Letter Sequence Response to RAI |
---|
EPID:L-2018-LLA-0060, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARCNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 ML24004A0402024-01-0303 January 2024 Response to Nrc’S November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation ML23117A1162023-04-27027 April 2023 Response to Follow-up Questions to Tva’S Response to Nrc’S Request for Supplemental Information (Rsi) Related to August 4, 2022, Sequoyah ISFSI Exemption Request CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 ML22353A0662022-12-19019 December 2022 – Response to Request for Supplemental Information (D-RSI) Request for Exemption from Non-Destruction-Examination Compliance CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-21-024, Partial Response to Additional Request for Information Re Application to Revise Updated Final Safety Analysis Report Re Changes to Hydrologic Analysis (TS-19-02)2021-06-15015 June 2021 Partial Response to Additional Request for Information Re Application to Revise Updated Final Safety Analysis Report Re Changes to Hydrologic Analysis (TS-19-02) CNL-21-039, Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2021-05-0505 May 2021 Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) CNL-20-082, Partial Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (TS-19-02)2020-11-10010 November 2020 Partial Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (TS-19-02) CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) CNL-20-057, Tennessee Valley Authority - Application to Revise Sequoyah Nuclear Plant Units 1 & 2 Updated FSAR Changes to Hydrologic Analysis - Partial Response to Additional Request for Additional Information (TS-19-02)2020-08-12012 August 2020 Tennessee Valley Authority - Application to Revise Sequoyah Nuclear Plant Units 1 & 2 Updated FSAR Changes to Hydrologic Analysis - Partial Response to Additional Request for Additional Information (TS-19-02) ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request CNL-20-032, Response to Request for Additional Information (TS-19-02) Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis2020-05-14014 May 2020 Response to Request for Additional Information (TS-19-02) Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis CNL-20-026, Supplement to Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2020-02-18018 February 2020 Supplement to Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-19-119, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Unit 1 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05)2019-11-19019 November 2019 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Unit 1 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) CNL-19-061, Seismic Probabilistic Risk Assessment for Sequoyah Nuclear Plant, Units 1 and 2 - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task2019-10-18018 October 2019 Seismic Probabilistic Risk Assessment for Sequoyah Nuclear Plant, Units 1 and 2 - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Fo ML19231A2082019-08-19019 August 2019 Response to Request for Information Regarding Unit 2 Cycle 22 - 180-Day Steam Generator Tube Inspection Report CNL-19-068, Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for2019-07-22022 July 2019 Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for .. CNL-19-057, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISl-12019-06-19019 June 2019 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISl-1 CNL-19-002, Response to Request for Additional Information Regarding Application to Modify Sequoyah Nuclear Plant Units 1 and 2, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,.2019-03-21021 March 2019 Response to Request for Additional Information Regarding Application to Modify Sequoyah Nuclear Plant Units 1 and 2, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,. CNL-19-016, Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report2019-01-30030 January 2019 Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report CNL-18-089, Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-0342018-07-23023 July 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plan Update for Browns Ferry Nuclear Plant and Sequoyah Nuclear Plant Independent Spent Fuel Storage Installations, Docket Nos. 72-052 and 72-034 NL-18-044, Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Pre2018-04-19019 April 2018 Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Prec CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation.2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation. CNL-17-063, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2017-10-26026 October 2017 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-17-104, Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04)2017-08-0707 August 2017 Response to Request for Additional Information Regarding Proposed Technical Specification Change to Revise the Note Modifying SR 3.8.1.17 of TS 3.8.1 AC Sources - Operating (TS-SQN-16-04) CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-27027 July 2017 Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-0707 July 2017 Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..2017-03-10010 March 2017 Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. CNL-16-194, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2016-12-23023 December 2016 Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid CNL-16-178, Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02)2016-12-23023 December 2016 Response to Request for Additional Information (RAI) Regarding Application to Modify Technical Specifications Regarding Diesel Generator Steady State Frequency (SQN-TS-14-02) CNL-16-196, Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-12-19019 December 2016 Revised Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-52016-07-28028 July 2016 Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System2016-05-31031 May 2016 Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information2015-10-23023 October 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information CNL-15-171, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional Information2015-09-11011 September 2015 Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) - Response to Request for Additional Information NL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.2015-08-0303 August 2015 Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor. CNL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.2015-08-0303 August 2015 Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor. CNL-15-146, Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482)2015-08-0303 August 2015 Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482) CNL-15-136, Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-072015-07-22022 July 2015 Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-07 ML15176A6792015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 ML15176A6812015-06-19019 June 2015 Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 ML15176A7482015-06-19019 June 2015 Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 8 of 8 2024-08-19
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-19-016 January 30, 2019 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR
-77 and DPR
-79 NRC Docket Nos. 50
-327 and 50
-328
Subject:
Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report for Sequoyah Nuclear Plant Units 1 and 2 (SQN
-TS-17-04) (EPID L-2018-LLA-0060)
References:
- 1. TVA Letter to NRC, CNL-17-150 , "Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report Sequoyah Nuclear Plant Units 1 and 2 (SQN
-TS-17-04)," dated March 9, 2018 (ML18071A349) 2. TVA Letter to NRC, CNL 054, "Supplement to Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report Sequoyah Nuclear Plant Units 1 and 2 (SQN
-TS-17-04)," dated April 11, 2018 (ML18102B430)
- 3. NRC Electronic Mail to TVA, "Request for additional information - Sequoyah Nuclear Plant, Units 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise Updated Final Analysis Report (SQN
-TS-17-04) (EPID: L
-2018-LLA-0060)," dated December 10, 2018 (ML18344A075)
In Reference 1 , Tennessee Valley Authority (TVA) submitt ed a request for an amendment to Renewed Facility Operating License Nos. DPR
-77 and DPR
-79 for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, respectively. The proposed change would modify the essential raw cooling water (ERCW) motor control center breakers and revise the Updated Final Safety Analysis Report for SQN Units 1 and 2 (SQN
-TS-17-04). In Reference 2, TVA supplemented the license amendment request.
Enclosure CNL-19-016 E1 of 4 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report for Sequoyah Nuclear Plant Units 1 and 2 (SQN
-TS-17-04) (EPID L-2018-LLA-0060) NRC Introduction By the letter dated March 9, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18071A349), Tennessee Valley Authority (TVA), submitted a request to amend the licenses for Sequoyah Nuclear Plant (SQN) Units 1 and 2 to modify the essential raw cooling water (ERCW) motor control center (MCC) breakers and revise the Updated Final Safety Analysis Report (UFSAR). SQN implemented a design change to remove the existing mechanical (Kirk Key) interlocking scheme from the feeder breakers and tie breakers for ERCW MCCs 1A
-A and 2A-A. The mechanical interlock for the ERCW MCC feeder breakers was replaced with administrative (procedural) controls. The NRC staff has reviewed the license amendment request (LAR) and determined that additional information is required for the staff to complete the review. The staff's request for additional information (RAI) follows. The draft RAI was emailed in draft form on November 30, 2018, and the TVA staff responded that they did not need a clarification call on the draft RAI and there was no proprietary or sensitive information. The TVA staff requested, and NRC agreed, a RAI response date of January 31, 2019, due to the current outages for both units and upcoming holidays.
Regulatory Basis Appendix A, "General Design Criteria for Nuclear Power Plants" to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities" states the following:
Criterion 5
-Sharing of structures, systems, and components, requires that structures, systems, and components important to safety, including the onsite electric power supplies and distribution systems, shall not be shared among nuclear power units unless it can be shown that such sharing will not significantly impair their ability to perform their safety functions, including, in the event of an accident in one unit, an orderly shutdown and cool down of the remaining units.
Criterion 17
-Electric power systems, requires, in part, that the onsite electric power supplies, including the onsite electric distribution system, shall have sufficient independence and redundancy to perform their safety functions assuming a single failure.
The Nuclear Regulatory Commission (NRC) staff reviews the human performance aspects of LARs using the guidance in Standard Review Plan Chapter 18 and NUREG
-1764 Rev. 1, "Guidance for the Review of Changes to Human Actions" (ADAMS Accession No.
ML072640413). In accordance with the generic risk categories established in Appendix A to NUREG-1764, the tasks under review involve human actions associated with a risk
-important system. Due to the risk importance, the NRC staff will perform a Level II human factors review per the guidance in Section 4 of NUREG
-1764, Rev. 1. NUREG-1764, Section 4, "Level II Review Guidance," includes the following 4 areas of review:
- 1. General Deterministic Review
- 2. Analysis Enclosure CNL-19-016 E2 of 4 3. Design of Human System Interface (HSI), Procedures, and Training
- 4. Human Action Verification RAI 1 The general deterministic review guidance in NUREG
-1764 states that the licensee should provide adequate assurance that the change does not compromise defense in depth. If the administrative controls were to fail (tie
-breakers left closed), discuss whether the normal and alternate power supplies aligned to an ERCW MCC belonging to a train (e.g. "A" train) could be out of phase if the 6.9kV shutdown boards (1A and 2A) are powered from offsite power. TVA Response to RA I 1 If administrative controls were to fail and the tie
-breakers left closed, the supplies to the ERCW MCCs from each unitized source will not be out of phase if the 6.9kV shutdown boards (1A and 2A) are powered from offsite power. Defense in depth of the SQN auxiliary power system would not be compromised. Both the 161kV and 500kV grids feeding the switchyard are in phase, connected through an intertie transformer that is Y
-Y with no phase shift.
Normal supply from offsite power to the auxiliary power system (APS) is through the main and unit station service transformers (USSTs). Main transformers are Y
-D with the high side leading the low, and the USSTs are D
-Y with the low side leading the high, thus reversing (or canceling) the phase shift. This configuration maintains the plant power system directly in phase with offsite power. Alternate power may be supplied through plant common station service transformers (CSSTs), which are Y
-Y with no phase shift. In all alignments with offsite power, the SQN APS is in phase with both units and the switchyard supply.
Phasing of t he APS boards is controlled by configuration management and shown on the following drawings, which reflects the configuration control of the plant board phasing.
Drawing 1, 2-15E500-1 shows single line representation and overview of the supply path from the switchyard to the ERCW MCCs. Drawing 1, 2-35W736-1 shows phasing of cables connected to 480V ERCW MCC 1A
-A, both supply and the crosstie to the 480V ERCW MCC 2A
-A. Drawing 1, 2-35W746-5 shows phasing of cables connected from ERCW MCCs to the ERCW 6.9kV/480V transformers and feeders from the 6.9kV shutdown boards (SDBD). Drawing 1-33-51068-D61 shows cables feeding from 6.9kV SDBD 1A-A to the ERCW transformer.
Drawing 1-33-47035-D266 shows cables feeding to 6.9kV SDBD 1A-A from Unit Board 1B. Drawing 1-33-47035-D867 shows feeder cables from Unit Board 1B to 6.9kV SDBD 1A-A. Drawing 1, 2-45N324 shows the phasing of all transformers from the offsite power supply to the APS. Additionally, performance of SQN Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.8 demonstrates that the load side of the USSTs and CSSTs are in phase. The fast transfer performed by this SR takes place in under six cycles, so if there were a transformer phase shift, then there would be significant circuit disturbance and the SR would not pass. Therefore, successful completion of this SR is sufficient to demonstrate that the normal and alternate power supplies to the ERCW MCCs are in phase.
Enclosure CNL-19-016 E3 of 4 RAI 2 The analysis review guidance in NUREG
-1764 states that the licensee should perform a functional and task analysis to identify how personnel will know when the human action is necessary and has been performed correctly. Describe the procedures and administrative controls that will be used to:
- Identify when it is acceptable to align the alternate power supply to an ERCW MCC (to ensure that the alternate power supply is only aligned for maintenance purposes),
- Identify when it is not appropriate to perform the action (to ensure that the alternate power supplies are not aligned when powered from the emergency diesel generators),
- Verify that the ERCW bus that will be powered by its alternate power supply is de
-energized prior to aligning the alternate supply, and
- Verify that the breaker alignment is correct after restoration of normal breaker alignment.
TVA Response to RAI 2
Alignment of the ERCW MCCs is governed by the SQN System Operating Instructions 1,2-SO-201-9, "480V ERCW Motor Control Centers
." Precaution 3.1.K in these procedures and a note in each section to realign ERCW MCC power supplies requires an engineering evaluation in accordance with drawing 1,2
-15E500-3. Table 3 o f drawing 1,2
-15E500-3 describes the alignment restrictions and limitations for the electrical distribution system. Aligning ERCW MCC from alternate power is not a "Normal Alignment
," which is defined as "ALL 6.9KV AND 480V BOARDS RECEIVING POWER FROM THEIR NORMAL SUPPLY AS SHOWN ON SHEETS 1 AND 2." Note 10 of Table 3 requires that any alignment not specified by this table to be evaluated by SQN electrical design engineering prior to implementation. The above evaluation is requested by operations and provided in the form of an engineering work request in accordance with TVA procedure NPG-SPP-09.0, "Conduct of Engineering," Section 3.2.9.C, "Engineering Work Requests.
" This requirement evaluate s any restrictions on concurrent alignments to ensure operability of emergency diesel generators and offsite power sources during the period of alternate alignment.
An emergency diesel generator supplying a 6.9KV Shutdown Board would not be considered a normal alignment and such an alignment is only normally performed during the performance of SQN TS SR 3.8.1.18, "AC Sources - Operating."
The required actions to transfer to alternate and back to normal power are detailed in 1,2-SO-201-9, Sections 8.1 through 8.4. As this is a "dead bus" transfer, steps are present to check annunciation of loss of voltage via annunciation
[loss of power to the ERCW multiplexer/de
-multiplexer (MUX/DEMUX) for 1A-A, or MCC undervoltage for other boards
.] In addition, 1,2
-SO-201-9, Sections 8.1 through 8.4, contain a step to check that the bus is dead prior to proceeding to steps to connect to alternate supply.
Sections 8.3 and 8.4 of 1,2-SO-201-9 perform the return to normal from alternate power alignment for the ERCW MCCs. These sections require operators to perform an independent verification of the correct lineup (i.e., tie breaker off and normal feeder breaker on).
Enclosure CNL-19-016 E4 of 4 RAI 3 The HSI, procedures, and training review guidance in NUREG
-1764 states that the licensee should describe any known operating experience issues. Describe any relevant operating experience related to failure of administrative controls, breaker manipulations, or concurrent/independent verification techniques and how that operator experience has been
considered in the proposed LAR.
TVA Response to RAI 3 TVA reviewed SQN condition reports associated with misposition events and did not identify any relevant operating experience (OE) at SQN related to failure of administrative controls, breaker manipulations, or concurrent/independent verification techniques that would affect procedural requirements related to the ERCW MCCs. As stated in the referenced letter:
"TVA procedure for 480V ERCW MCCs has concurrent verification (CV) to reduce the likelihood of a human performance event.
Five manual actions with CV steps involving four circuit breakers must be taken to manually make the transfer from the MCC normal supply to the alternate supply. An operations procedure step would have to be incorrectly followed and incorrectly verified (CV) for this failure to occur."
Additionally, TVA has revised SQN procedures 1,2-SO-201-9 to include details on expected annunciators and an additional check to prevent unintended paralleling of ERCW transformers.
These methods are in alignment with NPG
-SPP-22.206, "Verification Program." The response to RAI-2 further describes the administrative controls, breaker manipulations, and concurrent/independent verification techniques along with defense-in-depth measures to provide reasonable assurance of prevention of credible errors.
Reference TVA Letter to NRC, CNL 150, "Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report Sequoyah Nuclear Plant Units 1 and 2 (SQN-TS-17-04)," dated March 9, 2018 (ML18071A349)