

2.5 CONSTRUCTION

METHODS

3. TEST REQUIREMENTS

3.1 PRELIMINARY

SAFETY ANALYSIS REPORT

4. TEST PROCEDURES

4.1 GENERAL

DESCRIPTION

4.2 PREPARATION

4.3 DURING

TEST

4.4 FOLLOWING

TEST0

5. INSTRUMENTATION

5.1 GENERAL

DESCRIPTION

5.1.1 Displacement

Measurements

5.1.2 Strain

Measurements

5.1.4 Tendon

Anchorage Zone Inspection6

6. AS BUILT CONDITIONS
7. CALCULATED RESPONSE

7.1 GENERAL

DESCRIPTION

7.2 CALCULATED

DISPLACEMENTS 7.3 MEASUREMENT, ANALYSIS, AND CONSTRUCTION INACCURACIES

8. FORMS FOR RECORDING THE MEASURED DISPLACEMENTS, STRAINS, TEMPERATURE, AND TENDON ANCHORAGE OBSERVATIONS
9. INTERPRETATION OF RESULTS

TABLES FIGURES TMI-1 UFSAR APPENDIX 5E 5E-iv REV. 18, APRIL 2006 LIST OF TABLES

Table 1 Instrument Location

Table 2 Strain Gages Full Bridge

Table 3 Strain Gages Rosettes

Table 4 Displacement LVDT'S

Table 5 Displacement Scales and Tapes

Table 6 Temperature Readings

Table 7 Tendon Anchorage Observations - Wire Failures

TMI-1 UFSAR APPENDIX 5E 5E-v REV. 18, APRIL 2006 LIST OF FIGURES

Number Title 5E-1 Reactor Building - Cross Section

5E-2 Ideal Schedule

5E-3 Instrumentation - Outside Face

5E-4 Instrumentation - Inside Face

5E-5 Instrumentation - Equipment Access - Outside Face

5E-6 Instrumentation - Penetrations - Interior Face

5E-7 Radial Displacements of Reactor Building

5E-8 Crack Patterns - Wall and Dome Junction

5E-9 Crack Patterns - Wall

5E-10 Crack Patterns - Equipment Access

5E-11 Crack Patterns - Concrete Ring Beam Area

5E-12 Cylinder Base Radial Displacement

5E-13 Cylinder Base and Wall Radial Displacement

5E-14 Cylinder Wall and Dome Radial Displacement

5E-15 Cylinder Wall and Dome Radial Displacement

5E-16 Dome Radial Displacement and Cylinder Ledge Vertical Displacement

5E-17 Base and Dome Apex Vertical Displacement

5E-18 Equipment Access Displacement

5E-19 Equipment Access Displacement

5E-20 Equipment Access Displacement

5E-21 Equipment Access Displacement

5E-22 Equipment Access Displacement