Acceptance for Review of Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementation the Performance-Based Option of 10 CFR Part 50, Appendix J
ML093020074
Person / Time
Site: Nuclear Energy Institute
Issue date: 11/03/2009
From: Rosenberg S L
NRC/NRR/DPR/PSPB
To: Riley J H
Nuclear Energy Institute
Mensah T
References
TAC ME2164
Download: ML093020074 (4)


Text

November 3, 2009

Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE (NEI)

TOPICAL REPORT 94-01, REVISION 2-A SUPPLEMENT 1, "INDUSTRY GUIDELINE FOR IMPLEMENTING THE PERFORMANCE-BASED OPTION OF 10 CFR PART 50, APPENDIX J" (TAC NO. ME2164)

Dear Mr. Riley:

By letter dated September 2, 2009, NEI submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) 94-01, Revision 2-A Supplement 1, "Industry Guideline For Implementing The Performance-Based Option Of 10 CFR Part 50, Appendix J." The NRC staff has performed an acceptance review of the TR 94-01, Revision 2-A Supplement 1, and found that the material presented provides the technical information in sufficient detail to enable the staff to complete a detailed technical review. The NRC staff expects to issue its request for additional information by November 30, 2009, and issue its draft safety evaluation by March 12, 2010. The NRC staff estimates that the review will require approximately 100 staff hours including project management time. The review schedule milestones were discussed and agreed upon in an e-mail between Ms. Tanya Mensah and Ms. Julie Keys, Senior Project Manager, on October 29, 2009.

In accordance with the letter dated August 6, 2009 (Agencywide Documents Access and Management System Accession No. ML093060238), the Office of the Chief Financial Officer has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.

Sincerely, /RA/ Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689

cc: See next page Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE (NEI)

TOPICAL REPORT 94-01, REVISION 2-A SUPPLEMENT 1, "INDUSTRY GUIDELINE FOR IMPLEMENTING THE PERFORMANCE-BASED OPTION OF 10 CFR PART 50, APPENDIX J" (TAC NO. ME2164)

Dear Mr. Riley:

By letter dated September 2, 2009, NEI submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) 94-01, Revision 2-A Supplement 1, "Industry Guideline For Implementing The Performance-Based Option Of 10 CFR Part 50, Appendix J." The NRC staff has performed an acceptance review of the TR 94-01, Revision 2-A Supplement 1, and found that the material presented provides the technical information in sufficient detail to enable the staff to complete a detailed technical review. The NRC staff expects to issue its request for additional information by November 30, 2009, and issue its draft safety evaluation by March 12, 2010. The NRC staff estimates that the review will require approximately 100 staff hours including project management time. The review schedule milestones were discussed and agreed upon in an e-mail between Ms. Tanya Mensah and Ms. Julie Keys, Senior Project Manager, on October 29, 2009.

In accordance with the letter dated August 6, 2009 (Agencywide Documents Access and Management System Accession No. ML093060238), the Office of the Chief Financial Officer has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.

Sincerely, /RA/ Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689

cc: See next page

DISTRIBUTION

PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMTMensah RidsOgcMailCenter RidsNrrDssScvb RidsNRRDeEmcb SRosenberg (Hardcopy)

ADAMS ACCESSION NO.:ML093020074 NRR-106 OFFICE PSPB/PM PSPB/LA SCVB/BC PSPB/BC

NAME TMensah DBaxley (CHawes for) RDenning SRosenberg DATE 11/2/09 11/2/09 11/3/09 11/3/09 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689

cc:

Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Nuclear Generation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org

Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org

Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com

Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com

Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com

Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org

Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org

Dennis Buschbaum PWROG Chairman Comanche Peak Steam Electric Station 6322 North Farm to Marked Rd 56 Mail Code E15 Glen Rose, TX 76043 Dennis.Buschbaum@luminant.com