ML071620171

From kanterella
Jump to navigation Jump to search

Acceptance for Review of Topical Report Nuclear Energy Institute 04-10, Revision 1, Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies
ML071620171
Person / Time
Site: Nuclear Energy Institute
Issue date: 06/19/2007
From: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
To: Bradley B
Nuclear Energy Institute
Mensah T
References
NEI 04-10, Rev 1, TAC MD5333
Download: ML071620171 (3)


Text

June 19, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF TOPICAL REPORT (TR) NUCLEAR ENERGY INSTITUTE 04-10, REVISION 1, RISK-INFORMED TECHNICAL SPECIFICATION INITIATIVE 5B, RISK-INFORMED METHOD FOR CONTROL OF SURVEILLANCE FREQUENCIES (TAC NO. MD5333)

Dear Mr. Bradley:

By letter dated April 19, 2007, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review TR NEI 04-10, Revision 1, Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies. The NRC staff has performed an acceptance review of TR NEI 04-10, Revision 1. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by October 31, 2007, and issue its draft safety evaluation by April 14, 2008. The NRC staff estimates that the review will require approximately 230 staff hours including project management time. The review schedule milestones and estimated review costs were agreed upon by an exchange of emails between yourself and Tanya Mensah on May 23, 2007, and May 24, 2007.

In accordance with the letter dated January 10, 2003, (Agencywide Documents Access and Management System Accession No. ML030100090), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

June 19, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF TOPICAL REPORT (TR) NUCLEAR ENERGY INSTITUTE 04-10, REVISION 1, RISK-INFORMED TECHNICAL SPECIFICATION INITIATIVE 5B, RISK-INFORMED METHOD FOR CONTROL OF SURVEILLANCE FREQUENCIES (TAC NO. MD5333)

Dear Mr. Bradley:

By letter dated April 19, 2007, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review TR NEI 04-10, Revision 1, Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies. The NRC staff has performed an acceptance review of TR NEI 04-10, Revision 1. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by October 31, 2007, and issue its draft safety evaluation by April 14, 2008. The NRC staff estimates that the review will require approximately 230 staff hours including project management time. The review schedule milestones and estimated review costs were agreed upon by an exchange of emails between yourself and Tanya Mensah on May 23, 2007, and May 24, 2007.

In accordance with the letter dated January 10, 2003, (Agencywide Documents Access and Management System Accession No. ML030100090), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrCpnb RidsNrrApla RidsNrrCptb RidsNrrEgca RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcMailCenter SRosenberg (Hardcopy) RGrover TTjader ADAMS ACCESSION NO.: ML071620171 NRR-106 OFFICE PSPB/PM PSPB/LA APLA/BC ITSB/BC PSPB/BC NAME TMensah DBaxley MRubin TKobetz SRosenberg DATE 6/ 18 /07 6/14 /07 6/ 1 /07 6/ 19 /07 6/ 19 /07 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 cc:

Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mike Melton, Senior Project Manager Federal and Industry Activities, Nuclear 1776 I Street, NW, Suite 400 Sector Washington, DC 20006-3708 EPRI man@nei.org 2000 L Street, NW, Suite 805 Washington, DC 20036 Mr. James H. Riley, Director gvine@epri.com Engineering Nuclear Energy Institute Mr. James Gresham, Manager 1776 I Street, NW Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company jhr@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com 3/8/07