April 3, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
ACCEPTANCE FOR REVIEW OF PRESSURIZED WATER REACTOR OWNERS GROUP TOPICAL REPORT WCAP-16308-NP, 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)
Dear Mr. Bradley:
By letter dated September 25, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. The NRC staff has performed an acceptance review of TR WCAP-16308-NP. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by August 24, 2007, and issue its draft safety evaluation by June 26, 2008. The NRC staff estimates that the review will require approximately 700 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between yourself and Tanya Mensah on March 21, 2007.
In accordance with the letter dated December 26, 2006 (Agencywide Documents Access and Management System Accession No. ML063610018), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
April 3, 2007 Mr. Biff Bradley, Director Risk Assessment Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
ACCEPTANCE FOR REVIEW OF PRESSURIZED WATER REACTOR OWNERS GROUP TOPICAL REPORT WCAP-16308-NP, 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC NO. MD4229)
Dear Mr. Bradley:
By letter dated September 25, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. The NRC staff has performed an acceptance review of TR WCAP-16308-NP. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by August 24, 2007, and issue its draft safety evaluation by June 26, 2008. The NRC staff estimates that the review will require approximately 700 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between yourself and Tanya Mensah on March 21, 2007.
In accordance with the letter dated December 26, 2006 (Agencywide Documents Access and Management System Accession No. ML063610018), the fee branch has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrCpnb RidsNrrApla RidsNrrCptb RidsNrrEgca RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsOgcMailCenter SRosenberg (Hardcopy)
ADAMS ACCESSION NO.: ML070810506 NRR-106 OFFICE PSPB/PM PSPB/LA APLA/BC CPTB/BC CPNB/BC EGCA/BC PSPB/BC NAME TMensah DBaxley MRubin JMcHale TChan KManoly SRosenberg DATE 4/ 3 /07 4/ 3 /07 3/14/07 3/1/07 3/19/07 3/15 /07 4/ 3 /07 OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org