Monticello, Notification of Intention Regarding NRC Inspection Report 05000263/2015008 and 07200058/2014001 (EA-14-193)
ML15212A899
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 07/31/2015
From: Gardner P A
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
EA-14-193, IR 2014001, IR 2015008, L-MT-15-063
Download: ML15212A899 (1)


Text

Xcel Energy@ July 31, 2015 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 L-MT-15-063 EA-14-193 Notification of Intention Regarding NRC Inspection Report 05000263/2015008 and 07200058/2014001 (EA-14-193)

Reference:

Letter from Nuclear Regulatory Commission (NRC) to Mr. P. Gardner, "Monticello Nuclear Generating Plant, NRC Inspection Report 05000263/2015008 and 07200058/2014001 and Results of NRC Office of Investigation Report No. 3-2014-004," dated July 23, 2015. By the above referenced letter dated July 23, 2015, the NRC transmitted Inspection Report 05000263/2015008 for the Monticello Nuclear Generating Plant (MNGP). In the inspection report the NRC identified three apparent violation In the referenced letter the NRC also provided Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter NSPM) with the opportunity to 1) provide a written response, 2) request a Predecisional Enforcement Conference, or 3) request Alternative Dispute Resolutio NSPM appreciates the opportunity to meet with the NRC on this issue and by this letter requests the opportunity to discuss the apparent violations through the Alternative Dispute Resolution Process. Summary of Commitments This letter cont {t * s no new commitments and no revisions to existing commitment Peter A n r Site Vice-Pr Jdent Monticello Nuclear Generating Plant Northern States Power Company-Minnesota cc: Regional Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC