TMI-1 UFSAR APPENDIX 5E 5E-i REV. 18, APRIL 2006 APPENDIX 5E GILBERT ASSOCIATES, INC., PRELIMINARY REPORT TO METROPOLITAN EDISON COMPANY ON STRUCTURAL INTEGRITY TESTING OF THE REACTOR BUILDING STRUCTURE FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1 This Report Contains:
24 pages of text 7 tables 22 figures
TMI-1 UFSAR APPENDIX 5E 5E-ii REV. 18, APRIL 2006 November 5, 1969 GAI REPORT NO. 1710 PRELIMINARY REPORT ON STRUCTURAL INTEGRITY TESTING OF REACTOR BUILDING STRUCTURE FOR THREE MILE ISLAND NUCLEAR STATION UNIT 1 METROPOLITAN EDISON COMPANY Gilbert Associates, Inc.
525 Lancaster Avenue Reading, Pennsylvania
TMI-1 UFSAR APPENDIX 5E 5E-iii REV. 18, APRIL 2006 TABLE OF CONTENTS
- 1.
PURPOSE
- 2.
DESCRIPTION OF CONTAINMENT STRUCTURE 2.1 LOCATION 2.2 GEOMETRY AND PRINCIPAL ELEMENTS 2.3 MATERIALS 2.3.1 Liner 2.3.2 Mile Steel Reinforcement 2.3.3 Concrete 2.3.4 Tendons 2.4 DESIGN 2.5 CONSTRUCTION METHODS
- 3.
TEST REQUIREMENTS 3.1 PRELIMINARY SAFETY ANALYSIS REPORT
- 4.
TEST PROCEDURES 4.1 GENERAL DESCRIPTION 4.2 PREPARATION 4.3 DURING TEST 4.4 FOLLOWING TEST0
- 5.
INSTRUMENTATION 5.1 GENERAL DESCRIPTION 5.1.1 Displacement Measurements 5.1.2 Strain Measurements 5.1.4 Tendon Anchorage Zone Inspection6
- 6.
AS BUILT CONDITIONS
- 7.
CALCULATED RESPONSE 7.1 GENERAL DESCRIPTION 7.2 CALCULATED DISPLACEMENTS 7.3 MEASUREMENT, ANALYSIS, AND CONSTRUCTION INACCURACIES
- 8.
FORMS FOR RECORDING THE MEASURED DISPLACEMENTS, STRAINS, TEMPERATURE, AND TENDON ANCHORAGE OBSERVATIONS
- 9.
INTERPRETATION OF RESULTS TABLES FIGURES
TMI-1 UFSAR APPENDIX 5E 5E-iv REV. 18, APRIL 2006 LIST OF TABLES Table 1 Instrument Location Table 2 Strain Gages Full Bridge Table 3 Strain Gages Rosettes Table 4 Displacement LVDT'S Table 5 Displacement Scales and Tapes Table 6 Temperature Readings Table 7 Tendon Anchorage Observations - Wire Failures
TMI-1 UFSAR APPENDIX 5E 5E-v REV. 18, APRIL 2006 LIST OF FIGURES Number Title 5E-1 Reactor Building - Cross Section 5E-2 Ideal Schedule 5E-3 Instrumentation - Outside Face 5E-4 Instrumentation - Inside Face 5E-5 Instrumentation - Equipment Access - Outside Face 5E-6 Instrumentation - Penetrations - Interior Face 5E-7 Radial Displacements of Reactor Building 5E-8 Crack Patterns - Wall and Dome Junction 5E-9 Crack Patterns - Wall 5E-10 Crack Patterns - Equipment Access 5E-11 Crack Patterns - Concrete Ring Beam Area 5E-12 Cylinder Base Radial Displacement 5E-13 Cylinder Base and Wall Radial Displacement 5E-14 Cylinder Wall and Dome Radial Displacement 5E-15 Cylinder Wall and Dome Radial Displacement 5E-16 Dome Radial Displacement and Cylinder Ledge Vertical Displacement 5E-17 Base and Dome Apex Vertical Displacement 5E-18 Equipment Access Displacement 5E-19 Equipment Access Displacement 5E-20 Equipment Access Displacement 5E-21 Equipment Access Displacement 5E-22 Equipment Access Displacement