Pilgrim - Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03, Rev. 3
ML080460065
Person / Time
Site: Pilgrim
Issue date: 01/31/2008
From: Bethay S J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.08.007, PR-03, Rev 3
Download: ML080460065 (128)


Text

EnteW Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment January 31, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03, Rev. 3 LETTER NUMBER:

REFERENCES:

2.08.007 1. NRC Letter, Pilgrim Nuclear Power Station-Entergy Relief Request PR-03, High Pressure Coolant Injection Pump (TAC NO. MB8773)dated August 29, 2005 2. Entergy Letter No. 2.06.008, Pilgrim Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03, Rev. 3, dated June 29, 2006 3. Entergy Letter No. 2.07.056, Response to NRC Request for Additional Information Related to Pilgrim In-service Tesiing (IST)Relief Request PR-03 (TAC NO. MD2478), July 12, 2007

Dear Sir or Madam:

By this letter Entergy submits the HPCI Pump Relief Request PR-03, Revision 3 (Attachment 1)for NRC approval to continue for the remaining duration of the IST interval the alternative testing previously approved by the NRC in Reference

1. The PR-03 Rev. 3 includes updated information based on the results of NRC approved alternative comprehensive test and additional information concerning the alternative testing.Entergy submitted Relief Request, PR-03, Rev. 2 for the fourth IST interval and NRC approved the alternative testing for use until August 29, 2008. The fourth IST interval began on December 7, 2002 and ends on December 6, 2012.Entergy submitted additional information by Reference 3 in response to NRC Request for Additional Information.

This response stated that Entergy will provide an assessment of the HPCI pump vibration and performance assessment by an independent contractor.

Attachment 2 provides Reference 3 in its entirety and Attachment 3 provides the contractor report in support of the HPCI Pump Relief Request, PR-03, Rev. 3.208007;t , ldllegý47 Entergy Nuclear Operations, Inc. Letter Number: 2.08.007 Pilgrim Nuclear Power Station Page 2 The scope of this relief applies to ASME OMa-1996, ISTB 5.2.3, Comprehensive Test for HPCI pumps and includes confirmation of operational readiness of HPCI pumps based on the NRC approved alternative comprehensive test results and historical pump test data.Pursuant to 10 CFR 50.55 a(a)(3)(i), Entergy proposes to continue to use the alternative testing to comply with ISTB 5.2.3. The proposed alternative provides an acceptable level of quality and safety because it verifies the operational readiness of the as-built configuration of the HPCI pump, and the historical data has shown no signs of degradation in the HPCI pump.Pilgrim intends to continue to perform the alternative comprehensive HPCI surveillance test as approved for the remaining duration of the Fourth IST interval.This letter contains no new commitments.

If you have any questions or require additional information, please contact Mr. Joseph Lynch, Licensing Manager, at (508) 830-8403.Sincerely, S*teph, n J. B3ethay WGL/dl

Attachment:

1. HPCI Pump Relief Request, PR-03,,Revision 3 (86 pages)2. Reference 3, Entergy Letter No. 2.07.056, dated July 12, 2007 (25 pages)3. Contractor Report, "Independent Assessment of Pilgrim High Pressure Coolant Injection Pump Vibration and Performance", dated January, 2008 (14 pages)cc: Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 208007 ATTACHMENT 1 HPCI Pump Relief Request, PR-03, Revision 3. (8 gages)Enclosure 1 to PR-03, Rev. 3 (11 paqes)Enclosure 2 to PR-03, Rev. 3 (66 paaes)(Total 86 pages)

PUMP RELIEF REQUEST PR-03, Revision 3 PUMP: P-205 (Main/Booster)

SYSTEM: High Pressure Coolant Injection (HPCI)CLASS: 2 FUNCTION:

Provides emergency core cooling subsequent to a small break LOCA.TEST REQUIREMENTS:

ASME OM Code OMa-1996, ISTB 5.2.3, Comprehensive Test ISTB 5.2.3(d):

Vibration (displacement or velocity) shall be determined and compared with corresponding reference values. Vibration measurements are to be broad band (unfiltered).

If velocity measurements are used, they shall be peak. If displacement amplitudes are used, they shall be peak-to-peak.

1ISTB 5.2.3(e):

All deviations from the reference values shall be compared with the ranges of Tables ISTB 5.2.1-1 and ISTB 5.2.3-1 and corrective action taken as specified in paragraph ISTB 6.2. The vibration measurements shall be compared to the relative and absolute criteria shown in the Alert and Required Action Ranges of Table ISTB 5.2.1-1. For example, if vibration exceeds either 6 Vr or 0.7 in./sec, the pump is in the Required Action Range.RELIEF REQUESTED:

Relief is requested from the ASME OMa-1996, ISTB 5.2.3(d) required method of determining the vibration velocity (Vv) overall value for surveillance test use and for establishing reference values for the HPCI Main pump inboard (turbine side) bearing horizontal point (P3H) and the Main pump outboard (gearbox side) bearing horizontal point (P4H). PNPS proposes that the vibration occurring at the discrete frequency component that is at exactly 4x Booster pump RPM not be included as part of-the vibration spectrum vector summing process to obtain the Main pump overall value for these points during comprehensive pump testing. This method is equivalent to extracting the discrete frequency component that is at exactly 4x Booster pump RPM from the broad band vibration spectrum.

Since ISTB-5.2.3(d) requires broad band, vibration measurements, NRC approved alternative testing is required to demonstrate the operational readiness of the HPCI pump taking into account the as-built configuration of the HPCI pump as specified in ISTB 4.3(g) and associated footnote.Pilgrim requests relief from the Code requirements of paragraph ISTB 5.2.3(e) for the HPCI Main and Booster Pumps specifically from the vibration velocity (Vv) acceptance criteria specified in Table ISTB 5.2.1-1 for all Main pump and Booster pump vibration points except for the Booster pump outboard horizontal axial vibration point (P8A). Pilgrim proposes to expand the Acceptable Range identified in Table ISTB 5.2.1-1, for pump Quarterly and Biennial Comprehensive vibration monitoring.

BASIS FOR RELIEF: Relief from the referenced Code requirements is based on the determination that the proposed alternative testing would provide an acceptable level of quality and safety in accordance with 10 CFR 50.55 a(a)(3)(i), as evidenced by the results of recent pump tests performed in November 2005 and February 2006, and historical vibration test data.Page 1 of 8 Historic testing and analysis performed on the HPCI System by PNPS (and the pump manufacturer) have consistently revealed characteristic pump vibration levels that exceed the acceptance criteria stated in Table ISTB 5.2.1-1. High vibration appears on the Main pump bearing housings at approximately 2x RPM in the horizontal direction, which is caused by Booster pump excitation (at 4x RPM of the booster pump). Under normal circumstances at 4000 rpm, the vibration amplitude at the Main pump bearings in the horizontal direction exceeds the OM Code absolute vibration Required Action Range of.> 0.7 in./sec. Additionally, under the same conditions, all of the remaining HPCI Main and Booster pump vibration monitoring points, except for two, typically exceed the OM Code absolute acceptable range upper value of 0.325 in./sec.The vibration characteristics of the HPCI pump are predominantly a function of the pump design and should be identified as such rather than attributed to pump degradation.

The high vibration has been present to the same order of magnitude since the pump was new. Although existing vibration levels of the HPCI pump are higher than the acceptance criteria provided in Table ISTB 5.2.1-1, they reflect the unique operating characteristics of the HPCI pump design configuration.

There are no major vibrational concerns that would result in pump degradation or would prevent the HPCI pump from performing its design safety function for an extended period of operation.

The purpose of the Code required testing is to demonstrate the operational readiness of the HPCI pump by monitoring pump vibrations for degradation and taking corrective actions when those vibration levels exceed the Code specified values. The Code specifies in ISTB 4.3(g)footnote that the reference vibration measurements should be representative of the pump and that the measured vibration will not prevent the pump from fulfilling its function.

Accordingly, Pilgrim is proposing an alternative testing to demonstrate the operational readiness by taking into consideration the vibration measurements representative of the as-built configuration of the HPCI pump.Alternate Testing to the ASME OMa-1996 Code: Pilgrim proposes alternative testing as follows.1.ý The alternative testing proposes to remove the 4x Booster pump RPM frequency component (discrete peak) from the vibration spectrum of the Main pump since its amplitude is not related to the physical condition or rotating dynamics of the Main pump rotor or bearing system. The Main pump vibration spectrum, with this single 4x Booster pump RPM frequency component removed, has been shown to be stable and more useful for monitoring actual pump condition.

When this vibration frequency component at 4x Booster pump RPM is subtracted from the Main pump vibration spectrum the remaining vibration, which is attributed to the Main pump, is below the OM Code Required Action Range. This corrected vibration level provides a more representative measurement of the pump condition to be used for trending.2. All other discrete vibration peaks observed at the Main pump horizontal vibration points will be evaluated during each pump vibration test, and will have an Acceptable Range upper limit of 1.05 Vr and an Alert Range upper limit 1.3 Vr. The reviews of the frequency spectrum data ensure that any significant change in the vibration signature will be noted regardless of whether the severity causes the overall level to exceed its criteria.

For example, if the overall vibration level is acceptable but the Ix RPM component has increased to greater than 1.3 times the reference value overall level (Vr), then the pump will be placed in the vibration Required Action Range (>0.7in./sec).

Page 2 of 8 I

3. PNPS will increase the ASME OMa-1996, ISTB 5.2.3 required frequency for vibration monitoring (that is part of the comprehensive testing) from once/2 years to once/year.

The Code required comprehensive test for flow rates would continue to be once/2 years.Given that the HPCI vibration will normally exceed the OM Code limiting Alert Range of>0.325 in./sec, the once/year frequency will be doubled to twice/year.

The twice/year frequency will be the commitment frequency.

However, the normal PNPS practice will be to monitor vibration in the same manner during each of the Quarterly Group B Hydraulic Tests, whenever practicable.

Thus, vibration monitoring will be performed up to 8 times in two years as part of the Group B Hydraulic Tests; instead of once/2 years as part of the Comprehensive pump tests.4. As normal practice, Pilgrim will continue to monitor vibration of HPCI pump during each of the Quarterly Group B Hydraulic Tests in the same manner as required by the OM Code. The preventive maintenance (PM) procedure will also typically be performed, which provides for vibration monitoring of specific pumps for preventive maintenance and balancing, and includes vibration monitoring and trending of the HPCI pump to detect and monitor changes in equipment conditions.

As shown in the HPCI pump configuration figure, vibration monitoring is performed at locations required by the OM Code and at additional locations within the scope of the PM procedure (perpendicular to the shaft in the horizontal and vertical positions at each bearing locations and at axial direction to the shaft). Vibration monitoring is thereby routinely performed for the Main pump, Booster pump, Speed Reduction Gearbox, and Steam Turbine. Using the vibration data collected at these points, an accurate diagnosis is made by analyzing the vibration spectrum and planned maintenance is determined to prevent failures.

Thus, HPCI pump vibration monitoring will be performed up to 8 times in 2 years as part of Group B Hydraulic Tests and preventive or corrective maintenance will be implemented as necessary to prevent failures.

Enclosures 1 and 2 provide HPCI pump vibration spectrum at locations required by the OM Code procedure.

5. Pilgrim will continue current HPCI pump and turbine monitoring and maintenance activities, with changes as conditions warrant, as follows:* Quarterly pump and valve operability tests will be performed to ensure the HPCI pump and turbine function for the intended safety function.* Quarterly lubrication oil sampling and periodic laboratory analysis as appropriate for the pressure-fed bearings on the Turbine, Main pump, and Gear Reducer and once/cycle (2 years) sampling and analysis for the non-pressure fed Booster pump will be performed.

Lubrication oil analysis currently performed includes viscosity, acidity, residue, water content, metals by A.E. spectrometry, and ferrogram readings.This type of monitoring will detect degradation of the turbine or pump bearings due to accelerated wear, fretting, surface fatigue, or oil contamination." HPCI pump and Turbine lube oil system is serviced as-needed weekly. HPCI gland seal condenser hot well pump and motor bearings and HPCI auxiliary lube oil pump and motor bearings are serviced semiannually for lubrication." HPCI Turbine/Main pump, Main pump/Reducer, and Reducer/Booster pump gear-type shaft couplings are cleaned, examined, and grease-lubricated every 2 years.These examinations detect excessive wear, fretting, heating, or fatigue due to any unusual loading conditions.

Past monitoring and maintenance activities have shown no evidence or observations of degradation in the HPCI Turbine, Main pump, Gear Reducer, or Booster pump. The Page 3 of 8 attached HPCI and Booster pump historical vibration spectrum (Attachment

4) supports this conclusion.

Thus, the continuation of the above periodic monitoring and maintenance activities will ensure that the HPCI pump remains in a high level of operational readiness and that degradation of HPCI pump mechanical condition, reliability, or performance will be detected and corrected in a timely manner.Technical Justification:

PNPS has conducted an evaluation of the HPCI pump vibration characteristics.

An important conclusion of this evaluation is that the mechanical condition of the Main pump can be monitored satisfactorily by disregarding the single frequency component caused by the excitation at 4x Booster pump RPM. The four-vane impeller of the Booster pump generates the excitation force hydraulically.

This small pressure pulsation force exists at the vane passing frequency (number of vanes times RPM) for all centrifugal pumps and is usually seen as a significant but not particularly troublesome component on the frequency spectrum for vibration measurements taken at the bearing housings.

For the HPCI pump, this vane passing frequency is a problem because it coincides with a hydraulic standing wave resonance in the cross-over piping from the Booster pump to the Main pump when the machine is operating at the rated speed of 4000 RPM. There is an acoustic pressure standing wave pattern, at the 4x RPM frequency, whose wavelength in water is equal to an even fraction (1/4 or 1/2) of the dimensional length inside the cross-over pipe. This is the same principle on which an organ pipe generates a pure tone pneumatic pressure standing wave.In addition, and exacerbating the vibration resonance condition, the Main pump pedestal experiences a horizontal structural primary rocking mode of the pump pedestal at this same frequency when the Main pump is operating at the rated speed of 4000 RPM. The vibration mode is the second fundamental rocking mode, which is a torsional or twisting mode where the two end bearings move 180 degrees out of phase horizontally.

The result of these coincident acoustic and structural resonances is that the Main pump exhibits high vibration in the horizontal direction at the 4x Booster pump RPM frequency.

This is solely due to the excitation from the Booster pump being amplified by the coincident resonances.

This level of vibration at 4x Booster pump RPM would be seen on the Main pump bearing housings even if the Main pump was not actually running (which is not possible as both pumps are on the same drive train).The resonant vibration condition at the 4000 RPM operating speed is not detrimental and will not prevent the HPCI pump from fulfilling its function,.

At the 134 HzJfrequency of the resonant vibration on the Main pump, caused by the excitation at 4x Booster pump RPM, the actual displacement amplitude at 0.7 in/sec peak velocity amplitude is 0.0017 inches peak-to-peak.

This displacement imposes negligible alternating stresses on the pump pedestal, housings, and connected piping. The peak-to-peak displacement is also less than the Main pump fluid film journal bearing clearances and would impose negligible loading to these bearings.The purpose of the ASME OM Code for pump testing is to monitor pumps for degradation.

The concept of vibration monitoring is to establish baseline values for vibration when the pump is known to be in good working condition, such as after a maintenance overhaul.

From that reference point, trending is performed to monitor for degradation based on the ratio of subsequent vibration levels relative to the reference values. The OM Code also establishes absolute vibration level criteria for Alert (>0.325 in/sec) and Required Action (>0.7 in/sec). In doing so, it was recognized that absolute vibration level limits (as opposed to relative change or ratio limits) are not always quantitatively linked directly with pump physical condition and the following remarks are stated in the ASME OMa Code 1996: Vibration measurements of pumps may be foundation, driver, and piping dependent.

Therefore, if initial vibration readings are high and have no obvious relationship to the Page 4 of 8 pump, then vibration measurements should be taken at the driver, at the foundation, and on the piping and analyzed to ensure that the reference vibration measurements are representative of the pump and that the measured vibration levels will not prevent the pump from fulfilling its function.

" An important conclusion of the PNPS HPCI pump vibration evaluation is that the mechanical condition of the Main pump can be monitored satisfactorily by disregarding the single frequency component caused by the excitation at 4x Booster pump RPM. A single peak frequency component can be effectively isolated and deleted from a vibration spectrum using the mean-squared subtraction method, that is, the discrete component amplitude (in/sec peak) is squared and subtracted from the spectrum overall level squared, then the square root of that difference represents the overall vibration level that exists without the energy contributed by the deleted component.

It has been found that when this method is used, the remaining vibration overall level is much more consistent, stable, and trendable.

This method of vibration level correction has been applied to historical spectrums.

The 4x Booster pump RPM component was taken out of the calculation for the main pump overall vibration level. This data shows that when the 4x Booster pump RPM component is deleted from the Main pump vibration, the level is below the Required Action Range (> 0.7 in./sec) but still within the Alert Range (> 0.325 in./sec).

It was also shown that the potential effects from the dynamic alignment of pump shaft couplings (at 2X Main pump RPM) can still be monitored effectively.

The vibration spectra derived from the NRC approved alternative test conducted in November 2005 conforms to the historical vibration spectra documented since 1994. Enclosure 1 provides the November 2005 test results and Enclosure 2 provides the historical tests results. Since the observed vibration spectra have not changed, no degradation in the established operational readiness of the HPCI pump has taken place. Also, the alternative test verifies the operational readiness of the HPCI pump in its as-built configuration as stipulated by ISTB 4.3(g) with corresponding footnote.Impact of Potential Modifications:

For the HPCI Main and Booster pumps, it has been determined that the vibration is foundation and piping dependent.

To reduce the HPCI Main and Booster pump vibration down to levels that meet acceptable OM Code vibration criteria requires modifications to the HPCI pump, mounting components, foundation-and/or cross-over (interconnecting) piping.As suggested in a Byron Jackson Tech Note, this vibration may be improved by modifying the interconnecting piping and the Main pump mounting pedestal.

The alternative modification changes the Booster pump impeller from four to five vanes to alter the forcing function of the standing wave resonance.

The proposed Byron Jackson modifications, other than replacing the Booster pump impeller, are generally very difficult to implement successfully.

Altering the natural frequency of a large pump installation requires either considerable additions of stiffening components or substantial additions of mass. Often the results of such design changes are unsuccessful or unfavorable due to the variable speed operation requirements.

Modification of the HPCI Booster pump would require replacing the current four-vane impeller with an upgraded five-vane impeller.

The impeller modification, although yielding predictable results, requires extensive work to the HPCI pump at a time when such a major rebuild of this pump is not otherwise necessary or desired. The expected result would be a modest decrease in the vibration caused on the Main pump at 4000 RPM, although the vibration would remain Page 5 Of 8 above the 0.325 inch/sec Alert Range criteria.

A small decrease in hydraulic performance is also expected when changing from a four to five-vane impeller.

The proposed major modification would cost approximately

$500,000 without a compensating improvement in the pump vibration.

Most HPCI pump vibration points would remain above the 0.325 in./sec Alert Criteria.

Accordingly, the proposed modification would not achieve the underlying objective of performing the Code required testing without the need for Code relief.PNPS has also concluded that none of the possible modifications that could be performed on the HPCI pump, mounting pedestal, or cross-over piping are necessary.

This is primarily due to the nature of the HPCI pump service profile. The Byron Jackson Tech Note describes the following consideration in the Technical Discussion:

Pumping systems in which the vane passing pressure pulsations form standing waves in the attached piping are not unusual, especially if the pumps have a variable speed driver.Standing waves are highly dependent upon water temperature.

Thus, measured vibration amplitudes often vary from test to test. " The HPCI pump service is such that the pump runs for short periods of time at highly variable speeds. The pump inservice testing at PNPS is performed with the pump operating at or close to its rated speed (4000 RPM) and flow conditions (4250 GPM) that are unique to PNPS. For this particular pump configuration, this pump speed corresponds to the point where the acoustic resonant vibration is typically most pronounced.

In actual service for high pressure coolant injection to the reactor, the pump will operate at the speed that the flow controller requires to maintain reactor water level. The flow rate of 4250 GPM is the maximum makeup flow rate for which the HPCI System was intended to be capable of maintaining reactor water level. This flow rate is far in excess of the decay heat makeup water requirements for the reactor in the isolated condition in the absence of a major leak. The pump speed required is also dependent on reactor pressure with the required speed decreasing along with reactor pressure.The same general HPCI pump configuration is used at other plants but often with different pump impellers, rated speeds and plant design flow rates. For these plants the vibration characteristics at the inservice testing points are markedly different for that reason. The vibration monitoring performed (including a frequency spectral review) to date under the IST program and the PNPS Pump Vibration Monitoring Program has shown that there has not been degradation of these HPCI pump components.

Inservice Testing can be successfully performed for the PNPS HPCI pump using thie methods proposed in this relief request, along with monitoring and maintenance activities currently in practice.

Any significant degradation of the HPCI pump components will be readily identified using the vibration spectral analysis methods and other preventive monitoring activities described in this relief request. Therefore, Entergy believes that the proposed alternative testing and monitoring for the PNPS HPCI pump will provide an acceptable level of quality and safety in accordance with 10 CFR 50.55 a(a)(3)(i).

ALTERNATE TESTING: To allow for practicable monitoring of vibration levels on the HPCI pump, alternate vibration acceptance criteria are necessary.

A full spectrum review will be performed for all IST vibration points during each proposed comprehensive test, utilizing the following criteria.The table below provides the acceptance criteria that are applied to the overall vibration level for the Main pump. The note explains that for the horizontal Main pump points, the discrete frequency component at 4x Booster pump RPM will be extracted from the overall value using the mean-squared subtraction.

The two extracted discrete peaks (points P3H and P4H) will be Page 6 of 8 evaluated separately, and will have an Acceptance Range upper limit of 1.05Vr and Alert Range upper limit of 1.3Vr (where Vr equals the vibration reference overall value).The table boxes in bold italics have values that have been modified from the OM Code vibration criteria.

The Alert vibration range of 1.5Vr to 6Vr (in lieu of the OM Code range of 2.5Vr to 6Vr) has been applied as the modified OM vibration criteria.

The absolute limiting upper Alert Values (i.e. 0.375, 0.450, 0.500, 0.550, and 0.600) are based upon existing pump reference values, and fall between the values of 1.25Vr and 1.5Vr. All of the modified Alert Values have been compared to historical pump vibration data.The Table row for P8A is in compliance with the OM Code vibration criteria, and has been placed into this relief request for information only.MAIN PUMP**Test Vibration Point Acceptable Range Alert Range Required Action Parameter Ranae Vv Main pump** S1.5 Vr > 1.5 V, to 6 Vr > 6 Vr Horizontal but not or or Inboard (P3H) > 0.550 inWsec > 0.550 to 0.70 > 0.70 in./sec in/sec MV Main pump** S 1.5 V, > 1.5 V, to 6 V, > 6 Vr Horizontal but not or or Outboard (P4H) > 0.600 in/sec > 0.600 to 0.70 > 0.70 in./sec in/sec V Main pump 1.5 Vr > 1.5 Vr to 6 V, > 6 Vr Vertical but not or or Inboard (P3V) > 0.450 in/sec > 0.450 to 0.70 > 0.70'in./sec

_inJsec Vv Main pump 1.5 V, > 1.5 V, to 6 V, > 6 Vr Vertical but not or or Outboard (P4V) > 0.375 in/sec > 0.375 to 0.70 > 0.70 in./sec in/sec Vv Main, pump S1.5 V, >'1.5 V, to 6 V, > 6 Vr Axial but not or or Inboard (P3A)) > 0.500 inWsec > 0.500 to 0.70 > 0.70 in./sec.... ....... in/sec .**Note: For Main pump Horizontal vibration points P3H and P4H, a frequency spectrum analysis will be performed for each pump vibration operability test and the discrete peak at 4x Booster pump RPM will be extracted (using mean-squared subtraction method) from the vibration spectrum overall value. In addition, all other vibration spectrum discrete peaks (including the extracted discrete peak) will be evaluated during each test, and will have an Acceptable Range upper limit of 1.05 V, and an Alert Range upper limit 1.3 Vr.Page 7 of 8 BOOSTER PUMP Test Vibration Point Acceptable Range Alert Range Required Action Parameter Range V Booster pump S 1.5 V, > 1.5 Vr to 6 V, > 6 Vr Horizontal but not or or Inboard (P7H) > 0.450 in/sec > 0.450 to 0.70 > 0.70 in./sec_in.sec Vv Booster pump S 1.5 V, > 1.5 V, to 6 V, > 6 Vr Horizontal but not or or Outboard (P8H) > 0.500 inlsec > 0.500 to 0.70 > 0.70 in./sec inisec Vv Booster pump S 1.5 V, > 1.5 V, to 6 V, > 6 Vr Vertical but not or or Inboard (P7V) > 0.400 inlsec > 0.400 to 0.70 > 0.70 in./sec inisec VV Booster pump 1.5 V, > 1.5 V, to 6 V, > 6 Vr Vertical but not or or Outboard (P8V) > 0.500 in.Isec > 0.500 to 0.70 > 0.70 in./sec in_1sec Vv Booster pump < 2.5 Vr > 2.5 Vr to 6 V, > 6 Vr Axial but not or or Outboard (P8A) > 0.325 in./sec > 0.325 to 0.70 > 0.70 in./sec in./sec DURATION OF PROPOSED ALTERNATIVE The proposed alternative testing shall apply for the remainder of the 4 th Inservice Testing Interval at Pilgrim.REFERENCES

1. NRC Letter, Pilgrim Nuclear Power Station- Entergy Relief Request PR-03 High Pressure Coolant Injection Pump (TAC NO. MB8773), dated-August 29, 2005 2. Entergy Letter No. 02.05.042, Response to NRC Request for Additional Information Related to Pilgrim In-service Testing (IST) Relief Request PR-03 (TAC NO.MB8773), dated May 24, 2005 3. Entergy Letter No. 02.05.012, Pilgrim Fourth Ten-year In-Service Testing Program, IST relief Request PR-03, dated February 24, 2005 ENCLOSURES Enclosure 1: HPCI pump November 2005 Vibration Test Results (11 pages)Enclosure 2: HPCI pump Configuration and Historical Vibration Test Results (66 pages)Page 8 of 8 ENCLOSURE 1 HPCI PUMP NOVEMBER 2005 VIBRATION TEST RESULTS (11 oaaes)(Pilgrim Seeks Relief for P3H and P4H Points.Data for the remaining point is provided for information)
1. Relief Point P3H Data 2. Relief Point P4H Data 3. Point P3V Data 4. Point P3A Data 5. Point P4V Data 6. Point P7H Data 7. Point P7V Data 8. Point P8H Data 9. Point P8V Data 10. Point P8A Data encOO1. PDF 1ST- 1T1", P205 HPCQ 042J*1.o HPCI t -MP3 03 BEARN-PUMP HORZONTAL 1 ROUTE SPECTRUM 22-NOV0S 223W.24 OVRA.L- .8148 V-00 0.8 PKa .=6A7 LOAD -4250.0 RPM -3963 0.6 0.4 oi" ODter* Peak 0 4x B5oW PUMp RPM 0.2 (0.616t -(QA LeOa~-(0.864f -(4X aP RPM Peak?Subtad Sq Vaus 01 (0.22= = 0.473 lvSe OA 0 1 3 4 5 Frequency in Order 2.0 ROUTE WAVEFORM 1.5 22-NOV-0S 22:.3924 PK -.95A0 1.0 PK(+) = 1.47 PKC(-) n1.34 0.5 CRESTF- 2.15-1.0-t.5-2.0 Otd 2.017 40 So0 160 200 Fre 13.90 Ths"n Spec .6W4 10HPCI 18TR -P4H 4 OLERING-PUMP HORIZONTAL

1.0 1ROUTE

SPECTRUM 224-OV-05 22-41:44 OVRA.L- .,55l V..DG 0.8 PK -.5M LOAD -260.0 RPM, 3981.RP$ a 80.34*i 0.6 0.4 Delte Dwco Peak 0 4x 8o0ater PuMP RP"M 02(0.580)- (OA LOVel?0.2. (0.3)3. -P RPM Peak)'S&Z-fa Sq Value 0 (0.19B) a o.446 IaSw OA 01 3 4 5 Froquecy in Order 2.0 l ROUTE WAVEFORM 1.5 22-NOV-06 22.41:44 PK -.0635 1.0 PK(+) -.9470 PK(-)- 1.09 CRESTF= 2.33 0.6.0.90-1.0-1.5-2.0 00.00r 2.017 40 s 120 200 Fmeq 133.81 Time In mSecg Spec: .338 1.0 0.8 0.8 0.4 0.2 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 ROUTE SPECTRUM 22-NOV-06 22:40r42 OvRALL V-DG PK a .3108 LOAD -4250.0 RPM 3974.AP, E- 6as ROUTE WAVEFORM 22-NOV-05 22:40:42 PK -3506 PCK() -.=3 PK(4-) -.8753 CRESTF= 1.73 Frmquenoy In Order 0 40 80 160 Irdr: 2.019 133.69.197 Tim in mSecs IST -1ST, P205 HPCI 042.&NPCI STR -P4V 84 BEAMNG-PUMP VERTICAL 1.0- 1 'ROUTE SPECTRUM 22-NOV-05 22:42:30 OVRALL- .1547 V-D0 0.6 PK -.1429 LOAD =4250.O RPMa 3&3.RPS a 66.38 0.6 0.4 0.2 0 .0 3 4 5 6 FrequeMoy in Order 2.0 ROUTE WAVEFORM 1.5 22-NOV-06 22:42:3W PK , .1629 1.0 PK(+) -.2961 PK(-) -.2961 0.5 CCRETF 2.861-0.5-1.0-1.5-2-0 0 Ordr 2.017 0 40 s 1160 200 Freq: 133.9 Time in msecs Sp .103

.a-1.0 0.8 0.6 0.4 0.2 C 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 Freq*incy In Ordu ROUTE SPECTRUM 22-NOV-5 22.4644 OVRALL- .332M V-OG PK 267A24 LOAD -4250.0 RPMa 2006.RPS,, 33.42 L ROUTE WAVEFORM 22-NOV6 22:4644 PK , AM77 PK(+) , .5876 PI-) " .881 CRESTFm 2.9 Ordr 4.1 DO Fmq 13: Spom .2 0 0 40 s0 120 160 Thu. ki msecs)00°67 11 tu i -IST, P2 HP 042.5k 11.0 HPCI ISTR -PTV #7 BEARING-PUMP INBOARD VERTICAL ,'s-i 'ROUTE SPECTRUM 22-NOV.-5 22:40:12 OVRALLi .239= V-OG 0.8 PK a .1203 LOAD -4250.0 RPS, 33.45 0.4 02 0 1 2 3 5 Frequency In Oidet 2.0 2.0 ROUTE WAVEFORM 1.5 22-NOV-06 22.48.12 PKa -.2212 1.0 PK(+) -.40AM PK(-) -.4890 CRESTFu &17 , 0-0.5-1.0-1.5-2.0 0 40 so 120 20 Ordr &3.997 TO in "m Freq: 133.70 SpeM .09500 mi- iST, P205 HPCIr 042.5k 1.0 0.8 0.8 0.4 0.2 HDQ HQTQ JIM #8 BEARlW,-PUMP OUMW HORIZ ROUTE SPECTRUM 22-NOV-05 22.486M OVRALL, .3610 V-DG PK -254W LOAD =4250.0 RPM -2007.RPS -33.44 0 0 1 2 3 Frequency In Order 5 6 2.0 1.5 1.0 0.5 ROUTE WAVEFORM 22-NOV.05 2:46:58 PK -.3746 PK(+) -MW PK(-) -.69W1 CRESTF- 3.37 0-0.5-1.0-1.5-2.0 0 40 80 160 Ordr 200 Fmaq: 4.000 133.79.218 Tkme in mSscs to i -ib i, PAjb hrU 04WbM HPCI ISTR -PBV 08 BEARING-PUMP OUT1BOARD VERTICL 1.0 -0.8 I I ROUTE SPECTRUM 22-NOV-06 2247.20 OVRALLP .3521 V-DG PK ,, .106 LOAD =42M0.0 RPM= 1968.RP , 33.16.6 I a.0. L 0.4 0.2 0 0 1 2 3 Frequency in 0(8K 41 5 6 2.0 1.6 1.0 0.5 (-0.5-1.0-1.5 ROUTE WAVEFORM 22-NOV-.6 22:47:20 PK w .3768 PK(+) -.A217 PK(-) , .7122 CRESTF= 2.67 0 40 80 160 Fmqr 200 Fpe q 4.031 133.68.129 Time In mw IST -IST, P205 HPCI@042.5k 1.0 HPCI IS"R -4SA 6 BEARING-PUMP OUTBOAR AXIAL.' ' '1ROUTE SPECTRUM 22-NOV-05 22:47:46 OVRALLw .lr V-OG 0.8 PK a, .1483 LOADo -4250.0 RPM a 2004.0.6 RPIS 33.39> 0.4 02 0 1 2 3 6 Frequency In Ordw 2.0 1.5 ROUTE WAVEFORM 1.5_ 22-NOV-05 22:47:48 PK -.18AM 1.0 PK(+) -.459 CRESTF= 342 0.6 0-1.0-1.5-2.04.003 0 40 so 120 160 200 Freq 133.67 Thm in hmso Spec .03404 ENCLOSURE 2 HPCI PUMP CONFIGURATION AND HISTORICAL VIBRATION TEST RESULTS (Total 66 paaes)(Pilgrim seeks Relief for P3H and P4H Points. Data for the remaining point is provided for information)

HPCI Pump Layout 1. HPCI Pump Configuration

2. HPCI Pump Configuration
3. HPCI Pump Configuration
4. HPCI Pump Vibration Monitoring Program Relief Point P3H Data 5. P3H HPCI Vibration Spectrum Data, Nov. 24, 2004 6. P3H HPCI Vibration Spectrum Data, Aug. 24, 2004 7. P3H HPCI Vibration Spectrum Data, Dec. 17, 1997 8. P3H HPCI Vibration Spectrum Data, May 06, 1996 9. P3H HPCI Vibration Spectrum Data, Nov. 20, 1995 10. P3H HPCI Vibration Spectrum Data, May 25, 1994 Relief Point P4H Data 11. P4H HPCI Vibration Spectrum Data, Nov. 24, 2004 12. P4H HPCI Vibration Spectrum Data, Aug. 24, 2004 13. P4H HPCI Vibration Spectrum Data, Dec. 17,1997 14. P4H HPCI Vibration Spectrum Data, May 06, 1996 15. P4H HPCI Vibration Spectrum Data, Nov. 20, 1995 16. P4H HPCI Vibration Spectrum Data, May 25, 1994 Point P3V Data 17. P3V HPCI Vibration Spectrum Data, Nov. 24, 2004 18. P3V HPCI Vibration Spectrum Data, Aug. 24, 2004 19. P3V HPCI Vibration Spectrum Data, Dec. 17,1997 20. P3V HPCI Vibration Spectrum Data, May 06, 1996 21. P3V HPCI Vibration Spectrum Data, Nov. 20, 1995 22. P3V HPCI Vibration Spectrum Data, May 25, 1994 Point P3A Data 23. P3A HPCI Vibration Spectrum Data, Nov. 24, 2004 24. P3A HPCI Vibration Spectrum Data, Aug. 24, 2004 25. P3A HPCI Vibration Spectrum Data, Dec. 17,1997 26. P3A HPCI Vibration Spectrum Data, May 06, 1996 27. P3A HPCI Vibration Spectrum Data, Nov. 20,1995 28. P3A HPCI Vibration Spectrum Data, May 25, 1994 Point P4V Data 29. P4V HPCI Vibration Spectrum Data, Nov. 24, 2004 30. P4V HPCI Vibration Spectrum Data, Aug. 24, 2004 31. P4V HPCI Vibration Spectrum Data, Dec. 17, 1997 32. P4V HPCI Vibration Spectrum Data, May 06, 1996 33. P4V HPCI Vibration Spectrum Data, Nov. 20,1995 34. P4V HPCI Vibration Spectrum Data, May 25, 1994 Point P7H Data 35. P7H HPCI Vibration Spectrum Data, Nov. 24, 2004 36. P7H HPCI Vibration Spectrum Data, Aug. 24, 2004 37. P7H HPCI Vibration Spectrum Data, Dec. 17,1997 38. P7H HPCI Vibration Spectrum Data, May 06,1996 39. P7H HPCI Vibration Spectrum Data, Nov. 20, 1995 40. P7H HPCI Vibration Spectrum Data, May 25,1994 Point P7V Data 41. P7V HPCI Vibration Spectrum Data, Nov. 24, 2004 42. P7V HPCI Vibration Spectrum Data, Aug. 24, 2004 43. P7V HPCI Vibration Spectrum Data, Dec. 17, 1997 44. P7V HPCI Vibration Spectrum Data, May 06,1996 45. P7V HPCI Vibration Spectrum Data, Nov. 20, 1995 46. P7V HPCI Vibration Spectrum Data, May 25, 1994 Point P8H Data 47. P8H HPCI Vibration Spectrum Data, Nov. 24, 2004 48. P8H HPCI Vibration Spectrum Data, Aug. 24, 2004 49. P8H HPCI Vibration Spectrum Data, Dec. 17,1997 50. P8H HPCI Vibration Spectrum Data, May 06,1996 51. P8H HPCI Vibration Spectrum Data, Nov. 20,1995 52. P8H HPCI Vibration Spectrum Data, May 25, 1994 Point P8V Data 53. P8V HPCI Vibration Spectrum Data, Nov. 24, 2004 54. P8V HPCl Vibration Spectrum Data, Aug. 24, 2004 55. P8V HPCI Vibration Spectrum Data, Dec. 17, 1997 56. P8V HPCI Vibration Spectrum Data, May 06, 1996 57. P8V HPCI Vibration Spectrum Data, Nov. 20, 1995 58. P8V HPCI Vibration Spectrum Data, May 25, 1994 Point P8A Data 59. P8A HPCI Vibration Spectrum Data, Nov. 24, 2004 60. P8A HPCI Vibration Spectrum Data, Aug. 24, 2004 61. P8A HPCI Vibration Spectrum Data, Dec. 17, 1997 62. P8A HPCI Vibration Spectrum Data, July 31, 1996*63. P8A HPCI Vibration Spectrum Data, Nov. 20,1995 64. P8A HPCI Vibration Spectrum Data, May 25, 1994*July 31, 1996 data is submitted since May 06, 1996 data is not available for point P8A.encdOO1.PDF HPCI Pump Configuration P8H PUVN 05006a)3 Main Pump Boo6ter Pump H-PCI PUMP c 0 ontjguraof o, .I1 A HPCI Pump Configuration HPCI Pump Vibration Monitoring Program GOH GOV GOA P8H PSV, P3H P3V P3A P4H P4V P7H P7V PSH PaV P&A Other points are monitored as part of Vibration Monitoring for PrevenUve Maintsiumv SW Balance HPCI Data November 24,2004 1.S 0*MV 04 aw"It row ~a -Is Ill oi. I I65*l Il pa.wm .~~-ftn p-Gsa tw* OA I.0*0.4 a QWW.Raw fte" 3@i?

HPCI Data-August 24, 2004 18 B.I I as 064 ow*"* -* V*0S%* 3 OAO INNS G GA a Un OW.Pon opm IM77 RX -X203,P205 HPCI TURS & PUMP X203 HPOI -P3H 113 BEARPNG-PUMP hORIZONTAL 1.0 0.8 4 0.8 0.4 ROUTE SPECTRUM 17-DEC-97 16.49:30 OVRALL= 1.42 V-AP PK =c .6617 LOAD =4M5.0 RPM-= 3097.66.61 Dekte DI)wcete Peak 0 4x Booster Pump RPM: (0.6a,) -(OA Level-(0.519)'

-(4x SP RPM POW'--- Subra Sq Valuv (0.169f4 , 0.411 IbVSWcOA 0.2 Frequency in Order 2.0 1.5 1.0 ,, , fWAVEFORM DISPLAY 17-DEC-97 16:49:30 PK = .654 PK(+) -1.17 PK(-) A 1R 1.54 CJS- 2.87 4 I 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 Tuem In msem, 200 Ordr. 2.016 Fro 1."A 7 RX -X2O,,P206 HPCI TURB & PUMP X203 HPCI 4)3H #3 BEARING-PUMP HORIZONTAL

£I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 06.MAY-06 0921:06 OVRALL= .a51 V-DG PK -.8206 LOAD ,425M.0 RPM 4004.P$,- 66.73 Delee Discr PGak* 4x Boosm Pump RPM: (0.625)' -(OA Lvel)'(4x OP RPM Peatk-~saMba Sq VahiM-'0.390lNlSOC QA I WAVEFORM DISPLAY 6-MAY,-96 0021:06 PK m .9211 PK(+) ,1.30 PK(-) CRESTF- 2.26 0.2 0 2.0 1.5 1.0 Feqency in Orde 8 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 200 Time in mSem Frq: 2.016 134.53 RX -X203, P2W0 HPC, 'nR & PUMP e' Lirnr~ 002LA &a OCAtI.ULD6 IUD &4fli7teTAL 1.0 1 -, 1- ROUTE SPEGCTUM 20-NOV-.5 01:58.31 OVRALL= .6703 V-DG PC = .6638 LOAD -425M.0 RPM a 3M9.1PS = 68.63 0.6!" S .Delete Discmw Peak Y. 49 800o6sW PuWp RPM: (0.670f) a (OA Lve)'0.2 (0.51f)' -(4x 3P RPM Pee)Y-S.b_-SububW Sq Valus ,.(0181) " 0.425 kInSec OA 0 3 4 5 6 Frequency in Order 2.0 ' , ---, WAVEFORM DISPLAY 20.NOV-96 01:58:31 1.5 PK -.7635 PK(*) -12 GRESTF= 2.16-I 0 .> -0.5-1.0-1.5-I 5-2.0. .0 Ordr 2,016 0 40 so 120 160 200 Frq: 134.34 Tim in nucs RX -X203. P205 HPGI TURB & PUMP UpJ ..JW AM HORJZ(1.0o f..... ., , FROUTE SPECTRUM 2&"MAY44 0c27:30 OVRAULb .8615 V-OG 0.8 PK = ,4M8 LOAD o4250 RPM 460 I)0.0APS a 67.66 PUMP RPM I iga a Peak> 0.4 0... O 4X BDM Pum .M 2K RPM (0o2)' -(OA LQs)0.2 x RPM -.(0.710f' -(4OxOP RMPMI,)0. ---- ract Sq Valus 0 ~------~-.

(0222f 5 -0.471 kgSsc OA 0 1 3 4 56 Frequmncy In Order 2.0 -WAVEFORM DISPLAY 1.5 254MAY-94 09.27:30 PK -.,4 PK(+) ,1.16 1.0 PK(-). 1.43 0.5 CRESTF- 243 0.5-0.5 t.1.0-,1.5-2.0* .i ... .. ,Ordr.. 2.016 0 40 80 120 160 200 For: 136.32 IU w m~sec IST -IST, P205 HPCI @42.5k nfl*ICY ka DAUA AA AI=A0lkhl.Pl IUP WCM, 1.0 "! , , , ROUTE SPECTRUM 24-NOV04 WO:5428 OVRALL- .6774 V-iG 0.8 PK = .8719 LOAD -42500.RPM. 4017.0.6> 0.4 Deale DWOcret Pek@0 4x IBoostS Pump RPM: 0.2(0.T' -(OA Lvl)'0. (0.31 9)' (4y Bp RPM Peak------ Subtrat Sq Vaus 0.357t ,- 0.597 ktSec OA 0 1 3 4 5 6 Fmquenc in Order 2.0__ ____________

ROUTE WAVEFORM 24-NOV-04 00"54:26 1.5 PK .688 0PK(+) 1.09 1.0 1PK(-) 1.13 05CRESTF-2.35 0.5> -0.5-1.0-1.5 2-0 'Ordr 2.017 40 60 120 160 200 Freo: s. ,AC Time in mSecs 1ST -IST, P205 HP1I 042.5k.P4b U BEARINGPUMP HORIONAL 1.0 ROUTE SPECTRUM 24A -0 2.48:20 OVRAW. .6479 V-DG 0.8 PK -.6427 LOD-4260.0 Rpaw- 3973.0.RPS = 6 4X BOOSTER/ PUMP RPM Dolst Discrts PG"k> 0.4 0 4K Boose Punp RPM: 2KPA(0.848)

.(OA Levl)lx RPM----,-

(0.425f -(4x OP RPM Pesh 0.- _ ubtra, Sq Vahies (o 2 3)U .o0.49 WSOC OA 0 0 1 3 4 5 6 Frequency in Ordw 20-_2.0 ROUTE WAVEFORM 1-.5 .4AUG4 20A 1.5P =i -5804 PK(*) -1.08-1.0 1.0 PK(-)- 1.08 0.5 CRESTF. 2.48> -0.5-1.0-2.0 0 40 80 120 160 200 Fm 2. 133-57 160fw Now:13.5 a Hllim Ul lIOL RX -X203,P205 HPCI TURB & PUMP X203 HPCI -P4H #4 BEARING-PUMP HORIZONTAL 1.0 -ROUTE SPECTRUM 17-OEC-97 16:53:18 OVRALL= 1.11 V-AP 0.8 PK = .5153 0LOAD ,4250.0 RPM,% 3996.RPS 66.61-0.6 V> 0.4 .eete Dcrete Peak.0 4x Booste Pump RPM: (0.51S f -(OA Lo)-0.2 .- (0.272)f (4x SP RPM Peak)'Sub.-. tract Sq Vakmes (0.191)w -O.437IvSOA 0 1 3 4 5 Frequency in Order 2.0 -, _ __'___ __ _ WAVEFORM DISPLAY 1.5 J17-DEC-97 16:53:18 PK -.4946 PK(÷) = .9773 1.0 ... PK(-) = .?an 1I.0 0.5 CRESTFi' 3.15 10l-0.5-2.0 Ordr 2.013 0 40 80 120 160 200 Frq: 134.11 I wIm1 In olp RX -X?03,P206 HPCI TURB & PUMP X203 HPCI 4 BEARING-PUMP HORIZONTAL 1.0 1 ' -4 0.0.8 0.6 0.4 ROUTE SPECTRUM 06-MAY-6 09(23:46 OVR.ALL= .6006 V-DG PK = .6001 LOAD ,,4250.0 RPM,- 4009.RPS -66.82 Delete Discrete Peak 0 4x Booster Punmp RPM: (0.60f) -(OA Level)-(0.421f -(4x BP RPM Peak)f Subtract Sq Values (o.184)" .0.429 In/Sec OA WAVEFORM DISPLAY 064MAY-96 09:23:46 PK a .5673 PK(+) 1.10 PK(-)u 1.03 CRESTFia 2.44 0.2 C 2.0 1.5 1.0 I 0 Frequency In Order 4.5 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 160 Tim In mSecs 200 Ordr: Freq: spea 2.013 134.53 A21 FIX -X203. P205 HPCI TURB & PUMP MX20 HPQ -P4H #4 BEARING-PUMP HORIZONTAL ROUTE SPECTRUM 20-NOV-96 02:00:49 OVRALLm .4777 V-DG 0.8 PK = .4756 I LOAD =4250.0 RPM 4000.RPS = 66.66 0.6~> 0.4 Delete Discrete Peak B. 0 4x Booster Pump RPM:-(OA Laý'0.2 -(0.251)2 -(4x OP RPM Peak)f----- Sut~act Sq Values (0-1 6 6)u -0.407 kVSec OA 0 4'": 3 4 5 Frequency in Order 2.0 ------ WAVEFORM DISPLAY 1.5 20-NOV-96 02:00:49 PK = .4798 1.0 PK(+) =.gm2 PK(-) .- .951 05CRESTF,, 2.55 0.5-0.5-1.5-2.0 -.- -._ __ -_ _ _ __ _ _ _ _ _-2.o0. Or 2.014 0 40 so 120 1 200 Freq: 134.25 Tim in mSecs

1.0 ROUTE

SPECTRUM 254MAY-94 09.=18 OVRALLm .6118 V-OG 0.8 PK -.6014 LOAD -4250.0 RPM, 4061.0. RPS- 67.69 0.6> 0.4 O 4X Boos1er Pump RPM: 9L2x RPM (0.002)f (OA LeVel)0.2 lxRRPM (0.386)m -(4x BP RPM Pea'-. .Subtact Sq Vuem (0.316)Or a0. 562 kwSe OA 0.0 1 3 4 5 6 Frequency in Ordes 2.0 -WAVEFORM DISPLAY 1.5 25"4MY-4 0.9 W.1 PK(+) a 1.12 1 .0 PK(-) a 1.07 CRESTF= 2.47 0.5> -0.5-1.0-1.5-2.0 0 Ordr 2.013 0 40 so 120 ISO 200 Fro 1".2 i N!

16T -IST, P205 'PCI 042.5k HPCI ISMl -P3V 3 BEARING-PUMP VERnCAL I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 MA46.20 OVRALL= .30M V-OG PK w .3198 LOAD =4260.0 RPM w 4014.RPS = 66.90 0.2 C 2.0 1.5 1.0 Frequenoy in Order ROUTE WAVEFORM 24-NOV-04 0:468:20 PK = .3405 PK(+.) m..724 PK(-) -.6078 CRESTF= 2.59 4 0.5-1.0-1.5-2.0 0 40 80 120 Thi in mSecs 200 Oldr:.Freq.SpW: 2.018 135.00.157 IST -IST, P206 HPCI 042.5k HPCI 18Th -PSY #3 BEARING-PUMP VERTICAL 1.0 O.A 0.6 0.4 0.2 ROUTE SPECTRUM 24-AUG4 2-047".1VRAU. 28J64 V-OG PK- w221 LOAD ,w4250.0 RPM -3911.RPS'. 66.18 Fmqueny in Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-AUG-04 20.47.06 PK = .2W7 PK(+) ..6158 PK(-) -.5467 CRESTF= 3.05 S 8*1 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 Time In nSvem 200 Ordr.Freq: Spe.~2.019 133.69.151 RX -X2oP6 HPI "TURDS & PUMP I HPCI -P3V #3 BEARING-PUMP VERTIM 4 I 0~1.0 0.8 0.6 0.4 02 c 2.0 1.5 1.0 ROUTE SPECTRUM 17-DEC-97 16:51:14 OVRALL .SO9 V-AP PK -29M LOAD -4250.0 RPM= 390.RPS-a 66.50 WAVEFORM DISPLAY 17-DEC-07 16:51:14 PK -.2687 PK(+) w.4Wl P(-) = .4749 CRESTF= 2.58In Order I I I 4 0.5-0.5-1.0-1.5-2.0l0 40 120 Thm in mSecs Ordr:.Froq Spot: 2.015 134.01.118 fX -X203,P20S IIPCI TURB & PUMP X203 HPCI -P3V #3 BEARING-PUMP VERTiCAL i a.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 068MAY-96 09.22.6 OVRAU.5 .2835 V.0(PK -.2818 LOAD -4250.0 RPM , 40M3.RPS = 66.72 WAVEFORM DISPLAY 06-MAY-95 09-22W0 PK = 25677 PK(+) -.5314 PK(-) -.4947 CRESTF- 2.63 0.2 C 2.0 1.5 1.0 Fmquimcy In Ondar i 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 Time In mSecs Frq: Spec: 2.016 134.49.125 RX -X2, PB5 HPGI TURB & PUMP X203 HPCI -PV #3 BEARING-PUMP VERnICAL 1.0 0.8 ROUTE SPECTRUM 20-NOV-96 01 :530 OVRALL- 29M V-JOG PK a 28 LOAD -4260.0 RPM., 4001.RPS = 66.68 4 I 0.6 0.4 0.2 FmqUmcy In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 20-NOV-6 01:5W.30 PK n .3051 PK(+) = .5425 PK(-) -.4714 CRESTF, 2.72 4 I 0.5-0.5-1.0-1.5-2.0 0 40 80 160 Ordr: Freq Spec: 2.016 134.42.140 Tin in mSecs b (.FIX X203, P20 HPCI TURB & PUMP X203 HPCI -P1V 3 DEAFUNG4PUWP VERTICAL C i, 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09.02:650 OVRALL= .2846 V-DG PK a .2827 LOAD =4250.0 RPM -4075.RPS = 67.92 L WAVEFORM DISPLAY 25-MAY-94 092&50 PK = .2926 PK(+) -.5419 PK(-) -.584 CRESTF, 2.79 0.2 0.2.0 1.5 1.0 Fftumncy In Order 4 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 .160 Time In mSecs 200 Ordr: Freq: 2.006 136-26.100

.IST -WST. P205 hPCI 042.5k HPCI ISTR -PM_#3 BEARINGAP AXIAL I IL 1.0 0.8 0.6 0.4 ROUTE SPECTRUS 24-NOV04 00:51:19 OVRALL,- .3W, V-OG PK m .3631 LOAD m4250.0 RPM= 4018.RPS a 06.97 0.2 Fmqumncy In Oerdw 2.0 1.5 1.0 ROUTE WAVEFORM 24-,4OV-04 00:51:19 PK m .3707 PK(+) -.6139 PK(-) .8M CRESTF, 2.31 4 S I 0.5-0.5-1.0-1.5-2.0 0 40 80 160 2W0 F&.: Spec: 2.016 135.00.28 Time In mSecm IST -1ST, P205 HPCO 042.6k HPCI ISTR- 3 SEARMG-PUMP AXIAL 4 0.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG.04 204A7:48 OVRALLw .4050 V-OG PK u .4031 LOAD m4260.O RPM -3975.RPS, 86,25 0.2 0 2.0 1.5 1.0 Frequexcy In Order ROUTE WAVEFORM 24-AUG-04 20.47:48 PK -.4090 PK(+) -.6 PK(-) u.6451 CRESTF- 2.24 4 I 0.5.0-0.5-1.0-1.5 42.0 0 40 80 120 160 TIme In mSecs 200 Freq: Spec 2.017 133.63.363 RX -X20,P216 HPCI TURB & PUMP X203 HPC -P4A #3 BEARING-PUMP AXIAL 4 i 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 16:52:30 OVRAU.l .6150 V-AP PK -.3046 LOAD -4M0.0 RPM a 39.RPS -68.64 02 Frequen"y In Or3er 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 16:62:30 PK a .3076 PK(+) -.4940 PK(-) A .M CRESTF- 2.50 4 I 0.5-0.5-1.0-1.5-2.0 0 0 40 80 120 10 Time in mSeo Freq: Spec: 2.014 134.24 254 p RX -X6,P205 HPC TURB & PUMP X2Z3 HPCI -P4)A 3 BEARING-PUMP AMI.6 I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 06-MAY-gB 0923:10 OVRALm .3408 VDO0 PK -.3533 LOAD .4250.0 RPM -4006.RPS -66.80 6 WAVEFORM DISPLAY 06-MAY-6 0 ".23:10 PK -.3319 PK(+) W.6491 PK(-) n.498 CRESTF- 2.71 02 C 2.0 1.5 1.0 Frequmc In Orer I.6 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 This In mkcs 200 Freq: Spe: 2.014 134.66.310 a S 1.0 0.8 0.8 0.4 ROUTE SPECTRUM 20-NOV-96 02200" ovRALL= .30o2 V-DG PK = .3110 LOAD w4250.0 RPM- 4002.RPS 86.6.9 WAVEFORM DISPLAY 20-NOV-95 02:0M PK-a 280 PK* wm).5178 PK(-) -.4624 CRESTF- 2.46 02 2.0 1.5 1.0 Frequency In Order I 0.5-0.5-1.0-1.5-2.0 0 40 80 160 200 Freq: Spec: 2.014 13429 25m Time in mSecs 6 RX -X203, P205 HPCI TURD & PUMP X2D3 HPQ-4)3A 03 BEARM -P AXIAL I 0~1.0 0.8 0.6 0.4 0.2 2.0 1.5 1.0 ROUTE SPECTRUM 254AY-94 092960 OVRALL, .S312 V-DG PK " .3370 LOAD m4250.0 RPM,, 4059.RPSa 67.64 L WAVEFORM DISPLAY 25-MAY-94 09"29"50 PK .3123 PK(+) -.4462 PK(-) w .4866 CRESTF- 2.26 Frequency In Order I 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 200 Ord.Freq: Spec 2.014 13623 280 Trme In mSecs 11T -1ST. P= HPGI 942.5k HPCI ISTR -P4V #4 B.ARING-PUMP VERTICAL 4 Ie CL 1.0 0.8 0.6 O.4 (6 ROUTE SPECTRUM 24-NOV-04 00-52:14 WVRALL- .1842 V-OG PK -.1516 LOAD -4250.0 RPM- 4019.tiPS = 66.98 ROUTE WAVEFORM 24-NOV-04 00:52:14 PK in .1506 PK(÷) a 2756 PK(-) -.3687 CRESTF- 3.57 02 2.0 1.5 1.0 0 Frequency In Order I 0.6-0.5 0 llj-1.0-1.5-2.0 i 0 40 80 120 Tkm I ni~mSc 160 Oldr.Freq: spwc 2.016 135.00.07664 IST .IST. P20 IPCI O4.425k HPCI'T -P4V/ #4 BEARING-PUMP VERTICAL I I I I I 1.0 0.8 0.6 0.4 0.2 n ON 6 DMTE SPEGTRUM 4-AU-04 2AW.46 IRALi. .1474 V-DO'K = .1341.OAD =425.0:PM m 3976.IPS -6827 ROUTE WAVEFORM 24-AUG-04 20.48:46 PK = .1549 PK(+) .3373 PK(-) -2004 CRESTF- 3.07 I V I AL 0 1 3 4 5 Frequency In Orde 2.0 ------ ------1.5 1.0 0.5-0.5-1.0-1.5-2.0...0 40 so 120 Timinmsecs 1SO 200 Freq: SPec 2.016 133.69.07974 RX -X203,P2= HPCI TURB & PUMP 1.0 _ ' ' ROUTE SPECTRUM 17-DEC-U7 16:83:54 OVRALL. .3621 V-AP 0.6 PK -.1326 LOAD -42M0.0 RPM -3986.0.6 6> 0.4 02 0 0 1 3 4 5 6 Frequsncy In Order 2.0 -I WAVEFORM D0SPLAY 1.5 17-OEC-97 16:.53"64* ' PK w .1347 PK(+) = .2797 1.0 ...PK(-) -.2=CRESTF- 3.03-0.5> -0.5-1.0-1.5-2.0 0 .. ... OW. 2.017 0 40 FO 120 IGO 200 Frsq: 133.97 Thim In resos Spec: .07962 RX -yXapOm H TURB & PUMP x.0s HPCI -P4V WBEARING-PUMP VERTICAL 06,MAY-9 01.24:24 OVRALL- .1621 V-)G 0.8 PK -.1533 LOAD w4280.0 RPM , 3999.0.6 RPS- 6s.660.4 0.2 0 0 I 3 4 5 Frequency In Order 2.0 WAVEFORM DISPLAY 1.5 064MAY-S 09"24:24" PK a .1704 1.0 +)- .3405 PK- .2944 0.6 CRESTF,, 2.88-0.5-1.0-2.0 __, Ordr. 2.017 40 80 120 160 200 Freq: 134.47 Tihm~en Spec: .08144 fi X2(2, P205 NMPI TURB & PUMP I HPCI -PNV #4 BEARING-PUMP VERT 1.0 T ROUTE SPECTRUM 20CNOV-O5 02-01:17 OVRAULu .1456 V-DG 0.8 PK -.1376 LOAD m4250.0 RPM a 3M.RPS a 66.54 0.8~ 0.4 02 0 3 4 5 6 Frequenoy In Order 2.0o WAVEFORM DISPLAY 1.5 20-NOV-96 0:.01:17 PK -.1486 1.0 PK(÷) w .3639 PK(-) w.2796 CRESTF- 326 0.5 0 S -0.5-1.5-2.0 or& ,2,,01.40 80 120 160 200 Frsq: 134.17 Time In mSecs Spec: .06989 1.0 1 ' ROUTE SPECTRUM 90'W.46 OVRALL= .162 V-OG 0.8 PK -.1634 LOAD -4250.0 RPM a 4065.RPS -67.58> 0.4 0.2 0 0 3 4 5 6 Frequency In Orde 2.0 l WAVEFORM DISPLAY 1.5 25-MAY-94 09"0:48 PK a .1584 PK(÷) = .3902 1.0 PK(-) -,.262M 0.5 CRESTF- 3.35 C0-0.5-1.0-1.5-2.0 ,______Ordr 2.016 040 s 120 160 200 Freq: 136.25 Time In rests Spec .07871 181 -IST, P205 HPCI 042.5k HPCI ISTR -P7H #7 BEARING-PUMP INBOARD HORIZ I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24.NOV-04 00.47:45 OVRALL, .2981 V-OG PK a .1027 LOAD ,,4250.0 RPM- 2008.RPS -33.47 0.2 2.0 1.5 1.0 Frequncy In Ordw 4 I 0.5-0.5-1.0-1.5-2.0 ROUTE WAVEFORM 24-NOV-04 00.47:46 PK -.3023 PK(+) -M'PK(-)= .A CRESTF- 2.94 Ordr 4 Freq: I Spec: 0 40 80 120 Tim In mSew 2c0l.035 35.04 6375 I8T -IST. P205 HPCI @42.5k HPCI ISTR -P7H #7 BEARING4PJMP INBOARD HORIZ t 1.0 0.8 0.6 0.4 0.2 C 2.0 1.5 1.0 ROUTE SPECTRUM 24-AUG-04 20.51:42 OVRALL= .3277 V-OG PK a .2404 LOAD ,4250.0 RPM -2006.RPSa 33.42 ROUTE WAVEFORM 24-AUG-04 2M.51:42 PK -.3180 PK(÷) = .6541 PK(-) w .6249 CREST'F- 2.91 Fmequency In Order 4 I 0.6 0-0.5-1.0-1.5-2.0 0 40 8o 120 160 200 Tme In emSecs O~rd Froq: srpe: 4.002 133.76.178 FX -X203,P)05 KPGI TURB & PUMP X203 HPCI -P7M #7 BENAING-PUMP ImBOAmD HORIZ C.I, a-1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 21:49:.48 OVRA.L- 1.98 V-AP PK = .A538 LOAD =4250.0 RPM, 1993.RPS 33.21 N 02 C 2.0 1.5 1.0 Fmncuency in Oder WAVEFORM DISPLAY 17-DEC-97 21:49&.48 PK -.490 PK(+) = 1.14 PK(-)- 1.21 CRESTF= 3.11 4 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 160 200 OrdF Fmq: 4.033 133.95 214 Time in msocs FIX -X2M.P20 HPCI TURB & PUMP X203 HPCI 4PMH r7 BEARING-PUMP INBOARDHORIZ 1.0 0.8 4£I 0.6 0.4 02 2.0 1.5 1.0 ROUTE SPECTRUM O0-MAY-0S Ct.29.26 OVRALL- .3314 V-OG PK a .6015 LOAD -4250.0 RPM -2010.RPS -33.50 t WAVEFORM DISPLAY 064MAY-M 09-29-8 PK -.5612 PK(+). 1.09 PK(.) 1.18 CRESTF- 2.71 Frequuicy in Order 4 S I 0.5 0-0.6-1.0-1.5-2.0 0 40 120 Thmin Ininsec 160 Freq: Spec.4.022 134.75.144

.RX -X203, PM06 HPCI TURB & PUMP X3 HPCI 4P7H#7 BEAING-PUMP INBOARD HORIZ 4 se 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-OS 02:04'.06 OVRALL= .3746 V-DG PK a- A115 LOAD -4250.0 RPM,, 200W.RPS -33.38 6 I WAVEFORM DISPLAY 20-NOV-06 02.04:O6 PK ,a .rAM PK(+) 1.32 PK(-) 1.41 CRESTF" 2.37 0.2 C 2.0 1.5 1.0 Frequenoy In Orde I I 0.5 0-O.5-1.0-1.5-2.0 0 40 120 Thn In hmscs 160 200 Ordr: Freq: swe: 4.033 134.66.134 RX -X203, P205 HPCI TURB & PUMP X203 HPCI -P71 #7 BEARING-PUMP INBOARD HORIZ I, 1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 254MAY-94 09.'50 OVRALL- .3W5 V-DO PK -.A181 LOAD ,4250.0 RPM,= 2029.RPSa 33.81 C Frequmnc In Order 2.0 1.5 1.0 4 I.0.5-0.5 WAVEFORM DISPLAY 254AAY-94 00:33:50 PK m .6344 PK(+) -1.20 PK(-)- 1.13 CRESTF- 2.74 Ordr. 4.4 Fmq: 13 Spec. .1-1.0-1.5-2.0 0 40 80 120 160 Time In mSecs 20 033 9.36 198 1ST -1ST, P205 HP4 042.5k HPCI ISTR -P4)V 7 BEARING-PUMP INBOARD VERTICAL t 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 00W.48:16 OVRALLt .3021 V-OG PK m .1053 LOAD =4250.0 RPM. 2007.RPS , 33.46 0.2 Ffsmqur In Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-NOV-04 00:.48:16 PK -.3217 PK(+) -.6252 PK(-) -.7946 CRESTF= 3.49'pI 0.5 0-0.5-1.0-1.5-2.0 0 40 s0 160 Ordr: FrWq SIM.: 4.033 134.90.066m9 Thme In mnece 1ST -IST, P205 HPI 042.5k HPCI 11TR -P7V #7 BEARINGt-PUM INBOARD VERTIA 0.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 2rY5214 OVRALL- .2490 V-OG PK = .1579 LOAD m4250.0 RPM,- 2000.liPS. 33.33 0.2 Frequency In Order 4.5 I 2.0 1.5 1.0 0.5-0.5 ROUTE WAVEFORM 24-AUG-04 20.52:14 PK = .2830 PK(+) M .6877 PK(-) = .5496 CRESTF- 2.84-1.0-1.5-2.0 0 40 80 120 160 200 Time In mSecs Ordr:.Fmq: 9peW.4.010 133.67.0sm9 FIX -X2O3,P205 HPCI TURB & PUMP-X23 HPCI -.PV #7 BEARING-AP INBOARD VERTICAL I I I CI 1.0 0.8 0.6 0.4 02 0 2.0 1.5 1.0 ROUTE SPECTRUM 17-DEC-97 21:50.32 OVRALL, 1.54 V-AP PK w .4760 LOAD -4250.0 RPM- 2011.RPS -33.52 W AVEFORM DISPLAY 17EC-D.97 21:,0.32 WPK u .47M PK(+) w 1.02 CPK(-)- 1.70 CRESTF= 4.06 Ffequesny in Order I 0.5-0.5-1.0-1.5-2.0 0 40 s0 -120 180 200 Thm in mSecs Fmq Spec: 4.000 134.06.0750 RX -X203.P205 )PCA TURB & PUMP X203 HPCI 4P7V #7 BEARING-PUMP INBOARD VERTICAL 4 I 0.1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 06-MAY-6 0W30:.46 OVRAL- .3406 V-DG PK -.5168 LOAD =4250.0 RPM= 2010.RPS -33.60 0 2 3 4 5 6 FroqsM In Orde 4 S I 2.0 1.5 1.0 0.5-0.6-1.0-1.5-2.0 WAVEFORM DISPLAY 06-MAY-96 09:.30:48 PK w .5329 PK(+) u .9047 PK(-) -1.34 CRESTF- 324 0 0 40 80 120 Tkn In mSew FX -X20=3 P205 HPCI TURS & PUMP X23 HPCI -P7V 07 BEARING-PUMP INBOARD VERTICAL i 1.0 0.8 0.6 0.4 02 V 2.0 1.5 1.0 ROUTE SPECTRUM 20 V45v-9 0g.'06:02 OVRALLm .3429 V-DG PK a .4597 LOAD -420.0 RPM- 2016.RPS w 33.60[I WAVEFORM DISPLAY 20-NOV-4 (V'&W PK -.3m PK(+) -1.g PK(-) , 2.04 CRESTF- 2.88 Fmquwicy In Order 4 I 0.5-0.5-1.0-1.5-2.0 0 40 80 160 200 Fmq: Spec: 4.001 134.46.07230 TiremirmSece RX -X203. P206 HPCI TURB & PUMP X203 -PC 4TPV #7 BEARING,-PUMP INBOARD VERTICAL I 01.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:35:00 OVRALLm .3629 V-DG PK -.4330 LOAD -4250.0 RPM -2046.RPS= 34.08 0.2 Fmquenwy In Onder 2.0 1.5 1.0 4 C I 0.5-0.5 WAVEFORM DISPLAY 25-MAY-94 09:35:00 PK a .8398 PK(+) = 1.41 PK(-) = 2.08 CRESTFI 2.97 Ordr 4.000 0o Freq: 13.34 Spe: .08m-1.0-1.5-2.0/0 40 80 120 180 Time In mSecs 1ST -1ST. P205 HPCI 042.5k HPCI 8TR -P4H #e BEARING-PUMP OUTBOARD HORIZ 1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 24-NOV-04 00.5735 OVRN.L, .3549 V-DG PK m 2767 LOAD -425.0 RPM- 2M0.RPS 33.84 Frequency In Onisr I 2.0 1.5 1.0 0.5-0.6-1.0-1.6-2.0 ROUTE WAVEFORM 24-NOV-04 00-.57:35 PK w .3286 PK(+) -.7588 PK(-) ,7927 CRESTF= 3.04 0 40 80 120 r Tim In mSecs 200 Ordr.Freq.Spec: 4.000 135.33.226 i IST -IST, P206 HPCI 042.5k HPCI ISTR -P4*1 8 BEARING-PUMP OUTBOARD HORIZ i 0.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20:52:44 OVRAWL- .4133 V-OG PK a .3018 LOAD -4250.0 RPM = 2004.RPS w 33.40 0.2 Frequency in Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-AUG-04 20.52:44 PK -.4196 PK(+) -.8194 PK(-) -.856 CRESTFm 2.82 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 160 200 Time In mSecs Ordr: Freq: Spew.3.999 133.58 268 4 i 1.0 0.8 0.6 0.4 ROMTE SPECTRUM 17-oEC-97 21:53:40 OVRAL- 1.07 V-AP PK a .3725 LWAD "-.0 RPM a 2009 RPS a 33.48 I WAVEFORM DISPLAY 17-DEC-97 21:63:40 PK w .4679 PK(+) W.8102 PK(-) -.e8M9 CRESTF- 2.81 02 c 2.0 1.5 1.0 Frnumncy in Orde 4 0.5-0.5-1.0-2.0 0 40 80 120 160 Thie In m.ucs Ordr:.Fro%: swuq 3.999 133.87.295 RX -)M3,Pb TURB & PUMP X203 HPCI -Pm a BEARIING.,PUMP OUTGOARD HORIZ I .1 i ,.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 06-MAY-96 09"31:54 OVRALLU .3610 V-OG PK -.3499 LOAD ,,4250.0 RPM a 2010.RPS a 33.50 0.2 0 0 I Frequnwoy In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-06 0W.31:64 PK a .3M38 PK(+) -.8159 PK(-)- .79?CRESTF= 3.05 4-i 0.5-0.5-1.0-1.5-2.0 0 0 40 s0 1I0.Fmq: Spec: 4.(O3 134.78 234 Time In mSecs 4 I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-95 02-0W21 OVRIl. .3658 V-OG PK , .3339 LOAD -,42=0.O RPM- 2018.RPS -33.633 W AVEFORM DISPLAY 20-NOV-06

0&621 PK = .4641 PK() = .9881 PK(-).98961 CRESTF- 3.11 0.2 2.0 1.0 1.0 Frequenoy in Order'pI 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 Time In mSex 200 Freq: Spec: 3.999 134.49 210 RX -X203, P206 HPCI TURB & PUMP X203 HPCI 4%H, 98 BEARING-PUMP OUTBOARD HORIZ' I IL 1o0.0.8 0.6 0.4 ROUTE SPECTRUM 25-4AY-94 0W36.10 OVRALL= .3571 V-DG PK n .4744 LOAD m4250.0 RPM- 2046.RPS 0.2 Frequency In Order.5~1 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 WAVEFORM DISPLAY 25-MAY-04 09.610 PK m .8248 PK(+) -.9M39 PKC-) =, 1.23 CRESTF= 2.71 0 0 40 80 120 160 200 T"im In mSecs Ordr: Fmq Swpe 3.999 138.38.248 W -1ST, P2W HPCI 042.5k HPCI ISTR -P8V #6 BEARING-PUMP OUTBOARD VERTICL 4.5 I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 00:O.19 OVRALLp- .3576 V-DOG PK -.1753 LOAD -4250.0 RPM w 2007.RPS m 33.4 0.2 0 1 Frequency In Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-NOV-04 00:W0.19 PK -.36IM PK(+) m .784 PK(-) -.6216 CRESTF= 3.04 4.5 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 160 Tkm n ffinme 200 FrSq: 4.038 135.00.133 IST -IST, P206 HPCI @42.5k HPCI 18TR -P8V #6 BEARING-PUMP OUTBOARD'4L 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20:53:08 OVRALL- .3338 V-DG PK = .1177 LOAD o4250.0 RPM- 19865.RPS- 33.09 0.2 Frequency In Order I 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 ROUTE WAVEFORM 24-AUG-04 20:53:08 PK -.3259 PK(÷) -.7410 PK(-) .7385 CRESTF- 3.22 0 0 40 80 120 160 Tkms In recse 200 Ordr.Freq: spea 4.033 133.44.06510 FiX -X2,P205 WGPI TURB & PUMP I -PSV M BEARING-PUMP OUTBOARD VERTICI 4 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 21:54:16 OVRAM.- 1.16 V-AP PK -.3738 LOAD -4250.0 RPM= 1992.RPS- 33.2 WAVEFORM DISPLAY 17-DEC-97 21:54:16 WPK, .m258 PK(4) -.7513 PK(-)C 1.03 CRESTF,, 3.02 0.2 0 2.0 1.5 1.0 Frqm" In Order 4 I 0.5 0-0.5-1.0-1.5-2.0 0 40 120 Tlm In mSem 160 Fraq: Spec 4.038 134.06 RX -X2,1p205 HP0I TURD & PUMP X203 HPCI ,PqV #9 BEARING-PUMP OUTBOARD VERTICL 4 I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 08.MAY-48 09-W30 OVRN.Lm .3159 V.OG PK -.3983 LOAD -4250.0 RPM a 2010.RPS -33.50 0.2 Fmrquncy In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-96 0932:30 PK -.386 PK(+) -.7723 PK(-) -1.08 CRESTF- 3.44 4 i 0.5-0.5-1.0-1.5-2.0 0 40 80 120 160 Tim in flSees Ordr.Froq Spc: 4.020 134.65.102 RX -XWO, P20 WC TURB & PUMP (2 HPCI PSV # BEARING-PUMP OUTBOARD I -t T 4 i 1.0 0A 0.6 0.4 f ROUTE SPECTRUM 20-NOV-95 02.A:4S OVRALL- .2974 V-DG PK w .4175 LOAD m4250.0 RPM- 2001.RPS -33.34 0 WAVEFORM DISPLAY 20-NOV-96 02:08:46 PK = .4490 PK(+) a .8498 PK(-)E .92912112 0,2 0 2.0 1.6 1.0 0 1 2 FmquMcy In Order 4 S I 0.5-0.5-1.0-1.6-2.0 0 40 160 Ordr.Fmq: Spec., 4.034 134.52.00221 TkImo In rSem FX -X203, P205 HPCI TURB & PUMP X203 HPCI -PBV M BEARING-PUMP OUTBOARD VERTICL 4 S 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:3:36 OVRALL- .3279 V-DG PK ,, A190 LOAD -4250.0 RPM=, 2025.RPS = 33.75 SWAVIEFORM DISPLAY 25-MAY-94 09:.36:38 PK -.5485 PK(+.) = .8559 PK(-) 4.52 MRS'IF- 4.52 0.2 C 2.0 1.5 1.0 Frequency in Order I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 160 200 Time In rnSeo Ordr.Freq: Spec.4.035 136.18.107 IST -1ST. P205 HPCI 042.5k HPCI ISTR 4)8A M BEARING-PUMP OU ARD AXIAL I 1 I i 0~1.0 0.8 0.6 0.4 I ROUTE SPECTRUM 244-NOV-04 OVRALL= .1761 V-OG PK -.1623 LOAD -4250.0 RPM- 2017.RPS -33.62 0.2 0 0 Frequency in O~dsr 4 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 ROUTE WAVEFORM 24-NOV04 0&.57.06 PK = .1719 PK(+) -.389 PK(-) -.3766 CRESTFI 3.21 0 40' 80 120 Tin In mSem 200 Fmd: Fraq Spec: 2.006 67.50.04798 IST -IST, P206 HPCI @42.6k HPOI ISTR -PSA M BEARINGU OUTBOARD AXIAL I a-1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 24-AUG-04 2W5330 OVRALL- .1736 V.4G PK -.1499 LOAD -4250.0 RPM = RPS = 33.38 Frequency In Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-AUG-04 20:53:30 PK a .2222 PK(+) -.4984 PK(-) =.4486 CRESTF- 3.17 6 I 0.5 0-0.5-1.0-1.5-2.0 0 40 80 120 160 Tome In mSecs 200 Frsq: 4.000 133.51.03090 MIX -X203,P205 HPCI TURB & PUMP C1 -PSA 6 BEARING-PUMP OUTBOA 4 I A.1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 21:54:44 OVRM.I.x 1.01 V-AP PK= 1-2335 LOAD -4250.0 RPM- 2004.RPS- 33.40 WAVEFORM DISPLAY 17-DEC-U?

21:54:44 SPK, --2M -, PK(+) ..ew PK(-) -.6064 CRESTF, 3.19 02 0 2.0 1.5 1.0 FqumnK In Orde 4 i 0.5-0.5 0-1.0-1.5-2.0 0 40 60 120 160 Tlae In mSecs 200 Freq'.SOrdr 4.005 133.75.04367 Z, RX -X206,P20o HPCI TURD & PUMP XW3 HPCI -PSA S EARINGPUMP OUTBOARD AXIAL I 1.0 0.8 0.6 0.4 02 c 2.0 1.5 1.0 ROUTE SPECTRUM 31-JUL-98 0914.50 OVRAil. 2W7 V-DG PK .2211 LOAD =4250.0 RPM -2025.RPS -3W75 i WAVEFORM DISPLAY 31-JUL-96 0:.54:60 PK .= 7 PK(+) -.9o06 PK(-)- 1.54 CRESTF- 3,25 0 1 2 3 4 Fmqum In Order I 0.5-0.5-1.0-1.5-2.0 0 0 40 80 120 180 TlmIn mSics 200

.0 RX -P20 HKPI TURB & PUMP X203 HPCI -PBA #8 BEARINGPUMP OUTBOARD AXIAL I 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-96 0207:18 OVRALL- .2017 V-DG PK -.2314 LOAD -4250.0 RPM= 2087.RPSm 34.78 WAVEFORM DISPLAY 20NOV-6 02:07:18 PK n .2857 PK(+) -.6T PK(-) -1.01 CRESTF- 3.37 0.2 0 1 2 3 Fmouency in Order 4 5 I 0 40 80 120 Tim in mScs 2W0 p...' *RX -X203, P205 HPCI TURB & PUMP X203 HPCI 4%PA N BEARING-PUMP OUTBOARD AXIAL I 1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 25-MAY-94 0"37'08 OVRALL= .2237 V-OG PK -.2715 LOAD =4250.0 RPM- 2042.RPS" 34.03 Frequency in Order I 2.0 1.5 1.0 0.5-0.5-1.0-1.5-2.0 WAVEFORM DISPLAY 25-MAY-94 09:3706 PK -.3873 PK(+) -1.02 PK(-) -.8513 CRESTF- 2.65 0 40 80 120 160 Thue in mSecs 200 Ordr Freq: Sper 4.008 136.40.05659 ATTACHMENT 2 Entergy Letter No. 2. 07.056, dated July 12, 2007 (25 pages)Response to NRC Request for Additional Information Related to Pilgrim In-Service Testing (IST) Relief Request PR-03, Rev. 3 July 12, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Response to NRC Request for Additional Information Related to Pilgrim In-service Testing (IST) Relief Request PR-03 (TAC NO. MD2478)LETTER NUMBER: 2.07.056

REFERENCES:

1. Entergy Letter No. 2.06.008, Pilgrim Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request, PR-03, Rev. 3, dated June 29, 2006

Dear Sir or Madam:

The Attachment 1 to this letter provides Pilgrim response to NRC Request for Additional Information to complete the review and approval of IST Relief Request, PR-03 (Reference 1).The Attachment 1 confirms that Entergy will provide results of an independent consultant's assessment of Pilgrim HPCI Pump vibration analysis in an expeditious manner by October 2007 or earlier, as soon it becomes available.

NRC Staff at its option may defer the review of Pilgrim PR-03 until Entergy provides results of the consultant's assessment.

This submittal contains no new commitments.

If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.Sincerely, (original signed by S. Bethay)Stephen J. Bethay WGL/dI Attachment 1: Response to NRC Request for Additional information (12 pages)Attachment 2: HPCI Main Pump Vibration Data (10 pages)cc: Next page Entergy Nuclear Operations, Inc. Letter Number: 2.07.056 Pilgrim Nuclear Power Station Page 2 cc: Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station (

ATTACHMENT 1 TO ENTERGY LETTER 2.07.056 ENTERGY RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION RELATED TO PILGRIM IST LEIF REQUEST PR-03 FOR HPCI PUMP

Reference:

1 Entergy Letter No. 2.06.008, "Pilgrim Fourth Ten-Year In-service Testing (IST)Program, IST Relief Request PR-03, Rev. 3", dated June 29, 2006 RAI Question 1: The submitted revised relief request PR-03, Rev. 3 (Reference

1) did not demonstrate that compliance with Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Although the need to implement the Byron Jackson recommended modifications at an estimated cost of about $500,000 (as provided by Pilgrim) may be a hardship, the modification would likely lower the actual vibration levels of the HPCI Pump. Also, the licensee did not demonstrate that meeting the Code vibration acceptance criteria is impractical.

The NRC staff is aware of licensees who have performed the design modification per Byron Jackson recommendations, and were able to reduce HPCI Pump vibration levels. Please explain.Response: The ASME OMa-1 996 Code acceptance criteria for Group A and Comprehensive Tests are stipulated in ISTB Table 5.2.1-1. The stipulated "Alert Range" and "Required Action Range" values for the HPCI Pump are ">0.325-0.7 in/sec" and ">0.7 in/sec" respectively.

The Code also specifies in the ISTB 4.3(g) footnote that vibration measurements should be representative of the HPCI Main Pump and that measured vibration will not prevent the HPCI Main Pump from fulfilling its function.During the Third IST Interval, prior ASME IST Code did not provide absolute Code values. For the Fourth IST interval, the ASME OMa Code provides absolute Code values for vibration surveillances.

These absolute Code values do not take into consideration the as-built configuration of the HPCI Pump. Instead, the ISTP 4.3(g) footnote provides provisions to take into consideration the as-built configuration of HPCI Pump to determine the vibration value attributable to the HPCI Main Pump.Besides Pilgrim, several other licensees 1 (Monticello, Cooper, Fermi-2, Calvert Cliffs, and Seabrook) could not meet the absolute Code values, and sought relief from the ISTB requirements.

The NRC granted these requests.

Pilgrim relief request follows NRC approved precedents.

1. NRC SERs, Monticello Nuclear Generating Plant- Evaluation of Relief Request NOS. PR-01, PR-02, PR-03, PR-04, PR-05 and VR-02, related to the Fourth 10-Year Interval Inservice Testing Program (TAC No. MB6807), dated July 17, 2003; Cooper Nuclear Station (TAC No. MB 6821), dated February 25, 2004; Fermi-2 (TAC No. MA 6390) dated February 17, 2000; Calvert Cliffs (TAC NO. MA7848 and MA7849) dated August 22, 2000; FPL Energy Seabrook Station submittal letter, "Revision to Inservice Test Program Relief Request PR-3" dated September 23, 2003; and NRC SER on Seabrook Station-Inservice Testing Program Relief Request PR-3 (TAC NO. MB8941), dated February 4, 2004.Page 1 of 12 Pilgrim HPCI Pump configuration consists of a Booster Pump and a HPCI Main Pump as shown in Figure 1. The OM Code requires vibration measurements of the HPCI Main Pump. Since the Booster Pump is coupled with the HPCI Main Pump, in order to comply with the Table 5.2.1-1 acceptance criteria, the vibration value representative of the HPCI Main Pump must be determined, excluding the Booster Pump vibration, taking into consideration ISTB 4.3(g)footnote, to demonstrate that the HPCI Main Pump fulfills its function., Accordingly, as required by the ISTB 4.3(g) footnote, Entergy proposed in Reference 1 the vibration values applicable to the HPCI Main Pump in compliance with ISTB 4.3(g) footnote and ISTB Table 5.2.1-1.Entergy's approach requires separating the discrete peak attributable to the Booster Pump from the HPCI Main Pump spectrum.

In Reference 1, Entergy described the separation of discrete peak attributable to the Booster Pump from the HPCI Main Pump spectrum to obtain vibration values specific to the HPCI Main Pump to comply with the OM Code requirement.

Other licensees have taken similar approaches to account for the vibration values specific to the HPCI Main Pump, either by retaining or deriving the cumulative vibration values of all components coupled with the HPC1 Pump, that were observed prior to the OM Code became effective.

For example: NRC approved Monticello IST Relief Request PR-03 provides a good comparison to the Pilgrim Relief Request PR-03. Monticello HPCI Pump configuration is similar to the Pilgrim HPCI Pump configuration.

Both Monticello and Pilgrim HPCI Pump configurations have Booster Pumps and HPCI Main Pumps.NRC SER on Monticello (TAC No. MB6807), item 3.3.5 on page 8 states: "NMC requested reliet from the specific ASME OM Code requirements pursuant to 10 CFR 50.55a(a)(3)(ii) on the basis that complying with these [Table ISTP 5.2.1-11 requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The NRC staff authorized a similar relief for Monticello on September 9, 1994, for its previous 10-year IST interval.""HPCI pump P-209 at Monticello consists of a main pump and booster pump with a speed reducing gear driven by a common steam turbine. Because of this configuration, both pumps must be tested simultaneously.

NMC's letter of November 22, 2002, states that because of this combination, high vibration levels are recorded at the main and booster pump bearings of both pumps. NMC characterized this high bearing vibration level as the normal vibration level of the HPCI pump bearings.

Therefore, NMC stated that complying with the ASME OM Code requirements for HPCI pump P-209 would be a hardship without a compensating increase in level of quality and safety." NRC SER further states on page 9: "NMC's evaluation of the HPCI pump vibration issue, coupled with historical pump vibration data, show that HPCI pump p-209 normally runs at high levels of vibration and has not experienced any failure to date. Requiring NMC to meet the ASME OM Code requirements by increasing the frequency of the HPCI pump testing would result in hardship without a compensating increase in the level of quality and safety. This is because of the additional testing that would need to be performed on a pump that adequately operates at elevated vibration levels. The proposed testing provides reasonable assurance of operational readiness because NMC will continue to test HPCI pump p-209 quarterly, and will maintain the OM Code alert ranges for axial and vertical components of vibration." Page 2 of 12 Since Monticello's HPCI Pump configuration is similar to that of Pilgrim's HPCI Pump, NRC's Monticello HPCI Pump vibration evaluation conclusion is directly applicable to the Pilgrim HPCI Pump vibration evaluation.

There is no standard method in the OM Code or industry guidance that a licensee must follow to obtain a vibration value for the HPCI Main Pump from the as-built configuration within the prescribed OMa Code ISTB 4.3(g) footnote.

The inboard and outboard horizontal points (P3H and P4H) of the HPCI Main Pump require values representative of the HPCI Main Pump. Since vibrations at these points are influenced by the Booster Pump (as explained by Monticello in its letter dated November 22, 2002 and reiterated by the NRC SER on Monticello), in the absence of a standard method or industry guidance, Pilgrim has selected the approach to extract the discrete peak attributable to the Booster Pump based upon the performance trending data, (proven operability, and operational readiness of the HPCI Main Pump. ISTB 5.2.3(d) statement that vibration measurements are to be broad brand (unfiltered) applies to vibrations emerging from a single source. In the case of Pilgrim, vibrations are attributed to the Booster Pump and HPCI Main Pump as-built configuration.

In the case of Pilgrim HPCI Main Pump, performance trending was used to determine the vibration values attributable to the HPCI Main Pump in accordance with ISTB 4.6. ISTB 4.6 states an analysis should be performed to establish new set of reference values and this analysis shall include verification of the pump's operational readiness.

The analysis shall include both a pump level and a system level evaluation (emphasis added) of operational readiness, the cause of the change in pump performance, and an evaluation of all trends indicated by available data. The results of this analysis shall be documented in the record of tests. Entergy performed this analysis and docketed it by Reference

1. Thus, there is regulatory basis in the approach selected by Pilgrim to address the HPCIMain Pump surveillance for vibration measurements.

The trending of the vibration data since 1994 has shown no signs of degradation.

Therefore, relaxation in the absolute Code values is justified, similar to the afore mentioned licensees.

There is no compelling basis to accept the absolute Code values for'the HPCI Main Pump from the Code without considering the as-built configuration as specified in ISTB 4.3(g) footnote.The OM Code recognized the complexity of certain as-built configurations while measuring and comparing the vibration data. Thus provided an avenue to derive the vibration value of the HPCI Main Pump based upon its as-built configuration; otherwise, the Code would not have prescribed the ISTB 4.3(g) footnote.

10 CFR 50.55a provides a methodology to seek NRC approval, when strict compliance with the Code can not be achieved or would impose undue burden on the licensee.

Pilgrim is not alone in expressing the undue burden to comply with the regulation; Seabrook in its submittal seeking Inservice Test Program Relief Request PR-3, requested relief from the ISTB Table 5.2.1-1 requirement based on the undue burden.Likewise, Monticello also sought relief based on undue burden. Thus, Pilgrim relief request PR-03 follows the NRC approved industry precedents.

As explained in Reference 1, Pilgrim proposed an alternative pursuant to 10 CFR 50.55a(a)(3)(i) to monitor the HPCI Pump readiness (see pages 2 and 3 of Reference 1). This alternative approach to monitor the readiness of HPCI Pump provides assurance that any observed degradation in performance can be corrected in a timely manner. While the relief request qualifies for 10 CFR 50.55a(a)(3)(ii) for undue burden consideration, Entergy sought NRC approval on an alternative pursuant to (3)(i) because Pilgrim's Preventive Maintenance procedure and the fact that monitoring of HPCI Pump takes into consideration enhanced scope of performance monitoring as explained on pages 2 and 3 of Reference

1. Pilgrim's scope is significantly comprehensive, and warrants characterizing as an alternative pursuant to (3)(i), even though the basis for relief equally qualifies under the, provision of (3)(ii), like that of Monticello.

Page 3 of 12 Entergy in its submittal (Ref. 1) has provided extensive information concerning the justification for not making modifications to the HPCI system. Any modification to the HPCI system would not provide assurance that the vibrations would be reduced below the Code acceptance criteria, additionally the cost of such modification would easily exceed $500,000 on a time and material basis, thus placing undue burden to comply with the Code required absolute limits.The Original Equipment Manufacturers (OEM) recommendations were reviewed, but such modifications to operating equipment that has shown no degradation is not justified and, since the proposed modifications do not typically result in sufficiently lower vibration levels below the OM limits, ASME Code relief is still required.

Seabrook on the other hand provided a simple statement "Implementing a design chanqe solely for the purpose of establishing some test repeatability margin subjects Seabrook Station to an undue burden to comply with the requlation."The same statement is applicable to Pilgrim Relief Request, PR-03 as well.In summary, modifying a perfectly operating HPCI Pump presents no safety benefit. Since 1994, the HPCI Main Pump vibration data has been trended and the trend data shows no degradation in the pump performance, no operability issues have emerged, and no adverse conditions have been observed.

The HPCI Pump has been tested over 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> since the start of Pilgrim Station without any problems.

Its mission time for mitigating the consequences of design basis accidents is 30 minutes to 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, which is within the range of 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> of establishing test duration.

HPCI Pump has experienced a total of 270 hours0.00313 days <br />0.075 hours <br />4.464286e-4 weeks <br />1.02735e-4 months <br /> total operation inclusive of approximately 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> of testing time. Thus, HPCI Pump's readiness has been demonstrated through Code required tests with over 270 hours0.00313 days <br />0.075 hours <br />4.464286e-4 weeks <br />1.02735e-4 months <br /> of operation and testing times at the required flow no operability issues, even though it operates at elevated vibration levels like that of Monticello or Seabrook HPCI Pumps. The vibrations have shown no degradation on the pump performance.

Thus, there is no basis for modification for the purpose of establishing test repeatability to meet absolute Code vibration values that are derived without taking into consideration the as-built configuration of the HPCI Pump. HPCI Main Pump delivers the required flow at the required pressure in accordance with design basis to mitigate the consequences of design basis accidents.

Entergy has concluded that the HPCI Pump is in an operationally readiness condition to perform its design basis function and is in compliance with the objective of the OM Code requirement.

In addition to the proposed alternative (in Reference 1), Entergy has selected an independent consultant to review the performance of the HPCI Pump, vibration data, and trending information to determine any improvements to reduce vibration.

Entergy will provide the results of consultant's review to the NRC by October 2007. This independent evaluation is similar to other licensees' approach to resolve vibration issues.RAI Question 2: Please provide a detailed cost analysis showing the cost breakdowns resulting in the projected$ 500,000 cost to change the four-vane impeller with a five-vane impeller.Response: The cost, considered to be a minimum estimate, for the HPCI Booster Pump Rotating Element Replacement is as follows: Craft Labor $177,400.(Millwrights, Mechanics, Pipefitters, Laborers, w/Supervision)

Engineering

$ 34,000.Page 4 of 12 Materials (does not include cost escalation)

$110,000 Contingency x 1.25 Subtotal Base $ 402,000.Total w/Entergy Adders & Loaders > $ 500,000.RAI Question 3: Please provide a detailed analysis of the full spectrum pump Vibration data addressing each peak and identifying probable cause including degradation, resonance, mechanical looseness, misalignment, flow turbulence, cavitation, or vibration-beating, etc.Response: The latest HPCI Pump vibration data (Attachment

2) provided with this response includes annotations showing the following vibration components of interest: The high vibration on the HPCI Main Pump horizontally for points P3H and P4H is predominantly at just over 2x RPM and is due primarily to a hydraulic standing wave resonance in the interconnecting piping from the Booster Pump at the pump's vane-passing frequency (4x Booster Pump RPM) coinciding with structural resonances of the cross-over piping and the Main Pump pedestal when the machine is operating at the rated speed of 4000 RPM. The Main and Booster Pumps are connected via a speed reduction gear box (1.983 to 1 ratio) such that the Main Pump rated speed of 4000 RPM corresponds to a Booster Pump speed of 2017 RPM.This results in a high vibration discrete component on the Main Pump bearing housings appearing at just over 2x RPM in the horizontal direction but caused by the Booster Pump excitation at 4x Booster Pump RPM, transmitted and amplified by the interconnecting cross-over piping.It is also evident that the Main Pump has a structural resonance coinciding with 4x Booster Pump RPM. The vibration mode is the second order horizontal torsional rocking of the Main Pump pedestal.

This would not ordinarily be a problem except that this resonant frequency also coincides with the vane passing frequency (4x RPM) of the Booster Pump and'the hydraulic resonance of the interconnecting piping. This coincidence of hydraulic excitation with both hydraulic and structural resonances results in-the high vibration seen at the Main Pump but only at the discrete frequency that is just over 2x Main Pump RPM (typically at 2.017x RPM). The high resolution spectrums also show the separate discrete component at exactly 2x Main Pump RPM. A low level 2x RPM frequency component is typically present on all horizontal shaft pumps and is usually related to a slight distortion of the fundamental lx RPM shaft orbit caused by misalignment.

In this case, the 2x Main Pump RPM component is also amplified by the same structural resonance.

The Main Pump vibration spectrum also shows a discrete peak at 5X Main Pump RPM. This coincides with the Main Pump's five-vane impeller.

Pump vibration spectra typically show a discrete frequency peak at the number of impeller vanes times running speed and this is not an unusual for the Main Pump.In addition, the first fundamental horizontal rocking mode of the Main Pump appears to coincide closely with lx RPM resulting in moderately high horizontal vibration at the Main Pump 4000 RPM rated speed, particularly at the gearbox-end bearing (P4H).' This structural resonance at running speed causes the Main Pump to be particularly sensitive to otherwise normal unbalance and misalignment forces.Page 5 of 12 There are no other vibration spectrum frequency components that are noteworthy.

There are no indications of mechanical looseness, cavitation, vibration-beating, or degradation of any kind.The frequency components for points P3 & P4 remain consistent with the earliest data obtained in the same format in 1994.RAI Question 4: Please provide input or recommendations from the pump supplier stating that the current HPCI Pump's vibration levels are acceptable for~the required pump operation.

Response: The HPCI Pump Original Equipment Manufacturer (OEM) is Flowserve (formerly Byron Jackson).

Pilgrim has had discussions with Flowserve and there is ample industry operating experience related to HPCI Pump vibration issues. The OEM does not review and approve vibration data, this is the Owner's responsibility and is done in the context of the ASME OM Code. Flowserve has issued recommended actions and part replacements that Owners may take to reduce the effect of the Booster Pump hydraulic resonance effect, which includes replacing the four-vane pump impeller.

It is expected that the OEM would continue to provide the same recommendations for parts replacements.

Pilgrim has selected an independent pump consultant that is not currently affiliated with the OEM to review the Pilgrim HPCI Pump vibration information and provide the requested input and recommendations.

RAI Question 5: In the Basis for Relief Section, Item 3, the licensee states that "PNPS will increase the ASME OMa-1 996, ISTB 5.2.3 required frequency for vibration monitoring (that is part of the comprehensive testing) from once/2 years to once/year." Whereas, Item 4, states "As normal practice, Pilgrim will continue to monitor vibration of the HPCI Pump during each of the Quarterly Group B Hydraulic Tests in the same manner as required by the CM'Code. Thus, HPCI Pump vibration monitoring will 'be performed up to 8 times in 2 years as part of Group B Hydraulic Test." Please provide response to the following questions:

RAI Question (5a): Item 3 states the frequency of vibration monitoring is once/year, whereas, Item 4 states the frequency of vibration monitoring is quarterly.

Please explain and provide the correct frequency of vibration monitoring to be implemented as an alternative at Pilgrim.Response: Item 3 of the relief request states: "Pilgrim will increase the ASME OMa- 1996, ISTB 5.2.3 required frequency for vibration monitoring (that is part of the comprehensive testing) from once/2 years to once/year.

The Code required comprehensive test for flow rates would continue to be once/2 years. Given that the HPCI vibration will normally exceed the OM Code limiting Alert Range of >0.325 inlsec, the once/year frequency will be doubled to twice/year.

The twice/year frequency will be the commitment frequency.

However, the normal PNPS practice will be to monitor vibration in the same manner during each of the Quarterly Group B Hydraulic Tests, whenever practicable." (emphasis added)This means that the Relief Request commitment frequency for monitoring HPCI Pump vibration (Relief. Request -Alternate Testing frequency) will be twice/year, instead of the OM Page 6 of 12 Code required vibration monitoring frequency (for a standby pump) of once/2years.

If there is an unforeseen problem (i.e. equipment, human performance error, or other anomaly) that occurs during a Quarterly HPCI run which prevents collection of meaningful pump vibration data to meet the twice/year frequency (Relief Request commitment frequency), the Quarterly Test will be repeated to obtain the HPCI Pump vibration at the Relief Request commitment frequency of twice/year.

As an administrative practice PNPS will monitor vibration of the HPCI Pump during each of the Quarterly Group B Hydraulic Tests, whenever practicable.

The vibration monitored during quarterly testing will be performed in same manner as required by the Code once/2 year Biennial Comprehensive Pump Test (applying the same OM Code required methods) vibration monitoring.

RAI Question (5b): As mentioned in Item 4, vibration monitoring will be performed up to 8 times in 2 years. Please explain the meaning of the phrase "up to 8 times." Response: Item 4 of the relief request also states: "As normal practice, Pilgrim will continue to monitor vibration of HPCI Pump during each of the Quarterly Group B Hydraulic Tests in the same manner as required by the OM Code ..... Thus, HPCI Pump vibration monitoring will be performed up to 8 times in 2 years as part of Group B Hydraulic Tests..This means that PNPS will administratively implement the practice to monitor vibration of the HPCI Pump during the Quarterly (Group B) Hydraulic Tests, in the same manner as required by the Code once/2 year Biennial Comprehensive pump test (applying the OM Code required methods) vibration monitoring.

However, if there is an unforeseen problem (i.e. equipment, human performance error, or other anomaly) that occurs during a Quarterly HPCI run, which prevents collection of meaningful pump vibration data, the Quarterly Test will not be repeated just to obtain the HPCI Pump vibration at the administrative quarterly frequency.

PNPS expects to successfully monitor HPCI Pump vibration during each quarterly test, which translates into the phrase "vibration monitoring will be performed up to 8 times in-2 years".RAI Question (5c): As mentioned in Item 4, please provide the Section of the CM Code which requires vibration monitoring every quarter during Group B hydraulic testing.Response The OM Code does not require vibration monitoring during pump Group B hydraulic testing.PNPS proposes to administratively implement the practice to monitor vibration of the HPCI pump during.the Quarterly (Group B) Hydraulic Tests.RAI Question (5d): Please provide the flow reference point (minimum or full design) at which Vibration monitoring is to be performed during the quarterly Group B hydraulic test.Page 7 of 12 Response All HPCI Pump testing is conducted at the flow reference point of 4250 GPM, which is at the full flow design value.RAI Question 6: In the Alternate Testing section (Page 2 of 8), Item 1, the licensee states "the alternative testing proposes to remove the 4x Booster Pump RPM frequency component (discrete peak) from the vibration spectrum of the main pump since its amplitude is not related to the physical condition or rotating dynamics of the main pump rotor or bearing system." The Main Pump and Booster Pumps are connected together by the gear box. The value of vibration measured at the main pump, is physically present at the main pump irrespective of the source of vibration.

The actual vibration measured at the main pump can not be filtered.

CM Code Section ISTB 5.2.3.d states that "vibration shall be determined and compared with corresponding reference values.Vibration measurements are to be broad band (unfiltered).

If velocity measurements are used, they shall be peak." Therefore, please provide detailed verification that the proposed method of extracting the discrete frequencies where the high vibration peaks are experienced (1)demonstrates the HPCI Pump's current operational readiness and (2) will provide ongoing verification of pump operational readiness and trending of degradation during future testing.Response: All vibration measurements are currently, and will continue to be, broad band and unfiltered and in units of peak velocity.

The proposal to remove the 4x Booster Pump RPM frequency component (discrete peak) from the vibration spectrum of the Main Pump is a post-processing analytical tool and does not change the manner in which vibration measurements are made nor does it actually delete any information from the data. The overall vibration amplitude is always determined by a calculation process performed in the frequency domain, it is the square root of the sum of the squares of the individual frequency components.

It is a routine practice, in accordance with the Code (ISTB 4.7.1), to disregard the frequency components below 0.33x RPM and to disregard frequency components above 1000 Hz (this constitutes a "broad band" measurement).

The purpose of the proposed analytical method of also subtracting the 4x Booster Pump RPM, discrete frequency component from the Main Pump vibration spectrum overall level calculation is not to reduce the measured overall amplitude per se, but to determine an overall amplitude value that is directly related to the physical condition-and rotating dynamics of the Main Pump rotor and bearing system. This simple analytical processing does not disregard or lose any actual vibration data; it is performed to calculate a more meaningful reference and trending parameter for the Main Pump. All vibration spectral data is retained and is reviewed as part of this processing, as seen in the attached data plots that show the vibration spectrums along with the simple calculation that determines the trending parameter for the P3H and P4H points on the Main Pump.The vibration that is present as the 4x Booster Pump RPM frequency component has been shown not to be harmful to the Main Pump and bears no relation to the condition of the Main Pump. The vibration measured at the Main Pump is physically present at the Main Pump irrespective of the source of vibration, but it would be present at the same amplitude on the Main Pump even if the Main Pump was not running and, as such, it behaves the same as a high background noise. It has also been concluded that this resonant vibration condition at the 4000 RPM operating speed is not detrimental and will not prevent the HPCI Pump from fulfilling its function.

At the 134 Hz frequency of the resonant vibration on the Main Pump caused by the excitation at 4x Booster Pump RPM, the actual displacement amplitude at 0.70 in/sec peak velocity amplitude is 0.0017 inches peak-to-peak.

This displacement imposes negligible alternating stresses on the pump pedestal, housings, and connected piping. The peak-to-peak Page 8 of 12 displacement is also less than the Main Pump fluid film journal bearing clearances and would impose negligible loading to these bearings.

In addition, the 4x Booster Pump RPM frequency component, since it is caused by a hydraulic acoustic standing wave resonance, is highly variable in amplitude so that when it is included in the overall vibration amplitude calculation it renders the calculated overall value useless for trending purposes.The HPCI Pump's current operational readiness is unaffected by this vibration condition because it has no adverse affect on the operation of the Booster or Main Pump. The ongoing verification of pump operational readiness and trending of degradation during future testing' is assured by using the proposed analytical method for the spectrum analysis and overall level calculation.

This method extracts the useful overall level as a trending parameter for the Main Pump operating condition that is unaffected by the Booster Pump hydraulic resonance effect.RAI Question 7: In the Alternate Testing section, Table -Main Pump (page 7 of 8), under the columns"Acceptable Range" and "Alert Range," the licensee provided range in terms of V, and their numerical values. Please provide, the basis of the selected "Acceptable Range" and "Alert Range," and their numerical values.Response: To allow for practicable monitoring of vibration levels on the HPCI Pump, and to provide a trigger point for heightened awareness when monitoring HPCI Pump vibration, an alternate vibration Acceptance Range and Alert Range have been included into this relief request. A full spectrum review will also be performed for all 1ST vibration points during each HPCI test in which vibration is collected and analyzed.Since the HPCI Pump resides in the OM Code vibration Alert Range, and pump vibration is being monitored more frequently then specified by the OM Code for standby pumps that fall into the vibration Alert Range (OM Code requirement is to monitor vibration once per year) -the inclusion of revised Alert Range (lower limit value) is an enhancement which incorporates a useful trigger point which will implement a heightened awareness when there is an increase in the overall HPCI Pump vibration.

The assigned Acceptable upper limits (which are also the lower Alert limit) were established using the same methodology as the OM Code for establishing Acceptable Ranges. They are based upon a multiple of the specific vibration point reference values and are empirical in nature.* The upper limit for the Acceptable Ranges (also lower Alert limit) were established as a value which is higher th~an the respective vibration point reference values and provides a meaningful trigger point for heightened awareness.

The Acceptance upper limit must be high enough such that normal fluctuations in pump operation and vibration monitoring do not inadvertently trigger the limit and routinely place the pump in Alert test status. This would cause the pump to vacillate between the Acceptance Range and the Alert Range during expected variations in pump operation and, vibration monitoring.

This situation renders the Alert trigger point as more of an expected periodic nuisance alarm, without a meaningful purpose.* The upper limit for the Acceptable Ranges (also lower Alert limit) was established at a value low enough such that a significant increase in pump vibration amplitude will activate the pump trigger for vibration Alert status which would result in a heightened awareness for future pump testing and monitoring.

Page 9 of 12 The assigned Alert upper limits (6Vr or 0.70 in/sec) were established using the OM Code limits, and are not a deviation from the Code.The relief request assigned a revised Alert vibration range of 1.5Vr to 6Vr, which incorporates a multiple of the reference vibration and is more conservative than the OM Code Alert range of 2.5Vr to 6Vr. The absolute limiting lower Alert Values (i.e. 0.375, 0.450, 0.500, 0.550, and 0.600) are based upon existing pump reference values, and fall between the values of 1.25Vr and 1.5Vr. All of the modified Alert Values have been compared to and are based upon the historical pump vibration data. These lower Alert values are set as low as reasonably practical, and are established at a value which is high enough above the reference values so as to not inadvertently trigger the vibration point Alert lower limit during routine HPCI Pump operation and testing.RAI Question 8: In the Alternate Testing Section, the last sentence of the first paragraph states "A full spectrum review will be performed for all IST vibration points during each proposed comprehensive test," Whereas Item 4 in the Basis for Relief Section states "As normal practice, Pilgrim will continue to monitor vibration of the HPCI Pump during each of the Quarterly Group B Hydraulic Tests in the same manner as required by the CM Code (see RAI Question 2). Please explain what kind of test (comprehensive or Group B test) will be performed to measure pump vibration quarterly and whether a full spectrum review will-be performed quarterly.

Response: The pump vibration quarterly "Group B Hydraulic Test" is identical to the vibration testing during the once/year "Comprehensive Pump Test".As Item 2 in the "Basis for Relief" Section states: "All other discrete vibration peaks observed at the Main Pump horizontal vibration points will be evaluated during each pump vibration test, and will have an Acceptable Range upper limit of 1.05 Vr and an Alert Range upper limit 1.3 Vr.The reviews of the frequency spectrum data ensure that any significant change in the vibration signature will be noted regardless of whether the severity causes the overall level to exceed its criteria.

For example, if the overall vibration level is acceptable but the lx RPM component has increased to greater than 1.3 times the reference value overall level (Vr), then the pump will be placed in the vibration Required Action Range (>0.7 in./sec)." This review, as described, inherently requires a complete spectrum analysis each time vibration data is evaluated.

RAI Question 9: The revised relief request included additional vibration data from November 2005. Please provide quarterly vibration data (if available) for the quarterly tests performed from November 2005 through February 2007.Response: The data from the February 21, 2007 test is attached.

Previously submitted test data from May 1994 through November 2005 is included with IST Relief Request PR-03, Rev. 3 (dated June Page 10 of 12 29, 2006). Additional data for the intervening time is available but is redundant and unnecessary for supporting the conclusions.

For the attached plots, the overall vibration levels and the levels of the individual frequency components of interest are directly comparable and consistent with the November 22, 2005 test data as well as the earliest May 25, 1994 test data attached to the PR-03 submittal.

The recent and historical vibration data show that there have been no significant changes to the vibration characteristics of the HPCI Main or Booster Pumps during the entire monitored period from 1994 to the present.RAI Question 10: In the second paragraph on page 2 of 8, Reference 1, the licensee states that "There are no major vibrational concerns that would result in pump degradation or would prevent the HPCI Pump from performing its design safety function for an extended period of operation." The HPCI Pump is a Type B (i.e standby) pump; and only being tested for "short' runs quarterly.

Please provide a detailed analysis that includes evaluation of maximum accident conditions and maximum mission time showing that the HPCI Pump is in fact operable in its current configuration.

Also, please submit this detailed analyses/evaluation (including input by pump expert or manufacturer) confirming that the HPCI Pump is currently operable for its purpose.Response: PNPS acceptance of the HPCI Pump vibration is not dependent on the short duration of the HPCI design basis mission. The vibration evaluation has concluded that the 4x Booster Pump RPM vibration component is due solely to a structural resonance that causes vibration amplification in the range of the pump maximum speed. The resonance is foundation, pedestal, and piping dependent, and bears no relationship to the mechanical condition of the Booster Pump or the Main Pump. It was determined that the vibration amplitude at 4x Booster Pump RPM caused no damage or degradation to any HPCI Pump components.

It was also determined that the vibration spectrum information remained valid and could be used to trend the mechanical condition of the HPCI Pump, which currently shows no discernable change in.mechanical condition since this monitoring began.It should be noted that the HPCI Pump is a turbine-driven variable speed pump that is tested at approximately the rated speed of 4000 RPM. However, in actual design basis service for a small break LOCA the pump speed would, over a period of only a few hours, drop from the vicinity of the 4000 RPM rated speed to considerably lower speeds. At speeds significantly lower than the rated 4000 RPM, the vibration resonant amplification is less with the result that the vibration due to these resonant interactions will be reduced at these lower speeds.The short duration mission time for the HPCI System following a small-break LOCA serves only to reinforce the conclusion that the Main and Booster Pump would not be adversely affected by the evaluated vibration condition, but it is not the justification for accepting the condition.

That justification is based on the evaluation of the vibration and whether there is any potential degradation that can be caused by such a condition.

Page 11 of 12 HPC! Pump Configuration TOH roy TOA GOV GOA, P8" ft Min Pump 8ocster Pump Figure 1. Pilgrim HPCI Pump configuration and Monitoring Points Page 12 of 12 ATTACHMENT 2 TO ENTERGY LETTER 2.07.056 HPCI Main Pump Vibration Data (10 pages)-I IST -IST, P205HP CA @42-5k HPCI ISTH-P3H 4#3BEARINGIRUM' HOR03N'JAL in...U a)(n C 0 a)a-0.8.0.6 0.4 02 NOTE: CURSOR POIN 4x BOOSTER PUMP RPM T SHOWN HERE I ROUTE S PECTRUM 21-FEB.07 191208 OVRAU-. .7755V-DG PK = .7694 LOAD =4250.0 RPM= 3970.RPS = 66.16 IX RPM\I A OVERALL IN/SEC IS DIGITAL FREQUENCY SUMMATION FOR UNFILTERED SPECTRUM OUT TO 1500 HZ (22.5 ORDERS). DISPLAY EXPANDED TO SHOW ONLY FIRST 6 ORDERS.n-1-' n 33 I.0 1 3 lRequJeny i n Oide 6 4 5 C.)a)ci, 0 a)2.0 1.5 1.0 05 (-0.5-1.0-1.5 20 ROUTE WAVEFORM 21-FEB-07 191208 PK = .9364 PK(-) = 1.R PK(-)= 1.34 CRES'F=-2.

Delete Discrete Peak@ 4x Booster Pump RPM: (0.776)2 = (OA Level)2-(0.635)2 = (4x BP RPM Peak)2---------

Subtract Sq Values (0.199)0.5

= 0.446 In/Sec OA 0 40 80 160 Spec: 2-017 133.44.635 Tirre in nsecs THIS IS VIBRATION DATA FOR THE HPCI MAIN PUMP TURBINE-END BEARING HORIZONTAL (P3H). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 4x BOOSTER PUMP RPM, WHICH IS AT A NON-SYNCHRONOUS 2.017x MAIN PUMP RPM.THE lx MAIN PUMP RPM LEVEL IS 0.079 IN/SEC WHILE 2x RPM IS 0.194 IN/SEC.THIS VIBRATION SHOWS LI-TLE UNBALANCE OR MISALIGNMENT.

THE 0.175 IN/SEC @ 5x MAIN PUMP RPM IS DUE TO THE 5-VANE MAIN PUMP IMPELLER.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

THIS IS THE LAST FRAME OF TIME HISTORY DATA IN VELOCITY (INCH/SEC)

UNITS CURSOR POINT VALUES Page 1 of 10 6T-IS T, P205HP a @425k HPCI ISiR -P3 #313EARINGfPUMP VERTICAL 4 r%0 0)a.I.v!I 00.8 0.6{GA4 02-1XRPM 2X RPM 4x BOOSTER PUMP RPM RPM I 0 01 -3 4 5 Fxrscp~y i n Oder ROUTIE S PECTRUM 21-FEB.07 191236 OVRALL .V-DG PK = 2V43 LOAD 425.0D RPM= 3989.RPS = 66.15 6 ROUTE WAVE FORM 21-FEB-07 191236 PK = .3051 PK(4)=.5968 PK(-) =.5%29 CRESIF=2.7r-r 0.a)cj 0 1-.0-05~1.0-.5-O.5-1.5-2-0 FI 0 40 160 20 Oc Req: Spec: 2.017 133.44 209 Tirm in rrSecs THIS IS VIBRATION DATA FOR THE HPCI MAIN PUMPTURBINE-END BEARING VERTICAL (P3V). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS HIGHEST AT 4x BOOSTER PUMP RPM, WHICH AGAIN IS AT A NON-SYNCHRONOUS 2.017x MAIN PUMP RPM, BUT THE OVERALL LEVEL IS MUCH LOWER THAN P3H.THE Ix MAIN PUMP RPM LEVEL IS 0.038 IN/SEC WHILE 2x RPM IS 0.026 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THE 0.163 IN/SEC @ 5x MAIN PUMP RPM IS DUE TO THE 5-VANE MAIN PUMP IMPELLER.

THERE ARE NO OTH-ER SIGNIFICANT VIBRATION COMPONENTS.

Page 2 of 10 IST -IS T, P25HP CA @42.5k HPCI ISTR -PSA #3BEARINGPUIWi AXIL5~ci)0 ROUTE S PECTRUM 21-FEB-07 19132B OV/RALh= 383WV-DG PK = 3814 LOAD =4250.0 RPM= 3916.RPS = 66.14 ROUTE WAVEFORM 21-FEB-07 191328 PK = .4055 PK(+) = .521 PK(-) =.6023 CRES1F=-207 Raqiarry in Ode on 1,5 1.0 0 5 0..4-1.0-1.5-2.0 0 40 80 120 160 200 Odc-.Rteq Spec: 2017 133.42.334 Tm-m in rT6ecs THIS IS VIBRATION DATA FOR THE HPCI MAIN PUMP TURBINE-END BEARING AXIAL (P3A). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS HIGHEST AT 4x BOOSTER PUMP RPM, WHICH AGAIN IS AT A NON-SYNCHRONOUS 2.017x MAIN PUMP RPM, BUT THE OVERALL LEVEL IS MUCH LOWER THAN P3H.THE lx MAIN PUMP RPM LEVEL IS 0.063 IN/SEC WHILE 2x RPM IS 0.047 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THE 0.059 IN/SEC @ 5x MAIN PUMP RPM LEVEL IS DUE TO THE 5-VANE MAIN PUMP IMPELLER.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 3 of 10 IST -IST, P205 HPCl @425k HPCI ISTR-P4H #41BEARINGPUIVP HORI3I01AL 0)(D U)C 0 a)Reqiefy in Oder 2-0 1.5 1.0 0.5 RJUTE WAVEFORM 21-FEB-07 191400 PK = .4223 PK(-f)=.8810 PK(-) = .278 CRES 1F=-2.'Delete Discrete Peak§ 4x Booster Pump RPM: (0.538)2 = (OA Level)2-(0.263)2 = (4x BP RPM Peak)2 Subtract Sq Values (0.220)0.5

= 0.469 In/Sec CA-0.5-1.0-1.5-2.0 0 40 80 12) 160 Timre in rrSecs 20 Ordk: Req: Spec: 2016 133.32 263 THIS IS VIBRATION DATA FOR THE HPCI MAIN PUMP GEARBOX-END BEARING HORIZONTAL (P4H). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT lx MAIN PUMP RPM AND 4x BOOSTER PUMP RPM, WHICH IS AT A NON-SYNCHRONOUS 2.017x MAIN PUMP RPM.THE lx MAIN PUMP RPM LEVEL IS 0.358 IN/SEC, INDICATING SOME RESONANT AMPLIFICATION FROM A SIDE-TO-SIDE ROCKING MODE.THE 2x RPM IS 0.124 IN/SEC, INDICATING LITTLE EFFECT FROM MISALIGNMENT.

THE 0.075 IN/SEC @ 5x MAIN PUMP RPM LEVEL IS DUE TO THE 5-VANE MAIN PUMP IMPELLER.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 4 of 10 IST -IST, P205HPC @42,5k HPCIIS1R-P4V

  1. 41BEARINGPUVPVER11CAL u 1.0 l 1 ROUTE S PECiRUM 0.8 21-FEB4J7 191432 SOVRAL= .1402V-DG.t 0.6-- PK = .12E LOAD =4250.0> 0.4- IX RPM 4x BOOSTER RPS = 66.13 0X 02 PUMP RPM 5X RPM 02 01 3 4 '5 F-qjabzy in Oider 2-0-151 ROUTE WAVEFORM 21-FEB-07 191432 1.0 PK = .149D 051 PK(i) =.3079 PK(-) = 2389 CRES"F=-a3.c S-0.5-1.0-1.5_21.0 T 0 40 80 12D 160 200 O rSeq: 13,40 Tiffe in n*S ecs Spec: .0849D THIS IS VIBRATION DATA FOR THE HPCI MAIN PUMP GEARBOX-END BEARING VERTICAL (P4V). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS HIGHEST AT 4x BOOSTER PUMP RPM, WHICH AGAIN IS AT A NON-SYNCHRONOUS 2.017x MAIN PUMP RPM, BUT THE OVERALL LEVEL IS MUCH LOWER THAN P4H.THE lx MAIN PUMP RPM LEVEL IS 0.028 IN/SEC WHILE 2x RPM IS 0.018 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THE 0.064 IN/SEC @ 5x MAIN PUMP RPM IS DUE TO THE 5-VANE MAIN PUMP IMPELLER.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 5 of 10 IST-ISTP205HPCA

@42-%HPCIIS1R-P7H

  1. 7BEARINGPUWP INBOARD HORIZ 1.0 I 0 C)0 a)a-I 0,-I-0.6 ý_0.4 02 1XRPM 2XRPM 4x BOOSTER PUMP RPM Ir 0P A ROU]E SPECTRUM-21-FEB.07 1917.00 OVRALL- .3V-DG PK = 2173 LOAD =4250.0 RPM = 2012 RPS = 3337 ROUTE WAVE FORM 21-FEB-07 1917.00 PK = .314D PK(4) =.6783 PK(-) =.6319 CRES'F-3.CB 0 1 .2 3 5 6-q-a-:y in Oder 0 C)(J~C 0 C)15 1.0-05)05-1.0-1.5-o[0 40 80 120 Req 133.45 Spec: .163 lirre in rnrSEs THIS IS VIBRATION DATA FOR THE HPCI BOOSTER PUMP GEARBOX-END BEARING HORIZONTAL (P7H). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 4x BOOSTER PUMP RPM BUT AT A LOW OVERALL LEVEL.THE 0.163 IN/SEC @ 4x MAIN PUMP RPM LEVEL IS DUE TO THE 4-VANE BOOSTER PUMP IMPELLER.THE lx BOOSTER PUMP RPM LEVEL IS 0.015 IN/SEC WHILE 2x RPM IS 0.044 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 6 of 10 IST-IST, P205 HPCl @42_5k HPCI ISTR-P7V #7BEARINGPULIP INBOARD VERTICAL.1 A -Un 0)(L I*AVlI 0o.8 0.6 OA 02 IXRPM 2X RPM 4x BOOSTER PUMP RPM 4 A ROU-E S PECTRUM 21-FEB-07 1917.32 OVRALLF 2113V-DG PK = .119)LOAD =4250.0 RPM= 2000.RPS = 3.33 ROUTE WAVE FORM 21-FEB.07 191732 PK = 213 PK(4) = .4302 PK(-) = .4415 CRES'F=-283 0 1 2 3 5 6 Rec.y inCider ,') f'C.)ci)C,, 0 0)1.5 1.0-05.0.5-1.0-1.5-2.0 I I _ _ -~7 f 0 40 80 12D 160 Rteq Spec: 4.000 133.33.08752 Tirre in rrSecs THIS IS VIBRATION DATA FOR THE HPCI BOOSTER PUMP GEARBOX-END BEARING VERTICAL (P7V). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 4x BOOSTER PUMP RPM BUT AT A LOW OVERALL LEVEL.THE 0.088 IN/SEC @ 4x MAIN PUMP RPM LEVEL IS DUE TO THE 4-VANE BOOSTER PUMP IMPELLER.THE lx BOOSTER PUMP RPM LEVEL IS 0.008 IN/SEC WHILE 2x RPM IS 0.013 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 7 of 10 IST-T, P205HPCI @42Vk HPCI ISIR -P8H #8BEARINGPUIVP OUTBOARD HORIZ 11 ROUTE S PECTRUM O 21-FEB&G7 191810 OVRAUL= ....4V-DG" 0 PK =.- 0.6-- LOAD 4250.0 a) .0.4 1XRM4x BOOSTER RPM = 20XP.1XP 2X RPM y L PUMP RPM RPS = 33.37 Q.02A L(01 2 3 5 6 Foicy in Oder 20- 'ROUiE WAVEFORM" 021-FEB-07 191810 1.0 .PK = 3M7)0.51 PK(+)=.TM4 0 PK(-) =.6649-0 OCRES1F=-Z7.

> O-1.0 .".-1.5£0 Ord_: 4.000 0 40 80 120 160 2219 Tirm in rrS ecs Spec: 219 THIS IS VIBRATION DATA FOR THE HPCI BOOSTER PUMP OUTBOARD-END BEARING HORIZONTAL (P8H). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 4x BOOSTER PUMP RPM BUT AT A LOW OVERALL LEVEL.THE 0.219 IN/SEC @ 4x MAIN PUMP RPM LEVEL IS DUE TO THE 4-VANE BOOSTER PUMP IMPELLER.THE lx BOOSTER PUMP RPM LEVEL IS 0.004 IN/SEC WHILE 2x RPM IS 0.054 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 8 of 10 IST -IST, P205 HP a @42.5k HPCI ISTR-P8V #8 BEARINGPU MP OUTBOARD VER1iCL.1 C.)0)a.I*%#ROUTE S PECTRUM 21-FEB-07 191848 OVRAULL .3224V-DG PK = .13E2 LOAD RPM= 2000.RPS =33.3 0.6 0.4 02 1XRPM 2X RPM 4x BOOSTER PUMP RPM 0 a -1*- 1.0 1 2 3 Fecperry i n Cide 5 6 0 20 1.5 1.0 0.5-0.5-1.0-1.5-2.0 ROUTE WAVEFORM 21-FEB-07 191848 PK = 3071 PK(E)F=.6a5 PK(-) = .M3 CRESg-=- 3.22 0 40 80 12D 160"Tine in rrS ecs Spec: 3.999 133.3D THIS IS VIBRATION DATA FOR THE HPCI BOOSTER PUMP OUTBOARD-END BEARING VERTICAL (PaV). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 4x BOOSTER PUMP RPM BUT AT A LOW OVERALL LEVEL.THE 0.086 IN/SEC @ 4x MAIN PUMP RPM LEVEL IS DUE TO THE 4-VANE BOOSTER PUMP IMPELLER.THE lx BOOSTER PUMP RPM LEVEL IS 0.005 IN/SEC WHILE 2x RPM IS 0.023 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 9 of 10 IST -IST, P205 HPCI @42%5k HPCI ISTR-PSA #8 BEARINGPUMP QOLUBOARD AXIAL 0 a.1.0-0.8 0.6 I I I I 4 ROUTE S PECTRUM 21-FEB.07 191924 OVRALL_ .1527V-DG PK = .1373-LOAD 4350.0 RPM= 2001.-RPS = 3335 0.4_L 1X RPM 2X RPM 4x BOOSTER PUMP RPM 02 It A I iiii -i i i 0 1 2 3 Fmq~jaicy i n Oder 5 6 9n -0)0)1.04 05 Q-0.5 ROUTE WAVE FORM 21-FEB-07 191924 PK =.1607 PK(t) =.3155 PK(-) =.3555 CRESIF-=-B 0 Or: 4,001 Fte 13.43 Speci .02257-1.0 _L-1.5-2.0 0 40 80 12D 160 Time in n ecs THIS IS VIBRATION DATA FOR THE HPCI BOOSTER PUMP OUTBOARD-END BEARING VERTICAL. (PSA). THE SPECTRUM AND WAVEFORM SHOW THAT VIBRATION IS PREDOMINANTLY AT 2x BOOSTER PUMP RPM BUT AT A LOW OVERALL LEVEL.THE 0.023 IN/SEC @ 4x MAIN PUMP RPM LEVEL IS DUE TO THE 4-VANE BOOSTER PUMP IMPELLER.THE lx BOOSTER PUMP RPM LEVEL IS 0.003 IN/SEC WHILE 2x RPM IS 0.036 IN/SEC.THIS VIBRATION SHOWS LITTLE UNBALANCE OR MISALIGNMENT.

THERE ARE NO OTHER SIGNIFICANT VIBRATION COMPONENTS.

Page 10 of 10 ATTACHMENT 3 Contractor Report Entergy Letter No. 2. 08.007, dated January 2008 (14 pages)Independent Assessment of HPCI Pump Vibration and Performance Pilgrim Nuclear Power Station Independent Assessment of Pilgrim High Pressure Coolant Injection (HPCI) Pump Vibration and Performance January, 2008 Mancini Consulting Services A. Engineered Solutions for Superior Pump Performancesm Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance MICHAEL C. MANCINI CONSULTING SERVICES.

INC As the President and primary consultant of Mancini Consulting Services, Michael Mancini has over 30 years experience in pump design, engineering, and repair. Prior to his independent consultancy, he was a Vice President of Ingersoll Dresser Pump Company.Michael began as a pump Design Engineer at Ingersoll-Rand in 1974, where he worked many years along side seasoned pump designers, including the renowned Dr. Paul Cooper, Igor Karassik, Val Lobonoff, and Fred Antunes. After a long tenure at Ingersoll-Rand, Michael left in 1990 to work independently with pump consultant Dr. Elemer Makay. While working with Dr.Makay he performed numerous pump projects, specializing in root cause analysis of degraded pumping systems and applying leading edge designs for improving pump life and performance.

During this time period, Michael authored the Vertical Pump Maintenance Guideline for the Electric Power Research Institute (EPRI) and was appointed president of Hydro Engineering, Inc. (and later HydroAire, Inc.).Mancini Consulting Services, established in early 2003, has provided 'training for over 500 mechanics and engineers, and has completed numerous industrial projects related to performing root cause analysis, developing pump specifications, and implementing strategic pump programs.Michael Mancini is a member of the ASME OM Code, Subgroup ISTB, Inservice Testing of Pumps in Light Water Reactor Nuclear Power Plants. He is also currently part of an EPRI target action group on pump and motor smart component monitoring for new nuclear power plant designs.Mancini Consulting Services%-I Engineered Solutions for Superior Pump Performnancesm Page 2 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPCi Pump Vibration and Performance Abstract The consultant was requested to perform an independent assessment of the Pilgrim High Pressure Coolant Injection (HPCI) Pump turbine/pump configuration and the nature of the vibration associated with the HPCI main and booster pumps. The report results were to provide the consultant's expert opinion regarding the HPCI pump performance and its long term operational readiness.

The report concludes that the proposed methodology for monitoring the HPCI pump for degradation uses sound engineering judgment and pump performance monitoring practices.

These monitoring and testing activities satisfactorily verify HPCI pump performance and ensure its long term operational readiness.

C-'SMancini Consulting Services%-* Engineered Solutions for Superior Punip Performancesw Page 3 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance Table of Contents 1 Relief Request......................................................................................

5 2 Problem Statement

................................................................................

5 3 History ................................................................

I..............................

6 3.1 System Overview...............................................................................

6 3.2 Pump Configuration

..........................................................................

6 3.3 Operating History...........I..............................................

I.....................

7 3.4 Vibration Data .................................................................................

7 3.4.1 Main Pump...............................................................................

7 3.4.2 Booster Pump............................................................................

8 3.4.3 Summary of Vibration Data..............................................................

9 3.5 Performance Data ............................................................................

9 3.5.1 Early Testing .............................................................................

9 3.5.2 Recent Testing............................................................................

9 3.5.3 Summary of Testing Values .............................................................

9 4 Analysis ............................................................................................

10 4.1 Apparent Root Cause .......................................................................

10 4.2 Validation of Apparent Cause ..............................................................

10 5 Remedial Actions .................................................................................

10 6 Independent Assessment

........................................................................

10 6.1 No Design Changes .........................................................................

10 6.2 Altering Number of Impeller Vanes.........................................................

11 6.3 Altering the Gear Ratio......................................................................

11 6.4 Altering Crossover Piping.......................................

.............................

12 7 Conclusions........................................................................................

12 ,8 Summary .........................................................................................

113 Appendix A: Documents Reviewed by Mancini Consulting Services..............................

14 Figures Figure 1: HPCI/Booster Pump Configuration.........................................................

6 Figure 2: Total Vibration Plotted Against HPCI Running Speed....................................

7 Figure 3: Vibration vs. HPCI Running Speed,- Booster Pump Related Vibration Subtracted

....8 Figure 4: Vibration Plotted Against Booster Pump Running Speed................................

8 Tables Table 1: Historical Testing Data Adjusted for 4,000 rpm ............................................

9 Table 2: Relationship between Number of Vanes and Resonant Frequency.....................

11 Table 3: Relationship between Gear Ratio and Resonant Frequency.............................

11 fllnniui Pnnualin~uServcesPage 4 of 14 Man iniConultinServce January 30, 2008'.~ Engineered So/utons for Superfor Pump Perfonnancem" Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance I R~elief Request The Pilgrim High Pressure Coolant Injection (HPCI) Pump Relief Request PR-03 proposes to use alternative testing to comply with the ASME OM Code Subsection ISTB 5.2.3'. This alternative testing includes mathematically subtracting out the vibration peak associated with the 4x Booster Pump speed, which exceeds 0.70 inches per second (ips) and places the pump in an "action required" condition.

This discrete peak is not related to the physical condition or rotating dynamics of the Main Pump rotor or bearing system. The alternative testing also includes quarterly pump and valve operability tests, quarterly minimal analysis of oil samples for the pressure-fed bearings on the Turbine, Main Pump, and Gear Reducer, biannual in-depth lubrication oil sampling on both the pressure-fed and non-pressure-fed bearings, as-needed weekly service of the pump and turbine lube oil system, and cleaning and examination of gear-type shaft couplings every two years.2 Problem Statement The HPCI pump has exhibited an inherently high vibration, that exceeds the ASME OM Code Action required Range of 0.70 ips, since its installation at the Pilgrim Nuclear Station. The Main Pump and Booster pump have historically exhibited an inherently high base vibration (greater than 0.325 ips). Additionally, the Main Pump has a vibration peak that exceeds 0.70 ips at a frequency that corresponds with 4 times the speed of the Booster Pump when it is operating at the upper limit of its running speed (8,068 rpm or 4 x 2,017 or 134 Hz).2 This vibration has been determined to be caused by a resonant frequency in the crossover piping that is excited by the Booster Pump vane pass frequency.

1 ASME OM Code OMa-1996, ISTB 5.2.3, Comprehensive Test ISTB 5.2.3(d):

Vibration (displacement or velocity) shall be determined and compared with corresponding reference values. Vibration measurements are to be broad band (unfiltered).

If velocity measurements are used, they shaft be peak. If displacement amplitudes are used, they shall be peak-to-peak.

ISTB 5.2.3(e):

All deviations from the reference values shall be compared with the ranges paragraph ISTB 6.2. The vibration measurements shall be compared to the relative and absolute criteria shown in the Alert and Required Action Ranges of Table ISTB 5.2. 1-1. For example, if vibration exceeds either 6 V, or 0.70 in.!sec, the pump is in the Required Action Range.Footnote ISTB 4.3(g) -this footnote specifies that the reference vibration measurements should be representative of the pump, and that the measured vibration will not prevent pump from fulfilling its function.2 This corresponds with approximately 2.05 times the main pump running speed.an1ini~e

  • Page 5 of 14 4" aii Consulting Services January 30, 2008 V k Engineered Solutions for Superior Pump Performancew Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance 3 History 3.1 System Overview The HPCI pump is driven by a steam turbine in series with a Booster Pump. The Booster Pump is run through a speed-reduction gearbox with a 1.983 to 1 ratio.Booster Pump Figure 1: HPCI/Booster Pump Configuration The HPCI system is safety-related and operates only during a loss of coolant accident (LOCA), during in-service testing (IST) exercises, and during rare plant transients in which the reactor vessel is bottled up following power operation.

The unit is variable speed via the steam turbine drive and will operate at a speed during emergency conditions to provide the necessary coolant to the reactor based on reactor vessel pressure.The pumping system has been designed such that the pump will deliver the required pressure at a maximum speed of 4,000 rpm based on a small break LOCA (less than 0.75 square feet).For smaller breaks, the required flow rate to the reactor will be less and the pumping system will operate at a reduced speed based on the lower system resistance.

Also, in the case of a larger-scale (- 0.75 square feet) small break LOCA, the reactor vessel pressure will decay in time, and the pump will see very little emergency duty at the rated speed with extended emergency service completed at changing lower speeds.3.2 Pump Configuration The HPCI pump is a Byron Jackson model DVMX two-stage axially-split pump. The pump has a double suction 1 st stage impeller that discharges into a dual volute. The inboard and outboard radial bearings are sleeve-type journal bearings and the thrust bearing is a tilting pad-type bearing.The Booster Pump is a Byron Jackson model DVS single-stage double-suction pump. The inboard and outboard bearings are spherical roller bearings.0% iMancini Consulting Services Engineered Solutions for Superior Pump Perormance 5 Page 6 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPC1 Pump Vibration and Performance

3.3 Operating

History In the early years of the plant, the HPCI pumping system was being tested monthly on a go/no-go basis. Since 1992, the HPCI pump has been tested on a quarterly basis. The average annual testing time is 3-4 hours. In total, the HPCI pump has experienced approximately 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> of run time over the past 35 years.3.4 Vibration Data As discussed, the HPCI pump has experienced elevated vibrations from the time of its installation.

This vibration can be separated into two main categories-base vibration inherent from the Main Pump design independent of any influences caused by the Booster Pump, and vibration resulting exclusively due to excitation forces emanating from the Booster Pump operation.

The vibration is attributed to the as-built configuration of the HPCI pump system.1 .1 ...u, -.ep. amwmm~m Q p, w ra. mm.W -or. pmwa-Wo M&I --,9 _ --a -...MA 0 oft &P " 0 44 Figure 2: Total Vibration Plotted Against HPC! Running Speed 3.4.1 Main Pump The Main Pump exhibits elevated base vibration and peaks at lx and 5x of its tested running speed of 4,000 revolutions per minute (rpm). The lx vibration peak has been determined to be caused by a horizontal structural rocking mode of the pump pedestal at this frequency.

The 5x vibration peak is a result of impact loading of the exiting flow of the 5-vane impeller on the stationary casing dual-volute tongues.Page 7 of 14-0 IWAWManini Conslting UUiUU January 30, 2008 X-01 Engineered Solutions for Superior Pump Performance-A Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance I'I 0J~0S 04 0*0 Or eW. PM bePa e*M HM~ em ~#1 04 WAiFlgW %1dTN.114M W%7 PA Z$4#-O4 S.Q?.4 V40S K *.j710 LO'D .401.we m~utm* .4 80O P~W" MW ww7 -O.L6,?*" wQ w==,u pole-1 I I I 1'aI0 a S,5 4 APJWt WAVEO WAO -.I VIW4#. 2MS j 0 U 'Uti Thu =, 20 W. LI Fagm InaA apm .3" Figure 3: Vibration vs. HPCI Running Speed- Booster Pump Related Vibration Subtracted

3.4.2 Booster

Pump The elevated vibration experienced on the HPCI Main Pump that is generated by Booster Pump operation is experienced mainly at 4 times the Booster Pump running speed (approximately 2.05 times the Main Pump running speed) in the horizontal direction.

This vibration is detected by accelerometers mounted at the HPCI pump bearing housings.

This vibration is defined in the Apparent Cause section.WO I1UUU I RUI 47-OEC-47 21:40AS WAD ~0* ~p". ISM I&4 12 4' S 6 FmqjW in otw Figure 4: Vibration Plotted Against Booster Pump Running Speed 4"NMancini Consulthig Services%-0 Engineered Solutions for Superior Pump Performanco" Page 8 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance

3.4.3 Summary

of Vibration Data After an in-depth review of the historical vibration data, it is clear that vibration frequencies and values have remained unchanged in the period that this data has been recorded.

The constancy of the trendable base vibration values supports the statement that this vibration is not harmful to the pump internal elements.

It can be expected that peak vibration parameters at the 2.05x frequency caused by this acoustic resonance will remain within their historically established ranges.3.5 Performance Data 3.5.1 Early Testing Testing performed during the early years of the plant (1972-1978) were monthly tests with the objective of verifying that a discharge pressure of 1,225 pounds per square inch gauge (psig)could be reached at the 4,250 gpm flow. As such, many of the tests were performed at speeds less than the rated speed of 4,000 rpm; in fact, a majority of the tests taken between 1972 and 1973 were performed at 3,800 rpm and this lower speed is reflected in the hydraulic performance.

The testing data taken from 1972-1973 between the 3,900 rpm and 4,000 rpm speeds record an average AP of 1,196 pounds per square inch differential (psid) at an average flow rate of 4,250 gallons per minute (gpm) running at an average speed of 3,975 rpm. The testing data taken from 1977-1978 between the 3,900 rpm and 4,000 rpm speeds record an average AP of 1,197 psid at an average flow rate of 4,250 running at an average speed of 3,987 rpm.3.5.2 Recent Testinq Performance testing during recent years reflects no degradation in pump performance.

Tests taken from 1993-1997 record an average AP of 1,226 psid at an average flow of 4,263 gpm running at an average speed of 4,020 rpm. Tests taken from 2001-2007 record an average AP'of 1,215 psid at an average flow of 4,252 gpm running at an average speed of 3,997 rpm.3.5.3 Summary of Testing Values The testing data is taken at differing operating speeds. A good comparison of tested values can be made if these values are adjusted using the affinity laws to-estimate what the data would look as if it was all taken at the rated testing speed of 4,000 rpm.4irag Tested. Average Tested Average Tested 1 Adjusted'" ". ". Aver.g Tested Average Tested Differential Adjusted Flow, Differential Speed I Flow," -.Pressure Pressure rpm I gpm I psig gpmn psig 1972-1973 3,975 1 4,250 1,196 4,277 1,2111 1977-1978 3,987 4,250 1,197 4,264. 1,205 1993-1997 4,020 4,263 1,226 4,242 1,214 2001-2007 3,997 4,252 1,215 4,255 1,217 Table 1: Historical Testing Data Adjusted for 4,000 rpm It is clear that recent performance has not degraded from performance recorded during the early years of the plant. In fact, recent in-service testing data shows a slightly better performance than early testing, due to improved test operating procedures and technological advancement in instrumentation.

Page 9 of 14 Mancini Consuiting Services January 30, 2008 X -0 Engineered Solutions for Superfor Punw Performancea" Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance 4 Analysis 4.1 Apparent Root Cause The apparent root cause for the vibration experienced at 4 times the Booster Pump operating speed is an excitation of the main-to-Booster Pump crossover piping resonant frequency at the Booster Pump vane pass frequency.

The forcing function of this excitation is the impact loading of the Booster Pump impeller discharge upon the Booster Pump casing dual-volute tongues.4.2 Validation of Apparent Cause Byron-Jackson has confirmed that this is the apparent root cause in the Tech Note supplied to Pilgrim Station. Additionally, this root cause has been recognized industry-wide based on similar operating performance for installations employing the same pumping unit configuration utilizing the same models.5 Remedial Actions There are several courses of action that can be taken to reconcile the vibration issues:* Make No Design Changes: No design changes will be made. The vibration peak at 2.05x will be mathematically subtracted from the vibration spectra to obtain representative and trendable vibration data of the HPCI Main Pump., Pilgrim will continue to implement the specified test program yearly HPCI vibration testing schedule (as necessitated by the remaining vibration exceeding 0.325 ips).* Chan-ge the Booster Pump Impeller:

Substituting the current 4 vane impeller design for a 5 or 7 vane impeller design will alter the frequency of the running speed at which IST is performed and remove this frequency from the range at which the acoustic resonance occurs to a margin of approximately 25% for a 5 vane impeller and 75% for a 7 vane impeller.* Increase the Gear Ratio: Increasing the gear ratio will alter the maximum running speed of the Booster Pump, bringing it out of the resonant frequency range by a margin dependent on the new ratio. If this change is made, the Booster Pump impeller will need to be trimmed to maintain the designhydraulic requirements.

  • Alter Crossover Piping: The resonant frequency of the crossover piping can be changed by altering the piping itself, either by changing the length or diameter of the piping.6 Independent Assessment 6.1 No Design Changes It has been determined that the vibration experienced by the pump is not detrimental to pump health. Data taken from tests run during the past 35 years show that there has- been no measurable performance degradation in this pump, indicating that this vibration has not caused a large opening of the wear component clearances.

Despite the elevated vibration experienced, trended performance data has shown that the current pump design delivers satisfactory performance and reliability.

Maintaining the current pump design assures that no element is added that may cause unforeseen problems in the future.Page 10 of 14 mancii COnsuItIng SON = January 30, 2008 Engineered Solutions for Superior Pump Performanceo Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance

6.2 Altering

Number of Impeller Vanes This change has been made at other plants with moderate success. However, the modified impeller will excite the acoustic resonance when the pumps are running at a lower speed. It must be taken into consideration that IST is performed at the maximum speed limit of where the pump will be run and that the pump will see very little operation during accident conditions at this speed. In an actual accident condition, there is a much greater probability that the pump will be run through a resonant frequency when operating with a 5 or 7 vane impeller.

This scenario is much more troubling than the known conditions in which the pump is now being tested.PCPum oseBooster Pump Booster Pump Booster Pump1 SPpee B Spee Reennt Vane Pass- 4 Margin, Vane Pass- 5 Margin Vane Pass- 7 Margin Speed Speed Frequency.. = = = = Vane_ Vane 1 1 Vane 4,000 2,017 8,069 0.02% 10,086 24.98% 14,120 74.97%3,600 1,815 7,262 10.02% 9,077 12.48% 12,708 57.47%3,200 1,614 6,455 20.01% 8,069 0'02% 11,296 39.98%2,800 1,412 5,648 30.01% 7,060 12.52% 9,884 22.48%2,40" 0 1,210 8070.0 4,841 40.01% 6,051 25.01% .8,4721: : 4.98 2,000 1,009 4,034 50.01% 5,043 37.51% 7,060 12.52%1,600 807 3,227 60.01% 4,034 50.01% 5,648 30.01%1,200 605 2,421 70.01% 3,026 62.51% 4,236 47.51%800 403 1,614 80.00%1 2,017 75.00% 2,824 65.01%Table 2: Relationship between Number of Vanes and Resonant Frequency 6.3 Altering the Gear Ratio Altering the gear ratio in the speed-reduction gearbox will remove pump operation from the resonant condition at the rated testing speed of 4,000 rpm. Trimming the impeller will also be helpful in this case, as it will increase the clearance between the impeller blade and the volute.cutwater (Gap B), decreasing the intensity of the vane pass forcing function.

However, similar to changing the number of impeller vanes, this alteration will bring the resonant frequency into a lower speed range. Once again, concerns of running through the resonant frequency during an actual accident condition are very strong.HPCI Pump j Resonat4 Speed, 'Frequency 4.raio Pm Sowtev, Booster Pump~ Pump Vans Margin Pm Vanine Pass, Margin Ow Ratio Bouster.Bomostr.Pumnp Vane ,Pass: Margin.Gear Ratio Pump.P Speed *PumpVane 1= a = I = I = a = a =e a = a -q -4,000 3,600 3,200 2,800 2,400 2,000 1,600 1,200 800 2,017.1,815 1,614 1,412 1,210 1,009 807 605 403 8,069 7,262 6,455 5,648 4,841 4,034 3,227 2,421 1,614 0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%1.800 2,222 2,000 1,778 1,556 1,333 1,111 889 667 444 8,889 8,000 7,111 6,222 5,333 4,444 3,556 2,667 1,778 10.1%0.9%11.9%22.9%33.9%44.9%55.9%67.0%78.0%2,500 10,000 1.600 23.9%2,250 9,000 11.5%2,000: 8,000 0.9%1,750 7,000 13.3%1,500 6,000 25.7%1,250 5,000 38.0%1,000 4,000 50.4%750 3,000 500 2,000 L A. I. I I Table 3: Relationship between Gear Ratio and Resonant Frequency 4,} Mancini Consulting Services Engineemd Solutions fo, Superio r Pump Pe-rormncew

' Page 11 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance

6.4 Altering

Crossover Piping Other utilities have attempted to detune the crossover piping through various means of stiffening.

As expected, there has been little-to-no success with this change since it is the acoustic frequency, not the critical reed frequency that is being excited. In no utility has altering the crossover piping alone served to mitigate the vibration issue.Altering the acoustic resonance requires a change in the pipe length, diameter, or fluid temperature.

The current piping configuration represents the shortest length possible.Increasing the pipe length or diameter will reduce the acoustic frequency.

A lower acoustic frequency will result in higher vibrations at lower speeds. This represents the same problem as increasing the number of impeller vanes or altering the gear ratio in that there is a high risk of running through the resonant frequency during an actual accident condition.

7 Conclusions

1) It has been determined that the vibration experienced by the pump is not detrimental to pump health. Despite the high vibration experienced, trended performance data has shown that the current pump design delivers satisfactory performance and reliability.

Maintaining the current pump design assures that no element is added that may cause unforeseen problems in the future.2) Performing a design change which "Alters Number of Impeller Vanes" has been made at other plants with moderate success. However, the modified impeller will excite the acoustic resonance when the pumps are running at a lower speed. This scenario is much more troubling than the known conditions in which the pump is now being tested.3) Altering the gear ratio in the speed-reduction gearbox will remove pump operation from the resonant condition at the rated testing speed of 4,000 rpm. However, similar to changing the number of impeller vanes, this alteration will bring the resonant frequency into a lower speed range. Once again, strong concerns of running through the resonant frequency during an actual accident condition make this option a poor choice.4) Performing a design change which "Alters the Pump Crossover Piping" has been made at other plants with little to no success.* Detuning the crossover piping through various means of stiffening will not improve vibration characteristics since this change does not impact the pump acoustic frequency.

  • Increasing the pipe length or diameter is the only crossover piping modification which will reduce the acoustic frequency.

However, a lower acoustic frequency will result in higher vibrations at lower speeds. This represents the same problem as increasing the number of impeller vanes or altering the gear ratio, which also makes this option a poor choice.Unnnini Cnsulting Services Page 12 of 14%-AiV d Sons foupi UI SorIcs January 30, 2008' J Engineered Solutions for Superfor Pump PerformanceT" Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance

5) A review of the present IST and performance monitoring practices utilized at Pilgrim (as described in relief request PR-03 Revision 3) concludes the following:
  • Mathematically subtracting the discrete vibration peak at 2.05x the Main Pump running speed is the safest and most conservative action that can be taken, considering the possible repercussions of bringing the forcing function of the resonant condition into a lower speed range where the pump would operate during an actual accident condition." Mathematically subtracting the discrete vibration peak at 2.05x the Main Pump running speed will still allow the plant to monitor changes in vibration caused by the Main Pump rotor and bearing system, as this point is Unrelated to these parameters.
  • Pilgrim Station's alternative testing plan includes more than sufficient monitoring to trend pump performance and will detect any degradation that may occur.8 Summary The independent assessment confirms that (a) the Pilgrim HPCI pump has not degraded during its 35 years of service due the observed pump vibration, and (b) the proposed HPCI pump inservice testing and performance monitoring activities successfully monitor pump health, and ensure the continued operational readiness of this pump to meet its safety function.N Mancini Consulting Services%tEngineoreud Solutions for Superior Pump Petfonnanco'w Page 13 of 14 January 30, 2008 Pilgrim Nuclear Station Independent Assessment of HPCI Pump Vibration and Performance Appendix A: Documents Reviewed by Mancini Consulting Services ESR Response Memorandum No. ERM 90-445 Rev. 2 Date: 611711994 Response to ESR 90-146 Vibration Frequencies of Interest Telephone Call Record- Byron Jackson Byron Jackson TechNote No. 9112-80-018 Outgoing Letter from Entergy to NRC- ELNRC 1.2.04.010 Date: 211012004 Pilgrim Response to NRC Request for Additional Information HPCI Pump /ST Vibration Evaluation Outgoing Letter from Entergy to NRC- ELNRC 2.04.046 Date: 612/2004 HPCI Pump Relief Request PR-03, Revision 1 Additional Information Summary of Commitments HPCI Inservice Testing Vibration Exemption Presentation Date: 121812004 Outgoing Letter from Entergy to NRC- ELNRC 2.05.012 Date: 212412005 HPCI Pump Relief Request PR-03, Revision 2 Summary of Commitments Response to NRC Draft Request for Additional Information HPCI Pump Configuration and Historical and Current Vibration Data Incoming Letter from NRC to Entergy- NRCLE 1.1.05.0107 Date: 812912005 Safety Evaluation by the Office of the NRC- Docket No. 50-293 Outgoing Letter from Entergy to NRC- ELNRC 1.2.06.008 Date: 6/2912006 HPCI Pump Relief Request PR-03, Revision 3 HPCI pump November 2005 Vibration Test Results -HPCI pump Configuration and Historical Vibration Test Results Byron Jackson Pumps V-0303 Date: 911912006 Technical Manual for Installation, Operation, and Maintenance of B.J. Horizontal Double-Bearing Pumps (Type DVMX)Pump Assembly for High Pressure Coolant Injection Instruction -Type "DVMX and DVS" Bill of Materials Specification No. D. 12- Welding Procedure for Intermittent Welding Impeller Wear Rings to Impellers Procedure for Tightening Case Parting Nuts Installation, Operation, and Maintenance Instructions-Type "U" Mechanical Seals Borg-Warner Separators-Cyclone and Magnetic Instruction Manual- Speedmaster 4000 Series High-Speed Unit Outgoing Letter from Entergy to NRC- ELNRC 2.07.056 Response to NRC Request for Additional Information HPCI Main Pump Vibration Data Historical Tested Performance Data HPCI Pump Trends Date: 7/1212007 Date: 1972-1973, 1977-1978 Date: 31511993-812112007 Byron Jackson Drawing No. 2271-7-1 Rev. E3 Boston Edison Company Drawing No. MIJ6-4 Byron Jackson Drawing No. 2271-8-1 Rev. E2 Byron Jackson Drawing No. 2F-1245 DVS IF 5825 Cross-Section Process Diagram, HPCI System DVMX Pump IF-5824 Cross-Section Piping Diagram 1Ox12x15 2 Stg. DVMX ,I-%Mancini Consulting Ser'vices V 01Engineered Solutions for Supefor Pump PCrfonynances Page 14 of 14 January 30, 2008