Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0930200742009-11-0303 November 2009 Acceptance for Review of Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementation the Performance-Based Option of 10 CFR Part 50, Appendix J Project stage: Acceptance Review ML0933405412009-12-0303 December 2009 Request for Additional Information Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementing the Performance-Based Option of 10 CFR Part 50, Appendix J. Project stage: RAI ML1108903142011-04-21021 April 2011 Letter Revision 3 to Nuclear Energy Institute (NEI) NUMARC 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J Project stage: Other ML12226A5462012-12-0606 December 2012 NEI TR 94-01, Rev 3-A Approval Letter Project stage: Other 2009-12-03
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML14031A1582014-02-0303 February 2014 Acceptance Letter - NEI 13-10 Cyber Security Control Assessment ML1106600432011-03-19019 March 2011 Acceptance for Review of TR NEI 09-10, Rev 1, Guidelines for Effective Prevention and Management of System Gas Accumulation ML0930200742009-11-0303 November 2009 Acceptance for Review of Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A Supplement 1, Industry Guideline for Implementation the Performance-Based Option of 10 CFR Part 50, Appendix J ML0807806002008-03-25025 March 2008 Acceptance for Review of Nuclear Energy Institute Topical Report Material Reliability Program ML0716201712007-06-19019 June 2007 Acceptance for Review of Topical Report Nuclear Energy Institute 04-10, Revision 1, Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies ML0712004922007-05-14014 May 2007 Acceptance for Review of Topical Report No. NEI 07-03, Generic FSAR Template Guidance for Radiation Protection Program Description, Revision 0 (Project No. 689; TAC MD5248) ML0708105062007-04-0303 April 2007 Acceptance for Review of Pressurized Water Reactor Owners Group Topical Report WCAP-16308-NP, 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station ML0635203892006-12-20020 December 2006 Acceptance for Review of Topical Report No. NEI 06-13, Industry Training Program Description, Nuclear Energy Institute, Revision 0 (Project No. 689) ML0630404182006-11-22022 November 2006 Acceptance for Review of Topical Report No. NEI 06-14, Quality Assurance Program Description, Nuclear Energy Institute, Revision 0 (Project No. 689) ML0631203352006-11-14014 November 2006 Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software ML0606901582006-04-0505 April 2006 Acceptance for Review of NEI Submittal of EPRI Report 1009684, CEUS Ground Motion Project Final Report ML0222100072002-08-0808 August 2002 Acceptance Review of EPRI Report TR-1002865, Topical Report on Reactivity Initiated Accident: Bases for Ria Fuel and Core Coolability Criteria. 2014-02-03
[Table view] Category:Letter
MONTHYEARML24310A0552024-11-0404 November 2024 Comment (001) - Request for Extension of Comment Period from the Nuclear Energy Institute on Part 53 Rulemaking - Risk-Informed Technology-Inclusive Regulatory Framework for Advanced Reactors ML24307A0012024-10-31031 October 2024 Fee Exemption Extension Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems ML24304A3482024-10-29029 October 2024 10-29-24 NEI Letter to NRC Status and Way Forward on NEI 99-04 Revision 1 ML24302A3112024-10-28028 October 2024 NEI Input on Improvements to Licensing and Oversight Programs ML24274A3112024-09-30030 September 2024 Request for NRC Review and Endorsement of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML24255A0702024-09-0909 September 2024 09-09-24_NRC_Industry Timeliness Request Regarding Items Relied Upon for Safety ML24204A2162024-07-22022 July 2024 Withdrawal of Fee Exemption Request for Endorsement of NEI White Paper, Selection of a Seismic Scenario for an EPZ Boundary Determination ML24204A2082024-07-22022 July 2024 07-22-24_NRC_NEI Withdrawal of Fee Exemption Request for Wp Selection of Seismic Scenario for EPZ Determination ML24187A0552024-07-0303 July 2024 Fee Exemption Request for NEI White Paper Selection of Seismic Scenario for EPZ Determination ML24184C1212024-07-0202 July 2024 NEI - Request for NRC Endorsement of NEI 24-05 Revision 0, an Approach for Risk-Informed Performance-Based Emergency Planning ML24173A2712024-06-14014 June 2024 NEI - Proposed Changes to Inspection Procedure (IP) 71130.10, Cybersecurity ML24165A0862024-06-13013 June 2024 NEI White Paper - Proposed Control Room Dose Acceptance Criteria Supporting RG 1.183 R2 ML24165A0852024-06-13013 June 2024 NEI White Paper - Impact of Higher Source Term Fractions on EQ Doses ML24165A0872024-06-12012 June 2024 NEI White Papers Supporting NRC Workshop Discussions Regarding Nuclear Regulatory Commissions (NRC) Potential Changes to Regulatory Guide 1.183 ML24152A3242024-05-31031 May 2024 NEI Concept Paper: Regulation of Rapid High-Volume Deployable Reactors in Remote Locations ML24159A7312024-05-23023 May 2024 05-23-24 Nuclear Energy Institute Letter to the U.S. Nuclear Regulatory Commission Re Industry Comments on Buildings as Items Relied on for Safety ML24135A1982024-04-23023 April 2024 SFAQ No 2022-02, SAE Program Requirements - NEI Withdrawal Letter ML24078A2212024-03-15015 March 2024 3-15-24 NEI Letter Aveil from Juhle on Pur ML24061A0572024-02-29029 February 2024 Endorsement of NEI 08-09, Revision 7, Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations 2024-09-09
[Table view] |
Text
November 3, 2009 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE (NEI)
TOPICAL REPORT 94-01, REVISION 2-A SUPPLEMENT 1, INDUSTRY GUIDELINE FOR IMPLEMENTING THE PERFORMANCE-BASED OPTION OF 10 CFR PART 50, APPENDIX J (TAC NO. ME2164)
Dear Mr. Riley:
By letter dated September 2, 2009, NEI submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) 94-01, Revision 2-A Supplement 1, Industry Guideline For Implementing The Performance-Based Option Of 10 CFR Part 50, Appendix J. The NRC staff has performed an acceptance review of the TR 94-01, Revision 2-A Supplement 1, and found that the material presented provides the technical information in sufficient detail to enable the staff to complete a detailed technical review. The NRC staff expects to issue its request for additional information by November 30, 2009, and issue its draft safety evaluation by March 12, 2010. The NRC staff estimates that the review will require approximately 100 staff hours including project management time. The review schedule milestones were discussed and agreed upon in an e-mail between Ms. Tanya Mensah and Ms. Julie Keys, Senior Project Manager, on October 29, 2009.
In accordance with the letter dated August 6, 2009 (Agencywide Documents Access and Management System Accession No. ML093060238), the Office of the Chief Financial Officer has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page
Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
ACCEPTANCE FOR REVIEW OF NUCLEAR ENERGY INSTITUTE (NEI)
TOPICAL REPORT 94-01, REVISION 2-A SUPPLEMENT 1, INDUSTRY GUIDELINE FOR IMPLEMENTING THE PERFORMANCE-BASED OPTION OF 10 CFR PART 50, APPENDIX J (TAC NO. ME2164)
Dear Mr. Riley:
By letter dated September 2, 2009, NEI submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report (TR) 94-01, Revision 2-A Supplement 1, Industry Guideline For Implementing The Performance-Based Option Of 10 CFR Part 50, Appendix J. The NRC staff has performed an acceptance review of the TR 94-01, Revision 2-A Supplement 1, and found that the material presented provides the technical information in sufficient detail to enable the staff to complete a detailed technical review. The NRC staff expects to issue its request for additional information by November 30, 2009, and issue its draft safety evaluation by March 12, 2010. The NRC staff estimates that the review will require approximately 100 staff hours including project management time. The review schedule milestones were discussed and agreed upon in an e-mail between Ms. Tanya Mensah and Ms. Julie Keys, Senior Project Manager, on October 29, 2009.
In accordance with the letter dated August 6, 2009 (Agencywide Documents Access and Management System Accession No. ML093060238), the Office of the Chief Financial Officer has waived the Section 170.21 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689 cc: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMTMensah RidsOgcMailCenter RidsNrrDssScvb RidsNRRDeEmcb SRosenberg (Hardcopy)
ADAMS ACCESSION NO.:ML093020074 NRR-106 OFFICE PSPB/PM PSPB/LA SCVB/BC PSPB/BC NAME TMensah DBaxley RDenning SRosenberg (CHawes for)
DATE 11/2/09 11/2/09 11/3/09 11/3/09 OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 cc:
Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Nuclear Generation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com
Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Dennis Buschbaum PWROG Chairman Comanche Peak Steam Electric Station 6322 North Farm to Marked Rd 56 Mail Code E15 Glen Rose, TX 76043 Dennis.Buschbaum@luminant.com