Acceptance for Review of Pressurized Water Reactor Owners Group Topical Report WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station
ML070810506
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/03/2007
From: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
To: Bradley B
Nuclear Energy Institute
Mensah T
References
TAC MD4229
Download: ML070810506 (3)


Text

April 3, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF PRESSURIZED WATER REACTOR OWNERS GROUP TOPICAL REPORT WCAP-16308-NP, 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)

Dear Mr. Bradley:

By letter dated September 25, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. The NRC staff has performed an acceptance review of TR WCAP-16308-NP. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by August 24, 2007, and issue its draft safety evaluation by June 26, 2008. The NRC staff estimates that the review will require approximately 700 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between yourself and Tanya Mensah on March 21, 2007.

In accordance with the letter dated December 26, 2006 (Agencywide Documents Access and Management System Accession No. ML063610018), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page

April 3, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF PRESSURIZED WATER REACTOR OWNERS GROUP TOPICAL REPORT WCAP-16308-NP, 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)

Dear Mr. Bradley:

By letter dated September 25, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. The NRC staff has performed an acceptance review of TR WCAP-16308-NP. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by August 24, 2007, and issue its draft safety evaluation by June 26, 2008. The NRC staff estimates that the review will require approximately 700 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between yourself and Tanya Mensah on March 21, 2007.

In accordance with the letter dated December 26, 2006 (Agencywide Documents Access and Management System Accession No. ML063610018), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrCpnb RidsNrrApla RidsNrrCptb RidsNrrEgca RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcMailCenter SRosenberg (Hardcopy)

ADAMS ACCESSION NO.: ML070810506 NRR-106 OFFICE PSPB/PM PSPB/LA APLA/BC CPTB/BC CPNB/BC EGCA/BC PSPB/BC NAME TMensah DBaxley MRubin JMcHale TChan KManoly SRosenberg DATE 4/ 3 /07 4/ 3 /07 3/14/07 3/1/07 3/19/07 3/15 /07 4/ 3 /07 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 cc:

Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mike Melton, Senior Project Manager Federal and Industry Activities, Nuclear 1776 I Street, NW, Suite 400 Sector Washington, DC 20006-3708 EPRI man@nei.org 2000 L Street, NW, Suite 805 Washington, DC 20036 Mr. James H. Riley, Director gvine@epri.com Engineering Nuclear Energy Institute Mr. James Gresham, Manager 1776 I Street, NW Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company jhr@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com