ML081760288

From kanterella
Jump to navigation Jump to search

Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3
ML081760288
Person / Time
Site: Pilgrim
Issue date: 06/05/2008
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MD2478, TAC MD8052
Download: ML081760288 (9)


Text

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay June 5, 2008 Director, Nuclear Assessment U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

LETTER NUMBER:

2.08.026

REFERENCE:

1.

Entergy Letter No. 2.08.007, Pilgrim Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3, dated January 31, 2008

2.

Entergy Letter No. 2.07.56, Response to NRC Request for Additional Information Related to Pilgrim In-service Testing (IST) Relief Request PR-03 (TAC NO. MD2478), dated July 12, 2007

Dear Sir or Madam:

On or about April 14, 2008, the NRC technical staff requested Entergy to confirm eight (8) statements from the revised Relief Request PR-03, Revision 3 (Reference 1) including its attachments, and licensee's RAI responses (Reference 2). Attachment 1 to this letter provides Entergy's Clarification and Commitment sought by NRC.

By Reference 1, Entergy requested relief from the ASME OMa-1996, ISTB 5.2.3 requirements for the HPCI Main Pump two vibration points; inboard and outboard bearing horizontal points P3H and P4H respectively. NRC's request for Clarification and Certification makes reference only to point P3H, with no reference to P4H. Entergy requests NRC to include both points in the approval of the relief request. The Relief Request applies to both HPCI Main Pump points.

Without relief for both points, Entergy would not be able to implement the approved relief provisions.

The Clarifications and Confirmations provided in this letter fully supports Entergy proposed alternative testing to comply with ISTB 5.2.3. Additionally, the proposed alternative provides an acceptable level of quality and safety because it verifies the operational readiness of the as-built configuration of the HPCI pump, and the fact that the historical data showed no signs of degradation in the HPCI pump.

208026

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Letter Number: 2.08.026 Page 2 Pilgrim intends to continue to perform the alternative comprehensive HPCI Surveillance Test as approved for the remaining during the Fourth IST interval.

This letter makes no new commitments.

The confirmations included in Attachment 1 are already included in Reference 1.

If you have any questions or require additional information, please contact Mr. Joseph R. Lynch, Licensing Manager, at (508) 830-8403.

Sincerely, Stephn J.Bethay WGL/dal

Attachment:

1. Pilgrim Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052) (4 pages)
2. Table:, HPCI Vibration Data (1 page) cc:

Mr. James S. Kim, Project Manager Plant Licensing Branch I-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulator Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 208026

ATTACHMENT 1 Pilgrim Response-to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

(4 pages)

Pilqrim Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

References:

(1) Letter from Stephen J. Bethay of Entergy Nuclear Operation, Inc, to NRC, "Pilgrim Nuclear Power Station Fourth 10-year In-service Testing (IST) Program, IST Relief Request PR-03, Rev. 3" dated January 31, 2008.

NRC REQUEST FOR CLARIFICATION Relief Request page 4 of 8, first paragraph refers to Attachment 4 (see Item 5 below), whereas the licensee submittal does not contain Attachment 4.

ENTERGY RESPONSE There was no Attachment 4, this is a typographical error, the correct attachment is "Attachment 3,'Contractor Report, Independent Assessment of Pilgrim High Pressure Coolant Injection Pump Vibration and Performance', dated January, 2008 (14 pages)".

NRC REQUEST FOR ENTERGY'S CONFIRMATION Based on the revised Relief Request PR-03, Revision 3 including its attachments, and licensee's RAI responses, NRC staff would like to confirm the following:

NRC ITEM 1 Quarterly pump and valve operability tests will be performed to ensure the HPCI pump and turbine function for the intended safety function.

ENTERGY CONFIRMATION Entergy confirms that Quarterly pump and valve operability tests will be performed to ensure the HPCI pump and turbine function for the intended safety function.

NRC ITEM 2 Quarterly lubrication oil sampling and periodic laboratory analysis as appropriate for the pressure-fed bearings on the Turbine, Main pump, and Gear Reducer and once/cycle (2 years) sampling and analysis for the non-pressure fed Booster pump will be performed.

Lubrication oil analysis currently performed includes viscosity, acidity, residue, water content, metals by A.E. spectrometry, and ferrogram readings. This type of monitoring will detect degradation of the turbine or pump bearings due to accelerated wear, fretting, surface fatigue, or oil contamination. (Please provide frequency of the Lubrication analysis currently performed)

ENTERGY CONFIRMATION Quarterly lubrication oil sampling analysis will be performed. This includes analysis for viscosity, water content, chemical changes, and contaminants including ferrous particles.

Once/cycle (i.e., once/2 years) laboratory analysis of the lubrication oil for the pressure-fed bearings on the Turbine, Main pump, and Gear Reducer will be performed. The Laboratory reviews include but not limited to particle wear analysis, acid number readings, analytical ferrogram and oxidation stability. This type of monitoring will detect degradation of the turbine or pump bearings due to accelerated wear, fretting, surface fatigue, or oil contamination.

Once/cycle oil sampling analysis on the non-pressure fed Booster pump bearing sump will be performed.

Page 1 of 4

Pilgrim Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

NRC ITEM 3 HPCI pump and Turbine lube oil system is serviced as-needed weekly. HPCI gland seal condenser hot well pump and motor bearings and HPCI auxiliary lube oil pump and motor bearings are serviced semiannually for lubrication.

ENTERGY CONFIRMATION Entergy confirms that HPCI pump and Turbine lube oil system is serviced as-needed weekly. The weekly lube oil system 'servicing' consists of observing turbine/pump oil sump level, performing a visual check to verify oil condition, and monitoring for oil system leakage. During this surveillance the oil is visually observed for discoloration, emulsification, and foaming.

Observed oil system abnormalities are reported, and corrective action initiated. The HPCI gland seal condenser hot well pump and motor bearings and HPCI auxiliary lube oil pump and motor bearings are serviced semiannually for lubrication.

NRC ITEM 4 HPCI Turbine/Main pump, Main pump/Reducer, and Reducer/Booster pump gear type shaft couplings are cleaned, examined, and grease-lubricated every 2 years. These examinations detect excessive wear, fretting, heating, or fatigue due to any unusual loading conditions.

ENTERGY CONFIRMATION Entergy confirms that HPCI Turbine/Main

pump, Main pump/Reducer, and Reducer/Booster pump gear type shaft couplings are cleaned, examined, and grease-lubricated very 2 years. These examinations detect excessive wear, fretting, heating, or fatigue due to any unusual loading conditions.

NRC ITEM 5 Past monitoring and maintenance activities have shown no evidence or observations of the degradation in the HPCI Turbine, Main pump, Gear Reducer, or Booster Pump. The HPCI and Booster pump historical vibration spectrum (Attachment 4) supports this conclusion. Thus, the continuation of the above periodic monitoring and maintenance activities will ensure that the HPCI pump remains in a high level of operational readiness and that degradation of HPCI pump mechanical condition, reliability or performance will be detected and corrected in a timely manner.

ENTERGY CONFIRMATION Entergy confirms item 5 statement, except that Attachment 4 shall be read as, as provided in the clarification at the beginning of this Attachment.

Page 2 of 4

Pilgrim Response to NRC Request for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

NRC ITEM 6 Vibration monitoring (part of comprehensive testing) shall be performed once/year in lieu of the Code requirement of once/2 years. Further, as HPCI pump vibration will normally exceed the OM limiting Alert Range of >0.325 in/sec, the once/year frequency will be doubled to twice/year.

ENTERGY CONFIRMATION Entergy confirms that vibration monitoring will be performed twice/year as the commitment frequency for this relief request, even when the HPCI pump is below the modified Alert Ranges. The modified Alert levels have been applied to both the Main and Booster Pump vibration points where the normal vibration level has been historically at or above the value of 0.325 in/sec (some points have readings above and below the 0.325 in/sec value due to their normal variation). For the Main Pump, this includes all points P3H, P3V, P3A, P4H, while P4V remains consistently below 0.325 in/sec, and for the Booster Pump, this includes P7H, P7V, P8H, P8V, while P3A remains consistently below 0.325 in/sec. These Alert levels are being changed to new values so that the HPCI Pump is not continually in Alert such that any significant change to the vibration level will be highlighted by a corresponding change in status. The "absolute value" Alert levels (given as in/sec velocity) have been modified to higher values, but the "relative value" Alert levels (given as multiples of the Reference Value Vr) for the same points have been reduced from the OM Code value of 2.5Vr down to 1.5Vr. This was done so that the relative value Alert levels will be consistent with the absolute values, which tend to fall between 1.25Vr and 1.5Vr.

NRC ITEM 7 As an administrative practice, Pilgrim will monitor vibration of the HPCI pump during each of the Quarterly Group B test, whenever practicable, and preventive or corrective maintenance will be implemented as necessary to prevent failure.

ENTERGY CONFIRMATION The statement "Pilgrim will monitor vibration of the HPCI pump during each of the Quarterly Group B test' is not a commitment of frequency for vibration monitoring under the ISTB requirement every quarter.

Instead, it is Entergy's current administrative practice to ensure pump vibration is monitored on a quarterly basis while performing the Group B test. This approach is conservative and provides added confidence to monitor pump performance for its intended safety function.

NRC ITEM 8 Full spectrum analysis will be performed for all IST vibration points once/year while performing comprehensive pump test. As mentioned in Item 6 above, if frequency is doubled, the spectrum analysis will be performed twice/year.

ENTERGY CONFIRMATION The performance of spectral analysis twice/year is the vibration monitoring commitment frequency for this relief request. However, as an administrative practice (as stated in item 7), Pilgrim will monitor vibration of the HPCI pump during each of the Quarterly Group B tests, whenever practicable.

Page 3 of 4

Pilarim Response to NRC Reauest for Clarification and Commitment Related to HPCI Pump IST Relief Request PR-03, Rev. 3 (MD8052)

NRC NOTE Please note that NRC staff is not in a position to accept and agree with the Pilgrim and the Mancini Consulting Service approach of filtering the peak vibration from the HPCI pump spectrum to lower the overall HPCI pump vibration. The OM Code paragraph ISTB-5123(d) clearly states that vibration measurements are to be broad band (unfiltered). However, peak vibration value greater than 0.7 in/sec only at one point (P3H), along with other vibration values which are less than 0.7 in/sec (as mentioned in relief request) may be acceptable with additional vibration monitoring, spectrum analysis, history of vibration values, and maintenance history of the HPCI pumps etc. During IST testing, if the measured vibration values (except P3H) exceed the value of 0.7 in/sec, corrective action is required.

ENTERGY RESPONSE Pilgrim confirms that during IST testing, if the measured vibration values (except P3H and P4H) exceed the value of 0.7 in/sec, corrective action is required. The HPCI surveillance procedure acceptance criterion implements this OM Code requirement.

In addition, if the measured vibration values for P3H and P4H, with the relief request described discreet peak (at exactly 4x booster pump RPM) extracted from the overall bearing vibration value, exceed the value of 0.7 in/sec, corrective action is required.

Presently P4H does not exceed the 0.7 in/sec acceptance criterion. However, during the past two and half years the observed reading has fallen between 0.5 in/sec and 0.7 in/sec. Because the normal vibration amplitude is at the OM Code limit of 0.7 in/sec, relief for P4H is also needed.

Attached Table provides tabulated vibration results for P3H and P4H points. These results indicate the range of vibration amplitudes observed since 1994.

Entergy has explained in Reference 1, Attachment 1, RAI Question 1 Response that NRC accepted independent consultant's reports in granting past precedents. The Pilgrim request follows NRC approved precedents discussed therein. Specifically, the Pilgrim request follows the NRC approved Monticello (TAC No. MB6807) precedent discussed by the NRC in its SER on Monticello item 3.3.5 on pages 8 and 9. Entergy hereby requests that NRC staff consider Pilgrim relief request for approval in accordance with the established NRC precedents for Monticello, Cooper, Fermi-2, Calvert Cliff, and Seabrook with their respective contractor reports.

The Clarifications and Confirmations provided in this letter fully supports Entergy proposed alternative testing to comply with ISTB 5.2.3 and the proposed alternative provides an acceptable level of quality and safety because it verifies the operational readiness of the as-built configuration of the HPCI pump, and the historical data has shown no signs of degradation in HPCI pump performance.

Page 4 of 4

tabie, HPCI Vibration Dat".xks (1 Page) Attached

HPCI Vibration Data.xls HPCI TURBINE PUMP P-205 INTEGRAL - MAIN & BOOSTER PUMP I

I VrX.5-VibAlert Values 5 530 0562 0.325 0.15 0372 0531 PR1-03:

Vib.Ali.. Values 0450 0500 0375 0450

".040

[.. 0 oý*.

550

6..

0.5502-5 OS650 6..o:

_Olm.ý 4000!_I 4250 i250 j

0.9695 I0.3533 I0.3748 0.88

ýb 01,841 1

0,343 0.41 I03541

[0.3

.187

'0.4115 1

0.44.3 Re ni s

t M&TE ITESTI d W

~Velocity O

th Disnrete PoakbExtract ed

- DATE I SPEED.

TYPE F LOW DETA P.14 P3V

. PaA C-P4H

~

1P4V

.P7114 P7V

~

PFH

-Pi5 tv

.P8A P3H1P1 5/20/2008 I

3975 4250 1

1212 I

0931 0.281 1

0.406 I

0.617 I

0.161 I

0.335 I

0.248 0.417 I

0.345 1

0.162 1

0.440 I

0.480 1

2/21/2008J 4025 Q

4250 1

1238 0.726 0.338 0.363 I

0_561 5.178 0.307j 0.335 0.372 I

01332 I

0.15 I

0.433 I

0.455 I

11/20127 4005 0

4250 1221 0.73 5.316 0.366 0.576 0.160

.326 0,256 0.409 0.a353 0.162 0.433 0.486 6/21/2097 3978 Q

4250 I

1196 I

1.557 0.276 40.45-0.151 5.341 0.255 0.420 b4 i

01 0.460.4 0.507 5/5/2007 3987 Bi-Comp 4250 1211 I

0.795 0.314 5.357 I

5.552 0.153 5.307 0.275 0.401 0.3055 0.152 01 64 0.516 RF0-16PMT-CoupInAWor k.ube 2/21/2007 I3969 Q

4250 I

1200 I

0.776 0.321 i

O.3 I140 5

0.303 I

0.211 0.368 1

0.323 I

0.153 1

0.399 5

0.456 Val PMT-MR0510622 11120/2006 I 3996 I

0 1

4250 I

1218 0.850 0.312 I

0.365 I

0.593 0.143 I

0.345 I

0.273 0.376 1

0.352 1

0.165 0.384 I

0.451 5

.Sm. Viýb takni lcal5y 8/21/2006 3976 I 0

I 4250 1

1202 1.053 I

0.292 I

0.415 I

0.676 I

0.166 0.354 5.237 0.392 0.35 1

0.162 0.428 I

0.444 I

5/23/2006 3575 0

4250 1203 i

5 1

507 4

032 i

.645 5 0.162 0.337 0.245:

0.410 0.354 1

0.167 0.421 0.473 I

4/2006 4037 Q

4250 1252

.6582*

33 0.661 0.167 0.31 5.245 0.345 0.323 I

5.165 0.471 0.4 2

1) Rev 100 FirstOTest. 2) P3HwastakenLoCa-ly 1124/254 40350 iWP-Comp0 4255 I

1213 0.58 I

.355 I

0

-0.626 I

0.255 0.324 0

81128/2005

_ 4000 0.1 IW1 Q 0.559, 0.5 0.313 0.2407 5260.7 8/26/2005 4500 1 1WP-.O 4255 1

1211 i

0.535 5.256 1

I 0.655 0.325 0.245 1

5/25/2005

)

4000 1 JWP-O I 4275 1

1257 5

0.969 I0.354 1

0.611 0.347 1

0.253 1

I 40D I

WP-Q-1 0.703 0.241 i

__0_.23

.193 1

I I

11/ /220 04 I IW -

4 250 I

M1 1

0.ý798 1*.3 11 1

0.626*

0.298 1

0.302 1

1

  • 82,/2004,W

-Q 4250 1

1i2 1 2.39 i1 6

0.675 I

0.328 0 249 I

I 5/520 76 6

0.5 C2 _F 3-1 1- -0 2 HPCI PUMP TRENDS