MONTHYEARML19067A0092019-04-0606 April 2019 Revision 24 to Updated Final Safety Analysis Report, Chapter 2, Figures. Redacted ML18117A4332018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Table of Contents ML18117A4152018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A, Figures ML18117A3892018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.0-1 Through 6.6-13 ML18117A3912018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 06A TMI-18-047, Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Figures. Redacted2018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Figures. Redacted ML19067A0102018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 2, Sections 2.1-1 Thru 2.10-3. Redacted ML19067A0282018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 9, Figures. Redacted ML18117A3922018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Figures 6A-1 Through 6A-5 ML18117A4392018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14C, Table of Contents ML18117A4422018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Appendix a, Supplement ML19066A3772018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B ML18117A4372018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14B ML18117A4302018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML18117A4042018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 9, Sections 1 Through 11 ML18117A4382018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14B, Figures ML19066A3822018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Reference Drawings 1 - 157 ML18117A3942018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 06B ML18117A4172018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML18117A4272018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Figure ML18117A4132018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A, Table of Contents ML18117A4072018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML18117A4092018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Table of Contents ML18117A4142018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A, Post-Accident Shielding Evaluation ML18117A4282018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A, Table of Contents ML18117A4062018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents ML18117A4292018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A ML18117A3502018-04-0606 April 2018 Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 28 to Fire Hazards Analysis Report ML19067A0162018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment, Table of Contents. Redacted ML18117A4252018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents ML18120A0012018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Intro - Summary of Change ML19067A0662018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Sections 1 Thru 3. Redacted ML18117A4012018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Figures 8.2-4 Through 8.2-6-7 ML18117A4112018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Figures ML18117A3882018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Sections 1 Through 7 ML18117A4362018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix14B, Table of Contents ML18117A4412018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14C ML18117A3952018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures 6B-1 Through 6B-20 ML18117A4162018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents ML18117A3972018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 7, Sections 1 Through 5 ML18117A4002018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Through 6 ML18117A4202018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 12, Figures ML18117A3992018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Table of Contents ML19067A0512018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML18117A3932018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 06B, Table of Contents ML18120A0002018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Cover Page ML18117A4322018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Figures ML18117A4342018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A ML19066A3672018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1-1 Thru 1.9-1 ML18117A3902018-04-0606 April 2018 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Appendix 06A, Table of Contents 2019-04-06
[Table view] |
Text
TMI-1 UFSAR CHAPTER 05 5C-i REV. 18, APRIL 2006
APPENDIX 5C
GILBERT ASSOCIATES, INC., REPORT
TO METROPOLITAN EDISON COMPANY
ON DESIGN OF LARGE OPENING REINFORCEMENTS FOR REACTOR BUILDING
FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1
This Report Contains:
44 pages of text 8 tables 29 figures 2 drawings Appendix A (8 pages)
Appendix B (3 pages)
TMI-1 UFSAR CHAPTER 05 5C-ii REV. 18, APRIL 2006
DESIGN OF LARGE OPENING REINFORCEMENTS FOR REACTOR BUILDING METROPOLITAN EDISON COMPANY THREE MILE ISLAND NUCLEAR POWER STATION - UNIT NO. 1
BY GILBERT ASSOCIATES, INC.
TMI-1 UFSAR CHAPTER 05 5C-iii REV. 18, APRIL 2006 TABLE OF CONTENTS
ITEM TITLE
SUMMARY
1 DESIGN BASES
1.1 General
1.2 Design
Loads 1.3 Load Combinations
1.4 Material
Stress/Strain Criteria 1.5 Test Condition
1.6 Operating
Condition
2 GENERAL DESCRIPTION OF OPENING REINFORCEMENT
2.1 Introduction
2.2 Ring Reinforcement Splices
2.3 Normal
Shear at Edge of Opening
2.4 Prestressing
- 3. STRESS DISTRIBUTION AROUND A CIRCULAR HOLE IN A CIRCULAR CYLINDRICAL SHELL 3.1 Introduction 3.2 Finite-Element Method
3.3 Application
of Three-Dimensional Photoelasticity
4 ANALYSIS OF THE STRESS AROUND LARGE OPENINGS IN THE THREE MILE ISLAND REACTOR BUILDING 4.1 Verification of Finite-Element Method of Analysis
4.2 Stress
Analysis Under Operating and Accident Loads
4.2.1 Representation
of the Shell Around the Opening
4.2.2 Basic
Loading Conditions
4.2.3 Effect
of Creep and Shrinkage
5 VERIFICATION OF DESIGN CRITERIA
5.1 Basis
for Verification of Shell Loading Capacity Due to Primary Loads (Principal Stress-resultants and Principal Stress-couples) 5.2 Interaction Diagram
5.3 Reinforcing
Steel
5.4 Penetration
Barrel
5.5 Concrete
Shear
5.6 Shear
- Diagonal Tension
5.7 Shear
- Transfer Plates
5.8 Radial
Reinforcement
5.9 Summary
of Design and Conclusion
LIST OF REFERENCES
TABLES
FIGURES
DRAWINGS TMI-1 UFSAR CHAPTER 05 5C-iv REV. 18, APRIL 2006 LIST OF TABLES
NUMBER TITLE 5C-1 Fundamental Loads
5C-2 Stress Around Equipment Hatch Loading Condition No. 1 Dead Load
5C-3 Stress Around Equipment Hatch Loading Condition No. 2 Hoop & Verticle Prestress
5C-4 Stress Around Equipment Hatch Loading Condition No. 3 Operating Temperature (Winter) 5C-5 Stress Around Equipment Hatch Loading Condition No. 4 Accident Temperature (with Barrel Effect)
5C-6 Stress Around Equipment Hatch Loading Condition No. 5 55 Psig Internal Pressure 5C-7 Stress Around Equipment Hatch Loading Condition No. 6 Earthquake # 1
5C-8 Stress Around Equipment Hatch Loading Condition No. 7 Earthquake #2 TMI-1 UFSAR CHAPTER 05 5C-v REV. 18, APRIL 2006 LIST OF FIGURES
NUMBER TITLE 5C-1 Total Stress Concentration Factors For Given Loading Cases
5C-2 Stress Concentration Factor Variations For Different Bpo At Various Angles -
Capped Cylinder
5C-3 Stress Distribution Around Openings in Cylindrical Shells
5C-4 Grid For Finite Element Analysis of Stresses Around Equipment Hatch In RCB
5C-5 Layer Thickness And Designation
5C-6 Member Stresses Around Opening Edge (Vessel Subject To Internal Pressure)
5C-7 Surface Stresses Around Opening Edge (Vessel Subject To Internal Pressure)
5C-8 Hoop Stresses Along Longitudinal Axis (Vessel Subject To Internal Pressure)
5C-9 Axial Stresses Along Transverse Axis (Vessel Subject To Internal Pressure)
5C-10 Hoop Stress-Resultant N o Along Symmetry Axes (Test Problem)
5C-11 Effect of Tendon Curvature
5C-12 Nodal Forces Due to Curvature of Tendons In Neighborhood of Operating
5C-13 Normal Winter Operating Temperat ure Gradient-84" Thick Wall Near Equipment Opening 5C-14 Normal Winter Operating Temperat ure Gradient-42" Thick Wall Near Equipment Opening 5C-15 Normal Winter Operating Temperatur e Gradient-Transition Wall Near Equipment Opening 5C-16 Winter Accident Temperature Gr adient-84" Thick Wall Near Equipment Opening
5C-17 Winter Accident Temperature Gr adient-42" Thick Wall Near Equipment Opening
5C-18 Winter Accident Temperature Gr adient-Transition Wall Near Equipment Opening
5C-19 Interaction Diagram For Axial Compression/Tension And Bending
5C-20 Equipment Access Interaction Diagram -Elements 77 & 101
5C-21 Equipment Access Interaction Diagram - Elements 66 & 100
5C-22 Equipment Access Interaction Diagram - Elements 55 & 99 TMI-1 UFSAR CHAPTER 05 5C-vi REV. 18, APRIL 2006 5C-23 Equipment Access Interaction Diagram - Element 44
5C-24 Equipment Access Interaction Diagram - Element 73
5C-25 Equipment Access Interaction Diagram - Element 74
5C-26 Equipment Access Interaction Diagram - Elements 66 & 77
5C-27 Equipment Access Interaction Diagram - Elements 44 & 55
5C-28 Equipment Access Interaction Diagram - Elements 99, 100, & 101
5C-29 Sheer Transfer Plates TMI-1 UFSAR CHAPTER 05 5C-vii REV. 18, APRIL 2006 APPENDIX A
Effect of Concrete Creep and the Sustained Operating Stresses on Stress Distribution Around Openings in a Rapidly Pressurized Reinforced Concrete Vessel
APPENDIX B
Earthquake Analysis