ML080780600

From kanterella
Jump to navigation Jump to search

Acceptance for Review of Nuclear Energy Institute Topical Report Material Reliability Program
ML080780600
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 03/25/2008
From: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
To: Jeffrey Riley
Nuclear Energy Institute
Mensah, Tanya NRR/DPR/PSPB 415-3610
References
TAC MD8005
Download: ML080780600 (5)


Text

March 25, 2008 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIAL RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD 8005)

Dear Mr. Riley:

By letter dated September 7, 2005 (Agencywide Documents and Access Management System Accession (ADAMS) Accession No. ML052520325), the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) Material Reliability Program (MRP): Technical Basis For Preemptive Weld Overlays For Alloy 82/182 Butt Welds In Pressurized Water Reactors (MRP-169). In a letter to the NEI dated April 26, 2007, the NRC discontinued its review of MRP-169 (ADAMS Accession No. ML071130113). After an August 23, 2007, pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute (EPRI) indicated that they would submit the necessary documentation to re-initiate the NRCs review of MRP-169. By letter dated January 9, 2008, the NEI re-submitted for NRC staff review TR MRP-169 (ADAMS Package No. ML080780312).

The NRC staff has performed an acceptance review of the TR MRP-169. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by April 30, 2008, and issue its draft safety evaluation by August 22, 2008. The NRC staff estimates that the review will require approximately 250 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between Mike Melton, Senior Project Manager, and the NRC staff on March 18, 2008.

In accordance with the letter dated August 2, 2006 (ADAMS Accession No. ML061950468), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page

ML071130113). After an August 23, 2007, pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute (EPRI) indicated that they would submit the necessary documentation to re-initiate the NRCs review of MRP-169. By letter dated January 9, 2008, the NEI re-submitted for NRC staff review TR MRP-169 (ADAMS Package No. ML080780312).

The NRC staff has performed an acceptance review of the TR MRP-169. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by April 30, 2008, and issue its draft safety evaluation by August 22, 2008. The NRC staff estimates that the review will require approximately 250 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between Mike Melton, Senior Project Manager, and the NRC staff on March 18, 2008.

In accordance with the letter dated August 2, 2006 (ADAMS Accession No. ML061950468), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page ADAMS ACCESSION NO.: ML080780600 NRR-106 *concurred by email OFFICE PSPB/PM PSPB/LA CPNB/BC* PSPB/BC NAME TMensah DBaxley TChan SRosenberg DATE 3/ /08 3/ /08 3/17/08 3/25 /08 ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIAL RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169)

Date: March 25, 2008 DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrTMensah RidsOgcMailCenter RidsNRRDciCpnb ESullivan JTsao SRosenberg (Hardcopy)

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. John Butler, Director Mr. Anthony Pietrangelo, Vice President Safety-Focused Regulation Regulatory Affairs Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jcb@nei.org arp@nei.org Mr. James H. Riley, Director Mr. Jack Roe, Director Engineering Operations Support Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jhr@nei.org jwr@nei.org Mike Melton, Senior Project Manager Mr. Charles B. Brinkman 1776 I Street, NW, Suite 400 Washington Operations Washington, DC 20006-3708 ABB-Combustion Engineering, Inc. man@nei.org 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Chris Larsen brinkmcb@westinghouse.com Vice President and Chief Nuclear Officer EPRI Mr. James Gresham, Manager 3412 Hillview Avenue Regulatory Compliance and Plant Licensing Palo Alto, CA 94304-1338 Westinghouse Electric Company dblarsen@epri.com P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. David J. Modeen greshaja@westinghouse.com Director, External Affairs EPRI Ms. Barbara Lewis 1300 W. T. Harris Boulevard Assistant Editor Charlotte, NC 28262-8550 Platts, Principal Editorial Office dmodeen@epri.com 1200 G St., N.W., Suite 1100 Washington, DC 20005 Dr. Sean Bushart Barbara_lewis@platts.com EPRI 3412 Hillview Avenue Mr. Alexander Marion, Executive Director Palo Alto, CA 94304-1338 Nuclear Operations & Engineering sbushart@epri.com Nuclear Energy Institute 1776 I Street, NW, Suite 400 Mr. Kurt Edsinger Washington, DC 20006-3708 EPRI am@nei.org 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com

Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dstenin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com