TMI-1 UFSAR APPENDIX 5E 5E-i REV. 18, APRIL 2006 APPENDIX 5E GILBERT ASSOCIATES, INC., PRELIMINARY REPORT TO METROPOLITAN EDISON COMPANY ON STRUCTURAL INTEGRITY TESTING OF THE REACTOR BUILDING STRUCTURE FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1 This Report Contains:

24 pages of text 7 tables 22 figures

TMI-1 UFSAR APPENDIX 5E 5E-ii REV. 18, APRIL 2006 November 5, 1969 GAI REPORT NO. 1710 PRELIMINARY REPORT ON STRUCTURAL INTEGRITY TESTING OF REACTOR BUILDING STRUCTURE FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1 METROPOLITAN EDISON COMPANY Gilbert Associates, Inc.

525 Lancaster Avenue Reading, Pennsylvania

TMI-1 UFSAR APPENDIX 5E 5E-iii REV. 18, APRIL 2006 TABLE OF CONTENTS

1.

PURPOSE

2.

DESCRIPTION OF CONTAINMENT STRUCTURE 2.1 LOCATION 2.2 GEOMETRY AND PRINCIPAL ELEMENTS 2.3 MATERIALS 2.3.1 Liner 2.3.2 Mile Steel Reinforcement 2.3.3 Concrete 2.3.4 Tendons 2.4 DESIGN 2.5 CONSTRUCTION METHODS

3.

TEST REQUIREMENTS 3.1 PRELIMINARY SAFETY ANALYSIS REPORT

4.

TEST PROCEDURES 4.1 GENERAL DESCRIPTION 4.2 PREPARATION 4.3 DURING TEST 4.4 FOLLOWING TEST0

5.

INSTRUMENTATION 5.1 GENERAL DESCRIPTION 5.1.1 Displacement Measurements 5.1.2 Strain Measurements 5.1.4 Tendon Anchorage Zone Inspection6

6.

AS BUILT CONDITIONS

7.

CALCULATED RESPONSE 7.1 GENERAL DESCRIPTION 7.2 CALCULATED DISPLACEMENTS 7.3 MEASUREMENT, ANALYSIS, AND CONSTRUCTION INACCURACIES

8.

FORMS FOR RECORDING THE MEASURED DISPLACEMENTS, STRAINS, TEMPERATURE, AND TENDON ANCHORAGE OBSERVATIONS

9.

INTERPRETATION OF RESULTS TABLES FIGURES

TMI-1 UFSAR APPENDIX 5E 5E-iv REV. 18, APRIL 2006 LIST OF TABLES Table 1 Instrument Location Table 2 Strain Gages Full Bridge Table 3 Strain Gages Rosettes Table 4 Displacement LVDT'S Table 5 Displacement Scales and Tapes Table 6 Temperature Readings Table 7 Tendon Anchorage Observations - Wire Failures

TMI-1 UFSAR APPENDIX 5E 5E-v REV. 18, APRIL 2006 LIST OF FIGURES Number Title 5E-1 Reactor Building - Cross Section 5E-2 Ideal Schedule 5E-3 Instrumentation - Outside Face 5E-4 Instrumentation - Inside Face 5E-5 Instrumentation - Equipment Access - Outside Face 5E-6 Instrumentation - Penetrations - Interior Face 5E-7 Radial Displacements of Reactor Building 5E-8 Crack Patterns - Wall and Dome Junction 5E-9 Crack Patterns - Wall 5E-10 Crack Patterns - Equipment Access 5E-11 Crack Patterns - Concrete Ring Beam Area 5E-12 Cylinder Base Radial Displacement 5E-13 Cylinder Base and Wall Radial Displacement 5E-14 Cylinder Wall and Dome Radial Displacement 5E-15 Cylinder Wall and Dome Radial Displacement 5E-16 Dome Radial Displacement and Cylinder Ledge Vertical Displacement 5E-17 Base and Dome Apex Vertical Displacement 5E-18 Equipment Access Displacement 5E-19 Equipment Access Displacement 5E-20 Equipment Access Displacement 5E-21 Equipment Access Displacement 5E-22 Equipment Access Displacement